This addendum provides revisions to specifications and drawings for construction services for the Bankruptcy and Probation Courts Consolidation Project at the Conrad B. Duberstein U.S. Courthouse. Key changes include additions to specification sections for ornamental metalwork, solid surface fabrications, spray-applied fire resistive materials, stile and rail doors, all-glass doors and partitions, glass reinforced gypsum fabrications, access flooring, interior stone facing, special coatings, and signage. Drawings are revised to clarify construction details, door and partition specifications, mechanical, electrical, and plumbing plans and details.

The related federal contract opportunity notice announces a request for proposals for general construction services for the courts consolidation project located at the Conrad B. Duberstein Courthouse in Brooklyn, New York. As a total small business set aside with a NAICS code of 236220 and size standard of $39.5 million, the solicitation is seeking proposals due by the stated deadline. A pre-proposal conference will be held at the project site for interested small business offerors to register for. Proposals shall include paper and electronic copies as specified.

View the file

Other files

File Type Posted
Additional Responses for RFIs 1-24-2020.pdf PDF
Solicitation Amendment 2 -SF30.pdf PDF
Duberstein GC Bid Sheets_Rev 2.xlsx XLSX spreadsheet
GSA 012700 Unit Prices FY15 Update Oct. 1 2014.pdf PDF
01 COBie Quick Reference Guide.pdf PDF
RFI Responses Duberstein.pdf PDF
Copy of Specifications Addendum 1.pdf PDF
07 COBie Playbook Training.pdf PDF
Door Hardware Photos2.jpg JPG image
Door Hardware Photos1.jpg JPG image
Copy of Narrative Addendum 1.pdf PDF
02b COBie Requirements Specification.pdf PDF
Door Hardware Photos3.jpg JPG image
03b COBie Sample - As-Built Workbook.xlsx XLSX spreadsheet
Solicitation Amendment 1 -SF30.pdf PDF
04 COBie Information Delivery Plan (IDP).docx DOCX document
00 COBie Playbook - READ ME FIRST.pdf PDF
Duberstein GC Bid Sheets_Rev 1.xlsx XLSX spreadsheet
Asset ImpExp Template-simple 7-22-16 (with RKT Edits 6-27-17).xlsx XLSX spreadsheet
06 Quick Start Guide - Definitions.pdf PDF
05 Responsibility Matrix.xlsx XLSX spreadsheet
GSA 012700 Unit Prices FY15 Update Oct. 1, 2014.pdf PDF
SF 1442 Form.pdf PDF
Duberstein Courts Consolidation - Prebid Agenda 2019 12 19.pdf PDF
Walkthrough Sign in 2019 12 19.pdf PDF
Attachment A4 - Past Performance Questionnaire.docx DOCX document
GC Reps&Certs sep19 (1).docx DOCX document
Attachment A1 - Experience Summary Table.docx DOCX document
GSA_Form_527.pdf PDF
Conrad B. Duberstein U.S. Courthouse GC Agreement 2019 12 12.pdf PDF
Wage Determination 2019 12 11.pdf PDF
SF 1442 Form.pdf PDF
Attachment A3 - Sample Key Personnel Resume Format (1).pdf PDF
Conrad B. Duberstein U.S. Courthouse GC Solicitation 2019 12 12.pdf PDF
Duberstein GC SOW - Final (2019.11.18).pdf PDF
GC Bid Sheets.xlsx XLSX spreadsheet
SF24-16d (1).pdf PDF
Attachment A2 - Project Fact Sheet.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONRAD. B. DUBERSTEIN U.S. BANKRUPTCY COURTHOUSE

BANKRUPTCY & PROBATION CONSOLIDATION

PHASE 1 & PHASE 2

ADDENDUM NO.01

January 13, 2019

This Addendum contains changes to the requirements of the Contract Documents and Specifications.

Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force.

NOTE: Provisions of all Contract Documents apply.

SPECIFICATIONS

Item 1. Specifications Table of Contents

ADD the following:

05 70 00 Ornamental Metalwork 06 61 16 Solid Surface Fabrications 07 81 0 Spray-applied Fire Resistive Materials 08 14 13 Stile and Rail Doors 08 41 26 All-Glass Doors and Partitions 09 71 13 Glass Reinforced Gypsum Fabrications 09 69 00 Access Flooring 09 75 00 Interior Stone Facing 09 98 00 Special Coatings 10 14 00 Signage 10 21 13 Toilet Compartments

Item 2. Specifications Section 01 10 00 Summary

REMOVE Specific language regarding period of performance dates

Item 3. Specifications Section 01 27 00 Unit Prices

CLARIFY Unit Prices

Item 4. Specifications Section 08 14 13 Stile and Rail Doors

ADD Section 2.2.B.2 Face Veneer Grade: AA

Item 5. Specifications Section 10 14 00 Signage

ADD Section 1.2.A.3 Pre-spaced self-adhesive vinyl vinyl letters at north wall of Corridor 02239 (Option 5).

ADD Section 2.2 Applied Vinyl: Die-cut characters from vinyl film of nominal thickness of 3 mils (0.076 mm) with pressure-sensitive adhesive backing, suitable for exterior applications.

PHASE 1 & PHASE 2

Addendum No. 1

January 13, 2020

Item 6. Specifications Section 10 22 19 Demountable Partitions

ADD construction, finish, electrical, and hardware details

Item 7. Specifications Section 11 14 13 Turnstiles

ADD basis of design product, 56” high tempered glass panels

PHASE 1 DRAWINGS

Item 8. Drawing G-002

ADD 2 doors as per Keynote 2

REVISE 1 door to be 44” wide

CLARIFY area for passage of contractors but not for work

ADD sticky mats

CLARIFY Elevator 10 as designated elevator for construction access

CLARIFY protection materials and extent

Item 9. Drawing G-003

CLARIFY protection materials and extent

Item 10. Drawing AD-102

ADD The following note: “Salvage existing wood paneling from north wall of Room 2580.”

PHASE 1 & PHASE 2

Addendum No. 1

Item 11. Drawing A-112

CLARIFY bar grill at south end of Case Admin 02234. In lieu of “New continuous linear diffuser bar grill” note shall read “New architectural linear bar grille for entire length along existing curtain wall.”

Item 12. Drawing A-502

ADD General Notes.

Item 13. Drawing A-701

ADD Partition Types T9, T10, T11 and T12.

Item 14. Drawing A-731, Detail 11

CLARIFY spacing of angle bracket

DELETE plastic laminate access panel

REPLACE with solid surface removable access panel with concealed fasteners and hardware. (SS-6)

Item 15. Drawing A-731, Detail 13

ADD solid wood finger pull and stop.

Item 16. Drawing A-732, Detail 5

ADD blocking at apron

CLARIFY solid surface SS-1 material top and apron.

Item 17. Drawing A-732, Detail 9

ADD plastic laminate PL-1 at banquette apron

Item 18. Drawing A-900

CLARIFY wallcovering at fabric wrapped panels FP-2, FP-3, FP-4. (Carnegie Xorel)

CLARIFY thickness of fabric wrapped panel insulating material (2” thick)

Item 19. Drawing A-910

CLARIFY Door types, material, widths, thickness, and hardware sets.

PHASE 1 & PHASE 2

Addendum No. 1

CLARIFY Door and frame assembly for Doors 01125 and 01125A shall be STC 55.

CLARIFY the following doors are existing/relocated 1080A, 1080B, 1080C, and 01188.

Item 20. Drawing A-911

CLARIFY Door Types 5 and 6 shall be transparent finish wood veneer doors with hardwood reveal to match existing.

Item 21. Drawing DM-102

CLARIFY extent of existing trunk ducts to remain

Item 22. Drawing M-102

CLARIFY new ductwork to accommodate 2 areas of high ceiling at either end of main Corridor 02239 including at Circulation Hub 02119A.

Item 23. Drawing ED-101

ADD removal of 11 additional floor boxes west of Grid II in Atrium and 12 additional floor boxes east of Grid II in Atrium as indicated on Sheet AD-101.

Item 24. Drawing ED-102

ADD removal of 4 floor boxes in Room 2601 and 4 floor boxes in Deputy Clerk 2610 as indicated on Sheet AD-102.

Item 25. Drawing E-102

CLARIFY at Training AV Closet 02249, the (4) AV conduits shall be routed vertically through column enclosure at Grid F and Grid 10.

Item 26. Drawing E-202

ADD Type L16 recessed continuous linear light fixture to illuminate the tiled wall (east wall) in Break Room 02248 similar at Phase 2 Probation Staff Lounge 01032. Run fixture north-south along the entire length of wall.

Item 27. Drawing DSP-102

ADD removal of sprinkler main to Base Scope.

OMIT alternate for removal of sprinkler main.

PHASE 1 & PHASE 2

Addendum No. 1

Item 28. Drawing SP-102

ADD new sprinkler main to Base Scope.

OMIT alternate for new sprinkler main.

PHASE 2 PROBATION DRAWINGS

Item 29. Drawing G-002 1st Floor South – Temporary Facilities

CLARIFY designated passenger elevator for construction access

Item 30. Drawing G-003 1st Floor South – Temporary Facilities

CLARIFY Ceiling Condition at third floor, below poke throughs in Training Room 040144.

Item 31. Drawing A-112 First Floor North Reflected Ceiling Plan

CLARIFY partition to jog around existing duct

Item 32. Drawing A-701 Partition Types

ADD Partition Types T9, T10, T11 and T12.

ADD Top of Wall Details

Item 33. Drawing M-102 1st Floor North Mechanical Plan

ADD Fire Dampers/Fire Smoke Dampers

ADD Duct Wrap

MODIFY Ductwork

Item 34. M-103 4th Floor Mechanical Plan

ADD Fire Dampers

PHASE 1 & PHASE 2

Addendum No. 1

PHASE 2 JOHNSON STREET DRAWINGS

Item 35. Drawing A-101 Demolition and New Construction Floor Plan

CLARIFY restoration of materials

Item 36. Drawing A-102 Ceiling Plan

CLARIFY cleaning of ceiling

ATTACHMENTS

Specifications

TOC

011000 Summary 012700 Unit Prices 102219 11413

Phase 1 Drawings

G-002 1st Floor South – Temporary Facilities G-003 2nd Floor North – Temporary Facilities A-502 Demountable Partitions Elevations A-701 Partition Types A-731 Millwork Details II A-732 Millwork Details III A-900 Finish Legend A-910 Door Schedule DM-102 2nd Floor Mechanical Demolition Plan M-102 2nd Floor Mechanical Plan ED-101 1st Floor Electrical Demolition Plan ED-102 2nd Floor Electrical Demolition Plan DSP-102 2nd Floor Sprinkler Demolition Plan SP-102 2nd Floor Sprinkler Plan

Phase 2 Probation Drawings G-002 Ground Floor – Temporary Facilities G-003 1st Floor South – Temporary Facilities A-112 First Floor North Reflected Ceiling Plan A-701 Partition Types M-102 1st Floor North Mechanical Plan M-103 4th Floor Mechanical Plan

Phase 2 Johnson Street Drawings A-101 Demolition and New Construction Floor Plan

PHASE 1 & PHASE 2

Addendum No. 1

A-102 Ceiling Plan

****END OF ADDENDUM****