16-G4. REQUIRED CERTIFICATION OF UNDERSTANDING.pdf

PDF 122 KB Posted

Attached to
FORT KING ROAD FROM HESTER ROAD TO NORTH OF COLEMAN AVENUE SIDEWALK
Solicitation number
IFB-KM-26-002
Issued by
Pasco County, Florida

About this file

This is a Certification of Understanding document required for bidders on a Pasco County, Florida construction project involving the Fort King Road sidewalk and pedestrian safety improvements. The certification confirms that bidders understand the terms and conditions of the General National Pollutant Discharge Elimination System (NPDES) Permit that authorizes storm water discharge activities from the construction site. Bidders must certify under penalty of perjury that they comprehend the permit requirements and the Storm Water Pollution Prevention Control Plan applicable to the project, which includes construction of six-foot sidewalks on both sides of Fort King Road, enhanced pedestrian crosswalks with pushbutton activated rapid rectangular flashing beacons, and modifications to existing culverts, headwalls, and guardrails in the designated area.

The document requires authorized representatives of bidding entities to execute the certification by providing their name, printed name, title, and date. By signing this certification, bidders agree to hold Pasco County harmless from any violations of the General NPDES Permit conditions and the Storm Water Pollution Prevention Control Plan throughout the project duration. This certification serves as a binding commitment that demonstrates the bidder's understanding of environmental compliance obligations associated with the construction work and storm water management requirements specific to the Fort King Road project location in Florida.

View the file

Other files

File Type Posted
13-F. BID PROPOSAL-OFFEROR FORM - EDITABLE 8-28-25.pdf PDF
23-C. GENERAL CONDITIONS.pdf PDF
8-E7. Appendix 4.pdf PDF
18-G5. REQUIRED DOCUMENTS FOR LAP PROJECTS - ONLY IF APPLICABLE.pdf PDF
4-E9. Appendix 7 cover.pdf PDF
1-A. ADVERTISEMENT PAGE.pdf PDF
29-E1. ROADWAY PLANS.pdf PDF
26-G1. REQUIRED BID BOND.pdf PDF
5-E5. Appendix 2 cover.pdf PDF
7-E4. Appendices Coversheet.pdf PDF
31-E3. Utility Coordination.pdf PDF
30-E4.2 Appendix 1 LAP agreement.pdf PDF
14-G3. REQUIRED CONFLICT OF INTEREST DISCLOSURE.pdf PDF
32-E8. Appendix 5 Cover.pdf PDF
22-E3.2 Geotechnical Report.pdf PDF
17-G2. REQUIRED FLORIDA TRENCH SAFETY ACT CERTIFICATION AND DISCLOSURE STATEMENT.pdf PDF
11-E6. Appendix 3.pdf PDF
3-E. PROJECT-SPECIFIC CONDITIONS Mar 2026-WK.pdf PDF
10-E4.1 Appendix 1 cover.pdf PDF
21-I. POST AWARD DOCUMENTS - LAP CONSTRUCTION.pdf PDF
9-E5.1 Appendix 2.pdf PDF
12-F1. FEDERAL PROVISIONS - CONSTRUCTION - IF NEEDED.pdf PDF
28-E8.2 Appendix 6.pdf PDF
24-E9.1 Appendix 7.pdf PDF
27-B. INSTRUCTIONS TO BIDDERS.pdf PDF
20-E3.3 Culvert Design Calculations.pdf PDF
6-D. SPECIAL CONDITIONS.pdf PDF
25-E3.1 Drainage Design Memorandum.pdf PDF
2-E2. ERP Approve 05.08.2025.pdf PDF
19-H. AGREEMENT.pdf PDF
15-E8.1 Appendix 5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATION OF UNDERSTANDING

(NPDES AND PPCP)

On behalf of the BIDDER named below, I am authorized, and do hereby certify, under penalty of perjury, that I understand the terms and conditions of the General National Pollutant Discharge Elimination System (NPDES) Permit that authorizes the storm water discharge activity from the construction site identified as part of this certification.

Furthermore, I am authorized, and hereby certify, that the BIDDER will hold the COUNTY harmless for any and all violations of the General NPDES Permit conditions and the Storm Water Pollution Prevention Control Plan in connection with this Project.

NAME OF BIDDER

BY:

PRINTED NAME:

TITLE:

DATE:

NAME OF BIDDER:
PRINTED NAME:
undefined:
undefined_2:

File details come from the government source that posted it. Updated .