This solicitation is for the Blue Ridge Parkway Project NP-BLRI 2B13, 2H17, ETC located in North Carolina. The project consists of reconstruction and rehabilitation of the Blue Ridge Parkway from Milepost 229.6 to 305.1, including overlooks, parking areas, ramps, drainage assessments and improvements, signage, pavement markings, guardrail, and slope stabilization. The work will be split into multiple schedules with a total estimated cost between $75-100 million. Bids are due in December 2021 with the location and date specified in Block 13a of the solicitation. Annual representations and certifications must be completed on SAM.gov. Subcontracting plans are required from non-small businesses expected to exceed $750,000, with goals of 45.25% for small businesses, 5% each for small disadvantaged, women-owned, HUBZone and service-disabled veteran-owned small businesses.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5140-175P
GREEN MOUNTAIN CREEK BRIDGE INSPECTION DATE: 6/5/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... BOX GIRDER - SINGLE or SPREAD NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 297.8 FT (90.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 116.3 FT (35.4 M)
WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 38.0 FT (11.6 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 34.4 FT (10.5 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2G8 H1 / 2G8H1 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2008-JOINTS RESEALED, SOUTH APPROACH REPAIRED. 2012-ADDITIONAL PATCHING AT
SOUTH APPROACH.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 300.28 (KM PT 483.35)
STATE: ................................. NORTH CAROLINA LOCATION: 4.66 MILES FROM U.S. ROUTE 22
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. GREEN MOUNTAIN CREEK
STRUCTURE EVALUATION SUMMARY
This concrete box girder bridge is in fair condition overall. Problems include settlement and cracking of both approaches; exposed rebar on the west side of the north abutment breastwall; exposed rebar on the southeast cheekwall; exposed rebar on the box girder underside in the south span; vegetation growth along the west side of the bridge; and discarded cut trees along the west side of the north span.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M. BURNETT, T. POWELL, M. ROBERTSON (VOLKERT, INC.)
CONDITION ASSESSMENT:
MATT BURNETT, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/10/19
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-175P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.10, 59.11
REMOVE DISCARDED TREES FROM ALONG WEST SIDE OF NORTH SPAN.
REMOVE VEGETATION ALONG WEST SIDE OF BRIDGE.
59.2, 60.1 CLEAN AND COAT EXPOSED REBAR ON WEST SIDE OF NORTH ABUTMENT
BREASTWALL, ON SOUTHEAST CHEEKWALL, AND ON BOX GIRDER UNDERSIDE IN
SOUTH SPAN WITH APPROVED PROTECTIVE COATING.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
222.4,6 REPAVE BOTH APPROACHES.
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-175P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK
1. DECK SLAB
2. EXPANSION JOINTS
3. WEARING SURFACE
4. RIDEABILITY
5. CURBS, SIDEWALKS, AND MEDIAN
6. PARAPETS AND/OR RAILINGS
7. DRAINS AND DRAINAGE
8. UTILITIES
9. DEFLECTION AND/OR VIBRATION
10. OTHER (VEGETATION)
59. SUPERSTRUCTURE 6
1. BEARING DEVICES G
2. GIRDERS OR BEAMS F
3. ARCH(ES) OR SLAB(S) N
4. FLOOR BEAMS AND STRINGERS N
5. TRUSSES N
6. DIAPHRAGMS AND BRACING N
7. PAINT N
8. FASCIA(E) N
9. DEFLECTION AND/OR VIBRATION G
10. ALIGNMENT G
11. OTHER (TREE LIMBS) F
60. SUBSTRUCTURE 7
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER (DRAINAGE CHUTE)
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
F G N G G G G N G F
G N N N N G G N G G N F
G N N N G G N
58.1
58.2
58.5
58.7
58.10
59.2
59.11
60.1
ITEM REFERENCE AND REMARKS
MINOR CRACKING OF DECK SURFACE. MINOR ABRASION AND
SPALLING OF DECK SURFACE. MINOR DELAMINATION (6" DIA.)
ADJACENT TO EAST CURB OVER NORTH PIER. MINOR
TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK
OVERHANGS.
MINOR ADHESION FAILURE OF EXPANSION JOINT SEALS. JOINT
SEAL BACKING MATERIAL DISPLACED AT WEST SIDE OF NORTH
ABUTMENT.
MINOR SCALING AND CRACKING OF CURBS.
MINOR DEBRIS ACCUMULATION ALONG CURBLINES. CLOGGED
DROP INLET AT END OF NORTHEAST APPROACH PARAPET
VEGETATION ALONG EAST CURB AT NORTH END HAS BEEN
REMOVED SINCE PREVIOUS INSPECTION.
VEGETATION OVERHANGS WEST BRIDGE RAILING.
MINOR SPALLING WITH EXPOSED REBAR ON UNDERSIDE OF
BOTTOM FLANGE NEAR SOUTH ABUTMENT DUE TO INSUFFICIENT
CONCRETE COVER. HAIRLINE DIAGONAL CRACKING OF WEST
EXTERIOR WEB AT SOUTH ABUTMENT; 0.016" WIDE DIAGONAL
CRACK 15' FROM SOUTH ABUTMENT; SERIES OF VERTICAL CRACKS
25'-30' OUT FROM SOUTH ABUTMENT WITH SEVERAL VERTICAL
CRACKS EXTENDING INTO BOTTOM FLANGE; SIMILAR CRACKING OF
WEST EXTERIOR WEB AT NORTH END.
CUT TREE LIMBS DISCARDED ALONG WEST SIDE OF NORTH SPAN.
VEGETATION GROWTH IS IMPEDING INSPECTION ALONG WEST
SIDE OF NORTH SPAN.
EXPOSED REBAR (10" LONG) DUE TO INSUFFICIENT COVER ON
WEST SIDE OF NORTH ABUTMENT BREASTWALL. MINOR CRACKING
OF BREASTWALLS WITH EFFLORESCENCE; MODERATE LEAKAGE
AND STAINING ON BREASTWALLS. MODERATE CRACKING WITH
EFFLORESCENCE ON BOTH ABUTMENT CHEEKWALLS. MINOR
POPOUT WITH EXPOSED REBAR ON SOUTHEAST CHEEKWALL.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-175P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION :9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 8
G G N G N
MED
SUFF
60 FT.
ROCK
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
G N G F G F N G N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
N N N
60.6 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON
SOUTHEAST WINGWALL.
60.9,12 MODERATE EROSION AT END OF PAVED DRAINAGE CHUTE ALONG
SOUTHWEST WINGWALL; CHUTE HAS COLLAPSED AT WEST END OF
SOUTH ABUTMENT. 18" DEEP ANIMAL BURROWS AT EAST
WINGWALLS.
60.13 2'-3" H X 1'-7" W SURFACE SPALL ON EAST FACE AT BASE OF SOUTH
PIER.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
222.1 MINOR TO MODERATE CRACKING OF APPROACH SLABS. NORTH
APPROACH SLAB IN SOUTHBOUND SHOULDER 1/2" HIGHER THAN
DECK. SOUTH APPROACH SLAB IN SOUTHBOUND LANE 1/4" HIGHER
THAN DECK.
222.3 MINOR TO MODERATE SCALING OF APPROACH PARAPETS. MINOR
MOSS GROWTH ON APPROACH PARAPETS.
222.4 MINOR TO MODERATE CRACKING OF APPROACH PAVEMENT.
ASPHALT TRANSITION PATCHES AT BOTH APPROACHES; AREAS OF
FAILED PATCHING AT NORTH APPROACH.
222.6 1-1/2" SETTLEMENT OF NORTH APPROACH PAVEMENT AND
VEGETATION GROWTH AT DECK ARMOR PLATE; 1" SETTLEMENT OF
SOUTH APPROACH PAVEMENT.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-175P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 24 22 40 36
TYPE 3 23 21 38 35
TYPE 3S2 27 24 44 40
TYPE 3-3 29 26 48 44
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-175P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... GREEN MOUNTAIN CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 189 - WATAUGA
(204) STRUCTURE NUMBER: ..... 5140-175P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... GREEN MOUNTAIN CREEK
(207) ROAD SECTION NO: ..........175P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140175P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 4.66 MILES FROM U.S. ROUT
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................2G8 H1 (11) MILE POINT: .............................300.28 (KM PT 483.35)
(212) DRAWING NUMBERS: ....... 2G8H1 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
06 - BOX GIRDER - SINGLE or SPREAD
116.3 FT (35.4 M)
297.8 FT (90.8 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 1 - CONCRETE
(44B) APPR. STR. TYPE: ................ 04 - TEE BEAM
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 23.7 TONS (21.5 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 39.6 TONS (35.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-175P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°06'50.70"
(17) LONGITUDE: ......................... 81°46'47.90"
(19) DETOUR LENGTH: ............... 10 MI (16 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
34.4 FT (10.5 M)
38.0 FT (11.6 M)
30.0 FT (9.1 M)
22.0 FT (6.7 M)
5.0 FT (1.5 M)
3.0 FT (0.9 M)
0 - NO MEDIAN
0 °
NO
34.4 FT (10.5 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
2 - MOUNTED ON PARAPET
6 - ALUMINUM
1 - CONTINUOUS RAIL
2.83 FT (0.86 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2008-JOINTS RESEALED, SOUTH APPROACH REPAIRED. 2012-ADDITIONAL PATCHING AT SOUTH APPROACH.
(231) ADDITIONAL CONSIDERATIONS:
SNOOPER REQUIRED TO ACCESS DOORS INTO BOX GIRDER.
(330) ADDITIONAL CONFIG. INFO.:
https://81�46'47.90 https://36�06'50.70
PHOTOGRAPHS STRUCTURE NO. 5140-175P
PHOTO #1 - LOOKING NORTHBOUND TOWARD BLOWING ROCK
FLOW
PHOTO #2 - WEST (UPSTREAM SIDE)
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING NORTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING
NORTH
PHOTO #5 - CLOGGED DROP INLET AT END OF NORTHEAST APPROACH
PARAPET
PHOTO #6 - VEGETATION ALONG EAST CURB AT NORTH END HAS BEEN
REMOVED SINCE PREVIOUS INSPECTION; NOTE DEBRIS
ACCUMULATION REMAINS
PHOTO #7 - TYPICAL MOSS GROWTH ON APPROACH PARAPETS,
NORTHEAST APPROACH PARAPET SHOWN
PHOTO #8 - TYPICAL CRACKING OF APPROACH PAVEMENT, NORTH
APPROACH SHOWN
PHOTO #9 - TYPICAL SETTLEMENT AND DETERIORATION OF
APPROACH PAVEMENT, NORTH APPROACH SHOWN
PHOTO #10 - TYPICAL CONDITION OF EXPANSION JOINTS OVER
ABUTMENTS, NORTH JOINT SHOWN
PHOTO #11 - TYPICAL DEBRIS ACCUMULATION ALONG CURBLINES,
WEST CURBLINE IN NORTH SPAN SHOWN
PHOTO #12 - TYPICAL CRACKING OF CURBS, WEST CURB IN SOUTH
SPAN SHOWN
PHOTO #13 - TYPICAL VEGETATION GROWTH OVERHANGING WEST
BRIDGE RAILING, SOUTH END SHOWN
PHOTO #14 - TYPICAL CRACKING OF DECK SURFACE, CENTER SPAN
SHOWN
PHOTO #15 - DIAGONAL CRACKING OF SOUTH APPROACH SLAB IN
NORTHBOUND LANE
PHOTO #16 - SETTLEMENT OF SOUTH APPROACH PAVEMENT
PHOTO #17 - TYPICAL TRANSVERSE CRACKING OF SOUTH APPROACH
SLAB
PHOTO #18 - CRACKING OF WEST WEB OF BOX GIRDER AT NORTH
ABUTMENT
PHOTO #19 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #20 - EXPOSED REBAR DUE TO INSUFFICIENT COVER AT WEST
END OF NORTH ABUTMENT BREASTWALL
PHOTO #21 - DISPLACED JOINT MATERIAL AT WEST END OF NORTH
DECK JOINT
PHOTO #22 - CRACKING WITH EFFLORESCENCE ON NORTH
ABUTMENT BREASTWALL AT NORTHEAST CHEEKWALL
PHOTO #23 - GENERAL VIEW OF SOUTH PIER, SOUTH FACE SHOWN
PHOTO #24 - SPALLING OF EAST FACE AT BASE OF SOUTH PIER
PHOTO #25 - EXPOSED REBAR DUE TO INSUFFICIENT COVER ON BOX
GIRDER UNDERSIDE NEAR SOUTH ABUTMENT
PHOTO #26 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #27 - CRACKING WITH EFFLORESCE ON EAST END OF SOUTH
ABUTMENT BREASTWALL; NOTE LEAKAGE
PHOTO #28 - CRACKING WITH EFFLORESCE ON SOUTHEAST
CHEEKWALL
PHOTO #29 - COLLAPSED PAVED DRAINAGE CHUTE AT WEST END OF
SOUTH ABUTMENT
PHOTO #30 - VERTICAL CRACKING WITH EFFLORESCENCE ON
SOUTHEAST WINGWALL
PHOTO #31 - ANIMAL BURROW ALONG SOUTHEAST WINGWALL
File details come from the government source that posted it. Updated .