5140-171P12750.pdf
PDF 6 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000004
About this file
This solicitation from the Department of Transportation Federal Highway Administration seeks sealed bids for the Blue Ridge Parkway Project NP-BLRI 2B13, 2H17, and other schedules located in North Carolina. The project consists of reconstruction and rehabilitation of approximately 75 to 100 miles of the Blue Ridge Parkway including overlooks, parking areas, ramps, drainage, signage, pavement markings, guardrail, and slope stabilization. The project will be split into multiple work schedules with bidding expected to begin on December 16, 2021 and bids due on a date specified in the solicitation. Annual representations and certifications must be completed on SAM.gov along with required veteran-owned small business reporting. Subcontracting plans are required from businesses other than small with legislated goals of 45.25% for small businesses, 5% each for small disadvantaged, women-owned small, HUBZone, and service-disabled veteran-owned small businesses.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5140-171P
SIMS CREEK BRIDGE INSPECTION DATE: 6/4/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... GIRDER & FLOOR BEAM SYSTEM NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 2 STRUCT. TOTAL LENGTH: .. 388.0 FT (118.3 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 97.0 FT (29.6 M)
WEARING SURFACE: .......... INTEGRAL CONCRETE DECK WIDTH: ...................... 33.9 FT (10.3 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 26.3 FT (8.0 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 2006
PROJ./PLAN REF. NO: ......... 2G4 / RG1331 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ YES
STRUCTURE HISTORY: ...... 2006- PARTIAL DEPTH DECK REPLACEMENT INCLUDING DAMAGE REBARS; NEW WEARING
SURFACE; REPAINTING OF STRUCTURAL STEEL.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 295.34 (KM PT 475.28)
STATE: ................................. NORTH CAROLINA LOCATION: 3.5 MILES FROM U.S. ROUTE 321.
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. SIMS CREEK
STRUCTURE EVALUATION SUMMARY
This steel two-girder bridge is in fair condition overall. Problems at this time include spalling with exposed rebar, likely due to insufficient concrete cover, on the deck underside, pier columns, abutment breastwalls, caps, and northwest wingwall; debris accumulation on the pier bearing seats and in expansion joints; and separation of the elastomeric concrete joint nosing from the deck over the center pier. Another problem includes spalling of the deck underside above the center pier in Span #3, which has exposed an unpainted area on the west stringer resulting in rusting and pitting of the stringer. Additionally, rust staining is beginning to bleed through the paint; and surface rust is beginning to form on the girders at random locations.
Other problems include vegetation beginning to encroach the bridge in Spans #3 and #4; cracking of the south abutment strut; and spalling of the wearing surface in Span #4 at the south abutment.
This inspection report also constitutes the fracture critical inspection of this bridge.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: A. IMMEL, P. SWANN (VOLKERT, INC.)
CONDITION ASSESSMENT:
AARON IMMEL, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/10/19
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-171P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.10 TRIM VEGETATION ENCROACHING SIDES OF DECK IN SPANS #3 AND #4.
60.1,3 CLEAN AND SEAL CRACKING OF SOUTH ABUTMENT STRUT.
58.2 SEAL GAP BETWEEN ELASTOMERIC CONCRETE JOINT NOSING AND DECK AT
CENTER PIER JOINT.
58.3 REPAIR SPALLED AREA OF WEARING SURFACE IN SPAN #4 AT SOUTH ABUTMENT.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
58.1, 60.1,3,6,13
CLEAN AND SEAL AREAS OF EXPOSED REBAR ON DECK
UNDERSIDE, PIER COLUMNS, ABUTMENT BREASTWALLS, STRUTS,
AND NORTHWEST WINGWALL WITH APPROVED PROTECTIVE
58.2, 59.4, 60.3,13,15
REMOVE DEBRIS FROM PIER STRUTS, BEARING SEATS, AND
EXPANSION JOINTS. CLEAN AND PAINT WEST STRINGER ABOVE
CENTER PIER IN SPAN #3.
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN, AND CONSTRUCTION ENGINEERING.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-171P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
(VEGETATION)
G G N G N N G N G
N G
G N F G N G N N F G N N
G N G N G G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1 MINOR TRANSVERSE CRACKING, SOME FULL WIDTH, WITH
EFFLORESCENCE AND LEAKAGE ON DECK UNDERSIDE. MODERATE
HONEYCOMBING, SOME WITH EXPOSED REBAR, ON DECK
UNDERSIDE AND OVERHANGS. FORM WORK LEFT IN PLACE ON
UNDERSIDE AT NORTH PIER JOINT. SEVERAL SHALLOW SPALLS
WITH EXPOSED REBAR DUE TO INSUFFICIENT CONCRETE COVER.
DECK SOUNDS HOLLOW NEAR NORTH PIER, EAST SIDE (COULD
NOT VERIFY DURING THIS INSPECTION). MINOR VERTICAL
CRACKING WITH EFFLORESCENCE ON EXTERIOR SIDES OF DECK.
SEVERAL CRACKS WITH EFFLORESCENCE ALONG WEST
OVERHANG, PARTICULARLY IN SOUTH SPAN.
15' OF SPALLED HAUNCH ABOVE WEST GIRDER IN SOUTH SPAN
BETWEEN FLOOR BEAMS #1 AND #2; SPALLING OF HAUNCH
EXPOSES UNPAINTED STRINGER FLANGES.
CRACK DEVELOPING INTO SPALL ON DECK HAUNCH AT STRINGER
#2 OVER SOUTH ABUTMENT. SEVERAL AREAS OF MINOR
DELAMINATION ON DECK UNDERSIDE.
58.2 MINOR TO MODERATE DEBRIS ACCUMULATION IN JOINTS. MINOR
CRACKING OF CONCRETE AT NORTH AND SOUTH PIER JOINTS.
BATS INHABITING UNDERSIDE OF JOINT AT SOUTH PIER. UP TO 1/2"
OF SEPARATION BETWEEN ELASTOMERIC CONCRETE JOINT
NOSING AND DECK OVER CENTER PIER.
58.3 SPALLING, 12" W X 7" L X 1-1/2" D, WITH AREA OF DELAMINATION, 10"
W X 12" L, OF WEARING SURFACE IN NORTHBOUND LANE OF SPAN
#4 AT SOUTH ABUTMENT. MINOR POPOUTS THROUGHOUT
WEARING SURFACE; PARTICULARLY IN SPAN #2.
58.5 SPALLING, 7" DIA. X UP TO 1" D, ON TOP FACE OF WEST SIDEWALK
IN SPAN #2 EXPOSING FORMWORK.
58.5,6 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON CURBS
AND SIDEWALKS. MINOR VERTICAL CRACKING OF PARAPETS.
58.10 VEGETATION ENCROACHING DECK SIDES IN SPANS #3 AND #4.
F G G G G N
F
F
G
G
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 7
G G N G N
MED
SUFF
77 FT.
GRAVEL, SAND
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (VEGETATION)
N N G G G G G G G
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59 THIS INSPECTION CONSTITUTES FRACTURE CRITICAL INSPECTION.
59.1 SEVERAL ANCHOR BOLTS DO NOT PROTRUDE THROUGH NUTS.
ANCHOR BOLT AT EAST BEARING FOR SPAN #1 AT NORTH PIER HAS
BEEN REPLACED WITH SMALLER BOLT. DEBRIS UNDER ROCKER
BEARING COULD INTERFERE WITH ROTATION. MODERATE
DETERIORATION OF GROUT PAD AT EAST BEARING OF CENTER
PIER WITH MODERATE SECTION LOSS FROM ANCHOR BOLTS.
RECESS AROUND EAST BEARINGS AT CENTER PIER HOLDS WATER.
MINOR ROTATION OF WEST AND EAST BEARINGS FOR SPAN #4 AT
SOUTH PIER.
59.2,4,7 MINOR SURFACE RUSTING OF GIRDERS, RANDOMLY LOCATED.
BIRD DROPPINGS ON GIRDERS IN SEVERAL AREAS AND LARGE
BIRDS NESTS ON FLOOR BEAMS AT ISOLATED LOCATIONS
THROUGHOUT. SPALLING OF DECK HAUNCHES HAS EXPOSED
UNPAINTED AREA OF STRINGERS, RESULTING IN RUSTING AND
PITTING OF STRINGERS.
SCATTERED BENT AND MISALIGNED STIFFENERS THROUGHOUT
BRIDGE. POOR QUALITY WELDS AT TOPS OF VERTICAL
STIFFENERS AND ALONG HORIZONTAL STIFFENERS SCATTERED
THROUGHOUT, APPROXIMATELY 10%.
59.4 SEVERAL FLOOR BEAMS HAVE NOTCHES CUT AWAY AT GIRDER
CONNECTIONS; FLOOR BEAM #2 IN SPAN #1 HAS 1 1/4" NOTCH AT
TOP AND 5/8" NOTCH AT BOTTOM AT EAST GIRDER CONNECTION
AND 1" NOTCHES AT WEST GIRDER; CUTS EXTEND INTO WEBS
BEYOND NOTCHED AREAS. PACK RUST IN FLOOR BEAM BRACE
CONNECTION OVER SOUTHEAST BEARING AT CENTER PIER.
59.7 RUST BEGINNING TO BLEED THROUGH PAINT.
60.1 SPALLING WITH EXPOSED REBAR ON NORTH ABUTMENT STRUT.
HEAVY GRAFFITI ON ABUTMENTS. MINOR CRACKING OF ABUTMENT
BACKWALLS. MINOR STAINING ON SOUTH ABUTMENT. PATCH ON
EAST SIDE OF SOUTH ABUTMENT BEGINNING TO DELAMINATE.
60.3 VERTICAL CRACKING, UP 1/16" WIDE, WITH EFFLORESCENCE ON
SOUTH ABUTMENT STRUT. MINOR VERTICAL CRACKING OF
ABUTMENT BEARING SEATS.
MINOR SPALLING WITH EXPOSED REBAR ON NORTH ABUTMENT
BEARING SEAT. MINOR SPALLING WITH 6" OF EXPOSED REBAR ON
EAST SIDE OF SOUTH ABUTMENT BREASTWALL DUE TO
INADEQUATE CONCRETE COVER.
60.4 MINOR CRACKING WITH EFFLORESCENCE ON BACKWALLS. MINOR
TO MODERATE LONGITUDINAL CRACKING ON TOP OF BOTH
ABUTMENTS BACKWALL; MINOR ABRASION. MINOR EDGE SPALLING
ON TOP OF BACKWALLS ALONG APPROACH PAVEMENT. MINOR
SPALLING OF SOUTH ABUTMENT BREASTWALL, EAST SIDE.
ADDITIONAL ITEM REFERENCE AND REMARKS
60.6 MINOR CRACKING WITH EFFLORESCENCE, SCALING, AND MOSS GROWTH ON WINGWALLS.
60.9,17 MINOR UNDERMINING, UP TO 17", OF CURTAIN WALL BETWEEN NORTH ABUTMENT COLUMNS. MODERATE EROSION AT NORTH PIER, NORTH ABUTMENT, AND UNDER NORTH SPAN DUE TO DRAINAGE FROM SCUPPERS.
60.13,15 MINOR CRACKING WITH EFFLORESCENCE ON PIER COLUMNS. MODERATE STAINING AND EFFLORESCENCE ON PIER STRUTS. DEBRIS ON TOP OF SEVERAL PIER STRUTS/CAPS; CONCRETE PIECES ON TOP OF NORTH AND SOUTH PIER DIAPHRAGMS HAVE FALLEN FROM EXPANSION JOINTS AND LARGE AMOUNT OF BAT GUANO ON SOUTH PIER. MINOR SPALLING ALONG CONSTRUCTION JOINT ON EAST COLUMN OF NORTH PIER. NUMEROUS
SPALLS WITH EXPOSED FORM TIES ON NORTH FACE OF EAST COLUMN OF CENTER PIER. MINOR
HONEYCOMBING ON UNDERSIDE OF UPPER STRUT IN CENTER PIER. MINOR SPALLING WITH EXPOSED REBAR ON NORTH FACE OF EAST COLUMN OF SOUTH PIER. MINOR VERTICAL CRACKING WITH EFFLORESCENCE FROM
BEARING SEAT STEP AT WEST COLUMNS OF SOUTH AND CENTER PIERS.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.2,4 MINOR SLOUGHING OF CHANNEL BANKS NEAR CENTER PIER.
222.3 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON APPROACH PARAPETS. MINOR SPALLING OF FOOTING FOR SOUTHEAST APPROACH PARAPET. MINOR DEBRIS ACCUMULATION AND VEGETATION GROWTH ALONG
SOUTH APPROACH PARAPETS.
222.4 MINOR TO MODERATE CRACKING OF APPROACH PAVEMENT.
222.7 "SIMS CREEK" SIGNS AT BOTH APPROACHES.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-171P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 22 20 37 33
TYPE 3 21 19 35 32
TYPE 3S2 25 23 42 38
TYPE 3-3 28 25 47 42
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-171P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... SIMS CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 189 - WATAUGA
(204) STRUCTURE NUMBER: ..... 5140-171P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... SIMS CREEK
(207) ROAD SECTION NO: ..........171P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140171P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 3.5 MILES FROM U.S. ROUTE
(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................2G4 (11) MILE POINT: .............................295.34 (KM PT 475.28)
(212) DRAWING NUMBERS: ....... RG1331 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
03 - GIRDER & FLOOR BEAM SYSTEM
97.0 FT (29.6 M)
388.0 FT (118.3 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 2 - INTEGRAL CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 22.0 TONS (20.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 36.8 TONS (33.4 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES
INSP. EVERY: 24 MONTHS - LAST INSP. : 6/19 (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-171P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°08'44.80"
(17) LONGITUDE: ......................... 81°42'40.90"
(19) DETOUR LENGTH: ............... 15 MI (24 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
26.3 FT (8.0 M)
33.9 FT (10.3 M)
34.0 FT (10.4 M)
22.0 FT (6.7 M)
6.0 FT (1.8 M)
6.0 FT (1.8 M)
0 - NO MEDIAN
0 °
NO
26.3 FT (8.0 M)
2.5 FT (0.8 M)
2.5 FT (0.8 M)
2 - MOUNTED ON PARAPET
2 - CONCRETE/ALUMINUM
1 - CONTINUOUS RAIL
2.62 FT (0.80 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
4 - Stable; action required to pro
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2006- PARTIAL DEPTH DECK REPLACEMENT INCLUDING DAMAGE REBARS; NEW WEARING SURFACE; REPAINTING OF STRUCTURAL
STEEL.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://81�42'40.90 https://36�08'44.80
PHOTOGRAPHS STRUCTURE NO. 5140-171P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD ASHEVILLE
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF SPAN #4 LOOKING NORTH
PHOTO #5 - TYPICAL VERTICAL CRACKING WITH EFFLORESCENCE ON
APPROACH PARAPETS, SOUTHWEST APPROACH PARAPET SHOWN
PHOTO #6 - SPALLING OF FOOTING FOR SOUTHEAST PARAPET
PHOTO #7 - TYPICAL CONDITION OF JOINTS
OVER ABUTMENT, SOUTH ABUTMENT JOINT
SHOWN
PHOTO #8 - DELAMINATION AND SPALLING OF
WEARING SURFACE ADJACENT TO SOUTH
ABUTMENT JOINT; NOTE CRACKING ALONG
TOP OF SOUTH ABUTMENT BACKWALL
PHOTO #9 - DEBRIS ACCUMULATION IN JOINT
OVER SOUTH PIER AT EAST SIDEWALK
PHOTO #10 - TYPICAL CONDITION OF JOINT
SEALS, JOINT OVER SOUTH PIER SHOWN
PHOTO #11 - GENERAL VIEW OF JOINT OVER
CENTER PIER; NOTE SEPARATION OF
ELASTOMERIC CONCRETE JOINT NOSING
PHOTO #12 - SEPARATION OF ELASTOMERIC
CONCRETE JOINT NOSING OVER CENTER
PIER
PHOTO #13 - TYPICAL CONDITION OF JOINTS
OVER NORTH AND SOUTH PIERS, NORTH PIER
JOINT SHOWN; NOTE DEBRIS ACCUMULATION
PHOTO #14 - TRANSVERSE CRACKING OF
NORTH APPROACH PAVEMENT
PHOTO #15 - GENERAL VIEW OF SOUTH
ABUTMENT
PHOTO #16 - VERTICAL CRACKING WITH
EFFLORESCENCE ON SOUTH ABUTMENT
BEARING SEAT
PHOTO #17 - EXPOSED REBAR AT EAST SIDE
OF SOUTH ABUTMENT BREASTWALL NEAR
BASE
PHOTO #18 - DELAMINATION OF PATCH AT
EAST SIDE OF SOUTH ABUTMENT; NOTE
STAINING
PHOTO #19 - TYPICAL CONDITION OF SOUTH ABUTMENT BEARINGS,
WEST BEARING SHOWN
PHOTO #20 - EXPOSED REBAR ON DECK UNDERSIDE NEAR SOUTH
ABUTMENT; NOTE CRACKING WITH EFFLORESCENCE
PHOTO #21 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE ON DECK UNDERSIDE, SPAN #4 SHOWN
PHOTO #22 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE ON DECK OVERHANGS, WEST OVERHANG IN SPAN
#4 SHOWN
PHOTO #23 - SPALLING OF DECK HAUNCH AT WEST GIRDER BETWEEN
FLOOR BEAMS #1 AND #2; NOTE BIRD NEST
PHOTO #24 - DEVELOPING SPALL IN HAUNCH OVER STRINGER #2 AT
FLOOR BEAM #0 AT SOUTH ABUTMENT
PHOTO #25 - TYPICAL QUALITY OF WELDS ON SUPERSTRUCTURE;
NOTE RUSTING
PHOTO #26 - TYPICAL CONDITION OF EAST BEARINGS AT SOUTH PIER
PHOTO #27 - TYPICAL CONDITION OF WEST BEARINGS AT SOUTH PIER
PHOTO #28 - BAT GUANO ON TOP OF STRUT AT SOUTH PIER
PHOTO #29 - TYPICAL RUST BLEEDING
THROUGH PAINT, FLOOR BEAM #1 IN SPAN #3
SHOWN
PHOTO #30 - BENT VERTICAL STIFFENER ON
WEST GIRDER IN SPAN #3 BETWEEN FLOOR
BEAMS #1 AND #2 SHOWN
PHOTO #31 - HONEYCOMBING WITH EXPOSED
REBAR ON DECK UNDERSIDE IN BAY #3 OF
SPAN #3
PHOTO #32 - GENERAL VIEW OF CENTER PIER
PHOTO #33 - PACK RUST IN FLOOR BEAM BRACE CONNECTION OVER
SOUTHEAST BEARING AT CENTER PIER
PHOTO #34 - DETERIORATION OF GROUT PAD AROUND NORTHEAST
BEARING OF CENTER PIER; NOTE RUSTING AND SECTION LOSS FROM
ANCHOR BOLT AND NUT
PHOTO #35 - SECTION LOSS FROM ANCHOR BOLT AND NUT AT
SOUTHEAST BEARING OF CENTER PIER; NOTE RECESS AROUND
MASONRY PLATE
PHOTO #36 - TYPICAL CONDITION OF WEST BEARINGS AT CENTER
PIER
PHOTO #37 - EFFLORESCENCE ON NORTH FACE OF WEST COLUMN OF
CENTER PIER
PHOTO #38 - SPALLING OF HAUNCH EXPOSING UNPAINTED AND
RUSTED STRINGER AT NORTH SIDE OF CENTER PIER; NOTE FORM
BOARDS LEFT IN PLACE
PHOTO #39 - EFFLORESCENCE AND SPALLING
WITH EXPOSED REBAR ON NORTH FACE OF
EAST COLUMN OF CENTER PIER
PHOTO #40 - TYPICAL CONDITION OF
BEARINGS AT NORTH PIER, WEST BEARINGS
SHOWN
PHOTO #41 - GENERAL VIEW OF NOTCHES
CUT INTO FLOOR BEAM #1 AT CONNECTION
WITH EAST GIRDER IN SPAN #1
PHOTO #42 - NOTCH CUT INTO BOTTOM OF
FLOOR BEAM #1 AT CONNECTION WITH EAST
GIRDER IN SPAN #1
PHOTO #43 - NOTCH CUT INTO TOP OF FLOOR
BEAM #1 AT CONNECTION WITH EAST GIRDER
IN SPAN #1
PHOTO #44 - GENERAL VIEW OF NOTCHES
CUT INTO FLOOR BEAM #1 AT CONNECTION
WITH WEST GIRDER IN SPAN #1
PHOTO #45 - NOTCH CUT INTO TOP OF FLOOR BEAM #1 AT
CONNECTION WITH WEST GIRDER IN SPAN #1
PHOTO #46 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #47 - GENERAL VIEW OF VOID AT BASE OF NORTH ABUTMENT
CURTAIN WALL
PHOTO #48 - VOID AT BASE OF NORTH ABUTMENT CURTAIN WALL
PHOTO #49 - UPSTREAM CHANNEL
PHOTO #50 - DOWNSTREAM CHANNEL