About this file

This document contains a solicitation notice and bid sheets for construction services for a bankruptcy and probation courts consolidation project. The solicitation is issued by the General Services Administration's Northeast and Caribbean Region Public Buildings Service for general construction services at the Conrad B. Duberstein Courthouse in Brooklyn, New York. The NAICS code for the project is 236220 for commercial and institutional building construction, and the solicitation is set aside for small businesses with average annual receipts of $39.5 million or less over three years. The bid sheets provide line items for construction phases, general contractor fees, unit pricing, and multiple optional additions. Proposals are due by the date specified, and a pre-proposal conference will be held on December 19, 2019. Interested offerors must register on beta.sam.gov and contact the point of contact for additional details.

View the file

Other files

File Type Posted
Additional Responses for RFIs 1-24-2020.pdf PDF
Solicitation Amendment 2 -SF30.pdf PDF
GSA 012700 Unit Prices FY15 Update Oct. 1 2014.pdf PDF
01 COBie Quick Reference Guide.pdf PDF
RFI Responses Duberstein.pdf PDF
Copy of Specifications Addendum 1.pdf PDF
07 COBie Playbook Training.pdf PDF
Door Hardware Photos2.jpg JPG image
Door Hardware Photos1.jpg JPG image
Copy of Narrative Addendum 1.pdf PDF
02b COBie Requirements Specification.pdf PDF
Door Hardware Photos3.jpg JPG image
Narrative Addendum 1 rev 20-0114.pdf PDF
03b COBie Sample - As-Built Workbook.xlsx XLSX spreadsheet
Solicitation Amendment 1 -SF30.pdf PDF
04 COBie Information Delivery Plan (IDP).docx DOCX document
00 COBie Playbook - READ ME FIRST.pdf PDF
Duberstein GC Bid Sheets_Rev 1.xlsx XLSX spreadsheet
Asset ImpExp Template-simple 7-22-16 (with RKT Edits 6-27-17).xlsx XLSX spreadsheet
06 Quick Start Guide - Definitions.pdf PDF
05 Responsibility Matrix.xlsx XLSX spreadsheet
GSA 012700 Unit Prices FY15 Update Oct. 1, 2014.pdf PDF
SF 1442 Form.pdf PDF
Duberstein Courts Consolidation - Prebid Agenda 2019 12 19.pdf PDF
Walkthrough Sign in 2019 12 19.pdf PDF
Attachment A4 - Past Performance Questionnaire.docx DOCX document
GC Reps&Certs sep19 (1).docx DOCX document
Attachment A1 - Experience Summary Table.docx DOCX document
GSA_Form_527.pdf PDF
Conrad B. Duberstein U.S. Courthouse GC Agreement 2019 12 12.pdf PDF
Wage Determination 2019 12 11.pdf PDF
SF 1442 Form.pdf PDF
Attachment A3 - Sample Key Personnel Resume Format (1).pdf PDF
Conrad B. Duberstein U.S. Courthouse GC Solicitation 2019 12 12.pdf PDF
Duberstein GC SOW - Final (2019.11.18).pdf PDF
GC Bid Sheets.xlsx XLSX spreadsheet
SF24-16d (1).pdf PDF
Attachment A2 - Project Fact Sheet.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet Tab 1

Duberstein Courthouse - Bankruptcy Consildation Project
Offerer Name:
ITEMSERVICES FOR BIDQTYUNITAMOUNT
A.Phase 1 Construction Phase Services
A.1A10 - Foundations1LS
A.2A20 - Basement Construction1LS
A.3B10 - Superstructure1LS
A.4B20 - Exterior Enclosure1LS
A.5B30 - Roofing1LS
A.6C10 - Interior Construction1LS
A.7C20 - Stairs1LS
A.8C30 - Interior Finishes1LS
A.9D10 - Conveying1LS
A.10D20 - Plumbing1LS
A.11D30 - HVAC1LS
A.12D40 - Fire Protection1LS
A.13D50 - Electrical1LS
A.14E10 - Equipment1LS
A.15E20 - Furnishings1LS
A.16F10 - Special Construction1LS
A.17F20 - Selective Building Demolition1LS
A.18CSO Guard Services for Off Hour Disruptive Work1LS
A.19Construction Phase Subtotal (sum of A.1 through A.18)
ITEMSERVICES FOR BIDQTYUNITAMOUNT
B.G.C. Overhead, Profit, & Bonding Costs
B.1G.C. Overhead and Profit (___% x A.19)1LS
B.2G.C. Bonding Costs (___% x A.19)1LS
B.3G.C. OH, Profit, & Bonding Subtotal (sum of B.1 thru B.2)
B.4Estimated Cost of Construction at Award (total = A.19 + B.3)

C. Unit Prices - See Div 012700 Unit Prices for descriptions of each item. For C.1 through C.5 insert the proposed unit cost for each line item and multiply that cost by the indicated quantity. Insert the product of those numbers on the total line. Unit costs shall include all costs including Overhead, Profit, and Bonding Costs. These costs shall not also be included in Section A.

ITEMSERVICES FOR BIDQTYUNITUNIT COSTTOTAL AMOUNT
C.1Sheet S 002 - Detail 3 - performing the probe, documenting the existing conditions, and restoring the fireproofing (anticipated concrete encasements)12EAX=

C.2 Sheet S 002 - Detail 4 - performing the probe, documenting the existing conditions, and restoring the fireproofing (anticipated concrete encasements) 12 EA X =

C.3 Sheet S 202 - Detail 1 - Beam to Column Flange connections 10 EA X =

C.4 Sheet S 202 - Detail 2 - Beam to Column Web connection 5 EA X =

C.5Sheet S 202 - Detail 3 - Beam to Girder connections20EAX=
C.6Unit Price Total (sum of C.1 through C.5)
ITEMSERVICES FOR BIDQTYUNITAMOUNT
D.Add Options (Not included in base proposal above. Shall include all costs including Overhead, Profit, and Bonding Costs.)

D.1 Option 1A - Phase 2 Probation Construction (See Bid Sheet 2, Sections F and G for break down. Lump sum shall be Item G.4 from Bid Sheet 2) 1 LS

D.2Option 1B - Johnson Street Entrance Reactivation (See Bid Sheet 2, Sections H for break down. Lump sum shall be Item J.4 from Bid Sheet 2)1LS
D.3Option 2 - Bankruptcy - 2nd Floor Courtyard1LS
D.4Option 3 - Scope for GSA Space1LS
D.5Option 4A - Bankruptcy - IT Cabling1LS
D.6Option 4B - Probation - IT Cabling1LS
D.7Option 5 - Bankruptcy - DIRRT Partition1LS
D.8Option 6 - Bankruptcy - DIRRT Partition up to 5' above Base 10' Height1LS
D.9Option 7 - Bankruptcy - New Paint at 1st Floor Atrium1LS
D.10Option 8 - Probation - Curtain Wall Modification1LS
D.11Option 9A - Bankruptcy - High CAC Ceiling1LS
D.12Option 9B - Probation - High CAC Ceiling1LS
D.13Options Total (sum of D.1 through D.12)

E.1 Proposal Grand Total = Items B.4 + C.6 + D.13 + G.3 + J.3

&A Page &P of &N

Bid Sheet Tab 2

Duberstein Courthouse - Probation Build Out Project
Offerer Name:
ITEMSERVICES FOR BIDQTYUNITAMOUNT
F.Option 1A. - Probation Construction Phase Services
F.1A10 - Foundations1LS
F.2A20 - Basement Construction1LS
F.3B10 - Superstructure1LS
F.4B20 - Exterior Enclosure1LS
F.5B30 - Roofing1LS
F.6C10 - Interior Construction1LS
F.7C20 - Stairs1LS
F.8C30 - Interior Finishes1LS
F.9D10 - Conveying1LS
F.10D20 - Plumbing1LS
F.11D30 - HVAC1LS
F.12D40 - Fire Protection1LS
F.13D50 - Electrical1LS
F.14E10 - Equipment1LS
F.15E20 - Furnishings1LS
F.16F10 - Special Construction1LS
F.17F20 - Selective Building Demolition1LS
F.18CSO Guard Services for Off Hour Disruptive Work1LS
F.19Option 1A. Probation Construction Phase Subtotal (sum of F.1 through F.18)
G.G.C. Overhead, Profit, & Bonding Costs
G.1G.C. Overhead and Profit (___% x F.19)1LS
G.2G.C. Bonding Costs (___% x F.19)1LS
G.3G.C. Option 1A OH, Profit, & Bonding Subtotal (sum of G.1 through G.2)
G.4Estimated Cost of Option 1A (total = F.19 + G.3)
H.Option 1B - Johnson Street Entrance Reactivation Construction Phase Services
H.1A10 - Foundations (Shell)1LS
H.2A10 - Foundations (Tenant Improvements)1LS
H.3A20 - Basement Construction (Shell)1LS
H.4A20 - Basement Construction (TI)1LS
H.5B10 - Superstructure (Shell)1LS
H.6B10 - Superstructure (TI)1LS
H.7B20 - Exterior Enclosure (Shell)1LS
H.8B20 - Exterior Enclosure (TI)1LS
H.9B30 - Roofing (Shell)1LS
H.10B30 - Roofing (TI)1LS
H.11C10 - Interior Construction (Shell)1LS
H.12C10 - Interior Construction (TI)1LS
H.13C20 - Stairs (Shell)1LS
H.14C20 - Stairs (TI)1LS
H.15C30 - Interior Finishes (Shell)1LS
H.16C30 - Interior Finishes (TI)1LS
H.17D10 - Conveying (Shell)1LS
H.18D10 - Conveying (TI)1LS
H.19D20 - Plumbing (Shell)1LS
H.20D20 - Plumbing (TI)1LS
H.21D30 - HVAC (Shell)1LS
H.22D30 - HVAC (TI)1LS
H.23D40 - Fire Protection (Shell)1LS
H.24D40 - Fire Protection (TI)1LS
H.25D50 - Electrical (Shell)1LS
H.26D50 - Electrical (TI)1LS
H.27E10 - Equipment (Shell)1LS
H.28E10 - Equipment (TI)1LS
H.29E20 - Furnishings (Shell)1LS
H.30E20 - Furnishings (TI)1LS
H.31F10 - Special Construction (Shell)1LS
H.32F10 - Special Construction (TI)1LS
H.33F20 - Selective Building Demolition (Shell)1LS
H.34F20 - Selective Building Demolition (TI)1LS
H.35CSO Guard Services for Off Hour Disruptive Work (TI)1LS
H.36Option 1B - Johnson Street Entrance Reactivation Construction Phase Subtotal (sum of H.1 through H.35)
J.G.C. Overhead, Profit, & Bonding Costs
J.1G.C. Overhead and Profit (___% x H.36)1LS
J.2G.C. Bonding Costs (___% x H.36)1LS
J.3G.C. Option 1B OH, Profit, & Bonding Subtotal (sum of J.1 through J.2)
J.4Estimated Cost of Option 1B (total = H.36 + J.4)

&A Page &P of &N