This solicitation notice seeks proposals for construction services for the Bankruptcy and Probation Courts Consolidation Project at the Conrad B. Duberstein U.S. Courthouse. The General Services Administration Northeast and Caribbean Region Public Buildings Service will award a contract to provide general construction services including site work, interior buildout, and renovations. The small business set-aside solicitation is issued under NAICS code 236220 with an estimated value over $39.5 million. Interested small businesses must register in SAM and request access to secure documents on beta.sam.gov. A mandatory pre-proposal conference will be held on December 19, 2019 at the project site. Proposals are due on the date specified in the solicitation. Four paper copies and one electronic copy of proposals must be submitted. The solicitation includes all required documents for interested offerors to understand project requirements and respond appropriately.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS
GSA COBie Responsibility Matrix
Purpose This worksheet should be used to identify the parties responsible to complete COBie worksheet infomration during the course of a project
Instructions 1. List every company participating in the creation of COBie data in the "company" column of the legend. If needed add additional rows until all companies are listed.
2. For each company involved, provide point of contact information to ensure accountability.
3. Using the 'Fill Color' feature, choose a color for each company and fill the cell in the legend in the 'Color Code' column associated with that company.
4. Follow the process of the job from concept through handover. Using the Color Code for each company, use the 'Fill Color' feature to color each cell in the worksheet with the approriate color code for the company responsible for each item.
5. Cells remaining uncolored should be double checked to see if they are not needed for the project. If not, they should be filled with the Color Code assigned to Not Use or N/A.
6. Make sure to save and date the file as PDF and distribute to the team.
Team Responsibility Matrix GSA COBie Responsibility Matrix
| GSA Contract Number | Legend | Company | POC Name | POC email | POC Phone | Color Code |
| Task Order Number | Owner | fill color to use | ||||
| Project Name | Designer | fill color to use | ||||
| Location | Consultant | fill color to use | ||||
| COBie Version | General Contractor (Constructor) | fill color to use | ||||
| Date | All Parties | fill color to use | ||||
| Other | fill color to use | |||||
| Other | fill color to use | |||||
| Other | fill color to use | |||||
| Not Used or N/A for this project | fill color to use | |||||
| Not required | fill color to use |
| Worksheet => | Contact | Facility | Floor | Space | Zone | Type | Component | System | Assembly | |||||||||||
| (not used by GSA) | Connection | Spare | Resource | Job | Impact | |||||||||||||||
| (not used by GSA) | Document | Attribute | ||||||||||||||||||
| (not used by GSA) | Coordinate | |||||||||||||||||||
| (not used by GSA) | Issue | |||||||||||||||||||
| (not used by GSA) | PickLists | |||||||||||||||||||
| Column | ||||||||||||||||||||
| A | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Name | Category-Facility | ||
| B | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | CreatedBy | Category-Space | |
| C | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | CreatedOn | Category-Element | |
| D | Category | Category | Category | Category | Category | Category | TypeName | Category | SheetName | ConnectionType | Category | Category | Category | ImpactType | Category | Category | Category | Type | Category-Product | |
| E | Company | ProjectName | ExternalSystem | FloorName | SpaceNames | Description | Space | ComponentNames | ParentName | SheetName | TypeName | ExternalSystem | Status | ImpactStage | ApprovalBy | SheetName | SheetName | Risk | Category-Role | |
| F | Phone | SiteName | ExternalObject | Description | ExternalSystem | AssetType | Description | ExternalSystem | ChildNames | RowName1 | Suppliers | ExternalObject | TypeName | SheetName | Stage | RowName | RowName | Chance | LinearUnit | |
| G | ExternalSystem | LinearUnits | ExternalIdentifier | ExternalSystem | ExternalObject | Manufacturer | ExternalSystem | ExternalObject | AssemblyType | RowName2 | ExternalSystem | ExternalIdentifier | Description | RowName | SheetName | Value | CoordinateXAxis | Impact | AreaUnit | |
| H | ExternalObject | AreaUnits | Description | ExternalObject | ExternalIdentifier | ModelNumber | ExternalObject | ExternalIdentifier | ExternalSystem | RealizingElement | ExternalObject | Description | Duration | Value | RowName | Unit | CoordinateYAxis | SheetName1 | VolumeUnit | |
| I | ExternalIdentifier | VolumeUnits | Elevation | ExternalIdentifier | Description | WarrantyGuarantorParts | ExternalIdentifier | Description | ExternalObject | PortName1 | ExternalIdentifier | DurationUnit | ImpactUnit | Directory | ExternalSystem | CoordinateZAxis | RowName1 | FloorType | ||
| J | Department | CurrencyUnit | Height | RoomTag | WarrantyDurationParts | SerialNumber | ExternalIdentifier | PortName2 | Description | Start | LeadInTime | File | ExternalObject | ExternalSystem | SheetName2 | JobType | ||||
| K | OrganizationCode | AreaMeasurement | UsableHeight | WarrantyGuarantorLabor | InstallationDate | Description | ExternalSystem | SetNumber | TaskStartUnit | Duration | ExternalSystem | ExternalIdentifier | ExternalObject | RowName2 | ||||||
| L | GivenName | ExternalSystem | GrossArea | WarrantyDurationLabor | WarrantyStartDate | ExternalObject | PartNumber | Frequency | LeadOutTime | ExternalObject | Description | ExternalIdentifier | Description | |||||||
| M | FamilyName | ExternalProjectObject | NetArea | WarrantyDurationUnit | TagNumber | ExternalIdentifier | FrequencyUnit | ExternalSystem | ExternalIdentifier | AllowedValues | ClockwiseRotation | Owner | ||||||||
| N | Street | ExternalProjectIdentifier | ExternalSystem | BarCode | Description | ExternalSystem | ExternalObject | Description | ElevationalRotation | Mitigation | ||||||||||
| O | PostalBox | ExternalSiteObject | ExternalObject | AssetIdentifier | ExternalObject | ExternalIdentifier | Reference | YawRotation | ExternalSystem | |||||||||||
| P | Town | ExternalSiteIdentifier | ExternalIdentifier | ExternalIdentifier | Description | ExternalObject | ||||||||||||||
| Q | StateRegion | ExternalFacilityObject | ReplacementCost | TaskNumber | ExternalIdentifier | |||||||||||||||
| R | PostalCode | ExternalFacilityIdentifier | ExpectedLife | Priors | ||||||||||||||||
| S | Country | Description | DurationUnit | ResourceNames | ||||||||||||||||
| T | ProjectDescription | WarrantyDescription | ||||||||||||||||||
| U | SiteDescription | NominalLength | ||||||||||||||||||
| V | Phase | NominalWidth | ||||||||||||||||||
| W | NominalHeight | |||||||||||||||||||
| X | ModelReference | |||||||||||||||||||
| Y | Shape | |||||||||||||||||||
| Z | Size | |||||||||||||||||||
| AA | Color | |||||||||||||||||||
| AB | Finish | |||||||||||||||||||
| AC | Grade | |||||||||||||||||||
| AD | Material | |||||||||||||||||||
| AE | Constituents | |||||||||||||||||||
| AF | Features | |||||||||||||||||||
| AG | AccessibilityPerformance | |||||||||||||||||||
| AH | CodePerformance | |||||||||||||||||||
| AI | SustainabilityPerformance |