5140-176P2125.pdf

PDF 4 MB Posted

Attached to
Blue Ridge Parkway Federal contract opportunity
Solicitation number
693C73-22-B-000004
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains details for a federal solicitation seeking bids for reconstruction and rehabilitation work on the Blue Ridge Parkway in North Carolina. The solicitation number is 693C73-22-B-000004 and is being issued by the Department of Transportation Federal Highway Administration on behalf of the Eastern Federal Lands Highway Division. Bids are due on a date specified in Block 13a of the solicitation, which can be accessed on SAM.gov. The project consists of work along 75 miles of the parkway from Milepost 229.6 to 305.1, including overlooks, parking areas, ramps, drainage, signage, guardrails and slope stabilization. The total cost of the multiple work schedules/contract options is estimated between $75-100 million. Annual Representations and Certifications must be completed on SAM.gov and Form VETS-4212 must be filed for contracts over $750,000. Subcontracting plans are required and legislated small business goals include 45.25% for small businesses and 5% each for small disadvantaged, women-owned, HUBZone and veteran-owned small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Amendment 0004 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0003 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0002 - NP-BLRI 2B13 2H17 Etc.pdf PDF
Amendment 0001 - NP-BLRI 2B13 2H17 Etc.pdf PDF
5140-171P12750.pdf PDF
5140-175P2550.pdf PDF
5140-184P3188.pdf PDF
5140-189P1417.pdf PDF
5140-188P1594.pdf PDF
5140-190P142.pdf PDF
FP14_Eng.pdf PDF
BLRI_C5_RouteID.pdf PDF
5140-178P1594.pdf PDF
VETS-4212 Form.pdf PDF
CulvertData.pdf PDF
5140-179P1417.pdf PDF
5140-097P1821.pdf PDF
5140-174P3188.pdf PDF
5140-085P2550.pdf PDF
5140-093P4250.pdf PDF
5140-088P1594.pdf PDF
5140-172P6375.pdf PDF
BLRI_C4_MaintenanceFeatures.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
ADV Bidders Qualifications Form.doc DOC document
CADD_File_Disclaimer_Letter_2B13.pdf PDF
EnvironmentalData.pdf PDF
ADV_Subcontracting Plan - NP-BLRI 2B13 2H17 etc.doc DOC document
5140-180P159.pdf PDF
5140-086P2125.pdf PDF
5140-090P142.pdf PDF
5140-098P1594.pdf PDF
5140-095P2550.pdf PDF
5140-181P12750.pdf PDF
Plans - NP-BLRI 2B13 2H17 ETC.pdf PDF
BLRI_C5_RipReport.pdf PDF
IFB Solicitation - NP-BLRI 2B13 2H17 ETC.pdf PDF
5140-177P1821.pdf PDF
5140-087P1821.pdf PDF
5140-195P2550.pdf PDF
5140-183P4250.pdf PDF
5140-096P2125.pdf PDF
5140-187P1821.pdf PDF
5140-196P2125.pdf PDF
GeotechData.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5140-176P

RAVINE BRIDGE AT MP 302.43 INSPECTION DATE: 6/5/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... P/S CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... BOX GIRDER - SINGLE or SPREAD NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 276.0 FT (84.1 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 138.0 FT (42.1 M)

WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 38.8 FT (11.8 M)

ABUT. FOUNDATIONS: ........ OTHER CURB TO CURB WIDTH: ..... 34.7 FT (10.6 M)

PIER FOUNDATION(S): ........ OTHER YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 2H9 / 00000 SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 2008-APPROACHES PATCHED.

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 302.43 (KM PT 486.65)

STATE: ................................. NORTH CAROLINA LOCATION: 2.54 MILES FROM U.S. ROUTE 22

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. RAVINE

STRUCTURE EVALUATION SUMMARY

This prestressed concrete box girder bridge is in good condition overall and has only minor problems at this time.

Problems include exposed rebar on the west face of the pier; a broken access hatch door for the south span;

unsealed joints in the approach pavement; and erosion and undermining of the southeast approach parapet.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: M. BURNETT, T. POWELL, M. ROBERTSON (VOLKERT, INC.)

CONDITION ASSESSMENT:

MATT BURNETT, FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/10/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-176P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

222.2 CLEAN AND SEAL JOINTS IN APPROACH PAVEMENT.

60.13 CLEAN AND SEAL EXPOSED REBAR WITH APPROVED PROTECTIVE COATING ON

WEST SIDE OF CENTER PIER.

59.11 REPAIR ACCESS HATCH DOOR FOR SOUTH SPAN.

222.5 FILL AND STABILIZE EROSION AND UNDERMINING OF SOUTHEAST APPROACH

PARAPET.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-176P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

(VEGETATION)

N G N N N G N N G

P G

(ACCESS HATCH)

G N G G N G G N G G N N

G N G N G G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 MINOR LONGITUDINAL, DIAGONAL, AND MAP CRACKING WITH

EFFLORESCENCE AND SEVERAL AREAS OF MINOR SPALLING AND

ABRASION OF DECK SURFACE; SEVERAL PATCHED CORE HOLES

PRESENT. MINOR DIAGONAL CRACKING WITH EFFLORESCENCE ON

DECK OVERHANGS NEAR ABUTMENTS; CRACKING TRANSLATES

INTO ABUTMENT BREASTWALLS; SEE ALSO 60.1.

58.2 SAWCUT JOINTS AT BOTH ABUTMENTS.

58.5,6 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON CURBS.

GAP IN CONTINUITY OF TOP RAIL JOINT FOR EAST RAILING NEAR

PIER AND BOTTOM RAIL JOINT FOR WEST RAILING IN SOUTH SPAN;

INTERIOR CONNECTION SLEEVE HAS SHIFTED.

58.7 MINOR TO MODERATE DEBRIS ACCUMULATION ALONG CURBLINES

AND ON DROP INLET AT SOUTHEAST APPROACH PARAPET.

58.10 VEGETATION OVERHANGS BRIDGE RAILS.

59.2,6 EXTERIOR: HORIZONTAL CRACKING EXTENDS ALONG EXTERIOR

WEBS APPROXIMATELY 6', ORIGINATING FROM ABUTMENTS AT

CORNERS. MINOR SPALL OF WEST BOX GIRDER WEB AT NORTH

END. PATCHED SPALL ON UNDERSIDE AT SOUTH ABUTMENT.

UNDERSIDE OF BOTTOM FLANGE: MINOR SPALLING/POPOUTS AT

SEVERAL LOCATIONS. SEVERAL HONEYCOMBED AREAS IN SOUTH

SPAN.

INTERIOR: MINOR CRACKING OF END DIAPHRAGMS AT ABUTMENTS,

SEVERAL CRACKS EXTEND INTO GIRDER WEBS. MINOR VERTICAL

CRACKING OF INTERMEDIATE DIAPHRAGMS AT ACCESS HATCHES.

MINOR VERTICAL CRACKING OF PIER DIAPHRAGM.

59.11 ACCESS DOOR AT SOUTH END OF BRIDGE HAS BROKEN HINGES

AND IS LYING INSIDE BOX GIRDER; PUBLIC CAN EASILY ACCESS

BOX GIRDER. BATS ARE INHABITING BOX GIRDER.

N G G G G N

G

G

G

G

FIELD INSPECTION REPORT STRUCTURE NO. 5140-176P

ITEM REFERENCE AND REMARKS

61. CHANNEL 8

1. ALIGNMENT G

2. EROSION AND/OR SCOUR G

3. CHANNEL PROTECTION N

4. WATERWAY OBSTRUCTIONS G

5. OTHER N

6. ADEQUACY OF OPENING SUFF

7. NORMAL VELOCITY MED

8. AVERAGE CLEAR OPENING 30 FT.

9. STREAM BED COMPOSITION :

ROCK, GRAVEL

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

G G G G F G N G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

60.1,4 MASONRY STONE NOT IN FULL CONTACT WITH BREASTWALL

CONCRETE AT EAST SIDE OF NORTH ABUTMENT. MINOR CRACKING

OF NORTH ABUTMENT BACKWALL. MINOR TO MODERATE

CRACKING OF SOUTH ABUTMENT BREASTWALL AT JUNCTION WITH

BOX GIRDER.

60.6 MINOR CRACKING OF WINGWALL MASONRY MORTAR, SOME WITH

EFFLORESCENCE.

60.9 MINOR EROSION AT SOUTH WINGWALLS. MINOR EROSION AT

NORTH END OF SOUTH ABUTMENT.

60.13 TWO MINOR SPALLS WITH EXPOSED REBAR CHAIR ON WEST FACE

OF PIER.

222.1 MINOR LONGITUDINAL AND MAP CRACKING WITH EFFLORESCENCE

ON APPROACH SLABS. MINOR DELAMINATION (6" DIA.) AT

SOUTHEAST CORNER OF NORTH APPROACH SLAB. MINOR

CRACKING AT WEST END OF NORTH JOINT HEADER FOR NORTH

APPROACH SLAB.

222.2 UNSEALED JOINT AT TRANSITION PAVEMENT AT APPROACHES;

MINOR VEGETATION GROWTH FROM JOINTS.

222.3 MINOR STAINING AND EFFLORESCENCE ON APPROACH PARAPETS

AND CURBS.

222.4 MINOR CRACKING OF NORTH APPROACH PAVEMENT.

222.5 UP TO 36" OF UNDERMINING AT SOUTHEAST APPROACH PARAPET

AT JUNCTION WITH WINGWALL.

222.6 MINOR SETTLEMENT OF APPROACH SLABS AND APPROACH

PAVEMENT.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-176P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 21 19 35 31

HS 36 33 60 55

TYPE 3 35 32 59 53

TYPE 3S2 40 36 66 60

TYPE 3-3 42 38 70 64

DESIGN LOADING: HS20 (MS18)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-176P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... RAVINE BRIDGE AT MP 302.43 (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 011 - AVERY

(204) STRUCTURE NUMBER: ..... 5140-176P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... RAVINE

(207) ROAD SECTION NO: ..........176P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140176P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 2.54 MILES FROM U.S. ROUT

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................2H9 (11) MILE POINT: .............................302.43 (KM PT 486.65)

(212) DRAWING NUMBERS: ....... 00000 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

6 - P/S CONCRETE CONTINUOUS

06 - BOX GIRDER - SINGLE or SPREAD

138.0 FT (42.1 M)

276.0 FT (84.1 M)

5 - OTHER

5 - OTHER

5 - OTHER

5 - OTHER

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 60.1 TONS (54.5 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-176P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 36°05'56.40"

(17) LONGITUDE: ......................... 81°47'26.50"

(19) DETOUR LENGTH: ............... 10 MI (16 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 0 - OTHER

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... N

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

34.7 FT (10.6 M)

38.8 FT (11.8 M)

29.0 FT (8.8 M)

23.9 FT (7.3 M)

2.0 FT (0.6 M)

3.0 FT (0.9 M)

0 - NO MEDIAN

0 °

NO

34.7 FT (10.6 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

2 - MOUNTED ON PARAPET

6 - ALUMINUM

1 - CONTINUOUS RAIL

2.92 FT (0.89 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1111

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N

N - Not over waterway.

1 - MAINTENANCE

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2008-APPROACHES PATCHED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://81�47'26.50 https://36�05'56.40

PHOTOGRAPHS STRUCTURE NO. 5140-176P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD ASHEVILLE

FLOW

PHOTO #2 - GENERAL TOP SIDE VIEW LOOKING SOUTH

PHOTO #3 - GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING

NORTH

PHOTO #4 - DEBRIS ACCUMULATION CLOGGING NORTHWEST DROP

INLET

PHOTO #5 - CRACKING OF NORTH APPROACH PAVEMENT

PHOTO #6 - CRACKING OF NORTH APPROACH JOINT HEADER AT WEST

END

PHOTO #7 - TYPICAL LONGITUDINAL CRACKING OF APPROACH SLABS,

NORTH APPROACH SHOWN

PHOTO #8 - CRACKING WITH EFFLORESCENCE ON DECK AND NORTH

APPROACH SLAB AT EAST CURB

PHOTO #9 - TYPICAL CRACKING WITH EFFLORESCE AT DECK

CORNERS, NORTHWEST CORNER SHOWN; NOTE CRACKING OF

APPROACH SLAB

PHOTO #10 - TYPICAL LONGITUDINAL CRACKING OF DECK, NORTH

END SHOWN

PHOTO #11 - TYPICAL MISALIGNED CONTINUITY SLEEVE FOR RAILING,

EAST RAIL NEAR PIER SHOWN

PHOTO #12 - SPALLING DECK SURFACE IN SOUTHBOUND LANE NEAR

SOUTH ABUTMENT

PHOTO #13 - SETTLEMENT OF SOUTH APPROACH PAVEMENT; NOTE

VEGETATION GROWTH ALONG APPROACH HEADER

PHOTO #14 - TYPICAL UNSEALED JOINT IN APPROACH PAVEMENT;

SOUTH APPROACH SHOWN; NOTE VEGETATION GROWTH

PHOTO #15 - TYPICAL STAINING AND EFFLORESCENCE ON APPROACH

PARAPETS AND CURBS, SOUTHWEST APPROACH PARAPET SHOWN

PHOTO #16 - DEBRIS ACCUMULATION ALONG EAST PARAPET AT

SOUTH END; NOTE CLOGGED DROP INLET

PHOTO #17 - UNDERMINING OF SOUTHEAST APPROACH PARAPET AT

JUNCTION WITH WINGWALL

PHOTO #18 - CRACKING WITH EFFLORESCENCE ON EAST DECK

OVERHANG AT NORTH ABUTMENT

PHOTO #19 - CRACKING WITH EFFLORESCENCE ON WEST DECK

OVERHANG AT NORTH ABUTMENT

PHOTO #20 - POP OUT ON WEST WEB OF BOX GIRDER AT NORTH END

PHOTO #21 - CRACKING OF WEST WEB OF BOX GIRDER AT NORTH

END

PHOTO #22 - GENERAL VIEW OF NORTH ABUTMENT

PHOTO #23 - CRACKING OF NORTH ABUTMENT BACKWALL AT EAST

END

PHOTO #24 - GENERAL VIEW OF PIER, NORTH FACE SHOWN

PHOTO #25 - TYPICAL POPOUT WITH EXPOSED REBAR ON WEST FACE

OF PIER

PHOTO #26 - HONEYCOMBING OF BOX GIRDER UNDERSIDE IN SOUTH

SPAN

PHOTO #27 - CRACKING WITH EFFLORESCENCE ON EAST DECK

OVERHANG AT SOUTH ABUTMENT

PHOTO #28 - CRACKING WITH EFFLORESCENCE ON WEST DECK

OVERHANG AT SOUTH ABUTMENT

PHOTO #29 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #30 - TYPICAL VERTICAL CRACKING OF SOUTH ABUTMENT

BREASTWALL, EAST END SHOWN

PHOTO #31 - PATCHED SPALL ON BOX GIRDER UNDERSIDE AT SOUTH

ABUTMENT

PHOTO #32 - TYPICAL CRACKING OF END DIAPHRAGMS, NORTH END

DIAPHRAGM IN EAST CELL SHOWN

PHOTO #33 - TYPICAL VERTICAL CRACKING OF DIAPHRAGMS, SOUTH

INTERMEDIATE DIAPHRAGM IN EAST CELL OF NORTH SPAN SHOWN

PHOTO #34 - DISPLACED SOUTH SPAN ACCESS HATCH DOOR

PHOTO #35 - GENERAL VIEW INSIDE BOX GIRDER IN EAST CELL OF

SOUTH SPAN LOOKING NORTH

File details come from the government source that posted it. Updated .