5140-183P4250.pdf

PDF 4 MB Posted

Attached to
Blue Ridge Parkway Federal contract opportunity
Solicitation number
693C73-22-B-000004
Issued by
Department of Transportation Federal Highway Administration

About this file

This document provides details for a federal solicitation seeking bids for construction services on the Blue Ridge Parkway in North Carolina. The solicitation will be issued on December 16, 2021 for reconstruction and rehabilitation work on the parkway from milepost 229.6 to 305.1, including overlooks, parking areas, ramps, drainage assessments and improvements, signage, pavement markings, guardrail, and slope stabilization. The project will be split into multiple work schedules with an expected total cost between $75-100 million. Bids are due as specified in the solicitation to be issued. Interested vendors must register at www.sam.gov and www.dol.gov/vets/vets4212.htm to receive email notifications and comply with submission requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Amendment 0004 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0003 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0002 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0001 - NP-BLRI 2B13 2H17 Etc.pdf PDF
5140-171P12750.pdf PDF
5140-175P2550.pdf PDF
5140-184P3188.pdf PDF
5140-176P2125.pdf PDF
5140-189P1417.pdf PDF
5140-188P1594.pdf PDF
5140-190P142.pdf PDF
FP14_Eng.pdf PDF
BLRI_C5_RouteID.pdf PDF
5140-178P1594.pdf PDF
VETS-4212 Form.pdf PDF
Plans - NP-BLRI 2B13 2H17 ETC.pdf PDF
BLRI_C5_RipReport.pdf PDF
IFB Solicitation - NP-BLRI 2B13 2H17 ETC.pdf PDF
5140-177P1821.pdf PDF
5140-087P1821.pdf PDF
5140-195P2550.pdf PDF
5140-096P2125.pdf PDF
5140-187P1821.pdf PDF
5140-196P2125.pdf PDF
GeotechData.pdf PDF
EnvironmentalData.pdf PDF
ADV_Subcontracting Plan - NP-BLRI 2B13 2H17 etc.doc DOC document
5140-180P159.pdf PDF
5140-086P2125.pdf PDF
5140-090P142.pdf PDF
5140-098P1594.pdf PDF
5140-095P2550.pdf PDF
5140-181P12750.pdf PDF
CulvertData.pdf PDF
5140-179P1417.pdf PDF
5140-097P1821.pdf PDF
5140-174P3188.pdf PDF
5140-085P2550.pdf PDF
5140-093P4250.pdf PDF
5140-088P1594.pdf PDF
5140-172P6375.pdf PDF
BLRI_C4_MaintenanceFeatures.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
ADV Bidders Qualifications Form.doc DOC document
CADD_File_Disclaimer_Letter_2B13.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5140-183P

STACK ROCK CREEK BRIDGE INSPECTION DATE: 6/3/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... GIRDER & FLOOR BEAM SYSTEM NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 2 STRUCT. TOTAL LENGTH: .. 284.0 FT (86.6 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 140.0 FT (42.7 M)

WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 38.0 FT (11.6 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 34.5 FT (10.5 M)

PIER FOUNDATION(S): ........ OTHER YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 02H3J14 / 2H3JI4 SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ YES

STRUCTURE HISTORY: ...... 2008 - APPROACHES REPAVED

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 304.63 (KM PT 490.03)

STATE: ................................. NORTH CAROLINA LOCATION: 0.51 MILES FROM U.S. ROUTE 221

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. STACK ROCK CREEK

STRUCTURE EVALUATION SUMMARY

This weathering steel two girder bridge is in good condition overall with only minor problems. These problems include minor cracking of the deck surface and the underside; light surface rust on girders at splices; and minor cracking at the abutments and of the top of the pier.

Other problems include minor debris accumulation in the expansion joints; missing anchor nuts from the rails; and the southwest rail end is loose.

This inspection report also constitutes the fracture critical inspection of this bridge.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: A. IMMEL, P. SWANN (VOLKERT, INC.)

CONDITION ASSESSMENT:

AARON IMMEL, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/10/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-183P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.2 PERIODICALLY CLEAN DEBRIS FROM EXPANSION JOINTS.

58.6 TIGHTEN LOOSE RAILING. REPLACE MISSING RAIL ANCHOR NUTS ON BOTH

RAILS AS NECESSARY.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

58.1, 222.1 CLEAN AND SEAL DECK SURFACE AND APPROACH SLABS.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN/CONSTRUCTION ENGINEERING.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-183P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

G G N G N G N N G

N G

N G G F G N

N

G

G

F

58.1 MINOR TO MODERATE ABRASION OF DECK SURFACE. MINOR

EFFLORESCENCE ON DECK UNDERSIDE AT CONSTRUCTION

JOINTS. MINOR CRACKING OF FILLET. MINOR RANDOM CRACKING

OF DECK SURFACE AND UNDERSIDE. MINOR CRACKING AND

SPALLING OF HAUNCH OVER PIER DIAPHRAGM BOX NEAR

CENTERLINE. MINOR CRACKING WITH EFFLORESCENCE ON DECK

OVERHANGS. MINOR HORIZONTAL CRACKING ON WEST EXTERIOR

SIDE NEAR NORTH ABUTMENT. MINOR SPALLING OF DECK

SURFACE ALONG EAST CURB APPROXIMATELY 20' FROM NORTH

ABUTMENT. MINOR CRACKING AND SPALLING ALONG JOINT

BETWEEN DECK AND CURB, WEST FACE OF NORTH SPAN NEAR

NORTH ABUTMENT.

58.2 MINOR DEBRIS ACCUMULATION IN EXPANSION JOINTS. SEVERAL

NUT CAPS MISSING AT SOUTH JOINT. GOUGES IN RUBBER AT JOINT

OVER SOUTH ABUTMENT.

58.5 MINOR ABRASION, HONEYCOMBING, AND CRACKING OF CONCRETE

CURBS.

58.6 SOUTHWEST RAIL END IS LOOSE. SOUTH END RAIL CAP MISSING

ON EAST RAIL; HOWEVER, END HAS NOW BEEN FILLED WITH

CONCRETE. MINOR COLLISION DAMAGE TO WEST RAIL, 20' FROM

SOUTH ABUTMENT. SEVERAL NUTS MISSING FROM POST TO CURB

CONNECTION OF RAILS. WIDESPREAD RUSTING OF ANCHOR

BOLTS AND NUTS AT POST AND RAIL CONNECTION.

58.9, 59.9 MINOR VIBRATION UNDER VEHICULAR LOADS.

59 THIS INSPECTION CONSTITUTES FRACTURE CRITICAL INSPECTION.

59.1 NEOPRENE BEARING PAD AT SOUTHEAST CORNER IS

HORIZONTALLY DEFLECTED TO NORTH; 1-1/8" OVER 6" HEIGHT.

1. BREASTWALLS OR COLUMNS G

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS G

4. BACKWALLS AND/OR BULKHEADS G

5. FOUNDATIONS N

6. WINGWALLS G

7. WEEP HOLES N

8. EXPANSION JOINTS G

9. EROSION AND/OR SCOUR G

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER N

PIER(S)

G13. WALLS AND/OR COLUMNS

N14. PILE BENTS

G15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS (ROCK)

G17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

FIELD INSPECTION REPORT STRUCTURE NO. 5140-183P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 8

G G N G N

MED

SUFF

60 FT.

ROCK

222. APPROACHES 6

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

F N G G G G G G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59.2,6 WEATHERING STEEL. WEB STIFFENER WELDED TO FLANGES AT

FLOOR BEAMS. BOLTS ON HORIZONTAL FLANGES, FIELD SPLICES,

AND GUSSET PLATE TO BRACING CONNECTIONS ARE INSTALLED

UPSIDE DOWN. BIRD NESTS ON SEVERAL GUSSET PLATES

CONNECTIONS. MINOR FLAKING OF GIRDERS AND SPLICE PLATES

AT CONNECTIONS.

FLAKING PATINA AND SURFACE RUST ON TOP OF LATERAL BRACING

CONNECTION PLATE ON SOUTH SIDE OF PIER. MIS-DRILLED BOLT

HOLES ON LATERAL CONNECTION PLATE AT NORTH SIDE OF PIER.

MINOR DISTORTION, LESS THAN 1/2", OF WEST LATERAL BRACING

NEAR MIDSPAN OF NORTH SPAN.

59.6 PIER DIAPHRAGM BOX BEAM DOES NOT APPEAR TO BE

WEATHERING STEEL.

60.1 MINOR CRACKING OF ABUTMENT BREASTWALLS. DIAGONAL

CRACKING, UP TO 0.03" WIDE, WITH EFFLORESCENCE ON SOUTH

ABUTMENT BREASTWALL. MINOR POPOUT WITH EXPOSED FORM

TIES ON SOUTH ABUTMENT BREASTWALL. MINOR STAINING ON

BREASTWALLS.

60.3 MINOR CRACKING WITH EFFLORESCENCE ON BEARING SEAT FOR

EAST GIRDER AT NORTH ABUTMENT.

60.6 MINOR TO MODERATE DETERIORATION OF MORTAR JOINTS.

60.13 MINOR STAINING ON TOP OF PIER COLUMN ON NORTH FACE FROM

WEATHERING STEEL. MODERATE CRACKING, UP TO 0.06" WIDE,

WITH EFFLORESCENCE ON TOP OF PIER EXTENDING DOWN, UP TO

40", ON BOTH FACES OF PIER.

60.16, 61.2 PIER CAST DIRECTLY INTO BEDROCK.

SEE BRIDGE FILE FOR SCOUR EVALUATION.

222.1 MINOR TO MODERATE CRACKING, UP TO 0.07" WIDE, OF APPROACH

SLABS.

222.3 MINOR DETERIORATION OF APPROACH PARAPET MORTAR JOINTS.

222.6 MINOR SETTLEMENT, UP TO 1", OF APPROACH PAVEMENT AT

JUNCTION WITH APPROACH SLABS.

222.7 "STACK ROCK CREEK" POSTED AT NORTH APPROACH.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-183P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 26 24 44 40

TYPE 3 26 24 43 39

TYPE 3S2 29 26 48 44

TYPE 3-3 31 28 51 46

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-183P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... STACK ROCK CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 011 - AVERY

(204) STRUCTURE NUMBER: ..... 5140-183P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... STACK ROCK CREEK

(207) ROAD SECTION NO: ..........183P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140183P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 0.51 MILES FROM U.S. ROUT

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................02H3J14 (11) MILE POINT: .............................304.63 (KM PT 490.03)

(212) DRAWING NUMBERS: ....... 2H3JI4 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

03 - GIRDER & FLOOR BEAM SYSTEM

140.0 FT (42.7 M)

284.0 FT (86.6 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

5 - OTHER

6 - N/A

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 2

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 26.0 TONS (24.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 44.0 TONS (39.9 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES

INSP. EVERY: 24 MONTHS - LAST INSP. : 6/19(220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-183P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 36°05'25.00"

(17) LONGITUDE: ......................... 81°49'14.40"

(19) DETOUR LENGTH: ............... 10 MI (16 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

34.5 FT (10.5 M)

38.0 FT (11.6 M)

34.0 FT (10.4 M)

22.0 FT (6.7 M)

6.0 FT (1.8 M)

6.0 FT (1.8 M)

0 - NO MEDIAN

0 °

NO

34.5 FT (10.5 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

2 - MOUNTED ON PARAPET

2 - CONCRETE/ALUMINUM

1 - CONTINUOUS RAIL

3.08 FT (0.94 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

1 - MAINTENANCE

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2008 - APPROACHES REPAVED

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://81�49'14.40 https://36�05'25.00

PHOTOGRAPHS STRUCTURE NO. 5140-183P

PHOTO #1 - LOOKING NORTHBOUND TOWARD BLOWING ROCK

FLOW

PHOTO #2 - WEST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING NORTH

PHOTO #4 - GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING

NORTH

PHOTO #5 - GENERAL VIEW OF NORTH DECK

JOINT

PHOTO #6 - GENERAL VIEW OF SOUTH DECK

JOINT

PHOTO #7 - TYPICAL CRACKING OF DECK,

SOUTH SPAN SHOWN; NOTE ABRASION

PHOTO #8 - LONGITUDINAL CRACKING OF

DECK IN SOUTHBOUND LANE OF SOUTH SPAN

PHOTO #9 - DETACHED RAIL AT SOUTHWEST

END; NOTE TYPICAL MISSING ANCHOR NUT

PHOTO #10 - CRACKING OF SOUTH

APPROACH SLAB IN NORTHBOUND LANE

PHOTO #11 - TYPICAL SETTLEMENT OF APPROACH PAVEMENT AT

APPROACH SLAB ENDS, SOUTH APPROACH SHOWN

PHOTO #12 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #13 - VERTICAL CRACKING WITH

EFFLORESCENCE OF SOUTH ABUTMENT

BREASTWALL

PHOTO #14 - DIAGONAL CRACKING WITH

EFFLORESCENCE ON SOUTH ABUTMENT

BREASTWALL

PHOTO #15 - GENERAL VIEW OF EAST BEARING AT SOUTH ABUTMENT;

NOTE BEARING IN EXPANDED POSITION

PHOTO #16 - TYPICAL CRACKING WITH EFFLORESCENCE ON WEST

DECK OVERHANG

PHOTO #17 - TYPICAL EFFLORESCENCE ON DECK UNDERSIDE ALONG

CONSTRUCTION JOINTS, SOUTH SPAN SHOWN

PHOTO #18 - EFFLORESCENCE FROM CONSTRUCTION JOINT

LEACHING ON EAST GIRDER NEAR NORTH SPLICE CONNECTION IN

SOUTH SPAN

PHOTO #19 - GENERAL VIEW OF PIER

PHOTO #20 - TYPICAL VERTICAL CRACKING AT

TOP OF PIER, SOUTH FACE SHOWN; NOTE

EFFLORESCENCE

PHOTO #21 - TYPICAL CRACKING OF DECK HAUNCH, SOUTH SIDE OF

PIER SHOWN

PHOTO #22 - TYPICAL BIRD NEST ON TOP OF GUSSET PLATES; NOTE

TYPICAL CONNECTION BOLTS INSTALLED UPSIDE DOWN

PHOTO #23 - MIS-DRILLED HOLES ON LATERAL BRACING CONNECTION

AT NORTH SIDE OF PIER

PHOTO #24 - TYPICAL EDGE SPALLING OF DECK HAUNCH AT PIER,

NORTH SIDE SHOWN

PHOTO #25 - DEFORMATION OF WEST

LATERAL BRACE NEAR MIDSPAN OF NORTH

SPAN

PHOTO #26 - TYPICAL VERTICAL CRACKING OF

NORTH ABUTMENT BREASTWALL

PHOTO #27 - LOOKING UPSTREAM FROM

DECK

PHOTO #28 - LOOKING DOWNSTREAM

CHANNEL FROM DECK

File details come from the government source that posted it. Updated .