Duberstein GC Bid Sheets_Rev 1.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- 47PC0319N0001
About this file
This solicitation notice and bid sheets request proposals for general construction services for the Conrad B. Duberstein Courts Consolidation Project at the Duberstein Courthouse in Brooklyn, New York. The project involves consolidating the bankruptcy and probation courts through construction phase services such as foundations, superstructure, enclosure, interior construction and finishes, conveying, plumbing, HVAC, fire protection and electrical systems. The solicitation is a total small business set aside for NAICS 236220 with an average annual revenue limit of $39.5 million. Interested offerors should register for the pre-proposal conference on December 19, 2019 and submit four paper and one electronic copy of proposals by the stated due date. Pricing is to be provided using the bid sheet templates for construction phase services, overhead and profit, unit prices and optional add alternates. The General Services Administration Public Buildings Service is the contracting agency.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet 1
| Duberstein Courthouse - Bankruptcy Consildation Project | Sheet 1 of 2 | |||
| Offerer Name: | ||||
| ITEM | SERVICES FOR BID | QTY | UNIT | AMOUNT |
| A. | Construction Phase Services | |||
| A.1 | A10 - Foundations | 1 | LS | |
| A.2 | A20 - Basement Construction | 1 | LS | |
| A.3 | B10 - Superstructure | 1 | LS | |
| A.4 | B20 - Exterior Enclosure | 1 | LS | |
| A.5 | B30 - Roofing | 1 | LS | |
| A.6 | C10 - Interior Construction | 1 | LS | |
| A.7 | C20 - Stairs | 1 | LS | |
| A.8 | C30 - Interior Finishes | 1 | LS | |
| A.9 | D10 - Conveying | 1 | LS | |
| A.10 | D20 - Plumbing | 1 | LS | |
| A.11 | D30 - HVAC | 1 | LS | |
| A.12 | D40 - Fire Protection | 1 | LS | |
| A.13 | D50 - Electrical | 1 | LS | |
| A.14 | E10 - Equipment | 1 | LS | |
| A.15 | E20 - Furnishings | 1 | LS | |
| A.16 | F10 - Special Construction | 1 | LS | |
| A.17 | F20 - Selective Building Demolition | 1 | LS | |
| A.18 | CSO Guard Services for Off Hour Disruptive Work | 1 | LS | |
| A.19 | Construction Phase Subtotal (sum of A.1 through A.18) |
| ITEM | SERVICES FOR BID | QTY | UNIT | AMOUNT |
| B. | G.C. Overhead, Profit, & Bonding Costs | |||
| B.1 | G.C. Overhead and Profit (___% x A.19) | 1 | LS | |
| B.2 | G.C. Bonding Costs (___% x A.19) | 1 | LS | |
| B.3 | G.C. OH, Profit, & Bonding Subtotal (sum of B.1 thru B.2) | |||
| B.4 | Estimated Cost of Construction at Award (total = A.19 + B.1 + B.2) |
C. Unit Prices - See Div 012700 Unit Prices for descriptions of each item. For B.1 through B.5 insert the proposed unit cost for each line item and multiply that cost by the indicated quantity. Insert the product of those numbers on the total line. Unit costs shall include all costs including Overhead, Profit, and Bonding Costs.
| ITEM | SERVICES FOR BID | QTY | UNIT | UNIT COST | AMOUNT | ||
| C.1 | Sheet S 002 - Detail 3 - performing the probe, documenting the existing conditions, and restoring the fireproofing (anticipated concrete encasements) | X | = |
C.2 Sheet S 002 - Detail 4 - performing the probe, documenting the existing conditions, and restoring the fireproofing (anticipated concrete encasements) X =
C.3 Sheet S 202 - Detail 1 - Beam to Column Flange connections X =
C.4 Sheet S 202 - Detail 2 - Beam to Column Web connection X =
| C.5 | Sheet S 202 - Detail 3 - Beam to Girder connections | X | = |
| C.6 | Unit Price Total (sum of C.1 through C.5) |
| ITEM | SERVICES FOR BID | QTY | UNIT | AMOUNT |
| D. | Add Options (Not included in base proposal above. Shall include all costs including Overhead, Profit, and Bonding Costs. |
D.1 Option 1A - Phase 2 Probation Construction (See Sheet 2 for breakdown)
| D.2 | Option 1B - Johnson Street Entrance Reactivation |
| D.3 | Option 2 - Bankruptcy - 2nd Floor Courtyard |
| D.4 | Option 3 - Scope for GSA Space |
| D.5 | Option 4A - Bankruptcy - IT Cabling |
| D.6 | Option 4B - Probation - IT Cabling |
| D.7 | Option 5 - Bankruptcy - DIRRT Partition |
| D.8 | Option 6 - Bankruptcy - DIRRT Partition up to 5' above Base 10' Height |
| D.9 | Option 7 - Bankruptcy - New Paint at 1st Floor Atrium |
| D.10 | Option 8 - Probation - Curtain Wall Modification |
| D.11 | Option 9A - Bankruptcy - High CAC Ceiling |
| D.12 | Option 9B - Probation - High CAC Ceiling |
| D.13 | Options Total (sum of D.1 through D.12) |
F.1 Proposal Grand Total = Items A.19 + B.4 + D.13
Bid Sheet 2
| Duberstein Courthouse - Probation Build Out Project | Sheet 2 of 2 | |||
| Offerer Name: | ||||
| ITEM | SERVICES FOR BID | QTY | UNIT | AMOUNT |
| A. | Option 1A. - Probation Construction Phase Services | |||
| A.1 | A10 - Foundations | 1 | LS | |
| A.2 | A20 - Basement Construction | 1 | LS | |
| A.3 | B10 - Superstructure | 1 | LS | |
| A.4 | B20 - Exterior Enclosure | 1 | LS | |
| A.5 | B30 - Roofing | 1 | LS | |
| A.6 | C10 - Interior Construction | 1 | LS | |
| A.7 | C20 - Stairs | 1 | LS | |
| A.8 | C30 - Interior Finishes | 1 | LS | |
| A.9 | D10 - Conveying | 1 | LS | |
| A.10 | D20 - Plumbing | 1 | LS | |
| A.11 | D30 - HVAC | 1 | LS | |
| A.12 | D40 - Fire Protection | 1 | LS | |
| A.13 | D50 - Electrical | 1 | LS | |
| A.14 | E10 - Equipment | 1 | LS | |
| A.15 | E20 - Furnishings | 1 | LS | |
| A.16 | F10 - Special Construction | 1 | LS | |
| A.17 | F20 - Selective Building Demolition | 1 | LS | |
| A.18 | CSO Guard Services for Off Hour Disruptive Work | 1 | LS | |
| A.19 | Option 1A. Probation Construction Phase Subtotal (sum of A.1 thru A.18) |
| B. | Option 1B - Johnson Street Entrance Reactivation Construction Phase Services | ||
| B.1 | A10 - Foundations (Shell) | 1 | LS |
| B.2 | A10 - Foundations (Tenant Improvements) | 1 | LS |
| B.3 | A20 - Basement Construction (Shell) | 1 | LS |
| B.4 | A20 - Basement Construction (TI) | 1 | LS |
| B.5 | B10 - Superstructure (Shell) | 1 | LS |
| B.6 | B10 - Superstructure (TI) | 1 | LS |
| B.7 | B20 - Exterior Enclosure (Shell) | 1 | LS |
| B.8 | B20 - Exterior Enclosure (TI) | 1 | LS |
| B.9 | B30 - Roofing (Shell) | 1 | LS |
| B.10 | B30 - Roofing (TI) | 1 | LS |
| B.11 | C10 - Interior Construction (Shell) | 1 | LS |
| B.12 | C10 - Interior Construction (TI) | 1 | LS |
| B.13 | C20 - Stairs (Shell) | 1 | LS |
| B.14 | C20 - Stairs (TI) | 1 | LS |
| B.15 | C30 - Interior Finishes (Shell) | 1 | LS |
| B.16 | C30 - Interior Finishes (TI) | 1 | LS |
| B.17 | D10 - Conveying (Shell) | 1 | LS |
| B.18 | D10 - Conveying (TI) | 1 | LS |
| B.19 | D20 - Plumbing (Shell) | 1 | LS |
| B.20 | D20 - Plumbing (TI) | 1 | LS |
| B.21 | D30 - HVAC (Shell) | 1 | LS |
| B.22 | D30 - HVAC (TI) | 1 | LS |
| B.23 | D40 - Fire Protection (Shell) | 1 | LS |
| B.24 | D40 - Fire Protection (TI) | 1 | LS |
| B.25 | D50 - Electrical (Shell) | 1 | LS |
| B.26 | D50 - Electrical (TI) | 1 | LS |
| B.27 | E10 - Equipment (Shell) | 1 | LS |
| B.28 | E10 - Equipment (TI) | 1 | LS |
| B.29 | E20 - Furnishings (Shell) | 1 | LS |
| B.30 | E20 - Furnishings (TI) | 1 | LS |
| B.31 | F10 - Special Construction (Shell) | 1 | LS |
| B.32 | F10 - Special Construction (TI) | 1 | LS |
| B.33 | F20 - Selective Building Demolition (Shell) | 1 | LS |
| B.34 | F20 - Selective Building Demolition (TI) | 1 | LS |
| B.35 | CSO Guard Services for Off Hour Disruptive Work (TI) | 1 | LS |
| B.36 | Option 1B - Johnson Street Entrance Reactivation Construction Phase Subtotal (sum of B.1 thru B.35) |
| C. | G.C. Overhead, Profit, & Bonding Costs | ||
| C.1 | G.C. Overhead and Profit (___% x (A.19 + B.36)) | 1 | LS |
| C.2 | G.C. Bonding Costs (___% x (A.19 + B.36)) | 1 | LS |
| C.3 | G.C. OH, Profit, & Bonding Subtotal (sum of C.1 thru C.2) |
D.1 Proposal Grand Total = Items A.19 + B.36 + C.3