03b COBie Sample - As-Built Workbook.xlsx
XLSX spreadsheet 1 MB Posted
- Solicitation number
- 47PC0319N0001
About this file
This solicitation notice announces a Request for Proposals for general construction services for the Conrad B. Duberstein Courts Consolidation project located at the Conrad B. Duberstein Courthouse in Brooklyn, New York. The project involves consolidating the bankruptcy and probation courts into the courthouse facility. The General Services Administration Northeast and Caribbean Region is issuing the RFP as a total small business set-aside, with the applicable NAICS code being 236220 and an annual revenue size standard of $39.5 million or less to qualify as a small business. Interested offerors must register through beta.sam.gov to access all solicitation documents, some of which are sensitive but unclassified. A pre-proposal conference and site visit is scheduled for December 19, 2019 at 9:00 AM EST at the courthouse. Proposals are due on the date specified in the solicitation and must be submitted in four paper copies and one electronic copy to the GSA. The contact for any questions is Douglas Tumbrello at the provided email address.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contact
| CreatedBy | CreatedOn | Category | Company | Phone | ExternalSystem | ExternalObject | ExternalIdentifier | Department | OrganizationCode | GivenName | FamilyName | Street | PostalBox | Town | StateRegion | PostalCode | Country | |
| Allison.H@GSA.gov | Frank.Wright@InspiredArch.com | 2019-02-12T03:08:28 | 34-11 20 21: Manager | General Services Administration | (215) 280-7099 | Autodesk Revit Architecture 2016 | IfcIfcPerson | d67867b4-7423-4e73-a108-0725d2c017ab | BIM Program | PCL#123 | Allison | Harper | 1005 N Glebe Rd | 3022 | Arlington | VA | 22201 | USA |
| amerilux@amerilux.com | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 34-35 10 11: Manufacturer | TACO | (973) 882-5010 | Autodesk Revit Architecture 2017 | IfcOrganization | 48b006cf-6bf6-4d4e-ba88-0739a3df4f0c | Customer Support | n/a | n/a | n/a | 23 daniel road | n/a | Fairfield | NJ | 70041 | USA |
| trane@trane.com | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 34-35 10 11: Manufacturer | Trane | (410) 252-9550 | Autodesk Revit Architecture 2018 | IfcOrganization | e5aec4a3-c2f4-4e48-9854-23fa4cefce32 | Customer Support | n/a | n/a | n/a | 2208 Greenspring Drive | n/a | Timonium | MD | 21093 | USA |
| dunham-bush@dunham-bush.com | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 34-35 10 11: Manufacturer | Dunham Bush | (305) 883-0655 | Autodesk Revit Architecture 2019 | IfcOrganization | e5aec4a3-c2f4-4e48-9854-23fa4cefce33 | Customer Support | n/a | n/a | n/a | 836 W 18th Street | n/a | Hialeah | FL | 33010 | USA |
| GenContractor@GenContractor.com | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 34-35 15 11: Contractor | General Contracting Company ABC | (555) 555-5555 | Autodesk Revit Architecture 2019 | IfcOrganization | e5aec4a3-c2f4-4e48-9854-23fa4cefce34 | Construction | n/a | n/a | n/a | 1234 Construction Way | n/a | San Diego | CA | 92104 | USA |
| fabricationcontractor@fab.com | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 34-35 10 11: Manufacturer | ACME CENTRIM | (555) 555-5556 | Autodesk Revit Architecture 2019 | IfcOrganization | e5aec4a3-c2f4-4e48-9854-23fa4cefce35 | Ab Fab Department | n/a | n/a | n/a | 5678 Fab Way | n/a | San Diego | CA | 92104 | USA |
| Frank.Wright@InspiredArch.com | Frank.Wright@InspiredArch.com | 2019-02-12T03:08:28 | 34-55 14 11: Consultant | Inspired Architecture | (555) 555-5557 | Autodesk Revit Architecture 2019 | IfcOrganization | e5aec4a3-c2f4-4e48-9854-23fa4cefce36 | CEO | n/a | Frank | Wright | n/a | n/a | Arlington | VA | 22201 | USA |
| Bob.Builder@ConstructionCo.com | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 34-35 15 11: Contractor | The Construction Company | (555) 555-5558 | Autodesk Revit Architecture 2019 | IfcOrganization | e5aec4a3-c2f4-4e48-9854-23fa4cefce37 | n/a | n/a | Bob | Builder | n/a | n/a | Baltimore | MD | 19120 | USA |
| taco@taco.com | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 34-35 10 11: Manufacturer | TACO | (555) 555-5559 | Autodesk Revit Architecture 2019 | IfcOrganization | e5aec4a3-c2f4-4e48-9854-23fa4cefce38 | n/a | n/a | n/a | n/a | n/a | n/a | Ann Harbor | MI | 12121 | USA |
Facility
| Name | CreatedBy | CreatedOn | Category | ProjectName | SiteName | LinearUnits | AreaUnits | VolumeUnits | CurrencyUnit | AreaMeasurement | ExternalSystem | ExternalProjectObject | ExternalProjectIdentifier | ExternalSiteObject | ExternalSiteIdentifier | ExternalFacilityObject | ExternalFacilityIdentifier | Description | ProjectDescription | SiteDescription | Phase |
| DC000ZZ | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 11-27 38 11: Government Office Building | DC FEDERAL CENTER | DC FEDERAL CENTER | MM: Milimeter | SQ.M: Square Meter | CU.M.: Cubic Meter | Dollars | Autodesk Revit Architecture 2016 BIM Area | Autodesk Revit Architecture 2016 | ifcProject | 3eM8WbY_59RR5TDWry5aRV | IfcSite | 3eM8WbY_59RR5TDWry5aRT | IfcBuilding | 57ed7869-1bb7-4165-a158-0a902dcb47fd | DC00077-DC FEDERAL CENTER | A new 5 story federal building. | 2.5 Acres | As-built |
Floor
| Name | CreatedBy | CreatedOn | Category | ExternalSystem | ExternalObject | ExternalIdentifier | Description | Elevation | Height |
| Basement 1st Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | B1 - Basement, 1st Level | Autodesk Revit Architecture 2016 | ifcBuildingStorey | 2cf9db09-809f-46f7-b989-8fc21f43fd65 | 10" CIP Slab, rough finish | 6080 | 3040 |
| 1st Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 01 - Floor 01 | Autodesk Revit Architecture 2016 | ifcBuildingStorey | 30cb3eee-807c-4be6-af64-871e9990ea7c | First floor above grade | n/a | n/a |
| 2nd Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 02 - Floor 02 | Autodesk Revit Architecture 2017 | ifcBuildingStorey | 30cb3eee-807c-4be6-af64-871e9990ea7c | Second floor above grade | n/a | n/a |
| 3rd Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 03 - Floor 03 | Autodesk Revit Architecture 2018 | ifcBuildingStorey | 30cb3eee-807c-4be6-af64-871e9990ea7c | Third floor above grade | n/a | n/a |
| 4th Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 04 - Floor 04 | Autodesk Revit Architecture 2019 | ifcBuildingStorey | 30cb3eee-807c-4be6-af64-871e9990ea7c | Forth floor above grade | n/a | n/a |
| 5th Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 05 - Floor 05 | Autodesk Revit Architecture 2020 | ifcBuildingStorey | 30cb3eee-807c-4be6-af64-871e9990ea7c | Fifth floor above grade | n/a | n/a |
| 6th Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 06 - Floor 06 | Autodesk Revit Architecture 2021 | ifcBuildingStorey | 30cb3eee-807c-4be6-af64-871e9990ea7c | sixth floor above grade | n/a | n/a |
| 7th Floor | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 07 - Floor 07 | Autodesk Revit Architecture 2022 | ifcBuildingStorey | 30cb3eee-807c-4be6-af64-871e9990ea7c | sixth floor above grade | n/a | n/a |
Space
| Name | CreatedBy | CreatedOn | Category | FloorName | Description | ExternalSystem | ExternalObject | ExternalIdentifier | RoomTag | UsableHeight | GrossArea | NetArea |
| 1001 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-55 29 21 11: Conference Room | 1st Floor | CONFERENCE | Autodesk Revit Architecture 2016 | ifcSpace | e08c9c12-6caf-45e0-afe4-f38082021062 | 101 | 8 | 267 | 250 |
| 1002 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-61 13 13: Holding Cell | 1st Floor | HLDG. | Autodesk Revit Architecture 2016 | ifcSpace | eb18093c-2df2-4aff-b140-8a253a94f467 | n/a | n/a | n/a | n/a |
| 1003 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-69 25 17: Footpath | 1st Floor | ORR. | Autodesk Revit Architecture 2016 | ifcSpace | 32bee273-f26e-410e-bfbe-f01226010543 | n/a | n/a | n/a | n/a |
| 1004 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 11 13: Stairway | 1st Floor | TAIRWELL #3 | Autodesk Revit Architecture 2016 | ifcSpace | 5829ec51-c648-464a-a8e6-213c2c47fdbd | n/a | n/a | n/a | n/a |
| 1005 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-55 29 21 11: Conference Room | 1st Floor | ONFERENCE | Autodesk Revit Architecture 2016 | ifcSpace | 12954a35-0d72-4f5c-a3a4-561d6ed05386 | n/a | n/a | n/a | n/a |
| 1006 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 19 27: Electrical Room | 1st Floor | LEC. | Autodesk Revit Architecture 2016 | ifcSpace | b5192373-513d-47fd-b861-9d75995663aa | n/a | n/a | n/a | n/a |
| 1007 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-25 13 11: Entry Vestibule | 1st Floor | VEST. | Autodesk Revit Architecture 2016 | ifcSpace | 781e587b-d5d9-4522-9add-387e18b6e379 | n/a | n/a | n/a | n/a |
| 1008 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-25 13 11: Entry Vestibule | 1st Floor | VEST. | Autodesk Revit Architecture 2016 | ifcSpace | 180cf111-de3a-4874-a6bc-26b71a7437c3 | n/a | n/a | n/a | n/a |
| 10086 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-57 13 17: Coffee Stations | 1st Floor | BREAK | Autodesk Revit Architecture 2016 | ifcSpace | cb61c559-f517-4a7e-a043-ad43e9602954 | n/a | n/a | n/a | n/a |
| B1002 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 19 00: Utility Equipment Room | Basement 1st Floor | MECH. | Autodesk Revit Architecture 2016 | ifcSpace | d6080326-2a7f-4f61-b967-529721bebc2e | n/a | n/a | n/a | n/a |
| B1003 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-25 13 19: Elevator Lobby | Basement 1st Floor | ELEV. LOBBY #4 | Autodesk Revit Architecture 2016 | ifcSpace | dc6d822e-2c7d-4a21-a2dc-4b72689130a2 | n/a | n/a | n/a | n/a |
| B1006 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 11 13: Stairway | Basement 1st Floor | STAIRWELL #4 | Autodesk Revit Architecture 2016 | ifcSpace | 31a8f2d0-8760-4f1b-a13f-9271d83c2e03 | n/a | n/a | n/a | n/a |
| B1008 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-25 13 29: Sally Port | Basement 1st Floor | SALLY PORT | Autodesk Revit Architecture 2016 | ifcSpace | 483a0ed5-0819-423a-9aa1-d72b251331e8 | n/a | n/a | n/a | n/a |
| B1010 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-25 13 19: Elevator Lobby | Basement 1st Floor | ELEV. LOBBY #1, #2 | Autodesk Revit Architecture 2016 | ifcSpace | 7ee2d637-2ceb-43de-bf39-738131a54c59 | n/a | n/a | n/a | n/a |
| B1011 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-63 13 11: Storage Room | Basement 1st Floor | GSA STORAGE | Autodesk Revit Architecture 2016 | ifcSpace | 8035ebb5-c95b-4178-a8b9-a0127bfeee0b | n/a | n/a | n/a | n/a |
| B1015 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 23 13: Custodial Space | Basement 1st Floor | WATER CLOSET | Autodesk Revit Architecture 2016 | ifcSpace | 3acc29eb-a5d7-410d-b568-4854f492d71e | n/a | n/a | n/a | n/a |
| B1016 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-63 13 11: Storage Room | Basement 1st Floor | CLERK'S STORAGE | Autodesk Revit Architecture 2016 | ifcSpace | 8b97e4f4-f6ac-4e2a-9758-788153175175 | n/a | n/a | n/a | n/a |
| B1017 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 19 29: Switch Room | Basement 1st Floor | SWITCHGEAR | Autodesk Revit Architecture 2016 | ifcSpace | b06f8ba6-d204-410c-a9b1-c9cee68b919e | n/a | n/a | n/a | n/a |
| B1018 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 19 00: Utility Equipment Room | Basement 1st Floor | HV-2 and HV-3 | Autodesk Revit Architecture 2016 | ifcSpace | 1a88383e-b579-4e45-be51-23a475728cbf | n/a | n/a | n/a | n/a |
| B1019 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-21 13 00: Interior Parking Spaces | Basement 1st Floor | PARKING | Autodesk Revit Architecture 2016 | ifcSpace | 8cf9efe8-1305-48fb-95e7-ffed3a6db250 | n/a | n/a | n/a | n/a |
| B1020 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 19 00: Utility Equipment Room | 2nd Floor | EXHAUST FAN #2 | Autodesk Revit Architecture 2016 | ifcSpace | 63b93250-dce2-4ddc-ade3-54d17927db03 | n/a | n/a | n/a | n/a |
| B1021 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 19 00: Utility Equipment Room | 3rd Floor | MECH. | Autodesk Revit Architecture 2016 | ifcSpace | 7bb7cb89-7082-4159-81d9-cab816fad3c0 | n/a | n/a | n/a | n/a |
| B1022 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-25 13 19: Elevator Lobby | 4th Floor | ELEV. LOBBY #7 | Autodesk Revit Architecture 2016 | ifcSpace | 52ced054-df8a-44d5-a214-8b8d354a6756 | n/a | n/a | n/a | n/a |
| B1024 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 11 13: Stairway | 5th Floor | STAIRWELL #2 | Autodesk Revit Architecture 2016 | ifcSpace | 8bd8870a-fab0-4799-81fc-37b5e554fff2 | n/a | n/a | n/a | n/a |
| B1025 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 19 00: Utility Equipment Room | 6th Floor | PSE&G CLOSET | Autodesk Revit Architecture 2016 | ifcSpace | 892a1e63-1059-42c9-abfb-07fe141104d0 | n/a | n/a | n/a | n/a |
| B1E | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 13-23 11 11 11: Elevator Shaft | 1st Floor | ELEVATOR | Autodesk Revit Architecture 2016 | ifcSpace | f9f7f914-56b2-4a49-a1a3-7a6a86dd54ea | n/a | n/a | n/a | n/a |
Zone
| Name | CreatedBy | CreatedOn | Category | SpaceNames | ExternalSystem | ExternalObject | ExternalIdentifier | Description |
| Mechanical Zone | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Ventilation Zone | B1002 | Autodesk Revit Architecture 2016 | ifcZone | 2cf9db09-809f-46f7-b989-8fc21f43fd65 | Ventilation |
| Mechanical Zone | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Ventilation Zone | B1018 | Autodesk Revit Architecture 2017 | ifcZone | 2cf9db09-809f-46f7-b989-8fc21f43fd66 | Ventilation |
| Mechanical Zone | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Ventilation Zone | B1022 | Autodesk Revit Architecture 2018 | ifcZone | 2cf9db09-809f-46f7-b989-8fc21f43fd67 | Ventilation |
| Vertical Circulation | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Circulation Zone | B1006 | Autodesk Revit Architecture 2015 | ifcZone | 30cb3eee-807c-4be6-af64-871e9990ea7c | Circulation |
| Vertical Circulation | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Circulation Zone | 1004 | Autodesk Revit Architecture 2016 | ifcZone | 30cb3eee-807c-4be6-af64-871e9990ea7c | Circulation |
Type
| Name | CreatedBy | CreatedOn | Category | Description | AssetType | Manufacturer | ModelNumber | WarrantyGuarantorParts | WarrantyDurationParts | WarrantyGuarantorLabor | WarrantyDurationLabor | WarrantyDurationUnit | ExternalSystem | ExternalObject | ExternalIdentifier | ReplacementCost | ExpectedLife | DurationUnit | WarrantyDescription | NominalLength | NominalWidth | NominalHeight | ModelReference | Shape | Size | Color | Finish | Grade | Material | Constituents | Features | AccessibilityPerformance | CodePerformance | SustainabilityPerformance |
| Air Handling Unit | Allison.H@GSA.gov | 2019-02-12T03:08:28 | D304008.09.01 | Air Handling Unit, Up to 10 Tons | Fixed | trane@trane.com | CSAA | trane@trane.com | 2 | Bob.Builder@ConstructionCo.com | 1 | year | Autodesk Revit MEP 2016 | ifcFanType | 3acc29eb-a5d7-410d-b568-4854f492d71e | 15000 | 10 | Year | A two year parts warranty by the manufacturer, and two year warranty labor by the General Contractor. | 0.5 | 0.75 | 1 | www.trane.com/AHU/ProductInfo/notarealwebsitebutyougettheidea | Requires 18” clearance on all sides for maintenance | 450x450x300 | Silver | Paint | 1/12 grade | Steel | Product must be mounted 6” from other equipment to ensure proper ventilation | Includes mounting brackets that are compatible with 1-5/8" x 1-5/8" slotted unistrut channel | Should be mounted 33” to 36” above finished floor | Fire rating must match or exceed that of the wall in which the product is installed | Must be R45 or greater |
| Centrifugal Liquid Chiller | Allison.H@GSA.gov | 2019-02-12T03:08:28 | D303001.01.01.02.01 | Centrifugal Liquid Chiller | Fixed | dunham-bush@dunham-bush.com | R134a | dunham-bush@dunham-bush.com | 2 | Bob.Builder@ConstructionCo.com | 1 | Year | Autodesk Revit MEP 2016 | ifcEquipmentElement | 8b97e4f4-f6ac-4e2a-9758-788153175175 | 15000 | 10 | Year | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a |
| Chilled Water Pump | Allison.H@GSA.gov | 2019-02-12T03:08:28 | D303001.03.03 | Centrifugal Pump | Fixed | taco@taco.com | 302-003A | taco@taco.com | 2 | Bob.Builder@ConstructionCo.com | 1 | Year | Autodesk Revit MEP 2016 | ifcEquipmentElement | b06f8ba6-d204-410c-a9b1-c9cee68b919e | 15000 | 10 | Year | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a |
Component
| Name | CreatedBy | CreatedOn | TypeName | Space | Description | ExternalSystem | ExternalObject | ExternalIdentifier | SerialNumber | InstallationDate | WarrantyStartDate | TagNumber | BarCode | AssetIdentifier |
| Air Handling Unit-001 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Air Handling Unit | 1006 | Air Handling Unit, Up to 10 Tons | Autodesk Revit MEP 2016 | ifcFanType | 3acc29eb-a5d7-410d-b568-4854f492d71e | AH-250-PXL-3 | 41147 | 41147 | AHU-001 | BC14529839t5 | A1025467 |
| Air Handling Unit-002 | Allison.H@GSA.gov | 2019-02-12T03:08:29 | Air Handling Unit | 10086 | Air Handling Unit, Up to 10 Tons | Autodesk Revit MEP 2016 | ifcFanType | 8b97e4f4-f6ac-4e2a-9758-788153175175 | AH-250-PXL-4 | 41148 | 41148 | n/a | n/a | n/a |
| Chilled Water Pump-001 | Allison.H@GSA.gov | 2019-02-12T03:08:30 | Chilled Water Pump | B1002 | 4 BC_284TS-L Standard | Autodesk Revit MEP 2016 | ifcEquipmentElement | b06f8ba6-d204-410c-a9b1-c9cee68b919e | CWP1234 | 41149 | 41149 | n/a | n/a | n/a |
| Chilled Water Pump-002 | Allison.H@GSA.gov | 2019-02-12T03:08:31 | Chilled Water Pump | B1020 | 4 BC_284TS-L Standard | Autodesk Revit MEP 2016 | ifcEquipmentElement | c0260883-fcdf-454c-b448-9d4f60871f1a | CWP1235 | 41150 | 41150 | n/a | n/a | n/a |
| Centrifugal Liquid Chiller-001 | Allison.H@GSA.gov | 2019-02-12T03:08:32 | Centrifugal Liquid Chiller | B1002 | 400-500 Tons | Autodesk Revit MEP 2016 | ifcEquipmentElement | 6ae05128-d07c-4725-bf29-efb3bf532079 | CH5555A | 41151 | 41151 | n/a | n/a | n/a |
| Centrifugal Liquid Chiller-002 | Allison.H@GSA.gov | 2019-02-12T03:08:33 | Centrifugal Liquid Chiller | B1020 | 400-500 Tons | Autodesk Revit MEP 2016 | ifcEquipmentElement | 5ef1cbfe-e7d4-421b-a65e-122038b8d489 | CH5555A1 | 41152 | 41152 | n/a | n/a | n/a |
System
| Name | CreatedBy | CreatedOn | Category | ComponentNames | ExternalSystem | ExternalObject | ExternalIdentifier | Description |
| Air Distribution System-001 | Allison.H@GSA.gov | 2019-02-12T03:08:28 | 21-04 30 50 50: HVAC Air Distribution | Centrifugal Liquid Chiller-001 | Autodesk Revit MEP 2018 | ifcSystem | 483a0ed5-0819-423a-9aa1-d72b251331e10 | Air Distribution - Forced air |
| Air Distribution System-001 | Allison.H@GSA.gov | 2019-02-12T03:08:29 | 21-04 30 50 50: HVAC Air Distribution | Air Handling Unit-001 | Autodesk Revit MEP 2018 | ifcSystem | 483a0ed5-0819-423a-9aa1-d72b251331e10 | Air Distribution - Forced air |
Assembly Name CreatedBy CreatedOn SheetName ParentName ChildNames AssemblyType ExtSystem ExtObject ExtIdentifier Description
Connection Name CreatedBy CreatedOn ConnectionType SheetName RowName1 RowName2 RealizingElement PortName1 PortName2 ExtSystem ExtObject ExtIdentifier Description
Spare
| Name | CreatedBy | CreatedOn | Category | TypeName | Suppliers | ExternalSystem | ExternalObject | ExternalIdentifier | Description | SetNumber | PartNumber |
| AF-1 | Bob.Builder@ConstructionCo.com | 2019-02-12T03:08:28 | Part | Air Handling Unit | trane@trane.com | Autodesk Revit MEP 2018 | ifcSystem | 483a0ed5-0819-423a-9aa1-d72b251331e11 | Air filter | 3 | AF1-1A |
Resource Name CreatedBy CreatedOn Category ExtSystem ExtObject ExtIdentifier Description
Job
| Name | CreatedBy | CreatedOn | Category | Status | TypeName | Description | Duration | DurationUnit | Start | TaskStartUnit | Frequency | FrequencyUnit | ExternalSystem | ExternalObject | ExternalIdentifier | TaskNumber | Priors | ResourceNames |
| Weekly PM | Bob.Builder@ConstructionCo.com | 2019-02-12T03:08:28 | PM | Not Yet Started | Air Handling Unit | Observe unit weekly for any change in running condition and unusual noise. | 5 | minutes | 1 | month | 1 | week | Autodesk Revit MEP 2018 | ifcSystem | 483a0ed5-0819-423a-9aa1-d72b251331e12 | 0 | n/a | |
| Monthly PM | Bob.Builder@ConstructionCo.com | 2019-02-12T03:08:28 | PM | Not Yet Started | Air Handling Unit | Clean or replace air filters if clogged or dirty; coat permanent filters with oil after cleaning; change bag filters when pressure |
drop is 1 in. w.g. See “Filters,” p. 151 for more information.
• Belt-drive fans - relubricate fan bearings if necessary. See “Fan Bearing Lubrication,” p. 150 for more information.
| • Belt-drive fans - check and adjust fan belt tension.See “Tension the Fan Belt,” p. 119 for more information. | 30 | minutes | 1 | month | 1 | month | Autodesk Revit MEP 2019 | ifcSystem | 483a0ed5-0819-423a-9aa1-d72b251331e13 | 1 | 0 |
| 3 Month PM | Bob.Builder@ConstructionCo.com | 2019-02-12T03:08:28 | PM | Not Yet Started | Air Handling Unit | Belt-drive fans - check fan bearing grease line connections. Lines should be tight to the bearings. |
• Check motor bracket torque. See Table 53, p. 150 for torque requirements.
• Belt-drive fans - check bearing bolt torque and bearing setscrew torque. See Table 53, p. 150 for torque requirements.
• Belt-drive fans - align fan and motor sheaves. Tighten sheave set screws to the proper torque. See “Align Fan and Motor Sheaves,” p. 121 for more information.
• Inspect and clean drain pans. See “Drain Pans,” p. 136 for more information.
• Tighten electrical connections.
• Inspect coils for dirt build-up. See “Coils,” p. 134 for more information.
| • Clean moisture eliminator with high pressure sprayer. Remove pollen in the spring and leaves in the fall. | 60 | minutes | 3 | month | 3 | month | Autodesk Revit MEP 2020 | ifcSystem | 483a0ed5-0819-423a-9aa1-d72b251331e14 | 2 | 1 |
| Yearly PM | Bob.Builder@ConstructionCo.com | 2019-02-12T03:08:28 | PM | Not Yet Started | Air Handling Unit | Belt-drive fans - check fan bearing grease line connections. Lines should be tight to the bearings. |
• Check motor bracket torque. See Table 53, p. 150 for torque requirements.
• Belt-drive fans - check bearing bolt torque and bearing setscrew torque. See Table 53, p. 150 for torque requirements.
• Belt-drive fans - align fan and motor sheaves. Tighten sheave set screws to the proper torque. See “Align Fan and Motor Sheaves,” p. 121 for more information.
• Inspect and clean drain pans. See “Drain Pans,” p. 136 for more information.
• Tighten electrical connections.
• Inspect coils for dirt build-up. See “Coils,” p. 134 for more information.
• Clean moisture eliminator with high pressure sprayer. Remove pollen in the spring and leaves in the fall. 180 minutes 1 year 1 year Autodesk Revit MEP 2021 ifcSystem 483a0ed5-0819-423a-9aa1-d72b251331e15 n/a n/a
Impact Name CreatedBy CreatedOn ImpactType ImpactStage SheetName RowName Value ImpactUnit LeadInTime Duration LeadOutTime ExtSystem ExtObject ExtIdentifier Description
Document
| Name | CreatedBy | CreatedOn | Category | ApprovalBy | Stage | SheetName | RowName | Directory | File | ExternalSystem | ExternalObject | ExternalIdentifier | Description | Reference |
| Air Handling Unit Installation Instructions | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Manufacturer Instructions | Owner Approval | As-Built | Type | Air Handling Unit | Documents\Product Data | AHU-TRANE-INSTALLATION.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e8 | Product Data | A1 |
| Chiller Installation Instructions | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Manufacturer Instructions | n/a | As-Built | Type | Centrifugal Liquid Chiller | Documents\Product Data | DUNHAM_BUSH CHILLER INSTALLATION.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e9 | Product Data | A2 |
| Chilled Water Pump Installation Instructions | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Manufacturer Instructions | n/a | As-Built | Type | Chilled Water Pump | Documents\Product Data | TACO CWP INSTALLATION.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e10 | Product Data | A3 |
| Air Handling Unit O&M | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Operation and Maintenance | n/a | As-Built | Type | Air Handling Unit | Documents\Operations and Maintenance Manuals | AHU-OM-TRANE-CLCH-SVX07G-EN.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e11 | Product Data | A4 |
| Chiller O&M | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Operation and Maintenance | n/a | As-Built | Type | Centrifugal Liquid Chiller | Documents\Operations and Maintenance Manuals | CHILLER-OM-DUNHAM_BUSH-EN.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e12 | Product Data | A5 |
| Chilled Water Pump O&M | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Operation and Maintenance | n/a | As-Built | Type | Chilled Water Pump | Documents\Operations and Maintenance Manuals | CWP-OM-TACO-302-003A-EN.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e13 | Product Data | A6 |
| Air Handling Unit Warranty | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Closeout Submittals | n/a | As-Built | Type | Air Handling Unit | Documents | TRANE WARRANTY.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e14 | Product Data | A7 |
| Chiller Warranty | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Closeout Submittals | n/a | As-Built | Type | Centrifugal Liquid Chiller | Documents | DUNHAM-BUSH WARRANTY.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e15 | Product Data | A8 |
| Chilled Water Pump Warranty | Allison.H@GSA.gov | 2019-02-12T03:08:28 | Closeout Submittals | n/a | As-Built | Type | Chilled Water Pump | Documents | TACO WARRANTY.pdf | Autodesk Revit 2015 | ifcDocument | 483a0ed5-0819-423a-9aa1-d72b251331e16 | Product Data | A9 |
Attribute Name CreatedBy CreatedOn Category SheetName RowName Value Unit ExtSystem ExtObject ExtIdentifier Description AllowedValues
Coordinate Name CreatedBy CreatedOn Category SheetName RowName CoordinateXAxis CoordinateYAxis CoordinateZAxis ExtSystem ExtObject ExtIdentifier ClockwiseRotation ElevationalRotation YawRotation
Issue Name CreatedBy CreatedOn Type Risk Chance Impact SheetName1 RowName1 SheetName2 RowName2 Description Owner Mitigation ExtSystem ExtObject ExtIdentifier
PickLists
| Assembly-AssemblyType | Category-Connection | Category-Coordinate | Category-Document | Category-Element | Category-Facility | Category-Floor | Category-Impact | Category-Issue | Category-Job | Category-Product | Category-Resource | Category-Role | Category-Space | Category-Spare | Category-Zone | Document-ApprovalBy | Impact-ImpactStage | Issue-Chance | Issue-Impact | Issue-Risk | Job-Status | SheetName | SheetName-Assembly | SheetName-Coordinate | Stage | Type-AssetType | Units-Area | Units-Currency | Units-Duration | Units-Impact | Units-Linear | Units-Volume | objAssembly | objAttribute | objAttributeType | objComponent | objConnection | objContact | objCoordinate | objDocument | objFacility | objFloor | objImpact | objIssue | objJob | objProject | objResource | objSite | objSpace |
| Excluded | Control | Point | Certificates | 21-01 00 00 Substructure | 11-11 00 00 Assembly Facility | Floor | Cost | Change | Adjustment | 23-11 00 00 Site Products | Labor | 34-10 00 00 Entrepreneurial Roles | 13-11 00 00 Space Planning Types | Lubricant | Circulation Zone | Owner Approval | Installation | Has Occurred | Very High | Very High | Not Yet Started | Assembly | Attribute | Component | Approved | Fixed | Square Inches | Dollars | As required | Currency | Inches | Cubic Feet | IfcRelAggregates | IfcPropertyObjectReference | BoundedValue | IfcBeam | IfcRelConnectsElements | IfcOrganization | IfcBoundingBox | IfcDocumentInformation | IfcBuilding | IfcBuildingStorey | IfcPropertySet | IfcApproval | IfcProcedure | IfcProject | IfcConstructionProductResource | IfcSite | IfcSpace |
| Fixed | Flow | Line-end-one | Client Requirements | 21-01 10 Foundations | 11-11 11 00 Convention and Exhibition Facility | Roof | Climate Change | Claim | Calibration | 23-11 11 00 Ground Anchorages | Material | 34-10 11 00 Owner | 13-11 11 00 Planned Work Space | Other | Fire Alarm Zone | Contractor Certified | Maintenance | High | High | High | Started | Attribute | Component | Floor | As Built | Moveable | Square Feet | Euros | Day | Kg CO2e | Feet | Cubic Meters | IfcPropertySingleValue | EnumeratedValue | IfcBuildingElementPart | IfcPerson | IfcCartesianPoint | IfcDocumentReference | Pset_Risk | IfcTask | IfcCrewResource | ||||||||
| Included | Return | Line-end-two | Closeout Submittals | 21-01 10 10 Standard Foundations | 11-11 11 11 Convention Center | Site | Primary Energy Consumption | Coordination | Emergency | 23-11 11 11 Retaining Stabilizing Ground Anchors | Tools | 34-10 11 11 Developer | 13-11 13 00 Planned Building Service Space | Part | Historical Preservation Zone | Information Only | Production | Moderate | Moderate | Moderate | Completed | Component | Connection | Space | Exact Requirement | Square Miles | Minute | MJ | Miles | ListValue | IfcBuildingElementProxy | IfcPersonAndOrganization | IfcLaborResource | ||||||||||||||||
| Layer | Supply | Box-lowerleft | Contract Drawings | 21-01 10 10 10 Wall Foundations | 11-11 11 17 Conference Facility | Environmental | Inspection | 23-11 11 11 11 Retaining Stabilizing Ground Components | Training | 34-10 11 14 Corporate Entity | 13-11 15 00 Planned Amenity/Support Space | PartSet | Lighting Zone | Replacement | Low | Low | Low | Connection | Coordinate | Maximum Requirement | Square Millimeters | Month | Millimeters | ReferenceValue | IfcChamferEdgeFeature | ||||||||||||||||||||||||
| Mix | Structural | Box-upperright | Contract Drawings | 21-01 10 10 30 Column Foundations | 11-11 14 00 Meeting Facility | Function | Operation | 23-11 11 11 11 11 Stabilizing Ground Anchor Heads | 34-10 11 17 Public Entity | 13-11 17 00 Planned Circulation Space | Spare | Occupancy Zone | Reuse | Unknown | Unknown | Unknown | Contact | Document | Minimum Requirement | Square Meters | Quarter | Meters | SetValue | IfcColumn | |||||||||||||||||||||||||
| Optional | Contract Modifications | 21-01 10 10 90 Standard Foundation Supplementary Components | 11-11 14 11 Club or Organization Building | IndoorAirQuality | PM | 23-11 11 11 11 13 Stabilizing Ground Tendons | 34-10 21 00 Partner | 13-11 19 00 Planned Parking Space | SpareSet | Ventilation Zone | Use | Coordinate | Facility | Requirement | Square Kilometers | Week | Kilometers | SingleValue | IfcCovering | ||||||||||||||||||||||||||||||
| Contract Specifications | 21-01 10 20 Special Foundations | 11-11 14 14 Ceremonial Hall | Installation | Safety | 23-11 11 11 13 Stabilizing Ground Grouted Anchors | 34-11 00 00 Management Roles | 13-13 00 00 Void Areas | Document | Floor | Submitted | Year | TableValue | IfcCurtainWall | ||||||||||||||||||||||||||||||||||||
| Design Data | 21-01 10 20 10 Driven Piles | 11-11 21 00 Entertainment Assembly Facility | RFI | ShutDown | 23-11 11 11 15 Stabilizing Ground Plate Anchors | 34-11 10 00 Strategic Management Roles | 13-13 11 00 Light Well | Facility | Issue | IfcDiscreteAccessory | |||||||||||||||||||||||||||||||||||||||
| Design Review Comment | 21-01 10 20 15 Bored Piles | 11-11 21 11 Cinema | Safety | StartUp | 23-11 11 11 17 Stabilizing Ground Rock Bolts | 34-11 10 11 President | 13-13 13 00 Air Shaft | Floor | Job | IfcDistributionChamberElement | |||||||||||||||||||||||||||||||||||||||
| Manufacturer Field Reports | 21-01 10 20 20 Caissons | 11-11 21 17 Performing Arts Facility | Specification | Testing | 23-11 11 11 19 Stabilizing Ground Rock Anchors | 34-11 10 11 11 Vice President | 13-13 15 00 Occupant Void Area | Impact | Resource | IfcDistributionControlElement | |||||||||||||||||||||||||||||||||||||||
| Manufacturer Instructions | 21-01 10 20 30 Special Foundation Walls | 11-11 21 17 11 Auditorium and Theater Facility | Trouble | 23-11 11 11 21 Stabilizing Ground Anchor Tiebacks | 34-11 10 14 Chairperson | 13-15 00 00 Wall Spaces | Issue | Space | IfcDistributionElement | ||||||||||||||||||||||||||||||||||||||||
| Operation and Maintenance | 21-01 10 20 40 Foundation Anchors | 11-11 21 17 14 Outdoor Theater | 23-11 11 13 Earth Reinforcement Anchors | 34-11 10 17 Board Member | 13-15 11 00 Exterior Wall Space | Job | Spare | IfcDistributionFlowElement | |||||||||||||||||||||||||||||||||||||||||
| Preconstruction Submittals | 21-01 10 20 50 Underpinning | 11-11 21 21 Casino | 23-11 11 13 11 Earth Reinforcement Soil Nails | 34-11 20 00 Operational Management Roles | 13-15 13 00 Interior Wall Space | Resource | System | IfcDoor | |||||||||||||||||||||||||||||||||||||||||
| Product Data | 21-01 10 20 60 Raft Foundations | 11-11 21 22 Theme Park | 23-11 13 00 Ground Improvement Products | 34-11 20 11 Executive | 13-17 00 00 Encroachment Spaces | Space | Type | IfcElectricalElement | |||||||||||||||||||||||||||||||||||||||||
| Punch List Items | 21-01 10 20 70 Pile Caps | 11-11 21 23 Fair or Circus Ground | 23-11 13 11 Soil Stabilization Products | 34-11 20 14 Officer | 13-17 11 00 Interior Encroachment | Spare | Zone | IfcElectricDistributionPoint | |||||||||||||||||||||||||||||||||||||||||
| Request for Information | 21-01 10 20 80 Grade Beams | 11-11 21 24 Race Track | 23-11 13 11 11 Soil Stabilization Injectable Chemicals | 34-11 20 17 Director | 13-17 13 00 Perimeter Encroachment | System | IfcElementAssembly | ||||||||||||||||||||||||||||||||||||||||||
| Requests for Information | 21-01 20 Subgrade Enclosures | 11-11 21 24 11 Horse Racing Track | 23-11 13 11 13 Soil Stabilization Pressure Grouting | 34-11 20 21 Manager | 13-21 00 00 Parking Spaces | Type | IfcEnergyConversionDevice | ||||||||||||||||||||||||||||||||||||||||||
| Samples | 21-01 20 10 Walls for Subgrade Enclosures | 11-11 21 24 14 Dog Racing Track | 23-11 13 11 15 Ground Freezing Soil Stabilization | 34-11 20 24 Supervisor | 13-21 11 00 Exterior Parking Spaces | Zone | IfcEquipmentElement | ||||||||||||||||||||||||||||||||||||||||||
| Shop Drawings | 21-01 20 10 10 Subgrade Enclosure Wall Construction | 11-11 21 24 17 Automobile Racing Track | 23-11 13 11 17 Soil Stabilization Fills | 34-11 20 27 Coordinator | 13-21 11 11 Exterior Parking Circulation | IfcFastener | |||||||||||||||||||||||||||||||||||||||||||
| Specifications | 21-01 20 10 20 Subgrade Enclosure Wall Interior Skin | 11-11 21 27 Arena | 23-11 13 11 17 11 Soil Stabilization Fill Blocks | 34-11 20 31 Scheduler | 13-21 11 13 Exterior Parking Access Control Point | IfcFlowController | |||||||||||||||||||||||||||||||||||||||||||
| Test Reports | 21-01 20 10 90 Subgrade Enclosure Wall Supplementary Components | 11-12 00 00 Education Facility | 23-11 13 11 17 13 Soil Stabilization Compressible Fill | 34-11 20 34 Project Lead | 13-21 11 15 Exterior Parking Stall | IfcFlowFitting | |||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 Slabs-On-Grade | 11-12 11 00 Daycare or Preschool Facility | 23-11 13 11 19 Other Soil Stabilizations | 34-20 00 00 Development Roles | 13-21 13 00 Interior Parking Spaces | IfcFlowMovingDevice | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 10 Standard Slabs-on-Grade | 11-12 11 11 Daycare Facility | 23-11 13 11 21 Piped Field Drainage | 34-20 11 00 Design Roles | 13-21 13 11 Interior Parking Ramp and Circulation | IfcFlowSegment | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 20 Structural Slabs-on-Grade | 11-12 11 14 Preschool Facility | 23-11 13 11 21 11 Field Drainage Land Drainage Pipes | 34-20 11 11 Architect | 13-21 13 13 Interior Parking Access Control Point | IfcFlowStorageDevice | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 30 Slab Trenches | 11-12 21 00 K through 12 Learning Facility | 23-11 13 11 23 Field Drainage Blocks | 34-20 11 21 Engineer | 13-21 13 15 Interior Parking Stall | IfcFlowTerminal | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 40 Pits and Bases | 11-12 21 11 Kindergarten | 23-11 13 11 25 Field Drainage Geocomposite Drains | 34-20 11 31 Designer | 13-21 13 17 Interior Vehicle Service Space | IfcFlowTreatmentDevice | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 90 Slab-On-Grade Supplementary Components | 11-12 21 14 Elementary School | 23-11 13 11 25 11 Field Drainage Geocomposite Edge Drains | 34-20 11 41 Specifier | 13-23 00 00 Facility Service Spaces | IfcFooting | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 90 10 Perimeter Insulation | 11-12 21 21 Middle School | 23-11 13 11 25 13 Field Drainage Geocomposite In Place Wall Drains | 34-20 21 00 Planning Roles | 13-23 11 00 Vertical Penetration | IfcFurnishingElement | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 90 20 Vapor Retarder | 11-12 21 31 High School | 23-11 13 11 27 Geotextile Subsurface Drainage Filtration | 34-20 21 11 Planner | 13-23 11 11 Mechanical Circulation | IfcMechanicalFastener | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 90 30 Waterproofing | 11-12 24 00 Higher Education Facility | 23-11 15 00 Sheeting and Revetments | 34-20 21 14 Cost Estimator | 13-23 11 11 11 Elevator Shaft | IfcMember | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 90 50 Mud Slab | 11-12 24 11 University | 23-11 15 11 Sheeting Geosynthetics | 34-20 21 17 Scheduler | 13-23 11 11 13 Elevator Pit | IfcOpeningElement | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 40 90 60 Subbase Layer | 11-12 24 13 Business School | 23-11 15 11 11 Sheeting Geotextiles | 34-20 31 00 Surveyor | 13-23 11 11 15 Elevator Cab | IfcPile | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 60 Water and Gas Mitigation | 11-12 24 14 Science College | 23-11 15 11 13 Sheeting Geogrids | 34-20 41 00 Contract Administrator | 13-23 11 11 17 Elevator Machine Room | IfcPlate | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 60 10 Building Subdrainage | 11-12 24 17 Agricultural School | 23-11 15 11 15 Sheeting Geomembranes | 34-20 51 00 Observational Roles | 13-23 11 11 19 Dumbwaiter | IfcProjectionElement | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 60 10 10 Foundation Drainage | 11-12 24 21 Art School | 23-11 15 11 17 Sheeting Geocomposites | 34-20 51 11 Reviewer | 13-23 11 11 21 Escalator | IfcRailing | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 60 10 20 Underslab Drainage | 11-12 24 24 Vocational College | 23-11 15 11 19 Sheeting Mulch Control Netting | 34-20 51 14 Review Board | 13-23 11 11 23 Freight Elevator | IfcRamp | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 60 20 Off-Gassing Mitigation | 11-12 24 27 Liberal Arts College | 23-11 15 11 21 Sheeting Synthetic Erosion Controls | 34-20 51 17 Inspector | 13-23 11 13 Stairway | IfcRampFlight | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 60 20 10 Radon Mitigation | 11-12 24 31 Military Academy | 23-11 15 11 23 Sheeting Re vegetation Mats | 34-20 51 21 Observer | 13-23 11 13 11 Egress Stairway | IfcReinforcingBar | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 60 20 50 Methane Mitigation | 11-12 24 34 Professional College | 23-11 15 11 25 Sheeting Turf Reinforcement Mats | 34-35 00 00 Execution Roles | 13-23 11 13 13 Tenant Stairway | IfcRoof | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 Substructure Related Activities | 11-12 29 00 Library | 23-11 15 13 Revetments | 34-35 10 00 Procurement Roles | 13-23 11 15 Monumental Stair | IfcRoundedEdgeFeature | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 10 Substructure Excavation | 11-12 29 11 General Purpose Library | 23-11 15 13 11 Revetment Soil Blankets | 34-35 10 11 Manufacturer | 13-23 11 17 Ramp | IfcSlab | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 10 10 Backfill and Compaction | 11-12 29 14 Children’s Library | 23-11 15 13 13 Pool Revetments | 34-35 10 14 Fabricator | 13-23 11 19 Chimney | IfcStair | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 20 Construction Dewatering | 11-12 29 17 Special Library | 23-11 15 13 15 Trench Revetments | 34-35 10 17 Distributor | 13-23 11 21 Chute | IfcStairFlight | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 30 Excavation Support | 11-12 29 21 Academic Library | 23-11 15 13 17 Revetment Rock Linings | 34-35 10 21 Supplier | 13-23 11 23 Service Riser Space | IfcTendonAnchor | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 30 10 Anchor Tiebacks | 11-13 00 00 Public Service Facility | 23-11 15 13 19 Revetment Ripraps | 34-35 10 21 11 Product Representative | 13-23 11 23 11 Power Distribution Riser | IfcTransportElement | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 30 20 Cofferdams | 11-13 11 00 Government Facility | 23-11 17 00 Retention Structures | 34-35 10 24 Buyer | 13-23 11 23 13 Information Signal Distribution Riser | IfcWall | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 30 40 Cribbing and Walers | 11-13 11 11 Administrative Government Facility | 23-11 17 11 Sheet Piles | 34-35 15 00 Construction Roles | 13-23 11 23 15 Gas Distribution Riser | IfcWallStandardCase | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 30 60 Ground Freezing | 11-13 11 14 Regulatory Agency Facility | 23-11 17 13 Retaining Walls | 34-35 15 11 Contractor | 13-23 11 23 17 Liquid Distribution Riser | IfcWindow | ||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 30 70 Slurry Walls | 11-13 11 17 Courthouse | 23-11 17 13 11 Retaining Diaphragm Walls | 34-35 15 14 Sub Contractor | 13-23 12 00 Horizontal Infrastructure/Service Space, Non-Occupied | |||||||||||||||||||||||||||||||||||||||||||||
| 21-01 90 40 Soil Treatment | 11-13 11 21 Legislative Facility | 23-11 17 13 11 11 Retaining Slurry Wall Membranes | 34-35 15 17 Project Engineer | 13-23 12 11 Power Distribution Network | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 00 00 Shell | 11-13 11 23 Public Health and Safety Facility | 23-11 17 13 13 Continuous Retaining Walls | 34-35 15 21 Tradesperson | 13-23 12 13 Information Signal Network | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 Superstructure | 11-13 11 23 11 National Center | 23-11 17 13 15 Retaining Crib Walls | 34-35 15 21 11 Craftsperson | 13-23 12 15 Gas Distribution Network | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 10 Floor Construction | 11-13 11 23 14 Regional Fusion Center | 23-11 17 15 Gabions | 34-35 15 21 14 Journeyman | 13-23 12 17 Liquid Distribution Spaces | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 10 10 Floor Structural Frame | 11-13 11 24 Police Station | 23-11 17 17 Fascines | 34-35 15 21 17 Apprentice | 13-23 13 00 Control Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 10 20 Floor Decks, Slabs, and Toppings | 11-13 11 24 11 Booking Facility | 23-11 19 00 Slide and Avalanche Protection | 34-35 15 24 Laborer | 13-23 13 11 Fire Command Center | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 10 30 Balcony Floor Construction | 11-13 11 24 14 Custody Transfer Facility | 23-11 19 11 Bolt Down Snow Fences | 34-35 15 24 11 Skilled Laborer | 13-23 13 13 Guard Stations | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 10 40 Mezzanine Floor Construction | 11-13 11 24 17 Placement Facility | 23-11 19 13 Clamp on Equipment | 34-35 15 24 14 Unskilled Laborer | 13-23 15 00 Loading Dock | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 10 50 Ramps | 11-13 11 27 Post Office | 23-11 21 00 Pavements | 34-35 15 27 Installer | 13-23 17 00 Restroom | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 10 90 Floor Construction Supplementary Components | 11-13 11 31 Fire Station | 23-11 21 11 Porous Paving | 34-35 15 31 Operator | 13-23 17 11 Men's Restroom | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 20 Roof Construction | 11-13 11 33 Detention Center | 23-11 21 13 Roadways | 34-41 00 00 Utilization Roles | 13-23 17 13 Women's Restroom | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 20 10 Roof Structural Frame | 11-13 11 33 11 Prison | 23-11 21 13 11 Portable Roadways | 34-41 14 00 Facility Use Roles | 13-23 17 15 Unisex Restroom | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 20 20 Roof Decks, Slabs, and Sheathing | 11-13 11 33 14 Jail | 23-11 21 13 13 Roadway Surfacing | 34-41 14 11 Facility Manager | 13-23 19 00 Utility Equipment Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 20 30 Canopy Construction | 11-13 11 33 17 Immigration Detention Center | 23-11 21 13 13 11 Roadway Antiskid Texturing | 34-41 14 14 Facility Maintenance | 13-23 19 11 Refrigerant Machinery Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 20 90 Roof Construction Supplementary Components | 11-13 11 33 21 Juvenile Detention Center | 23-11 21 13 15 Detectable Warning Surfaces for Roadways | 34-41 14 17 Facility Engineer | 13-23 19 13 Furnace Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 80 Stairs | 11-13 11 34 Embassy | 23-11 21 13 15 11 Crosswalks | 34-41 31 00 Facility Service Roles | 13-23 19 15 Incinerator Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 80 10 Stair Construction | 11-13 11 37 Public Grounds Fencing, Gate, or Guard Tower | 23-11 21 13 15 13 Warning Tiles | 34-41 31 11 Custodian | 13-23 19 17 Fuel Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 80 30 Stair Soffits | 11-13 21 00 Military Facility | 23-11 21 15 Runways | 34-55 00 00 Support Roles | 13-23 19 19 Gas Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 80 50 Stair Railings | 11-13 21 11 Military Headquarters | 23-11 21 15 11 Portable Runway | 34-55 11 00 Administrative Service Roles | 13-23 19 21 Liquid Storage Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 80 60 Fire Escapes | 11-13 21 11 01 Pentagon | 23-11 21 15 13 Helicopter Landing Pads | 34-55 11 11 Administrative Assistant | 13-23 19 23 Liquid Use, Dispensing and Mixing Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 80 70 Metal Walkways | 11-13 21 12 Administrative Military Facility | 23-11 21 15 15 Runway Surfacing | 34-55 11 14 Receptionist | 13-23 19 25 Hydrogen Cutoff Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 10 80 80 Ladders | 11-13 21 14 Military Training Facility | 23-11 21 15 15 11 Runway Antiskid Texturing | 34-55 11 17 Records Manager | 13-23 19 27 Electrical Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 Exterior Vertical Enclosures | 11-13 21 17 Military Research Facility | 23-11 21 17 Paving Blocks | 34-55 11 21 Intern | 13-23 19 29 Switch Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 Exterior Walls | 11-13 21 21 Military Base | 23-11 21 17 11 Unit Pavers | 34-55 11 24 Assistant | 13-23 19 31 Telecommunications Room | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 10 Exterior Wall Veneer | 11-13 21 24 Military Field Facility | 23-11 21 17 11 11 Asphalt Block Pavers | 34-55 11 27 Trainer | 13-23 19 33 Transformer Vault | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 20 Exterior Wall Construction | 11-13 21 27 Joint Services Facility | 23-11 21 17 11 13 Brick Pavers | 34-55 14 00 Professional Service Roles | 13-23 21 00 Waste and Recycling Spaces | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 30 Exterior Wall Interior Skin | 11-13 21 31 Remote Delivery Facility | 23-11 21 17 11 15 Interlocking Precast Concrete Pavers | 34-55 14 11 Consultant | 13-23 21 11 Hazardous Waste Storage | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 40 Fabricated Exterior Wall Assemblies | 11-13 21 34 Military Ground Operational Facility Other Than Building | 23-11 21 17 11 17 Precast Concrete Pavers | 34-55 14 14 Librarian | 13-23 23 00 Building Service Support Spaces | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 50 Parapets | 11-13 21 37 Military Operational Support Facility Other Than Building | 23-11 21 17 11 19 Pressed Pavers | 34-55 14 17 Draftsperson | 13-23 23 11 Building Manager Office | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 60 Equipment Screens | 11-13 21 41 Military Locker Room Facility | 23-11 21 17 11 21 Stone Pavers | 34-55 14 19 Marketing Roles | 13-23 23 13 Custodial Space | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 80 Exterior Wall Supplementary Components | 11-13 21 44 Military Exchange Support Facility | 23-11 21 19 Pavement Slabs | 34-55 14 19 11 Salesperson | 13-23 23 15 Shop Area | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 10 90 Exterior Wall Opening Supplementary Components | 11-13 21 47 Military Exchange Warehouse | 23-11 21 21 Pavement Drainage | 34-55 14 22 Financial Roles | 13-23 23 17 Access Chamber | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 20 Exterior Windows | 11-13 21 51 Simulation Facility | 23-11 21 21 11 Culverts | 34-55 14 22 11 Accountant | 13-23 23 19 Areaway | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 20 10 Exterior Operating Windows | 11-13 21 54 Military Training Support Facility | 23-11 21 21 11 11 Pipe Culverts | 34-55 14 22 14 Banker | 13-23 23 21 Service Space | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 20 20 Exterior Fixed Windows | 11-13 21 57 Military Training Facility Other Than Building | 23-11 21 21 11 11 11 Metal Pipe Arch Culverts | 34-55 14 22 17 Record Keeper | 13-23 23 23 Furred Space | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 20 30 Exterior Window Wall | 11-13 21 61 Impact, Maneuver, and Training Area | 23-11 21 21 11 13 Concrete Culverts | 34-55 14 22 21 Bookkeeper | 13-23 23 25 Crawl Space | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 20 50 Exterior Special Function Windows | 11-13 21 64 Small Arms Range | 23-11 21 21 11 13 11 Concrete Arch Buried Bridge Culverts | 34-55 14 24 Lawyer | 13-23 23 27 Attic Space | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 Exterior Doors and Grilles | 11-13 21 67 Weapon Range | 23-11 21 21 11 13 13 Concrete Arch Culverts | 34-55 14 27 Agent | 13-23 23 29 Plenum | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 10 Exterior Entrance Doors | 11-13 21 71 Team and Unit Range | 23-11 21 21 11 13 15 Concrete Box Culverts | 34-55 14 31 Specialist | 13-23 25 00 Equipment Platform | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 20 Exterior Utility Doors | 11-13 21 74 Explosives and Flame Range | 23-11 21 21 11 13 17 Concrete Rigid Frame Culverts | 34-61 00 00 Group Roles | 13-23 27 00 Interstitial Space | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 30 Exterior Oversize Doors | 11-13 21 77 Military Maintenance Facility | 23-11 21 21 13 Catch Basins | 34-61 11 00 Teams | 13-23 29 00 Unimproved Shell | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 40 Exterior Special Function Doors | 11-13 21 77 11 Guided Missile Maintenance Facility | 23-11 21 21 15 Channels | 34-61 11 11 Task Team | 13-23 31 00 Alteration or Conversion Space | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 60 Exterior Grilles | 11-13 21 77 14 Weapons and Spares Maintenance Facility | 23-11 21 21 17 Cleanouts | 34-61 11 21 Task Force | 13-25 00 00 Circulation Spaces | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 70 Exterior Gates | 11-13 21 77 17 Ammunition, Explosives, and Toxic Maintenance Facility | 23-11 23 00 Parking Controls | 34-61 21 00 Boards | 13-25 11 00 Primary Circulation Spaces | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 50 90 Exterior Door Supplementary Components | 11-13 21 77 21 Miscellaneous Items and Equipment Maintenance Facility | 23-11 23 11 Parking Meters | 34-61 21 11 Board of Directors | 13-25 11 11 Corridor | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 70 Exterior Louvers and Vents | 11-13 21 77 24 Installation Repair and Operation Maintenance Facility | 23-11 23 13 Parking Ticket Dispensers | 34-61 31 00 Committees | 13-25 11 13 Aisle | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 70 10 Exterior Louvers | 11-13 27 00 Public Welfare Facility | 23-11 23 15 Parking Coin Machine Units | 34-61 31 21 Ad Hoc Committee | 13-25 11 15 Mall | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 70 50 Exterior Vents | 11-13 27 11 Homeless Shelter | 23-11 23 17 Parking Key and Card Control Units | 34-61 41 00 Business Organizations | 13-25 11 17 Concourse | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 80 Exterior Wall Appurtenances | 11-13 27 14 Food Bank | 23-11 23 19 Parking Gates | 34-61 41 11 Corporation | 13-25 11 19 Breezeway | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 80 10 Exterior Fixed Grilles and Screens | 11-13 27 17 Forestry Guard Station | 23-11 23 21 Parking Dividers | 34-61 41 21 Partnership | 13-25 11 21 Moving Walkway | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 80 30 Exterior Opening Protection Devices | 11-13 27 21 Air Raid/Fallout Shelter | 23-11 23 23 Parking Signs | 34-61 41 31 Sole Proprietorship | 13-25 13 00 Transitional Circulation Spaces | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 80 50 Exterior Balcony Walls and Railings | 11-13 27 23 Miscellaneous Personnel Shelter | 23-11 23 23 11 Handicap Parking Signs | 34-61 41 41 Joint Venture | 13-25 13 11 Entry Vestibule | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 80 70 Exterior Fabrications | 11-13 27 26 Public Restroom/Shower | 23-11 23 23 13 Parking Time Zone Signs | 34-61 41 51 Single Purpose Entity | 13-25 13 13 Entry Lobby | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 80 80 Bird Control Devices | 11-13 29 00 Juvenile Facility | 23-11 23 23 15 Parking Tow Away Signs | 34-61 51 00 Nonprofit Organizations | 13-25 13 15 Box Lobby | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 20 90 Exterior Wall Specialties | 11-13 29 11 Orphanage | 23-11 25 00 Site Barrier Products | 34-61 51 11 Association | 13-25 13 17 Vestibule | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 Exterior Horizontal Enclosures | 11-13 29 14 Foster Home | 23-11 25 11 Perimeter Entry Devices | 34-61 51 21 Foundation | 13-25 13 19 Elevator Lobby | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 10 Roofing | 11-14 00 00 Cultural Facility | 23-11 25 11 11 Anti Ram Wedge Barriers | 34-61 51 31 Union | 13-25 13 21 Freight Elevator Vestibule | |||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 10 10 Steep Slope Roofing | 11-14 15 00 Monument and Memorial | 23-11 25 13 Perimeter Walls | 13-25 13 23 Landing | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 10 50 Low-Slope Roofing | 11-14 21 00 Museum | 23-11 25 13 11 Precast Perimeter Concrete Panel Perimeter Walls | 13-25 13 25 Anteroom | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 10 70 Canopy Roofing | 11-14 21 11 Art Museum | 23-11 25 13 13 Precast Perimeter Post Perimeter Walls | 13-25 13 27 Air Lock | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 10 90 Roofing Supplementary Components | 11-14 21 14 History Museum | 23-11 25 15 Perimeter Gates | 13-25 13 29 Sally Port | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 20 Roof Appurtenances | 11-14 21 17 Science and Technology Museum | 23-11 25 15 11 Drop Arm Gates | 13-25 13 31 Jet Way | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 20 10 Roof Accessories | 11-14 21 21 Children’s Museum | 23-11 25 15 11 11 Anti Ram Drop Arm Gates | 13-25 15 00 Connector | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 20 30 Roof Specialties | 11-14 21 24 Special Purpose Museum | 23-11 25 15 13 Rolling Gates | 13-25 17 00 External Circulation Spaces | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 20 70 Rainwater Management | 11-14 24 00 Religious Institution | 23-11 25 15 15 Sliding Gates | 13-25 19 00 Secondary Circulation Spaces | ||||||||||||||||||||||||||||||||||||||||||||||
| 21-02 30 40 Traffic Bearing Horizontal Enclosures | 11-14 24 11 Religious Facility | 23-11 25 15 15 11 Anti Ram Sliding Gates | 13-25 19 11 Door Set-Back |