30-E4.2 Appendix 1 LAP agreement.pdf

PDF 12 MB Posted

Attached to
FORT KING ROAD FROM HESTER ROAD TO NORTH OF COLEMAN AVENUE SIDEWALK
Solicitation number
IFB-KM-26-002
Issued by
Pasco County, Florida

About this file

This is a Local Agency Program (LAP) Agreement document involving the Florida Department of Transportation (FDOT) and Pasco County for a sidewalk and pedestrian safety improvement project. The agreement establishes the partnership framework for construction of a six-foot sidewalk on the east side of Fort King Road from Hester Road to north of Coleman Avenue, and a sidewalk on the west side of Fort King Road from Morningside Drive to the south side of Pasco High School property. The project scope includes enhanced pedestrian crosswalks with pushbutton-activated rapid rectangular flashing beacons and lighting at the Pasco High School property and the Coleman Avenue intersection, modifications to an existing culvert and headwall between Dixie Avenue and Poinsettia Avenue, and installation of new guardrail with reduced post spacing. The LAP agreement defines the roles, responsibilities, and obligations of both FDOT and Pasco County throughout project development and construction phases.

The agreement specifies funding arrangements, project cost sharing, and compliance requirements for the Local Agency Program, which provides federal funding through FDOT for transportation projects developed and administered by local governments. The document outlines the conditions under which Pasco County must operate and maintain the completed improvements, ensure project compliance with applicable federal and state standards, and coordinate with FDOT on project oversight and approvals. The LAP agreement establishes the legal and financial framework governing the relationship between the state and local agency, including provisions for project modifications, change orders, dispute resolution, and closeout procedures upon project completion.

View the file

Other files

File Type Posted
13-F. BID PROPOSAL-OFFEROR FORM - EDITABLE 8-28-25.pdf PDF
23-C. GENERAL CONDITIONS.pdf PDF
8-E7. Appendix 4.pdf PDF
18-G5. REQUIRED DOCUMENTS FOR LAP PROJECTS - ONLY IF APPLICABLE.pdf PDF
4-E9. Appendix 7 cover.pdf PDF
1-A. ADVERTISEMENT PAGE.pdf PDF
29-E1. ROADWAY PLANS.pdf PDF
26-G1. REQUIRED BID BOND.pdf PDF
5-E5. Appendix 2 cover.pdf PDF
7-E4. Appendices Coversheet.pdf PDF
31-E3. Utility Coordination.pdf PDF
14-G3. REQUIRED CONFLICT OF INTEREST DISCLOSURE.pdf PDF
32-E8. Appendix 5 Cover.pdf PDF
22-E3.2 Geotechnical Report.pdf PDF
17-G2. REQUIRED FLORIDA TRENCH SAFETY ACT CERTIFICATION AND DISCLOSURE STATEMENT.pdf PDF
11-E6. Appendix 3.pdf PDF
3-E. PROJECT-SPECIFIC CONDITIONS Mar 2026-WK.pdf PDF
10-E4.1 Appendix 1 cover.pdf PDF
21-I. POST AWARD DOCUMENTS - LAP CONSTRUCTION.pdf PDF
9-E5.1 Appendix 2.pdf PDF
12-F1. FEDERAL PROVISIONS - CONSTRUCTION - IF NEEDED.pdf PDF
28-E8.2 Appendix 6.pdf PDF
24-E9.1 Appendix 7.pdf PDF
27-B. INSTRUCTIONS TO BIDDERS.pdf PDF
16-G4. REQUIRED CERTIFICATION OF UNDERSTANDING.pdf PDF
20-E3.3 Culvert Design Calculations.pdf PDF
6-D. SPECIAL CONDITIONS.pdf PDF
25-E3.1 Drainage Design Memorandum.pdf PDF
2-E2. ERP Approve 05.08.2025.pdf PDF
19-H. AGREEMENT.pdf PDF
15-E8.1 Appendix 5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .