24-E9.1 Appendix 7.pdf
PDF 93 KB Posted
- Solicitation number
- IFB-KM-26-002
- Issued by
- Pasco County, Florida
About this file
This is a Florida Department of Transportation Project Commitments Record detailing an environmental compliance document for a Pasco County sidewalk and pedestrian infrastructure project on Fort King Road. The project, identified as FAP# D723-074-B and FM# 445503-1, involves construction of a six-foot sidewalk on the east side of Fort King Road from Hester Road to north of Coleman Avenue, and a sidewalk on the west side from Morningside Drive to the south side of Pasco High School property. Additional work includes enhanced pedestrian crosswalks with pushbutton-activated rapid rectangular flashing beacons and lighting at Pasco High School and the Coleman Avenue intersection, modifications to an existing culvert and headwall between Dixie Avenue and Poinsettia Avenue, and installation of new guardrail with reduced post spacing. The environmental commitment was approved by the US Fish and Wildlife Service Florida Ecological Services Office.
The environmental document establishes a specific commitment regarding Eastern Indigo Snake protection during the construction phase. The commitment requires that the most recent version of the USFWS Standard Protection Measures for the Eastern Indigo Snake be utilized throughout construction activities. This commitment is categorized as a construction implementation discipline and affects no other environmental commitments. No other projects are linked to this environmental commitment, and the record was printed on January 21, 2025.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FM:
Project Name:
Environmental Document Type:
445503-1
PASCO ELEMENTARY - FORT KING RD FROM HESTER TO
N OF COLEMAN AVE
FAP#: D723-074-B
Environmental Document Approval Date:
Commitment Title: Eastern Indigo Snake Commitment Made To: US Fish and Wildlife Service Florida Ecological
Services Office Environmental Commitment: No
Status: Commitment Added Affects Any Other Environmental Commitment: No
Implementation Discipline: Construction Commitment Approval Date:
Transmittal Date:
Commitment Description: The most recent version of the USFWS Standard Protection Measures for the Eastern Indigo Snake will be utilized during construction.
Comments/Notes:
(Most Recent Comment Shown)
Projects Linked to the Commitment There are no other projects linked to this commitment.
FM#: 445503-1 Print Date: 1/21/2025 7:07:56 AMPage 1 of 1
PSEE
State of Florida Department of Transportation
Project Commitments Record
File details come from the government source that posted it. Updated .