This solicitation is for the Blue Ridge Parkway Project NP-BLRI 2B13, 2H17, and other schedules located in North Carolina. The project consists of reconstructing and rehabilitating 75 to 100 million dollars worth of the Blue Ridge Parkway from milepost 229.6 to 305.1, including overlooks, parking areas, ramps, drainage, signage, guardrail, and slope stabilization. The work will be split into multiple schedules, with bids due on unspecified dates to be specified in the solicitation. Registered vendors will receive email notifications regarding added or updated documents. Annual representations and certifications must be completed on SAM.gov. Firms must also be registered in SAM.gov to receive payment. Subcontracting plans are required from businesses other than small businesses for opportunities over $750,000 or $1,500,000 for construction.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Amendment 0004 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0003 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0002 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0001 - NP-BLRI 2B13 2H17 Etc.pdf PDF
5140-171P12750.pdf PDF
5140-175P2550.pdf PDF
5140-184P3188.pdf PDF
5140-176P2125.pdf PDF
5140-189P1417.pdf PDF
5140-188P1594.pdf PDF
5140-190P142.pdf PDF
FP14_Eng.pdf PDF
BLRI_C5_RouteID.pdf PDF
5140-178P1594.pdf PDF
VETS-4212 Form.pdf PDF
CulvertData.pdf PDF
5140-179P1417.pdf PDF
5140-097P1821.pdf PDF
5140-174P3188.pdf PDF
5140-093P4250.pdf PDF
5140-088P1594.pdf PDF
5140-172P6375.pdf PDF
BLRI_C4_MaintenanceFeatures.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
ADV Bidders Qualifications Form.doc DOC document
CADD_File_Disclaimer_Letter_2B13.pdf PDF
EnvironmentalData.pdf PDF
ADV_Subcontracting Plan - NP-BLRI 2B13 2H17 etc.doc DOC document
5140-180P159.pdf PDF
5140-086P2125.pdf PDF
5140-090P142.pdf PDF
5140-098P1594.pdf PDF
5140-095P2550.pdf PDF
5140-181P12750.pdf PDF
Plans - NP-BLRI 2B13 2H17 ETC.pdf PDF
BLRI_C5_RipReport.pdf PDF
IFB Solicitation - NP-BLRI 2B13 2H17 ETC.pdf PDF
5140-177P1821.pdf PDF
5140-087P1821.pdf PDF
5140-195P2550.pdf PDF
5140-183P4250.pdf PDF
5140-096P2125.pdf PDF
5140-187P1821.pdf PDF
5140-196P2125.pdf PDF
GeotechData.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5140-085P

LITTLE GLADE CREEK BRIDGE #1 INSPECTION DATE: 6/27/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... TEE BEAM NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 35.3 FT (10.8 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 35.3 FT (10.8 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 33.8 FT (10.3 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 30.6 FT (9.3 M)

PIER FOUNDATION(S): ........ N/A YEAR BUILT:

ABUTMENT / PIER MAT'L: ... MASONRY YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 2B2 / NONE SKEW ANGLE: ..................... 53 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1980-JOINT REPAIR.

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 229.84 (KM PT 369.93)

STATE: ................................. NORTH CAROLINA LOCATION: 0.2 MILES FROM U.S. ROUTE 21

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. LITTLE GLADE CREEK

STRUCTURE EVALUATION SUMMARY

This concrete tee beam bridge is in fair condition overall with only minor problems at this time. These problems include deterioration of the masonry mortar joints in the parapets, abutments, and wingwalls; cracking with efflorescence on the both sides of the deck slab; and minor settlement with minor transverse cracking of the pavement at both of the approaches.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: R. SILVESTRY, E. JOHNSON

CONDITION ASSESSMENT:

REINALDO SILVESTRY, P.E., FIELD TEAM LEADER 703-404-6251

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/10/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-085P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

58.6, 60.6 CLEAN AND REPOINT MASONRY MORTAR JOINTS AT WINGWALLS

AND PARAPETS.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN, AND CONSTRUCTION ENGINEERING (APPROXIMATELY

70% OF TOTAL REHAB COST) PLUS PARK LOCATION FACTOR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-085P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

N F N N N N N N G

N G

G G N F G N

N

N

N

F

58.1 MINOR CRACKING WITH EFFLORESCENCE ON BOTH SIDES OF

DECK SLAB. MINOR CRACKING WITH EFFLORESCENCE ON NORTH

SIDE OF EAST DECK OVERHANG.

58.6 MODERATE DETERIORATION OF MASONRY MORTAR JOINTS WITH

MINOR EFFLORESCENCE AND MINOR VEGETATION GROWTH.

MODERATE MOSS GROWTH ON EXTERIOR OF PARAPETS. SEVERE

DETERIORATION OF MASONRY JOINTS AT SOUTHWEST PARAPET

EXTERIOR FACE (AWAY FROM TRAFFIC).

58.7 MODERATE MOSS GROWTH ALONG CURBLINES. DEBRIS

ACCUMULATION ALONG WEST CURB LINE.

59.2 MINOR SPALLING WITH EXPOSED REBAR ON BEAM #1 (TWO

AREAS), BEAM #3, BOTTOM FACE OF BEAM #4 DUE TO

INSUFFICIENT CONCRETE COVER NEAR SOUTH ABUTMENT. MINOR

DELAMINATION AND SPALLING OF BOTTOM OF BEAM #5 NEAR

SOUTH ABUTMENT.

MAP CRACKING ON UNDERSIDE OF EAST EXTERIOR BEAM ON THE

MID SPAN AREA.

60.1,6,10 MINOR DETERIORATION OF MASONRY JOINTS. MODERATE AT

SOUTH ABUTMENT AT WATER LINE. MODERATE EFFLORESCENCE

ON BREASTWALLS. DIAGONAL CRACK IN NORTH ABUTMENT, WEST

SIDE, POSSIBLY DUE TO SETTLEMENT. MINOR VEGETATION

GROWTH ON NORTHWEST WINGWALL.

60.9 MODERATE EROSION ALONG SOUTHWEST WINGWALL, APPEARS

STABLE AND IS FOUNDED ON ROCK HOWEVER. MINOR EROSION

ALONG NORTHEAST WINGWALL. MINOR SCOUR ON WEST SIDE OF

NORTH ABUTMENT HAS PARTIALLY SILTED IN.

1. BREASTWALLS OR COLUMNS G

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS G

4. BACKWALLS AND/OR BULKHEADS N

5. FOUNDATIONS N

6. WINGWALLS G

7. WEEP HOLES G

8. EXPANSION JOINTS N

9. EROSION AND/OR SCOUR G

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER N

PIER(S)

13. WALLS AND/OR COLUMNS N

14. PILE BENTS N

15. CAPS AND/OR BEARING SEATS N

16. FOUNDATIONS N

17. EROSION AND/OR SCOUR N

18. SETTLEMENT OR DEFLECTION N

19. OTHER N

FIELD INSPECTION REPORT STRUCTURE NO. 5140-085P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION :9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 6

F G N G N

MED

SUFF

9 FT.

ROCK, GRAVEL

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N G G G F G N

223. RETAINING WALL 7

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

G G G G G N

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

61.1 WATER FLOW IS ALONG SOUTH ABUTMENT BREASTWALL THEN

REDIRECTS TO WEST END OF NORTH ABUTMENT.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

222.4,6 MINOR SETTLEMENT WITH TRANSVERSE CRACKING OF PAVEMENT

AT BOTH APPROACHES. SMALL (2' DIA.) ASPHALT PATCH AT

NORTHBOUND LANE, NORTH ABUTMENT.

222.7 IF TRAFFIC CONDITIONS WARRANT, OBJECT MARKERS AND

GUARDRAIL REFLECTORS SHOULD BE PLACED AT APPROACHES TO

BRIDGE. "LITTLE GLADE BRANCH" SIGNS AT BOTH APPROACHES.

"OVERLOOK AHEAD" SIGN AT SOUTH APPROACH.

223.1 MINOR EFFLORESCENCE ON MASONRY JOINTS. MINOR

DETERIORATION OF JOINT MATERIAL WITH MODERATE VEGETATION

AND MOSS GROWTH. JOINT MORTAR HAS BEEN WASHED OUT AT

WATER LINE.

223.3,4 FOOTING EXPOSED IN SEVERAL LOCATIONS; STRUCTURE APPEARS

TO BE FOUNDED ON ROCK, HOWEVER.

36.A PARAPET HEIGHT OF 1'-8 1/2" DOES NOT MEET AASHTO MINIMUM

HEIGHT SPECIFICATION OF 2'-3".

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-085P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 22 20 36 33

HS 28 25 47 43

TYPE 3 26 24 43 39

TYPE 3S2 42 38 70 64

TYPE 3-3 50 45 83 75

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 9/16

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-085P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... LITTLE GLADE CREEK BRIDGE #1 (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY

(204) STRUCTURE NUMBER: ..... 5140-085P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... LITTLE GLADE CREEK

(207) ROAD SECTION NO: ..........085P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140085P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 0.2 MILES FROM U.S. ROUTE

(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................2B2 (11) MILE POINT: .............................229.84 (KM PT 369.93)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

1 - CONCRETE

04 - TEE BEAM

35.3 FT (10.8 M)

35.3 FT (10.8 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

6 - N/A

6 - N/A

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 28.0 TONS (25.4 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 47.0 TONS (42.6 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-085P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 36°26'38.90"

(17) LONGITUDE: ......................... 81°01'43.90"

(19) DETOUR LENGTH: ............... 25 MI (40 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

30.6 FT (9.3 M)

33.8 FT (10.3 M)

28.0 FT (8.5 M)

20.0 FT (6.1 M)

4.0 FT (1.2 M)

4.0 FT (1.2 M)

0 - NO MEDIAN

53 °

NO

30.6 FT (9.3 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

3 - PARAPET ONLY

9 - OTHER

1 - CONTINUOUS RAIL

1.71 FT (0.52 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL:

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1980-JOINT REPAIR.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://81�01'43.90 https://36�26'38.90

PHOTOGRAPHS STRUCTURE NO. 5140-085P

PHOTO #1 - LOOKING SOUTH TOWARD BLOWING ROCK

FLOW

PHOTO #2 - EAST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING SOUTH;NOTE CRACKING OF

WEARING SURFACE AT NORTH END AND

NORTH APPROACH

PHOTO #4 - LONGITUDINAL AND TRANSVERSE

CRACKING AT SOUTH APPROACH

PHOTO #5 - TYPICAL CONDITION OF PARAPET AND DEBRIS

ACCUMULATION ALONG CURB; NOTE VEGETATION GROWTH

PHOTO #6 - PARTIALLY CLOGGED DRAINAGE HOLE AT NORTH END OF

WEST PARAPET

PHOTO #7 - NORTH ABUTMENT

PHOTO #8 - DETERIORATION OF MASONRY MORTAR JOINTS ON WEST

SIDE OF NORTH ABUTMENT

PHOTO #9 - GENERAL UNDERSIDE VIEW LOOKING NORTH

PHOTO #10 - SPALL IN EAST BAY NEAR NORTH ABUTMENT

PHOTO #11 - LONGITUDINAL CRACK WITH

EFFLORESCENCE ON UNDERSIDE OF EAST

OVERHANG

PHOTO #12 - MAP CRACKING ALONG

UNDERSIDE OF EAST BEAM

PHOTO #13 - EXPOSED REBAR DUE TO

INSUFFICIENT COVER ON EAST BEAM NEAR

SOUTH ABUTMENT

PHOTO #14 - SPALL IN EAST BAY OVER SOUTH

ABUTMENT

PHOTO #15 - EXPOSED REBAR ON BEAM 3 NEAR SOUTH ABUTMENT

PHOTO #16 - EFFLORESCENCE FROM BEARING AREA UNDER WEST

BEAM AT SOUTH ABUTMENT

PHOTO #17 - SOUTH ABUTMENT

PHOTO #18 - MOSS GROWTH FROM JOINTS OF MASONRY RETAINING

WALL ON SOUTHEAST SIDE

PHOTO #19 - UPSTREAM CHANNEL

PHOTO #20 - DOWNSTREAM CHANNEL

File details come from the government source that posted it. Updated .