5140-177P1821.pdf
PDF 5 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000004
About this file
This document summarizes a federal solicitation for construction services on the Blue Ridge Parkway in North Carolina. The solicitation seeks sealed bids for reconstruction and rehabilitation work on segments of the parkway from milepost 229.6 to 305.1, including overlooks, parking areas, ramps, drainage assessments and improvements, signage, pavement markings, guardrail, and slope stabilization. The work will be split into multiple schedules with a total projected cost between $75-100 million. Bids are due on a date to be specified after solicitation documents are issued around December 16, 2021. The solicitation is available on SAM.gov and includes requirements for annual representations and certifications in SAM and completion of Form VETS-4212.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5140-177P
RAVINE BRIDGE AT MP 302.58 INSPECTION DATE: 6/5/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... P/S CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... BOX GIRDER - SINGLE or SPREAD NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 446.0 FT (135.9 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 170.0 FT (51.8 M)
WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 38.8 FT (11.8 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L / OTHE CURB TO CURB WIDTH: ..... 34.5 FT (10.5 M)
PIER FOUNDATION(S): ........ OTHER YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2H9 / 2H9 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2008-TRANSITION SLAB INSTALLED ADJACENT TO APPROACH SLAB TO ALLEVIATE
SETTLEMENT.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 302.58 (KM PT 486.97)
STATE: ................................. NORTH CAROLINA LOCATION: 2.38 MILES FROM U.S. ROUTE 22
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. RAVINE & STREAM
STRUCTURE EVALUATION SUMMARY
This prestressed concrete box girder bridge is in good condition overall. The main problem is the settlement of the approach pavement which creates a rough transition on the bridge. Other problems include cracking of the approach slabs and debris accumulation along the west parapet at the north approach clogging a drop inlet.
Corrective action should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M. BURNETT, T. POWELL, M. ROBERTSON (VOLKERT, INC.)
CONDITION ASSESSMENT:
MATT BURNETT, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/10/19
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-177P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.1 CLEAN AND SEAL CRACKING OF APPROACH SLABS.
58.7 REMOVE DEBRIS FROM CLOGGED DROP INLET AT NORTH APPROACH.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
58.4, 222.6 PROVIDE SMOOTH TRANSITION TO BRIDGE AT APPROACHES.
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-177P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N G N N N G N N G
N G
N F G F G N
N
G
G
F
58.1 MINOR TO MODERATE DECK ABRASION IN SEVERAL AREAS. MINOR
CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF
OVERHANGS; SEVERAL CRACKS TRANSLATE INTO ABUTMENT
BREASTWALLS; ALSO SEE 60.1. MINOR LONGITUDINAL CRACKING
OF DECK SURFACE IN SEVERAL LOCATIONS; MINOR MAP CRACKING
AT DECK CORNERS. MINOR TRANSVERSE CRACKING OF DECK
SURFACE AT NORTH PIER. MINOR SPALLING OF DECK SURFACE AT
SOUTH ABUTMENT, IN NORTHBOUND LANE. DELAMINATED AREA, 1'
WIDE X 10' LONG, AT SOUTH DECK END NEAR SOUTH ABUTMENT.
58.2 POURED JOINTS BETWEEN DECK AND APPROACH SLABS.
58.4, 222.6 MINOR SETTLEMENT, UP TO 1/2", OF NORTH AND SOUTH APPROACH
PAVEMENT; SETTLEMENT AT JUNCTION WITH APPROACH HEADER
CREATES MODERATELY ROUGH RIDE.
58.5, 222.9 MINOR CRACKING WITH EFFLORESCENCE ON CURBS. MINOR
SPALLING AND DELAMINATION OF FINISH COAT ON EAST CURB IN
CENTER SPAN.
58.6 CONTINUITY RAIL INSERT MISSING FROM LOWER RAIL IN EAST
RAILING IN CENTER SPAN. RAILING CONNECTION HARDWARE
MISSING AND RAIL POST ANCHOR NUTS NOT FULLY SEATED AT
SEVERAL LOCATIONS.
58.7 CLOGGED DROP INLET WITH VEGETATION GROWTH AT NORTH
APPROACH AT WEST PARAPET.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
13. WALLS AND/OR COLUMNS G
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS G
16. FOUNDATIONS G
17. EROSION AND/OR SCOUR G
18. SETTLEMENT OR DEFLECTION G
19. OTHER N
FIELD INSPECTION REPORT STRUCTURE NO. 5140-177P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 8
G G N G N
MED
SUFF
20 FT.
ROCK
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (CURBS)
F N G F G F N G G
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.2,6 EXTERIOR: MINOR CRACKING WITH EFFLORESCENCE AND MINOR
HONEYCOMBING ON UNDERSIDE OF BOTTOM FLANGE IN CENTER
SPAN. MINOR HONEYCOMBING AT CORNER OF BOX GIRDER IN
SOUTH SPAN ON WEST SIDE. MINOR DIAGONAL CRACKING ON
EAST WEB AT NORTH ABUTMENT AND WEST WEB AT SOUTH
ABUTMENT; ALSO SEE 60.1.
INTERIOR: HAIRLINE CRACKING RANDOMLY LOCATED. TWO MINOR
SPALLS ON NORTH PIER DIAPHRAGM IN EAST CELL. MINOR
VERTICAL CRACKING OF INTERMEDIATE DIAPHRAGMS IN NORTH
SPAN. MINOR CRACKING OF NORTH ABUTMENT DIAPHRAGMS IN
BOTH CELLS. NORTH SPAN BOX GIRDER CELLS ACCESSED DURING
THIS INSPECTION; UBIV NEEDED TO ACCESS CENTER AND SOUTH
SPANS.
60.1 MINOR CRACKING WITH EFFLORESCENCE ON ABUTMENT
BREASTWALLS. MINOR CRACKING AT NORTHEAST AND
SOUTHWEST CORNERS TRANSLATES INTO EXTERIOR WEB OF BOX
GIRDER; ALSO SEE 59.2.
60.3 GRAFFITI ON NORTH ABUTMENT.
60.9 MINOR EROSION AT NORTHWEST ABUTMENT/WINGWALL JUNCTION.
60.13 EXPOSED REBAR DUE TO INSUFFICIENT COVER ON WEST FACE OF
NORTH PIER.
60.16,17 MINOR EROSION AT BASE OF SOUTH PIER ALONG EAST FACE HAS
EXPOSED 2" OF STEEL CASING FOR DRILLED SHAFT FOUNDATION.
222.1 MINOR TO MODERATE LONGITUDINAL AND DIAGONAL CRACKING OF
APPROACH SLABS; MINOR ABRASION.
222.4 MODERATE CRACKING ON PAVEMENT AT BOTH APPROACHES.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-177P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 33 30
HS 36 33 60 55
TYPE 3 39 35 65 59
TYPE 3S2 43 39 71 65
TYPE 3-3 45 41 75 68
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-177P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... RAVINE BRIDGE AT MP 302.58 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 011 - AVERY
(204) STRUCTURE NUMBER: ..... 5140-177P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... RAVINE & STREAM
(207) ROAD SECTION NO: ..........177P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140177P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 2.38 MILES FROM U.S. ROUT
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................2H9 (11) MILE POINT: .............................302.58 (KM PT 486.97)
(212) DRAWING NUMBERS: ....... 2H9 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
6 - P/S CONCRETE CONTINUOUS
06 - BOX GIRDER - SINGLE or SPREAD
170.0 FT (51.8 M)
446.0 FT (135.9 M)
2 - SPREAD FTG ON BEARING MAT'L
5 - OTHER
5 - OTHER
5 - OTHER
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.1 TONS (54.5 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-177P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°05'55.70"
(17) LONGITUDE: ......................... 81°47'42.40"
(19) DETOUR LENGTH: ............... 10 MI (16 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 0 - OTHER
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
34.5 FT (10.5 M)
38.8 FT (11.8 M)
28.0 FT (8.5 M)
22.0 FT (6.7 M)
3.0 FT (0.9 M)
3.0 FT (0.9 M)
0 - NO MEDIAN
0 °
NO
34.5 FT (10.5 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
2 - MOUNTED ON PARAPET
2 - CONCRETE/ALUMINUM
1 - CONTINUOUS RAIL
2.92 FT (0.89 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2008-TRANSITION SLAB INSTALLED ADJACENT TO APPROACH SLAB TO ALLEVIATE SETTLEMENT.
(231) ADDITIONAL CONSIDERATIONS:
SNOOPER NEEDED TO ACCESS BOX GIRDER HATCHES.
(330) ADDITIONAL CONFIG. INFO.:
https://81�47'42.40 https://36�05'55.70
PHOTOGRAPHS STRUCTURE NO. 5140-177P
PHOTO #1 - LOOKING NORTHBOUND TOWARD BLOWING ROCK
FLOW
PHOTO #2 - WEST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING
NORTH
PHOTO #5 - CLOGGED DROP INLET AT NORTH APPROACH AT WEST
PARAPET
PHOTO #6 - TYPICAL CRACKING AND SETTLEMENT OF APPROACH
PAVEMENT, NORTH APPROACH SHOWN
PHOTO #7 - TYPICAL CRACKING WITH EFFLORESCENCE ON DECK AT
CORNERS, NORTHEAST DECK CORNER SHOWN
PHOTO #8 - LONGITUDINAL CRACKING OF DECK AT NORTH END
PHOTO #9 - TYPICAL SPALLING AND DELAMINATION OF FINISH COAT
ON EAST CURB IN NORTH SPAN
PHOTO #10 - TYPICAL MISSING RAIL CONNECTION HARDWARE, WEST
RAIL IN NORTH SPAN SHOWN
PHOTO #11 - GENERAL VIEW OF DECK OVER NORTH PIER; NOTE
TYPICAL PATCHING OF DECK OVER PIERS
PHOTO #12 - RAIL CONTINUITY INSERT MISSING FROM EAST RAIL IN
CENTER SPAN
PHOTO #13 - TYPICAL LONGITUDINAL CRACKING OF DECK, SOUTH
SPAN SHOWN
PHOTO #14 - CRACKING OF DECK IN SOUTH SPAN NEAR SOUTH
ABUTMENT
PHOTO #15 - TYPICAL CONDITION OF SOUTH DECK JOINT; NOTE
SPALLING OF DECK
PHOTO #16 - TYPICAL CRACKING OF APPROACH SLABS, SOUTH
APPROACH SLAB SHOWN
PHOTO #17 - TYPICAL CONDITION OF APPROACH SLAB JOINTS, SOUTH
APPROACH SHOWN; NOTE TYPICAL SETTLEMENT OF APPROACH
PAVEMENT
PHOTO #18 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #19 - CRACKING WITH EFFLORESCENCE ON WEST DECK
OVERHANG NEAR NORTH ABUTMENT; NOTE CRACKING EXTENDS TO
ABUTMENT BREASTWALL
PHOTO #20 - CRACKING WITH EFFLORESCENCE ON EAST WEB OF
BOX GIRDER AT NORTH ABUTMENT
PHOTO #21 - EROSION AT BASE OF NORTH PIER ALONG WEST FACE
PHOTO #22 - EXPOSED REBAR DUE TO INSUFFICIENT COVER ON
WEST FACE OF NORTH PER
PHOTO #23 - GENERAL VIEW OF SOUTH PIER, SOUTH FACE SHOWN
PHOTO #24 - SPALLING AT BASE OF SOUTH PIER ON EAST FACE
PHOTO #25 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #26 - TYPICAL CRACKING WITH EFFLORESCENCE ON DECK
OVERHANGS, WEST OVERHANG AT SOUTH ABUTMENT SHOWN
PHOTO #27 - GENERAL VIEW INSIDE WEST CELL LOOKING NORTH IN
NORTH SPAN
PHOTO #28 - GENERAL VIEW OF SPALLING OF EAST PIER DIAPHRAGM
IN EAST CELL OF NORTH SPAN
PHOTO #29 - SPALLING OF EAST PIER DIAPHRAGM IN EAST CELL OF
NORTH SPAN
PHOTO #30 - SPALLING OF EAST PIER DIAPHRAGM IN EAST CELL OF
NORTH SPAN
PHOTO #31 - TYPICAL VERTICAL CRACKING OF INTERMEDIATE
DIAPHRAGMS, WEST CELL IN NORTH SPAN SHOWN
PHOTO #32 - GENERAL VIEW OF NORTH END DIAPHRAGM IN WEST
CELL
PHOTO #33 - TYPICAL HORIZONTAL CRACKING OF END DIAPHRAGMS,
NORTH END DIAPHRAGM IN WEST CELL SHOWN
PHOTO #34 - TYPICAL VERTICAL CRACKING OF END DIAPHRAGMS,
NORTH END DIAPHRAGM IN WEST CELL SHOWN
PHOTO #35 - UPSTREAM CHANNEL
PHOTO #36 - DOWNSTREAM CHANNEL
File details come from the government source that posted it. Updated .