2-E2. ERP Approve 05.08.2025.pdf

PDF 137 KB Posted

Attached to
FORT KING ROAD FROM HESTER ROAD TO NORTH OF COLEMAN AVENUE SIDEWALK
Solicitation number
IFB-KM-26-002
Issued by
Pasco County, Florida

About this file

Summary

This is an ERP (Enterprise Resource Planning) approval document dated May 8, 2025, related to the Pasco County Board of County Commissioners' Fort King Road sidewalk and pedestrian safety improvement project in Florida. The project encompasses construction of a six-foot sidewalk on the east side of Fort King Road from Hester Road to north of Coleman Avenue, and a sidewalk on the west side from Morningside Drive to the south side of Pasco High School property. The scope includes enhanced pedestrian crosswalks with pushbutton-activated rapid rectangular flashing beacons at the south side of Pasco High School and at the Coleman Avenue intersection, as well as modifications to an existing culvert and headwall on the east side of Fort King Road between Dixie Avenue and Poinsettia Avenue, and construction of new guardrail with reduced post spacing.

The document serves as an approval mechanism for the project within Pasco County's procurement and project authorization framework. While specific contract pricing, funding amounts, and response deadlines are not detailed in the document title or description provided, the approval indicates the project has progressed through internal county review processes and is authorized to move forward to the bidding and construction phases. The ERP approval confirms alignment with county procedures and resource allocation for this transportation and pedestrian safety enhancement initiative.

View the file

Other files

File Type Posted
13-F. BID PROPOSAL-OFFEROR FORM - EDITABLE 8-28-25.pdf PDF
23-C. GENERAL CONDITIONS.pdf PDF
8-E7. Appendix 4.pdf PDF
18-G5. REQUIRED DOCUMENTS FOR LAP PROJECTS - ONLY IF APPLICABLE.pdf PDF
4-E9. Appendix 7 cover.pdf PDF
1-A. ADVERTISEMENT PAGE.pdf PDF
29-E1. ROADWAY PLANS.pdf PDF
26-G1. REQUIRED BID BOND.pdf PDF
5-E5. Appendix 2 cover.pdf PDF
7-E4. Appendices Coversheet.pdf PDF
31-E3. Utility Coordination.pdf PDF
30-E4.2 Appendix 1 LAP agreement.pdf PDF
14-G3. REQUIRED CONFLICT OF INTEREST DISCLOSURE.pdf PDF
32-E8. Appendix 5 Cover.pdf PDF
22-E3.2 Geotechnical Report.pdf PDF
17-G2. REQUIRED FLORIDA TRENCH SAFETY ACT CERTIFICATION AND DISCLOSURE STATEMENT.pdf PDF
11-E6. Appendix 3.pdf PDF
3-E. PROJECT-SPECIFIC CONDITIONS Mar 2026-WK.pdf PDF
10-E4.1 Appendix 1 cover.pdf PDF
21-I. POST AWARD DOCUMENTS - LAP CONSTRUCTION.pdf PDF
9-E5.1 Appendix 2.pdf PDF
12-F1. FEDERAL PROVISIONS - CONSTRUCTION - IF NEEDED.pdf PDF
28-E8.2 Appendix 6.pdf PDF
24-E9.1 Appendix 7.pdf PDF
27-B. INSTRUCTIONS TO BIDDERS.pdf PDF
16-G4. REQUIRED CERTIFICATION OF UNDERSTANDING.pdf PDF
20-E3.3 Culvert Design Calculations.pdf PDF
6-D. SPECIAL CONDITIONS.pdf PDF
25-E3.1 Drainage Design Memorandum.pdf PDF
19-H. AGREEMENT.pdf PDF
15-E8.1 Appendix 5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .