5140-195P2550.pdf
PDF 5 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000004
About this file
This document consists of a federal contract opportunity notice for bridge reconstruction and rehabilitation work on the Blue Ridge Parkway in North Carolina. The project involves work from milepost 229.6 to 305.1, including overlooks, parking areas, ramps, drainage, signage, pavement markings, guardrail, and slope stabilization. The work will be split into multiple schedules with a total estimated price between $75-100 million. Sealed bids are due in December 2021 as specified in the solicitation. Interested vendors must register at www.sam.gov and complete annual representations and certifications at that site and http://www.dol.gov/vets/vets4212.htm. Questions should be sent to eflhd.contracts@dot.gov. Bidders must have active SAM registration for payment. Subcontracting plans are required from businesses over $750,000/$1,500,000 and must be approved by the Office of Small Disadvantaged Business Utilization. Visitor security procedures are outlined.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5140-195P
AIR BELLOWS ROAD BRIDGE INSPECTION DATE: 10/2/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... FRAME NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 11.9 FT (3.6 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 11.9 FT (3.6 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 34.6 FT (10.5 M)
ABUT. FOUNDATIONS: ........ UNKNOWN CURB TO CURB WIDTH: ..... 28.9 FT (8.8 M)
PIER FOUNDATION(S): ........ N/A YEAR BUILT: ........................ 1940 (EST.)
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 000000000000 / NONE SKEW ANGLE: ..................... 30 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2007-SIGNAGE INSTALLED. 2011-RAILS REPLACED.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 237.18 (KM PT 381.73)
STATE: ................................. NORTH CAROLINA LOCATION: 10.7 MILES FROM NC ROUTE 18
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. AIR BELLOWS ROAD
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in good condition overall. The main problem is deterioration of the parapet mortar joints, which has resulted in detachment and rotation of multiple parapet corner sections. Other problems include displaced capstones at the west side wingwalls; misalignment of the southeast reflective object marker and the vertical clearance sign at the west underpass approach; graffiti obscuring the reflective object markers at the west underpass approach; and vegetation obscuring the reflective object markers at the east underpass approach.
Additional problems include vine and vegetation growth on the east side wingwalls; vegetation growth through the parapet mortar joints; an area with exposed rebar due to insufficient concrete cover along the east face of the deck slab; and several voids with exposed rebar on the deck underside near the roadway centerline.
It should also be noted that the reflective object markers do not properly define the roadway limits. Since the previous inspection, a “ONE LANE BRIDGE” sign has been installed at the west underpass approach and reflective object markers have been installed at the east underpass.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future. Consideration should be given to installing a railing system capable of meeting current safety and minimum height guidelines for traffic barriers.
INSPECTION TEAM: S. DOSSETT, T. POWELL (VOLKERT, INC.)
CONDITION ASSESSMENT:
STEPHEN DOSSETT, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 1/7/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-195P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.6, 60.6 RESET MASONRY STONES AT BOTH ENDS OF WEST PARAPET AND NORTH END
OF EAST PARAPET. RESET CAPSTONES AT WEST WINGWALLS. REPOINT
PARAPET MORTAR JOINTS AS NECESSARY.
222.7 REALIGN REFLECTIVE OBJECT MARKERS TO DEFINE ROADWAY LIMITS. REALIGN
VERTICAL CLEARANCE SIGN AT WEST UNDERPASS APPROACH. REPLACE
REFLECTIVE OBJECT MARKERS AT WEST UNDERPASS APPROACH.
58.6, 60.6,12, 222.7
REMOVE VEGETATION OBSCURING REFLECTIVE OBJECT MARKERS AT EAST
UNDERPASS APPROACH. REMOVE VINE AND VEGETATION GROWTH FROM EAST
WINGWALLS. REMOVE VEGETATION FROM PARAPET MORTAR JOINTS.
59.3 CLEAN AND SEAL AREAS OF EXPOSED REBAR ON SLAB UNDERSIDE AND EAST
FACE OF SLAB WITH APPROVED PROTECTIVE COATING.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
Consideration should be given to installing a railing system capable of meeting current safety and minimum height guidelines for traffic barriers.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-195P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N N G N N N N N G
N G
G G N P G N
N
N
G
G
58.1, 59.3 AREA OF EXPOSED REBAR ON EAST FACE OF DECK NEAR SOUTH
ABUTMENT. SMALL VOIDS, SEVERAL WITH EXPOSED REBAR, ON
SLAB UNDERSIDE. RANDOM HAIRLINE CRACKING AND
WIDESPREAD MINOR MAP CRACKING OF SLAB UNDERSIDE NEAR
ROADWAY CENTERLINE.
58.1, 59.3, 60.1
MINOR CRACKING OF BOTH BREASTWALLS. HEAVY GRAFFITI ON
BREASTWALLS AND SLAB UNDERSIDE. MINOR GRAFFITI ON
SOUTHWEST AND NORTHEAST WINGWALLS.
58.3, 222.4,6 MINOR SETTLEMENT, UP TO 1", WITH TRANSVERSE CRACKING OF
ASPHALT PAVEMENT.
58.6 MODERATE TO SEVERE DETERIORATION OF PARAPET MORTAR
JOINTS WITH SEVERAL LOOSE STONES. BOTH ENDS OF WEST
PARAPET HAVE DETACHED AND ROTATED INWARD WITH
VEGETATION GROWTH IN MORTAR JOINTS. NORTH END OF EAST
PARAPET HAS NEARLY DETACHED WITH VEGETATION GROWTH IN
MORTAR JOINTS.
60.6 WEST WINGWALLS HAVE ROTATED OUTWARD, MOST NOTICEABLY
AT SOUTHWEST WINGWALL. SEVERAL CAPSTONES ON WEST
WINGWALLS HAVE SHIFTED OUTWARD. MODERATE CRACKING
WITH EFFLORESCENCE ON WINGWALL MORTAR JOINTS. GRAFFITI
ON WINGWALLS.
60.6,12 HEAVY VINE GROWTH ON EAST SIDE WINGWALLS. MINOR MOSS
GROWTH ON WINGWALLS. MINOR VEGETATION GROWTH FROM
WINGWALL MORTAR JOINTS.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS N
6. WINGWALLS P
7. WEEP HOLES G
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER (VEGETATION) F
PIER(S)
13. WALLS AND/OR COLUMNS N
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS N
16. FOUNDATIONS N
17. EROSION AND/OR SCOUR N
18. SETTLEMENT OR DEFLECTION N
19. OTHER N
FIELD INSPECTION REPORT STRUCTURE NO. 5140-195P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION :9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL N
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (UNDERPASS ROADWAY)
N N G G G G F G G
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
222.3 MINOR CHECKING OF TIMBER APPROACH GUARDRAIL AND POSTS.
222.7 11'-9" VERTICAL CLEARANCE AND "ONE LANE BRIDGE" SIGNS AT
BOTH UNDERPASS APPROACHES. REFLECTIVE OBJECT MARKERS
AT UNDERPASS APPROACHES; EAST MARKERS OBSCURED BY
VEGETATION; WEST MARKERS OBSCURED BY GRAFFITI.
REFLECTIVE OBJECT MARKERS DO NOT PROPERLY DEFINE
ROADWAY LIMITS. SOUTHEAST REFLECTIVE OBJECT MARKER
MISALIGNED. NATIONAL PARK SERVICE INFORMATIONAL SIGNS AT
SOUTHEAST AND NORTHWEST APPROACH.
"ONE LANE BRIDGE" SIGN INSTALLED AT WEST UNDERPASS
APPROACH AND REFLECTIVE OBJECT MARKERS INSTALLED AT
EAST UNDERPASS APPROACH SINCE PREVIOUS INSPECTION.
222.9 MINOR ABRASION OF UNDERPASS ROADWAY. MINOR SOIL AND
DEBRIS ACCUMULATION ON UNDERPASS ROADWAY.
36.A,C,D PARAPET HEIGHT OF 1'- 3" DOES NOT MEET CURRENT MINIMUM
HEIGHT GUIDELINES FOR TRAFFIC BARRIERS. APPROACH
GUARDRAIL HEIGHT VARIES AND DOES NOT MEET CURRENT
MINIMUM HEIGHT GUIDELINES FOR TRAFFIC BARRIERS.
APPROACH GUARDRAIL ENDS DO NOT MEET CURRENT SAFETY
GUIDELINES FOR TRAFFIC BARRIERS.
36.B TRANSITIONS NOT PROVIDED BETWEEN APPROACH GUARDRAIL
AND PARAPETS.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-195P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 27 24 45 41
TYPE 3 25 23 42 38
TYPE 3S2 40 36 67 61
TYPE 3-3 49 45 82 75
DESIGN LOADING: UNKNOWN (H15 ASSUMED - SEE REMARKS)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: DESIGN LOADING IS UNKNOWN; ASSUMPTION IS BASED ON STRUCTURE TYPE, LOCATION, AGE AND
CONDITION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-195P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... AIR BELLOWS ROAD BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY
(204) STRUCTURE NUMBER: ..... 5140-195P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... AIR BELLOWS ROAD
(207) ROAD SECTION NO: ..........195P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140195P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 10.7 MILES FROM NC ROUTE
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................000000000000 (11) MILE POINT: .............................237.18 (KM PT 381.73)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
07 - FRAME
11.9 FT (3.6 M)
11.9 FT (3.6 M)
0 - UNKNOWN
0 - UNKNOWN
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 27.0 TONS (24.5 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 45.1 TONS (40.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 10/19 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-195P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°25'41.80"
(17) LONGITUDE: ......................... 81°07'38.30"
(19) DETOUR LENGTH: ............... 20 MI (32 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 01
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
28.9 FT (8.8 M)
34.6 FT (10.5 M)
29.0 FT (8.8 M)
21.0 FT (6.4 M)
4.0 FT (1.2 M)
4.0 FT (1.2 M)
0 - NO MEDIAN
30 °
NO
28.9 FT (8.8 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
3 - PARAPET ONLY
9 - OTHER
1 - CONTINUOUS RAIL
1.25 FT (0.38 M)
99.99 FT (99.99 M)
11.92 FT (3.63 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
1 - MAINTENANCE
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2007-SIGNAGE INSTALLED. 2011-RAILS REPLACED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://81�07'38.30 https://36�25'41.80
PHOTOGRAPHS STRUCTURE NO. 5140-195P
PHOTO #1 - LOOKING SOUTH TOWARD ASHEVILLE
PHOTO #2 - WEST SIDE; NOTE GRAFITTI ON OBJECT MARKERS
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW LOOKING WEST; NOTE
GRAFFITI
PHOTO #5 - GENERAL VIEW OF APPROACH GUARDRAIL END
TREATMENT, SOUTHEAST END TREATMENT SHOWN
PHOTO #6 - TYPICAL CRACKING OF APPROACH PAVEMENT,
NORTHBOUND LANE OF SOUTH APPROACH SHOWN; NOTE SIMILAR
CRACKING OVER STRUCTURE
PHOTO #7 - TRANSITIONS NOT PROVIDED BETWEEN APPROACH
GUARDRAIL AND PARAPETS, SOUTH END OF EAST PARAPET SHOWN
PHOTO #8 - DETERIORATION OF PARAPET MASONRY MORTAR JOINTS,
SOUTH END OF WEST PARAPET SHOWN; NOTE LOOSE AND
DISPLACED MASONRY STONES
PHOTO #9 - DETERIORATION OF PARAPET MASONRY MORTAR JOINTS,
NORTH END OF WEST PARAPET SHOWN; NOTE LOOSE AND
DISPLACED MASONRY STONES
PHOTO #10 - TYPICAL DETERIORATION OF PARAPET MASONRY
MORTAR JOINTS, WEST PARAPET SHOWN
PHOTO #11 - DETERIORATION OF PARAPET MASONRY MORTAR
JOINTS, NORTH END OF EAST PARAPET SHOWN; NOTE LOOSE AND
DISPLACED MASONRY STONES AND VEGETATION GROWTH
PHOTO #12 - TYPICAL SETTLEMENT OF PAVEMENT OVER ABUTMENTS,
PAVEMENT OVER SOUTH ABUTMENT SHOWN
PHOTO #13 - SIGNAGE AT WEST UNDERPASS APPROACH
PHOTO #14 - VERTICAL CLEARANCE SIGN AT WEST UNDERPASS
APPROACH; NOTE MISALIGNMENT
PHOTO #15 - SIGNAGE AT EAST UNDERPASS APPROACH
PHOTO #16 - TYPICAL CRACKING WITH EFFLORESCENCE ON
WINGWALL MASONRY MORTAR JOINTS, SOUTHWEST WINGWALL
SHOWN; NOTE GRAFFITI
PHOTO #17 - TYPICAL DISPLACED CAPSTONES
AT WEST WINGWALLS, SOUTHWEST
WINGWALL SHOWN; NOTE TYPICAL MOSS AND
VEGETATION GROWTH
PHOTO #18 - OUTWARD ROTATION OF
SOUTHWEST WINGWALL
PHOTO #19 - EXPOSED REBAR ON EAST FACE OF SLAB NEAR SOUTH
ABUTMENT
PHOTO #20 - TYPICAL EXPOSED REBAR DUE TO INSUFFICIENT
CONCRETE COVER ON DECK SLAB UNDERSIDE, NEAR WEST SIDE
SHOWN
PHOTO #21 - VOIDS WITH EXPOSED REBAR ON DECK SLAB
UNDERSIDE, NEAR CENTERLINE SHOWN
PHOTO #22 - GENERAL VIEW OF NORTH ABUTMENT; NOTE GRAFFITI
PHOTO #23 - TYPICAL VINE AND VEGETATION GROWTH ON EAST
WINGWALLS, SOUTHEAST WINGWALL SHOWN
PHOTO #24 - GENERAL VIEW OF SOUTHEAST REFLECTIVE OBJECT
MARKER; NOTE MISALIGNMENT AND TYPICAL VEGETATION
OBSCURING EAST MARKERS
PHOTO #25 - GENERAL VIEW OF UNDERPASS ROADWAY LOOKING
WEST
PHOTO #26 - TYPICAL SOIL AND DEBRIS ACCUMULATION ON
UNDERPASS ROADWAY; NOTE ABRASION