5140-171P12750.pdf

PDF 6 MB Posted

Attached to
Blue Ridge Parkway Federal contract opportunity
Solicitation number
693C73-22-B-000004
Issued by
Department of Transportation Federal Highway Administration

About this file

This solicitation from the Department of Transportation Federal Highway Administration seeks sealed bids for the Blue Ridge Parkway Project NP-BLRI 2B13, 2H17, and other schedules located in North Carolina. The project consists of reconstruction and rehabilitation of approximately 75 to 100 miles of the Blue Ridge Parkway including overlooks, parking areas, ramps, drainage, signage, pavement markings, guardrail, and slope stabilization. The project will be split into multiple work schedules with bidding expected to begin on December 16, 2021 and bids due on a date specified in the solicitation. Annual representations and certifications must be completed on SAM.gov along with required veteran-owned small business reporting. Subcontracting plans are required from businesses other than small with legislated goals of 45.25% for small businesses, 5% each for small disadvantaged, women-owned small, HUBZone, and service-disabled veteran-owned small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Amendment 0004 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0003 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0002 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0001 - NP-BLRI 2B13 2H17 Etc.pdf PDF
5140-175P2550.pdf PDF
5140-184P3188.pdf PDF
5140-176P2125.pdf PDF
5140-189P1417.pdf PDF
5140-188P1594.pdf PDF
5140-190P142.pdf PDF
FP14_Eng.pdf PDF
BLRI_C5_RouteID.pdf PDF
5140-178P1594.pdf PDF
VETS-4212 Form.pdf PDF
Plans - NP-BLRI 2B13 2H17 ETC.pdf PDF
BLRI_C5_RipReport.pdf PDF
IFB Solicitation - NP-BLRI 2B13 2H17 ETC.pdf PDF
5140-177P1821.pdf PDF
5140-087P1821.pdf PDF
5140-195P2550.pdf PDF
5140-183P4250.pdf PDF
5140-096P2125.pdf PDF
5140-187P1821.pdf PDF
5140-196P2125.pdf PDF
GeotechData.pdf PDF
EnvironmentalData.pdf PDF
ADV_Subcontracting Plan - NP-BLRI 2B13 2H17 etc.doc DOC document
5140-180P159.pdf PDF
5140-086P2125.pdf PDF
5140-090P142.pdf PDF
5140-098P1594.pdf PDF
5140-095P2550.pdf PDF
5140-181P12750.pdf PDF
CulvertData.pdf PDF
5140-179P1417.pdf PDF
5140-097P1821.pdf PDF
5140-174P3188.pdf PDF
5140-085P2550.pdf PDF
5140-093P4250.pdf PDF
5140-088P1594.pdf PDF
5140-172P6375.pdf PDF
BLRI_C4_MaintenanceFeatures.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
ADV Bidders Qualifications Form.doc DOC document
CADD_File_Disclaimer_Letter_2B13.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5140-171P

SIMS CREEK BRIDGE INSPECTION DATE: 6/4/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... GIRDER & FLOOR BEAM SYSTEM NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 2 STRUCT. TOTAL LENGTH: .. 388.0 FT (118.3 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 97.0 FT (29.6 M)

WEARING SURFACE: .......... INTEGRAL CONCRETE DECK WIDTH: ...................... 33.9 FT (10.3 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 26.3 FT (8.0 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 2006

PROJ./PLAN REF. NO: ......... 2G4 / RG1331 SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ YES

STRUCTURE HISTORY: ...... 2006- PARTIAL DEPTH DECK REPLACEMENT INCLUDING DAMAGE REBARS; NEW WEARING

SURFACE; REPAINTING OF STRUCTURAL STEEL.

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 295.34 (KM PT 475.28)

STATE: ................................. NORTH CAROLINA LOCATION: 3.5 MILES FROM U.S. ROUTE 321.

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. SIMS CREEK

STRUCTURE EVALUATION SUMMARY

This steel two-girder bridge is in fair condition overall. Problems at this time include spalling with exposed rebar, likely due to insufficient concrete cover, on the deck underside, pier columns, abutment breastwalls, caps, and northwest wingwall; debris accumulation on the pier bearing seats and in expansion joints; and separation of the elastomeric concrete joint nosing from the deck over the center pier. Another problem includes spalling of the deck underside above the center pier in Span #3, which has exposed an unpainted area on the west stringer resulting in rusting and pitting of the stringer. Additionally, rust staining is beginning to bleed through the paint; and surface rust is beginning to form on the girders at random locations.

Other problems include vegetation beginning to encroach the bridge in Spans #3 and #4; cracking of the south abutment strut; and spalling of the wearing surface in Span #4 at the south abutment.

This inspection report also constitutes the fracture critical inspection of this bridge.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: A. IMMEL, P. SWANN (VOLKERT, INC.)

CONDITION ASSESSMENT:

AARON IMMEL, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/10/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-171P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.10 TRIM VEGETATION ENCROACHING SIDES OF DECK IN SPANS #3 AND #4.

60.1,3 CLEAN AND SEAL CRACKING OF SOUTH ABUTMENT STRUT.

58.2 SEAL GAP BETWEEN ELASTOMERIC CONCRETE JOINT NOSING AND DECK AT

CENTER PIER JOINT.

58.3 REPAIR SPALLED AREA OF WEARING SURFACE IN SPAN #4 AT SOUTH ABUTMENT.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

58.1, 60.1,3,6,13

CLEAN AND SEAL AREAS OF EXPOSED REBAR ON DECK

UNDERSIDE, PIER COLUMNS, ABUTMENT BREASTWALLS, STRUTS,

AND NORTHWEST WINGWALL WITH APPROVED PROTECTIVE

58.2, 59.4, 60.3,13,15

REMOVE DEBRIS FROM PIER STRUTS, BEARING SEATS, AND

EXPANSION JOINTS. CLEAN AND PAINT WEST STRINGER ABOVE

CENTER PIER IN SPAN #3.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN, AND CONSTRUCTION ENGINEERING.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-171P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

(VEGETATION)

G G N G N N G N G

N G

G N F G N G N N F G N N

G N G N G G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 MINOR TRANSVERSE CRACKING, SOME FULL WIDTH, WITH

EFFLORESCENCE AND LEAKAGE ON DECK UNDERSIDE. MODERATE

HONEYCOMBING, SOME WITH EXPOSED REBAR, ON DECK

UNDERSIDE AND OVERHANGS. FORM WORK LEFT IN PLACE ON

UNDERSIDE AT NORTH PIER JOINT. SEVERAL SHALLOW SPALLS

WITH EXPOSED REBAR DUE TO INSUFFICIENT CONCRETE COVER.

DECK SOUNDS HOLLOW NEAR NORTH PIER, EAST SIDE (COULD

NOT VERIFY DURING THIS INSPECTION). MINOR VERTICAL

CRACKING WITH EFFLORESCENCE ON EXTERIOR SIDES OF DECK.

SEVERAL CRACKS WITH EFFLORESCENCE ALONG WEST

OVERHANG, PARTICULARLY IN SOUTH SPAN.

15' OF SPALLED HAUNCH ABOVE WEST GIRDER IN SOUTH SPAN

BETWEEN FLOOR BEAMS #1 AND #2; SPALLING OF HAUNCH

EXPOSES UNPAINTED STRINGER FLANGES.

CRACK DEVELOPING INTO SPALL ON DECK HAUNCH AT STRINGER

#2 OVER SOUTH ABUTMENT. SEVERAL AREAS OF MINOR

DELAMINATION ON DECK UNDERSIDE.

58.2 MINOR TO MODERATE DEBRIS ACCUMULATION IN JOINTS. MINOR

CRACKING OF CONCRETE AT NORTH AND SOUTH PIER JOINTS.

BATS INHABITING UNDERSIDE OF JOINT AT SOUTH PIER. UP TO 1/2"

OF SEPARATION BETWEEN ELASTOMERIC CONCRETE JOINT

NOSING AND DECK OVER CENTER PIER.

58.3 SPALLING, 12" W X 7" L X 1-1/2" D, WITH AREA OF DELAMINATION, 10"

W X 12" L, OF WEARING SURFACE IN NORTHBOUND LANE OF SPAN

#4 AT SOUTH ABUTMENT. MINOR POPOUTS THROUGHOUT

WEARING SURFACE; PARTICULARLY IN SPAN #2.

58.5 SPALLING, 7" DIA. X UP TO 1" D, ON TOP FACE OF WEST SIDEWALK

IN SPAN #2 EXPOSING FORMWORK.

58.5,6 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON CURBS

AND SIDEWALKS. MINOR VERTICAL CRACKING OF PARAPETS.

58.10 VEGETATION ENCROACHING DECK SIDES IN SPANS #3 AND #4.

F G G G G N

F

F

G

G

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 7

G G N G N

MED

SUFF

77 FT.

GRAVEL, SAND

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER (VEGETATION)

N N G G G G G G G

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59 THIS INSPECTION CONSTITUTES FRACTURE CRITICAL INSPECTION.

59.1 SEVERAL ANCHOR BOLTS DO NOT PROTRUDE THROUGH NUTS.

ANCHOR BOLT AT EAST BEARING FOR SPAN #1 AT NORTH PIER HAS

BEEN REPLACED WITH SMALLER BOLT. DEBRIS UNDER ROCKER

BEARING COULD INTERFERE WITH ROTATION. MODERATE

DETERIORATION OF GROUT PAD AT EAST BEARING OF CENTER

PIER WITH MODERATE SECTION LOSS FROM ANCHOR BOLTS.

RECESS AROUND EAST BEARINGS AT CENTER PIER HOLDS WATER.

MINOR ROTATION OF WEST AND EAST BEARINGS FOR SPAN #4 AT

SOUTH PIER.

59.2,4,7 MINOR SURFACE RUSTING OF GIRDERS, RANDOMLY LOCATED.

BIRD DROPPINGS ON GIRDERS IN SEVERAL AREAS AND LARGE

BIRDS NESTS ON FLOOR BEAMS AT ISOLATED LOCATIONS

THROUGHOUT. SPALLING OF DECK HAUNCHES HAS EXPOSED

UNPAINTED AREA OF STRINGERS, RESULTING IN RUSTING AND

PITTING OF STRINGERS.

SCATTERED BENT AND MISALIGNED STIFFENERS THROUGHOUT

BRIDGE. POOR QUALITY WELDS AT TOPS OF VERTICAL

STIFFENERS AND ALONG HORIZONTAL STIFFENERS SCATTERED

THROUGHOUT, APPROXIMATELY 10%.

59.4 SEVERAL FLOOR BEAMS HAVE NOTCHES CUT AWAY AT GIRDER

CONNECTIONS; FLOOR BEAM #2 IN SPAN #1 HAS 1 1/4" NOTCH AT

TOP AND 5/8" NOTCH AT BOTTOM AT EAST GIRDER CONNECTION

AND 1" NOTCHES AT WEST GIRDER; CUTS EXTEND INTO WEBS

BEYOND NOTCHED AREAS. PACK RUST IN FLOOR BEAM BRACE

CONNECTION OVER SOUTHEAST BEARING AT CENTER PIER.

59.7 RUST BEGINNING TO BLEED THROUGH PAINT.

60.1 SPALLING WITH EXPOSED REBAR ON NORTH ABUTMENT STRUT.

HEAVY GRAFFITI ON ABUTMENTS. MINOR CRACKING OF ABUTMENT

BACKWALLS. MINOR STAINING ON SOUTH ABUTMENT. PATCH ON

EAST SIDE OF SOUTH ABUTMENT BEGINNING TO DELAMINATE.

60.3 VERTICAL CRACKING, UP 1/16" WIDE, WITH EFFLORESCENCE ON

SOUTH ABUTMENT STRUT. MINOR VERTICAL CRACKING OF

ABUTMENT BEARING SEATS.

MINOR SPALLING WITH EXPOSED REBAR ON NORTH ABUTMENT

BEARING SEAT. MINOR SPALLING WITH 6" OF EXPOSED REBAR ON

EAST SIDE OF SOUTH ABUTMENT BREASTWALL DUE TO

INADEQUATE CONCRETE COVER.

60.4 MINOR CRACKING WITH EFFLORESCENCE ON BACKWALLS. MINOR

TO MODERATE LONGITUDINAL CRACKING ON TOP OF BOTH

ABUTMENTS BACKWALL; MINOR ABRASION. MINOR EDGE SPALLING

ON TOP OF BACKWALLS ALONG APPROACH PAVEMENT. MINOR

SPALLING OF SOUTH ABUTMENT BREASTWALL, EAST SIDE.

ADDITIONAL ITEM REFERENCE AND REMARKS

60.6 MINOR CRACKING WITH EFFLORESCENCE, SCALING, AND MOSS GROWTH ON WINGWALLS.

60.9,17 MINOR UNDERMINING, UP TO 17", OF CURTAIN WALL BETWEEN NORTH ABUTMENT COLUMNS. MODERATE EROSION AT NORTH PIER, NORTH ABUTMENT, AND UNDER NORTH SPAN DUE TO DRAINAGE FROM SCUPPERS.

60.13,15 MINOR CRACKING WITH EFFLORESCENCE ON PIER COLUMNS. MODERATE STAINING AND EFFLORESCENCE ON PIER STRUTS. DEBRIS ON TOP OF SEVERAL PIER STRUTS/CAPS; CONCRETE PIECES ON TOP OF NORTH AND SOUTH PIER DIAPHRAGMS HAVE FALLEN FROM EXPANSION JOINTS AND LARGE AMOUNT OF BAT GUANO ON SOUTH PIER. MINOR SPALLING ALONG CONSTRUCTION JOINT ON EAST COLUMN OF NORTH PIER. NUMEROUS

SPALLS WITH EXPOSED FORM TIES ON NORTH FACE OF EAST COLUMN OF CENTER PIER. MINOR

HONEYCOMBING ON UNDERSIDE OF UPPER STRUT IN CENTER PIER. MINOR SPALLING WITH EXPOSED REBAR ON NORTH FACE OF EAST COLUMN OF SOUTH PIER. MINOR VERTICAL CRACKING WITH EFFLORESCENCE FROM

BEARING SEAT STEP AT WEST COLUMNS OF SOUTH AND CENTER PIERS.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

61.2,4 MINOR SLOUGHING OF CHANNEL BANKS NEAR CENTER PIER.

222.3 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON APPROACH PARAPETS. MINOR SPALLING OF FOOTING FOR SOUTHEAST APPROACH PARAPET. MINOR DEBRIS ACCUMULATION AND VEGETATION GROWTH ALONG

SOUTH APPROACH PARAPETS.

222.4 MINOR TO MODERATE CRACKING OF APPROACH PAVEMENT.

222.7 "SIMS CREEK" SIGNS AT BOTH APPROACHES.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-171P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 22 20 37 33

TYPE 3 21 19 35 32

TYPE 3S2 25 23 42 38

TYPE 3-3 28 25 47 42

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-171P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... SIMS CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 189 - WATAUGA

(204) STRUCTURE NUMBER: ..... 5140-171P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... SIMS CREEK

(207) ROAD SECTION NO: ..........171P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140171P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 3.5 MILES FROM U.S. ROUTE

(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................2G4 (11) MILE POINT: .............................295.34 (KM PT 475.28)

(212) DRAWING NUMBERS: ....... RG1331 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

03 - GIRDER & FLOOR BEAM SYSTEM

97.0 FT (29.6 M)

388.0 FT (118.3 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 2 - INTEGRAL CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 22.0 TONS (20.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 36.8 TONS (33.4 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES

INSP. EVERY: 24 MONTHS - LAST INSP. : 6/19 (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-171P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 36°08'44.80"

(17) LONGITUDE: ......................... 81°42'40.90"

(19) DETOUR LENGTH: ............... 15 MI (24 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

26.3 FT (8.0 M)

33.9 FT (10.3 M)

34.0 FT (10.4 M)

22.0 FT (6.7 M)

6.0 FT (1.8 M)

6.0 FT (1.8 M)

0 - NO MEDIAN

0 °

NO

26.3 FT (8.0 M)

2.5 FT (0.8 M)

2.5 FT (0.8 M)

2 - MOUNTED ON PARAPET

2 - CONCRETE/ALUMINUM

1 - CONTINUOUS RAIL

2.62 FT (0.80 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

4 - Stable; action required to pro

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2006- PARTIAL DEPTH DECK REPLACEMENT INCLUDING DAMAGE REBARS; NEW WEARING SURFACE; REPAINTING OF STRUCTURAL

STEEL.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://81�42'40.90 https://36�08'44.80

PHOTOGRAPHS STRUCTURE NO. 5140-171P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD ASHEVILLE

FLOW

PHOTO #2 - EAST (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH

PHOTO #4 - GENERAL UNDERSIDE VIEW OF SPAN #4 LOOKING NORTH

PHOTO #5 - TYPICAL VERTICAL CRACKING WITH EFFLORESCENCE ON

APPROACH PARAPETS, SOUTHWEST APPROACH PARAPET SHOWN

PHOTO #6 - SPALLING OF FOOTING FOR SOUTHEAST PARAPET

PHOTO #7 - TYPICAL CONDITION OF JOINTS

OVER ABUTMENT, SOUTH ABUTMENT JOINT

SHOWN

PHOTO #8 - DELAMINATION AND SPALLING OF

WEARING SURFACE ADJACENT TO SOUTH

ABUTMENT JOINT; NOTE CRACKING ALONG

TOP OF SOUTH ABUTMENT BACKWALL

PHOTO #9 - DEBRIS ACCUMULATION IN JOINT

OVER SOUTH PIER AT EAST SIDEWALK

PHOTO #10 - TYPICAL CONDITION OF JOINT

SEALS, JOINT OVER SOUTH PIER SHOWN

PHOTO #11 - GENERAL VIEW OF JOINT OVER

CENTER PIER; NOTE SEPARATION OF

ELASTOMERIC CONCRETE JOINT NOSING

PHOTO #12 - SEPARATION OF ELASTOMERIC

CONCRETE JOINT NOSING OVER CENTER

PIER

PHOTO #13 - TYPICAL CONDITION OF JOINTS

OVER NORTH AND SOUTH PIERS, NORTH PIER

JOINT SHOWN; NOTE DEBRIS ACCUMULATION

PHOTO #14 - TRANSVERSE CRACKING OF

NORTH APPROACH PAVEMENT

PHOTO #15 - GENERAL VIEW OF SOUTH

ABUTMENT

PHOTO #16 - VERTICAL CRACKING WITH

EFFLORESCENCE ON SOUTH ABUTMENT

BEARING SEAT

PHOTO #17 - EXPOSED REBAR AT EAST SIDE

OF SOUTH ABUTMENT BREASTWALL NEAR

BASE

PHOTO #18 - DELAMINATION OF PATCH AT

EAST SIDE OF SOUTH ABUTMENT; NOTE

STAINING

PHOTO #19 - TYPICAL CONDITION OF SOUTH ABUTMENT BEARINGS,

WEST BEARING SHOWN

PHOTO #20 - EXPOSED REBAR ON DECK UNDERSIDE NEAR SOUTH

ABUTMENT; NOTE CRACKING WITH EFFLORESCENCE

PHOTO #21 - TYPICAL TRANSVERSE CRACKING WITH

EFFLORESCENCE ON DECK UNDERSIDE, SPAN #4 SHOWN

PHOTO #22 - TYPICAL TRANSVERSE CRACKING WITH

EFFLORESCENCE ON DECK OVERHANGS, WEST OVERHANG IN SPAN

#4 SHOWN

PHOTO #23 - SPALLING OF DECK HAUNCH AT WEST GIRDER BETWEEN

FLOOR BEAMS #1 AND #2; NOTE BIRD NEST

PHOTO #24 - DEVELOPING SPALL IN HAUNCH OVER STRINGER #2 AT

FLOOR BEAM #0 AT SOUTH ABUTMENT

PHOTO #25 - TYPICAL QUALITY OF WELDS ON SUPERSTRUCTURE;

NOTE RUSTING

PHOTO #26 - TYPICAL CONDITION OF EAST BEARINGS AT SOUTH PIER

PHOTO #27 - TYPICAL CONDITION OF WEST BEARINGS AT SOUTH PIER

PHOTO #28 - BAT GUANO ON TOP OF STRUT AT SOUTH PIER

PHOTO #29 - TYPICAL RUST BLEEDING

THROUGH PAINT, FLOOR BEAM #1 IN SPAN #3

SHOWN

PHOTO #30 - BENT VERTICAL STIFFENER ON

WEST GIRDER IN SPAN #3 BETWEEN FLOOR

BEAMS #1 AND #2 SHOWN

PHOTO #31 - HONEYCOMBING WITH EXPOSED

REBAR ON DECK UNDERSIDE IN BAY #3 OF

SPAN #3

PHOTO #32 - GENERAL VIEW OF CENTER PIER

PHOTO #33 - PACK RUST IN FLOOR BEAM BRACE CONNECTION OVER

SOUTHEAST BEARING AT CENTER PIER

PHOTO #34 - DETERIORATION OF GROUT PAD AROUND NORTHEAST

BEARING OF CENTER PIER; NOTE RUSTING AND SECTION LOSS FROM

ANCHOR BOLT AND NUT

PHOTO #35 - SECTION LOSS FROM ANCHOR BOLT AND NUT AT

SOUTHEAST BEARING OF CENTER PIER; NOTE RECESS AROUND

MASONRY PLATE

PHOTO #36 - TYPICAL CONDITION OF WEST BEARINGS AT CENTER

PIER

PHOTO #37 - EFFLORESCENCE ON NORTH FACE OF WEST COLUMN OF

CENTER PIER

PHOTO #38 - SPALLING OF HAUNCH EXPOSING UNPAINTED AND

RUSTED STRINGER AT NORTH SIDE OF CENTER PIER; NOTE FORM

BOARDS LEFT IN PLACE

PHOTO #39 - EFFLORESCENCE AND SPALLING

WITH EXPOSED REBAR ON NORTH FACE OF

EAST COLUMN OF CENTER PIER

PHOTO #40 - TYPICAL CONDITION OF

BEARINGS AT NORTH PIER, WEST BEARINGS

SHOWN

PHOTO #41 - GENERAL VIEW OF NOTCHES

CUT INTO FLOOR BEAM #1 AT CONNECTION

WITH EAST GIRDER IN SPAN #1

PHOTO #42 - NOTCH CUT INTO BOTTOM OF

FLOOR BEAM #1 AT CONNECTION WITH EAST

GIRDER IN SPAN #1

PHOTO #43 - NOTCH CUT INTO TOP OF FLOOR

BEAM #1 AT CONNECTION WITH EAST GIRDER

IN SPAN #1

PHOTO #44 - GENERAL VIEW OF NOTCHES

CUT INTO FLOOR BEAM #1 AT CONNECTION

WITH WEST GIRDER IN SPAN #1

PHOTO #45 - NOTCH CUT INTO TOP OF FLOOR BEAM #1 AT

CONNECTION WITH WEST GIRDER IN SPAN #1

PHOTO #46 - GENERAL VIEW OF NORTH ABUTMENT

PHOTO #47 - GENERAL VIEW OF VOID AT BASE OF NORTH ABUTMENT

CURTAIN WALL

PHOTO #48 - VOID AT BASE OF NORTH ABUTMENT CURTAIN WALL

PHOTO #49 - UPSTREAM CHANNEL

PHOTO #50 - DOWNSTREAM CHANNEL