5140-181P12750.pdf
PDF 4 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000004
About this file
This solicitation is for the Blue Ridge Parkway Project NP-BLRI 2B13, 2H17, and other related work, with an estimated total project cost between $75 million to $100 million. The project consists of reconstructing and rehabilitating sections of the Blue Ridge Parkway in North Carolina from Milepost 229.6 to 305.1, including overlooks, parking areas, ramps, drainage improvements, signage, guardrails, pavement markings, and slope stabilization. The project will be split into multiple work schedules and contract options. Bid documents will be issued on or about December 16, 2021, with bid due dates to be specified on the SF1442 form included in the solicitation. The solicitation is being conducted by the Department of Transportation Federal Highway Administration for work located in Alleghany, Ashe, Avery, Burke, Caldwell, Watauga and Wilkes Counties in North Carolina.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5140-181P
SLAB OVER UNDERGROUND STREAM INSPECTION DATE: 10/1/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
CONCRETE
SLAB
CONCRETE CAST-IN-PLACE
MONOLITHIC CONCRETE
N/A
N/A
CONCRETE
0002H10 / 00000
1 - PRINCIPAL PARK ROAD
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
340.0 FT (103.6 M)
0.0 FT (0.0 M)
39.0 FT (11.9 M)
34.3 FT (10.5 M)
N/A
0 °
NO
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 303.77 (KM PT 488.86)
STATE: ................................. NORTH CAROLINA LOCATION: 1.35 MILES FROM U.S. ROUTE 22
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. UNDERGROUND STREAM
STRUCTURE EVALUATION SUMMARY
This concrete slab bridge is in good condition overall with only minor problems. The main problems are deterioration of the vertical parapet masonry mortar joints at the bridge corners; and cracking at the top of the abutment backwalls near the parapets.
Since the previous inspection, the approach roadway has been resurfaced and restriped.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future. Consideration should be given to installing railing end treatments capable of meeting current safety guidelines for traffic barriers.
INSPECTION TEAM: S. DOSSETT, T. POWELL (VOLKERT, INC.)
CONDITION ASSESSMENT:
STEPHEN DOSSETT, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 1/7/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-181P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.6, 222.3 REPOINT VERTICAL PARAPET MASONRY MORTAR JOINTS AT BRIDGE CORNERS.
60.4 INJECT CRACKING AT TOP OF ABUTMENT BACKWALLS WITH APPROVED EPOXY
SEALANT.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-181P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7 ITEM REFERENCE AND REMARKS
G1. DECK SLAB
G2. EXPANSION JOINTS
G3. WEARING SURFACE
G4. RIDEABILITY
N5. CURBS, SIDEWALKS, AND MEDIAN
F6. PARAPETS AND/OR RAILINGS
G7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
F10. OTHER (VEGETATION)
59. SUPERSTRUCTURE 7
N1. BEARING DEVICES
N2. GIRDERS OR BEAMS
G3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
N6. DIAPHRAGMS AND BRACING
N7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 6
58.1,6, 59.3 EFFLORESCENCE LEACHES THROUGH WEST PARAPET MORTAR
JOINTS AND COLLECTS ALONG WEST CURBLINE; RUNS ACROSS
DECK TO EAST CURBLINE AT SEVERAL LOCATIONS.
EFFLORESCENCE LEACHES THROUGH EAST PARAPET MORTAR
JOINTS AND ONTO EAST DECK SIDE.
58.1, 59.3 MINOR TRANSVERSE, LONGITUDINAL, AND MAP PATTERN
CRACKING OF SLAB SURFACE. MINOR CRACKING WITH
EFFLORESCENCE ON DECK SURFACE ALONG WEST CURBLINE.
MINOR SPALLING OF SLAB SURFACE THROUGHOUT; NUMEROUS
PATCHED SPALLS.
58.2 POURED DECK JOINTS AT BRIDGE ENDS IN GOOD CONDITION.
58.6, 222.3 MODERATE TO SEVERE DETERIORATION OF VERTICAL PARAPET
MORTAR JOINTS AT BRIDGE CORNERS.
58.7 MINOR VEGETATION GROWTH ALONG CURBLINES. MINOR DEBRIS
ACCUMULATION ALONG EAST CURBLINE.
58.10 HEAVY VEGETATION GROWTH ALONG WEST SIDE OF STRUCTURE;
MODERATE TO HEAVY ALONG EAST SIDE.
60.4 MODERATE LONGITUDINAL CRACKING, UP TO 1/4" W, AT TOP OF
ABUTMENT BACKWALLS: EAST SIDE OF SOUTH ABUTMENT
BACKWALL AND BOTH SIDES OF NORTH ABUTMENT BACKWALL.
ABUTMENTS
1. BREASTWALLS OR COLUMNS N
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS F
5. FOUNDATIONS N
6. WINGWALLS N
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR N
10. SETTLEMENT OR DEFLECTION N
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
13. WALLS AND/OR COLUMNS N
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS N
16. FOUNDATIONS N
17. EROSION AND/OR SCOUR N
18. SETTLEMENT OR DEFLECTION N
19. OTHER N
FIELD INSPECTION REPORT STRUCTURE NO. 5140-181P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION :9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 8
G G G G N
222.4 APPROACHES HAVE BEEN RESURFACED AND RESTRIPED SINCE
PREVIOUS INSPECTION.
36.D GUARDRAIL ENDS DO NOT MEET CURRENT SAFETY GUIDELINES
FOR TRAFFIC BARRIERS.
STONES
222. APPROACHES 8
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
G N G G G G N G N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-181P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 33 30
HS 36 33 60 55
TYPE 3 59 54 99 90
TYPE 3S2 62 57 104 95
TYPE 3-3 64 58 107 97
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-181P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY
(202) STRUCTURE NAME: .......... SLAB OVER UNDERGROUND STREAM
(203) STRUCTURE KIND: ............5 - OTHER
(204) STRUCTURE NUMBER: ..... 5140-181P
(205) NPS REGION: .................... 4 - SOUTHEAST
(206) ROUTE CODE NUMBER: ... 1
(207) ROAD SECTION NO: ..........181P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................0002H10
(212) DRAWING NUMBERS:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
374 - NORTH CAROLINA (NC)
011 - AVERY
161000010
UNDERGROUND STREAM
BLUE RIDGE PARKWAY
5140181P0000000
1.35 MILES FROM U.S. ROUT
99.99 FT (99.99 M)
303.77 (KM PT 488.86)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
01 - SLAB
0.0 FT (0.0 M)
340.0 FT (103.6 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.1 TONS (54.5 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 10/19 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-181P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°05'57.60"
(17) LONGITUDE: ......................... 81°48'41.04"
(19) DETOUR LENGTH: ............... 10 MI (16 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 0 - OTHER
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
34.3 FT (10.5 M)
39.0 FT (11.9 M)
25.0 FT (7.6 M)
24.9 FT (7.6 M)
0.0 FT (0.0 M)
4.0 FT (1.2 M)
0 - NO MEDIAN
0 °
NO
34.3 FT (10.5 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
3 - PARAPET ONLY
9 - OTHER
1 - CONTINUOUS RAIL
2.75 FT (0.84 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N - Not over waterway.
1 - MAINTENANCE
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://81�48'41.04 https://36�05'57.60
PHOTOGRAPHS STRUCTURE NO. 5140-181P
PHOTO #1 - LOOKING NORTH TOWARD U.S. ROUTE 321
FLOW
PHOTO #2 - WEST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING NORTH
PHOTO #4 - APPROACHES HAVE BEEN RESURFACED AND RESTRIPED
SINCE PREVIOUS INSPECTION, SOUTH APPROACH SHOWN
PHOTO #5 - GENERAL VIEW OF PARAPET END TREATMENT,
SOUTHEAST END TREATMENT SHOWN
PHOTO #6 - TYPICAL DETERIORATION OF VERTICAL PARAPET MORTAR
JOINTS, SOUTHWEST JOINT SHOWN
PHOTO #7 - CRACKING AT TOP OF SOUTH
ABUTMENT BACKWALL, EAST SIDE SHOWN;
NOTE SIMILAR CRACKING AT BOTH SIDES OF
NORTH ABUTMENT BACKWALL
PHOTO #8 - TYPICAL CONDITION OF DECK
JOINTS, SOUTH DECK JOINT SHOWN
PHOTO #9 - TYPICAL EFFLORESCENCE FROM WEST PARAPET MORTAR
JOINTS COLLECTING ALONG CURBLINE, NEAR SOUTH END SHOWN
PHOTO #10 - EFFLORESCENCE FROM WEST PARAPET MORTAR JOINTS
COLLECTING ON ALONG CURBLINE, NEAR MIDSPAN SHOWN
PHOTO #11 - TYPICAL CRACKING WITH EFFLORESCENCE ALONG WEST
CURBLINE, NEAR MIDSPAN SHOWN; NOTE VEGETATION GROWTH
PHOTO #12 - TYPICAL SPALLING OF DECK SURFACE ALONG WEST
CURBLINE, NEAR MIDSPAN SHOWN
PHOTO #13 - TYPICAL SPALLING OF DECK SURFACE, SOUTHBOUND
LANE NEAR MIDSPAN SHOWN
PHOTO #14 - TYPICAL CRACKING WITH EFFLORESCENCE ALONG
WEST CURBLINE NEAR NORTH END
PHOTO #15 - TYPICAL CRACKING OF DECK SURFACE, SOUTHBOUND
LANE NEAR NORTH END SHOWN
PHOTO #16 - TYPICAL PATCHED AREA ON DECK SURFACE,
SOUTHBOUND LANE NEAR NORTH END SHOWN
PHOTO #17 - TYPICAL MAP PATTERN CRACKING OF DECK SURFACE,
EAST CURBLINE NEAR NORTH END SHOWN
PHOTO #18 - TYPICAL EFFLORESCENCE LEACHING THROUGH
PARAPET MORTAR JOINTS, BACK SIDE OF EAST PARAPET NEAR
MIDSPAN SHOWN
PHOTO #19 - VEGETATION GROWTH ALONG
WEST SIDE OF BRIDGE
PHOTO #20 - VEGETATION GROWTH ALONG
EAST SIDE OF BRIDGE
File details come from the government source that posted it. Updated .