4-E9. Appendix 7 cover.pdf

PDF 87 KB Posted

Attached to
FORT KING ROAD FROM HESTER ROAD TO NORTH OF COLEMAN AVENUE SIDEWALK
Solicitation number
IFB-KM-26-002
Issued by
Pasco County, Florida

About this file

This is an Appendix cover document for a construction contract opportunity issued by the Pasco County Board of County Commissioners in Florida. The project involves the construction of sidewalks and pedestrian safety improvements on Fort King Road. Specifically, the work includes constructing a six-foot sidewalk on the east side of Fort King Road from Hester Road to north of Coleman Avenue, and a sidewalk on the west side from Morningside Drive to the south side of the Pasco High School property. The project also encompasses the construction of enhanced pedestrian crosswalks with pushbutton-activated rapid rectangular flashing beacons and lighting at two locations: the south side of Pasco High School property and the northern leg of the Coleman Avenue and Fort King Road intersection. Additional scope includes modifications to an existing culvert and headwall on the east side of Fort King Road between Dixie Avenue and Poinsettia Avenue, as well as the installation of new guardrail with reduced post spacing.

The document serves as a cover page for Appendix 7 of the project specifications and does not contain specific information regarding pricing terms, bid amounts, set-asides, contract duration, response deadlines, or funding sources. Further documentation within the complete bid package would contain these essential contract details and financial requirements necessary for vendors to prepare comprehensive proposals.

View the file

Other files

File Type Posted
13-F. BID PROPOSAL-OFFEROR FORM - EDITABLE 8-28-25.pdf PDF
23-C. GENERAL CONDITIONS.pdf PDF
8-E7. Appendix 4.pdf PDF
18-G5. REQUIRED DOCUMENTS FOR LAP PROJECTS - ONLY IF APPLICABLE.pdf PDF
1-A. ADVERTISEMENT PAGE.pdf PDF
29-E1. ROADWAY PLANS.pdf PDF
26-G1. REQUIRED BID BOND.pdf PDF
5-E5. Appendix 2 cover.pdf PDF
7-E4. Appendices Coversheet.pdf PDF
31-E3. Utility Coordination.pdf PDF
30-E4.2 Appendix 1 LAP agreement.pdf PDF
14-G3. REQUIRED CONFLICT OF INTEREST DISCLOSURE.pdf PDF
32-E8. Appendix 5 Cover.pdf PDF
22-E3.2 Geotechnical Report.pdf PDF
17-G2. REQUIRED FLORIDA TRENCH SAFETY ACT CERTIFICATION AND DISCLOSURE STATEMENT.pdf PDF
11-E6. Appendix 3.pdf PDF
3-E. PROJECT-SPECIFIC CONDITIONS Mar 2026-WK.pdf PDF
10-E4.1 Appendix 1 cover.pdf PDF
21-I. POST AWARD DOCUMENTS - LAP CONSTRUCTION.pdf PDF
9-E5.1 Appendix 2.pdf PDF
12-F1. FEDERAL PROVISIONS - CONSTRUCTION - IF NEEDED.pdf PDF
28-E8.2 Appendix 6.pdf PDF
24-E9.1 Appendix 7.pdf PDF
27-B. INSTRUCTIONS TO BIDDERS.pdf PDF
16-G4. REQUIRED CERTIFICATION OF UNDERSTANDING.pdf PDF
20-E3.3 Culvert Design Calculations.pdf PDF
6-D. SPECIAL CONDITIONS.pdf PDF
25-E3.1 Drainage Design Memorandum.pdf PDF
2-E2. ERP Approve 05.08.2025.pdf PDF
19-H. AGREEMENT.pdf PDF
15-E8.1 Appendix 5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX

File details come from the government source that posted it. Updated .