About this file

This federal contract opportunity solicitation is for the reconstruction and rehabilitation of segments of the Blue Ridge Parkway in North Carolina. Work includes road, parking area and ramp reconstruction, drainage and signage improvements, guardrail installation, and slope stabilization. The project will be split into multiple schedules with a total estimated cost between $75-100 million. Sealed bids are due by the date specified in the solicitation, which references number 693C73-22-B-000004. The soliciting agency is the Department of Transportation Federal Highway Administration for work located in Alleghany, Ashe, Avery, Burke, Caldwell, Watauga and Wilkes Counties.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Amendment 0004 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0003 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0002 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0001 - NP-BLRI 2B13 2H17 Etc.pdf PDF
EnvironmentalData.pdf PDF
ADV_Subcontracting Plan - NP-BLRI 2B13 2H17 etc.doc DOC document
5140-180P159.pdf PDF
5140-086P2125.pdf PDF
5140-090P142.pdf PDF
5140-098P1594.pdf PDF
5140-095P2550.pdf PDF
5140-181P12750.pdf PDF
5140-171P12750.pdf PDF
5140-175P2550.pdf PDF
5140-184P3188.pdf PDF
5140-176P2125.pdf PDF
5140-189P1417.pdf PDF
5140-188P1594.pdf PDF
5140-190P142.pdf PDF
FP14_Eng.pdf PDF
BLRI_C5_RouteID.pdf PDF
5140-178P1594.pdf PDF
VETS-4212 Form.pdf PDF
CulvertData.pdf PDF
5140-179P1417.pdf PDF
5140-097P1821.pdf PDF
5140-174P3188.pdf PDF
5140-085P2550.pdf PDF
5140-093P4250.pdf PDF
5140-172P6375.pdf PDF
BLRI_C4_MaintenanceFeatures.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
ADV Bidders Qualifications Form.doc DOC document
CADD_File_Disclaimer_Letter_2B13.pdf PDF
Plans - NP-BLRI 2B13 2H17 ETC.pdf PDF
BLRI_C5_RipReport.pdf PDF
IFB Solicitation - NP-BLRI 2B13 2H17 ETC.pdf PDF
5140-177P1821.pdf PDF
5140-087P1821.pdf PDF
5140-195P2550.pdf PDF
5140-183P4250.pdf PDF
5140-096P2125.pdf PDF
5140-187P1821.pdf PDF
5140-196P2125.pdf PDF
GeotechData.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5140-088P

U.S. ROUTE 21 BRIDGE INSPECTION DATE: 6/27/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 40.0 FT (12.2 M)

DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 40.0 FT (12.2 M)

WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 35.0 FT (10.7 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 31.0 FT (9.4 M)

PIER FOUNDATION(S): ........ N/A YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 2B3 / 1011C SKEW ANGLE: ..................... 27 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1983-JOINT REPAIR.

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 229.53 (KM PT 369.45)

STATE: ................................. NORTH CAROLINA LOCATION: 18.4 MILES FROM NC ROUTE 18

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. U.S. ROUTE 21

STRUCTURE EVALUATION SUMMARY

This concrete arch bridge is in good condition overall. Problems include minor cracking with efflorescence on the underside of the arch, moderate efflorescence on the ring stones and wingwalls, leakage and deterioration of joint filler material at the vertical joints between wingwalls and abutments, and exposed rebar due to insufficient cover in the arch underside.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: R. SILVESTRY, E. JOHNSON

CONDITION ASSESSMENT:

REINALDO SILVESTRY, P.E., FIELD TEAM LEADER 703-404-6251

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/10/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-088P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

59.3 CLEAN AND REPOINT MASONRY MORTAR JOINTS AS NEEDED.

58.6, 60.8 REPLACE JOINT FILLER MATERIAL AT PARAPET JOINTS AND

WINGWALL/ABUTMENT VERTICAL JOINTS.

59.3 CLEAN AND SEAL EXPOSED REBAR IN ARCH UNDERSIDE NEAR

MIDSPAN AND NORTHWEST CORNER.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN, AND CONSTRUCTION ENGINEERING (APPROXIMATELY

70% OF TOTAL REHAB COST) PLUS PARK LOCATION FACTOR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-088P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

N

(SHOULDER)

N N G N N N N G G

N G

G G N G G N

F

N

N

N

58.3, 222.4 WEARING SURFACE OVER STRUCTURE AND APPROACHES

REPAVED SINCE PREVIOUS INSPECTION. FULL WIDTH TRANSVERSE

CRACKING OF WEARING SURFACE OVER SOUTH ABUTMENT.

58.6 MINOR DETERIORATION OF MASONRY MORTAR JOINTS WITH MINOR

VEGETATION GROWTH.

58.6, 60.8 EXPANSION JOINT MATERIAL IS SEVERELY DETERIORATED IN

PARAPET JOINTS AND WINGWALL/ABUTMENT VERTICAL JOINTS.

MINOR LEAKAGE AT VERTICAL JOINTS BETWEEN WINGWALLS AND

ABUTMENTS.

58.10 SEVERAL SINKHOLES ALONG UNPAVED SHOULDERS

59.3, 8 MINOR CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF

ARCH, MAINLY NEAR JOINTS WITH FASCIA. MODERATE (2' LONG)

SPALL WITH EXPOSED REBAR DUE TO INADEQUATE COVER NEAR

NORTHWEST CORNER. MINOR SPALL WITH EXPOSED REBAR DUE

TO INADEQUATE COVER NEAR MIDSPAN. MODERATE TO SEVERE

EFFLORESCENCE ON RING STONES. RANDOMLY LOCATED

EXPOSED REBAR CHAIRS ON ARCH UNDERSIDE.

60.6 MINOR EFFLORESCENCE ON WINGWALLS; MINOR VEGETATION

GROWTH ON WINGWALLS.

1. BREASTWALLS OR COLUMNS G

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS N

4. BACKWALLS AND/OR BULKHEADS N

5. FOUNDATIONS N

6. WINGWALLS G

7. WEEP HOLES G

8. EXPANSION JOINTS P

9. EROSION AND/OR SCOUR G

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER N

PIER(S)

13. WALLS AND/OR COLUMNS N

14. PILE BENTS N

15. CAPS AND/OR BEARING SEATS N

16. FOUNDATIONS N

17. EROSION AND/OR SCOUR N

18. SETTLEMENT OR DEFLECTION N

19. OTHER N

222.7 OBJECT MARKERS PROVIDED AT CORNERS OF BRIDGE ALONG

UNDERPASS ROADWAY.

9. STREAM BED COMPOSITION :

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N G G G N G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-088P

U.S. ROUTE 21 BRIDGE INSPECTION DATE: 6/27/19

ITEM REFERENCE AND REMARKS

61. CHANNEL N

1. ALIGNMENT

2. EROSION AND/OR SCOUR

3. CHANNEL PROTECTION

4. WATERWAY OBSTRUCTIONS

5. OTHER

6. ADEQUACY OF OPENING

7. NORMAL VELOCITY

8. AVERAGE CLEAR OPENING

STRUCTURE LOAD RATING STRUCTURE NO. 5140-088P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 22 20 36 33

HS 47 43 78 71

TYPE 3 29 26 49 44

TYPE 3S2 68 62 114 103

TYPE 3-3 96 87 161 146

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 7/16

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-088P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... U.S. ROUTE 21 BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY

(204) STRUCTURE NUMBER: ..... 5140-088P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... U.S. ROUTE 21

(207) ROAD SECTION NO: ..........088P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140088P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 18.4 MILES FROM NC ROUTE

(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................2B3 (11) MILE POINT: .............................229.53 (KM PT 369.45)

(212) DRAWING NUMBERS: ....... 1011C (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

1 - CONCRETE

11 - ARCH - DECK

40.0 FT (12.2 M)

40.0 FT (12.2 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

6 - N/A

6 - N/A

N - NOT APPLICABLE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 47.0 TONS (42.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 78.0 TONS (70.8 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-088P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 36°26'51.00"

(17) LONGITUDE: ......................... 81°01'33.10"

(19) DETOUR LENGTH: ............... 20 MI (32 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 02

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 1 - HIGHWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... N

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 6.8 FT (2.1 M)

(56) LEFT: ......................... 99.9 FT (99.9 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

31.0 FT (9.4 M)

35.0 FT (10.7 M)

30.0 FT (9.1 M)

20.0 FT (6.1 M)

5.0 FT (1.5 M)

5.0 FT (1.5 M)

0 - NO MEDIAN

27 °

NO

30.0 FT (9.1 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

3 - PARAPET ONLY

9 - OTHER

1 - CONTINUOUS RAIL

2.50 FT (0.76 M)

99.99 FT (99.99 M)

15.42 FT (4.70 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK: ................................. N

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: .......................... N

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 111N

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N - Not over waterway.

2 - REHAB/RECONSTRUCTION

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1983-JOINT REPAIR.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://81�01'33.10 https://36�26'51.00

APPENDIX STRUCTURE NO. 5140-088P

PHOTOGRAPHS STRUCTURE NO. 5140-088P

PHOTO #1 - LOOKING NORTH TOWARD CUMBERLAND KNOB

PHOTO #2 - EAST SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING SOUTH

PHOTO #4 - FULL WIDTH TRANSVERSE

CRACKING OF WEARING SURFACE OVER

SOUTH ABUTMENT

PHOTO #5 - EFFLORESCENCE ALONG MORTAR

JOINTS ON NORTHEAST PARAPET

PHOTO #6 - 1' DEEP SINKHOLE AT SOUTHEAST

SHOULDER

PHOTO #7 - 1.5' WIDE BY 4" DEEP SINKHOLE AT

SOUTHEAST SHOULDER

PHOTO #8 - UNDERSIDE OF ARCH LOOKING

NORTH

PHOTO #9 - EFFLORESCENCE FROM EAST

FASCIA RINGSTONES; NOTE LONGITUDINAL

CRACK WITH EFFLORESCENCE ON SLAB

UNDERSIDE

PHOTO #10 - LONGITUDINAL CRACK WITH

EFFLORESCENCE AND SPALL WITH EXPOSED

REBAR ON NORTHWEST SIDE; NOTE

EFFLORESCENCE FROM FASCIA RINGSTONES

PHOTO #11 - SOUTH ABUTMENT

PHOTO #12 - CRACKING OF MASONRY

MORTAR JOINTS AT CENTER OF SOUTH

ABUTMENT

PHOTO #13 - NORTH ABUTMENT

PHOTO #14 - VERTICAL CRACK WITH

EFFLORESCENCE ON NORTH WALL OF ARCH

PHOTO #15 - EFFLORESCENCE FROM FASCIA

RINGSTONES AT NORTHWEST SIDE

PHOTO #16 - SOUTHWEST WINGWALL; NOTE

EFFLORESCENCE FROM MASONRY MORTAR

JOINTS AND FASCIA STONES

PHOTO #17 - TYPICAL CONDITION OF

VERTICAL JOINT FILLER AT SOUTHWEST

WINGWALL

PHOTO #18 - GENERAL VIEW OF NORTHWEST

WINGWALL; NOTE EFFLORESCENCE FROM

MASONRY MORTAR JOINTS

PHOTO #19 - TYPICAL CONDITION OF

NORTHWEST EXPANSION JOINT

PHOTO #20 - EROSION AND SINKHOLE

AROUND SOUTHWEST OBJECT MARKER