This solicitation package requests proposals for general construction services for the Conrad B. Duberstein Courts Consolidation project in Brooklyn, New York. The project involves consolidating the bankruptcy and probation courts through construction work at the existing Conrad B. Duberstein Courthouse. Interested offerors should review the attached solicitation documents, including construction specifications, pricing sheets, and options for additional work. A mandatory pre-proposal conference will be held on December 19, 2019, with proposals due based on the date specified in the solicitation. The General Services Administration (GSA) is issuing this request as a total small business set-aside, where the applicable NAICS code of 236220 considers a small business to have average annual receipts of $39.5 million or less over three years.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet 1
| Duberstein Courthouse - Bankruptcy Consildation Project | Sheet 1 of 2 | |||
| ITEM | SERVICES FOR BID | QTY | UNIT | AMOUNT |
| A. | Construction Phase Services | |||
| A.1 | A10 - Foundations | 1 | LS | |
| A.2 | A20 - Basement Construction | 1 | LS | |
| A.3 | B10 - Superstructure | 1 | LS | |
| A.4 | B20 - Exterior Enclosure | 1 | LS | |
| A.5 | B30 - Roofing | 1 | LS | |
| A.6 | C10 - Interior Construction | 1 | LS | |
| A.7 | C20 - Stairs | 1 | LS | |
| A.8 | C30 - Interior Finishes | 1 | LS | |
| A.9 | D10 - Conveying | 1 | LS | |
| A.10 | D20 - Plumbing | 1 | LS | |
| A.11 | D30 - HVAC | 1 | LS | |
| A.12 | D40 - Fire Protection | 1 | LS | |
| A.13 | D50 - Electrical | 1 | LS | |
| A.14 | E10 - Equipment | 1 | LS | |
| A.15 | E20 - Furnishings | 1 | LS | |
| A.16 | F10 - Special Construction | 1 | LS | |
| A.17 | F20 - Selective Building Demolition | 1 | LS | |
| A.18 | CSO Guard Services for Off Hour Disruptive Work | 1 | LS | |
| A.19 | Construction Phase Subtotal (sum of A.1 thru A.18) |
| B. | G.C. Overhead, Profit, & Bonding Costs | ||
| B.1 | G.C. Overhead and Profit (___% x A.10) | 1 | LS |
| B.2 | G.C. Bonding Costs (___% x A.10) | 1 | LS |
| B.3 | G.C. OH, Profit, & Bonding Subtotal (sum of B.1 thru B.2) | ||
| B.4 | Estimated Cost of Construction at Award (total = A.11 + B.1 + B.2) |
| C. | Add Alternates (Not included in base proposal above. Shall include all costs including Overhead, Profit, and Bonding Costs.) | ||
| C.1 | Alternate 1 - Remove and replace existing sprinkler main at 2nd floor area of work | 1 | LS |
| C.2 | Alternate 2 - New Electrical Panel | 1 | LS |
| D. | Add Options (Not included in base proposal above. Shall include all costs including Overhead, Profit, and Bonding Costs.) | ||
| D.1 | Option 1A - Phase 2 Probation Construction (See Sheet 2 for breakdown) | 1 | LS |
| D.2 | Option 1B - Johnson Street Entrance Reactivation | 1 | LS |
| D.3 | Option 2 - Bankruptcy - 2nd Floor Courtyard | 1 | LS |
| D.4 | Option 3 - Scope for GSA Space | 1 | LS |
| D.5 | Option 4A - Bankruptcy - IT Cabling | 1 | LS |
| D.6 | Option 4B - Probation - IT Cabling | 1 | LS |
| D.7 | Option 5 - Bankruptcy - DIRRT Partition | 1 | LS |
| D.8 | Option 6 - Bankruptcy - DIRRT Partition up to 5' above Base 10' Height | 1 | LS |
| D.9 | Option 7 - Bankruptcy - New Paint at 1st Floor Atrium | 1 | LS |
| D.10 | Option 8 - Probation - Curtain Wall Modification | 1 | LS |
| D.11 | Option 9A - Bankruptcy - High CAC Ceiling | 1 | LS |
| D.12 | Option 9B - Probation - High CAC Ceiling | 1 | LS |
| D.13 | Options Total (sum of D.1 through D.12) |
E.1 Proposal Grand Total = Items A.11 + B.4 + D.13
Bid Sheet 2
| Duberstein Courthouse - Probation Build Out Project | Sheet 2 of 2 | |||
| ITEM | SERVICES FOR BID | QTY | UNIT | AMOUNT |
| A. | Option 1A. - Probation Construction Phase Services | |||
| A.1 | A10 - Foundations | 1 | LS | |
| A.2 | A20 - Basement Construction | 1 | LS | |
| A.3 | B10 - Superstructure | 1 | LS | |
| A.4 | B20 - Exterior Enclosure | 1 | LS | |
| A.5 | B30 - Roofing | 1 | LS | |
| A.6 | C10 - Interior Construction | 1 | LS | |
| A.7 | C20 - Stairs | 1 | LS | |
| A.8 | C30 - Interior Finishes | 1 | LS | |
| A.9 | D10 - Conveying | 1 | LS | |
| A.10 | D20 - Plumbing | 1 | LS | |
| A.11 | D30 - HVAC | 1 | LS | |
| A.12 | D40 - Fire Protection | 1 | LS | |
| A.13 | D50 - Electrical | 1 | LS | |
| A.14 | E10 - Equipment | 1 | LS | |
| A.15 | E20 - Furnishings | 1 | LS | |
| A.16 | F10 - Special Construction | 1 | LS | |
| A.17 | F20 - Selective Building Demolition | 1 | LS | |
| A.18 | CSO Guard Services for Off Hour Disruptive Work | 1 | LS | |
| A.19 | Option 1A. Probation Construction Phase Subtotal (sum of A.1 thru A.18) |
| B. | Option 1B - Johnson Street Entrance Reactivation Construction Phase Services | ||
| B.1 | A10 - Foundations (Shell) | 1 | LS |
| B.2 | A10 - Foundations (Tenant Improvements) | 1 | LS |
| B.3 | A20 - Basement Construction (Shell) | 1 | LS |
| B.4 | A20 - Basement Construction (TI) | 1 | LS |
| B.5 | B10 - Superstructure (Shell) | 1 | LS |
| B.6 | B10 - Superstructure (TI) | 1 | LS |
| B.7 | B20 - Exterior Enclosure (Shell) | 1 | LS |
| B.8 | B20 - Exterior Enclosure (TI) | 1 | LS |
| B.9 | B30 - Roofing (Shell) | 1 | LS |
| B.10 | B30 - Roofing (TI) | 1 | LS |
| B.11 | C10 - Interior Construction (Shell) | 1 | LS |
| B.12 | C10 - Interior Construction (TI) | 1 | LS |
| B.13 | C20 - Stairs (Shell) | 1 | LS |
| B.14 | C20 - Stairs (TI) | 1 | LS |
| B.15 | C30 - Interior Finishes (Shell) | 1 | LS |
| B.16 | C30 - Interior Finishes (TI) | 1 | LS |
| B.17 | D10 - Conveying (Shell) | 1 | LS |
| B.18 | D10 - Conveying (TI) | 1 | LS |
| B.19 | D20 - Plumbing (Shell) | 1 | LS |
| B.20 | D20 - Plumbing (TI) | 1 | LS |
| B.21 | D30 - HVAC (Shell) | 1 | LS |
| B.22 | D30 - HVAC (TI) | 1 | LS |
| B.23 | D40 - Fire Protection (Shell) | 1 | LS |
| B.24 | D40 - Fire Protection (TI) | 1 | LS |
| B.25 | D50 - Electrical (Shell) | 1 | LS |
| B.26 | D50 - Electrical (TI) | 1 | LS |
| B.27 | E10 - Equipment (Shell) | 1 | LS |
| B.28 | E10 - Equipment (TI) | 1 | LS |
| B.29 | E20 - Furnishings (Shell) | 1 | LS |
| B.30 | E20 - Furnishings (TI) | 1 | LS |
| B.31 | F10 - Special Construction (Shell) | 1 | LS |
| B.32 | F10 - Special Construction (TI) | 1 | LS |
| B.33 | F20 - Selective Building Demolition (Shell) | 1 | LS |
| B.34 | F20 - Selective Building Demolition (TI) | 1 | LS |
| B.35 | CSO Guard Services for Off Hour Disruptive Work (TI) | 1 | LS |
| B.36 | Option 1B - Johnson Street Entrance Reactivation Construction Phase Subtotal (sum of B.1 thru B.35) |
| C. | G.C. Overhead, Profit, & Bonding Costs | ||
| C.1 | G.C. Overhead and Profit (___% x (A.19 + B.36)) | 1 | LS |
| C.2 | G.C. Bonding Costs (___% x (A.19 + B.36)) | 1 | LS |
| C.3 | G.C. OH, Profit, & Bonding Subtotal (sum of C.1 thru C.2) |
D.1 Proposal Grand Total = Items A.19 + B.36 + C.3