31-E3. Utility Coordination.pdf

PDF 19 MB Posted

Attached to
FORT KING ROAD FROM HESTER ROAD TO NORTH OF COLEMAN AVENUE SIDEWALK
Solicitation number
IFB-KM-26-002
Issued by
Pasco County, Florida

About this file

Utility Coordination Status Memorandum and Project Documents for Fort King Road Sidewalk Construction

This is a utility coordination status memorandum and associated construction documents for the Fort King Road Sidewalk project in Pasco County, Florida, prepared by Ayres Associates for Pasco County Engineering Services. The project involves constructing a six-foot sidewalk on the east side of Fort King Road from Hester Road to north of Coleman Avenue and on the west side from Morningside Drive to the Pasco High School property, including enhanced pedestrian crosswalks with rapid rectangular flashing beacons and lighting, culvert modifications, and new guardrail installation. The utility coordination identifies five utility owners within the project corridor: CenturyLink (Fiber, Telephone), City of Dade City (Sewer, Water), Spectrum (Cable, Fiber), TECO-Distribution (Electric), and TECO-Peoples Gas. All utility owners have submitted signed Utility Work Schedules (UWS) and Relocation Graphics Basis (RGB) documents. CenturyLink requires 30 days prior to construction and 1 day during construction; City of Dade City requires 0 days prior and 11 days during; Spectrum requires 80 days prior and 0 days during; and TECO-Distribution requires 0 days prior and 5 days during construction. TECO-Peoples Gas confirmed no conflict with the proposed construction on January 23, 2025.

The utility work schedules establish detailed protocols for facility management, including location, protection, and adjustment activities. CenturyLink's work includes locating, protecting, and adjusting fiber and telephone facilities, with a master contractor providing onsite representation during excavation operations; specific contact requirements include notification to John Plamondon at least 5 business days prior to construction start and 5 business days before required work at each location. TECO-Distribution's schedule specifies a minimum 30-calendar-day lead time for any work requests, normal work hours of Monday through Friday 8 a.m. to 5 p.m., and limitations due to emergency response requirements and adverse weather conditions. The construction start date is September 1, 2025, with the project location in Dade City, Pasco County, Florida. All utility coordination is based on preliminary construction plans dated December 2024, and any deviations may render work schedules void, requiring additional assessment and renegotiation.

View the file

Other files

File Type Posted
13-F. BID PROPOSAL-OFFEROR FORM - EDITABLE 8-28-25.pdf PDF
23-C. GENERAL CONDITIONS.pdf PDF
8-E7. Appendix 4.pdf PDF
18-G5. REQUIRED DOCUMENTS FOR LAP PROJECTS - ONLY IF APPLICABLE.pdf PDF
4-E9. Appendix 7 cover.pdf PDF
1-A. ADVERTISEMENT PAGE.pdf PDF
29-E1. ROADWAY PLANS.pdf PDF
26-G1. REQUIRED BID BOND.pdf PDF
5-E5. Appendix 2 cover.pdf PDF
7-E4. Appendices Coversheet.pdf PDF
30-E4.2 Appendix 1 LAP agreement.pdf PDF
14-G3. REQUIRED CONFLICT OF INTEREST DISCLOSURE.pdf PDF
32-E8. Appendix 5 Cover.pdf PDF
22-E3.2 Geotechnical Report.pdf PDF
17-G2. REQUIRED FLORIDA TRENCH SAFETY ACT CERTIFICATION AND DISCLOSURE STATEMENT.pdf PDF
11-E6. Appendix 3.pdf PDF
3-E. PROJECT-SPECIFIC CONDITIONS Mar 2026-WK.pdf PDF
10-E4.1 Appendix 1 cover.pdf PDF
21-I. POST AWARD DOCUMENTS - LAP CONSTRUCTION.pdf PDF
9-E5.1 Appendix 2.pdf PDF
12-F1. FEDERAL PROVISIONS - CONSTRUCTION - IF NEEDED.pdf PDF
28-E8.2 Appendix 6.pdf PDF
24-E9.1 Appendix 7.pdf PDF
27-B. INSTRUCTIONS TO BIDDERS.pdf PDF
16-G4. REQUIRED CERTIFICATION OF UNDERSTANDING.pdf PDF
20-E3.3 Culvert Design Calculations.pdf PDF
6-D. SPECIAL CONDITIONS.pdf PDF
25-E3.1 Drainage Design Memorandum.pdf PDF
2-E2. ERP Approve 05.08.2025.pdf PDF
19-H. AGREEMENT.pdf PDF
15-E8.1 Appendix 5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

813.978.8688 | 8875 Hidden River Parkway, Suite 200 | Tampa, FL 33637-1035 www.AyresAssociates.com

Project: 62-0203.002 File: i:\62\00 roadway\62022302 fort king rd sidewalk\03 project data\08 utilities\44550313801-lap-fort king rd-utility_coord_status_memo_final.docx

MEMORANDUM

To: Erin Swanson, Pasco County - PM

From: Maria Baucom, Utility Coordinator

Date: July 16, 2025 Project No.: 62-0223.02

Re: 445503-1-38-01 (LAP) Fort King Rd (Hester Rd to Coleman Ave and Morningside Dr to Pasco

High School Main Entrance) Sidewalk Design – Final Utility Coordination Status Memo

The following list identifies all Utility Owners identified on the Sunshine 811 Design Ticket, within the project corridor, and the status of the Utility Coordination response to date.

RGBs and UWS

1. CenturyLink (Lumen) – Fiber, Telephone – RGB and signed UWS

30 days Prior to Construction 1 day During Construction

2. City of Dade City – Sewer, Water – RGB & signed UWS 0 days Prior to Construction 11 days During Construction

3. Spectrum – Cable, Fiber – RGB & signed UWS 80 days Prior to Construction 0 days During Construction

4. TECO – Electric – Distribution – RGB & signed UWS 0 days Prior to Construction 5 days During Construction

No Conflict Response

1. TECO-Peoples Gas – January 23, 2025

PASCO COUNTY ENGINEERING SERVICES

UTILITY WORK SCHEDULE

Project: Fort King Rd (Hester Rd to Coleman Ave and Morningside Dr to Pasco High School Main Entrance) Sidewalk

Work Order Number: SDW004126.00

Project ID: 44550313801

Road Name / No.: Fort King Rd

A. CenturyLink Communications LLC Summary of Utility Work And Execution

Estimated Time (calendar days)

Total Time Prior to Project Construction 30 Total Time During Project Construction 1

This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pasco County, the County’s Contractor, and other right-of-way users, the location, relocation, adjustment, installation, and/or protection of their facilities, on this Improvement Plan project. The following data is based on preliminary construction plans dated December 2024 . Any deviation by Pasco County or its contractor from the plans, as provided, may render this work schedule null and void. Upon notification by Pasco County of such change, this utility may require additional days for assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond the control of the UAO that could not reasonably be anticipated by the UAO and which could not be avoided by the UAO with the exercise of due diligence at the time of the occurrence. The UAO agrees to notify Pasco County in writing prior to starting, stopping, resuming, or completing work.

UAO Project Representative: Kurt Judd Telephone Number: 352-401-6555

UAO Field Representative: John Plamondon Telephone Number: 352-425-4444

This document is a printout of a form maintained in an electronic format and all revisions thereto by the UAO in the form of additions, deletions or substitutions are reflected only in an Appendix entitled “Changes to Form Document” and no change is made in the text of the document itself. Hand notations on affected portions of this document may refer to changes reflected in the above-named Appendix but are for reference purposes only and do not change the terms of the document. By signing this document, the UAO hereby represents that no change has been made to the text of this document except through the terms of the appendix entitled “Changes to Form Document”.

You MUST signify by selecting or checking which of the following applies:

No changes to forms document.

Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.

Authorized Utility Agent: Engineer of Record (EOR): Acceptance by Pasco County:

(Signature) (Signature) (Signature)

Jeffrey Siewert, P.E. Erin Swanson

(Printed Name) (Printed Name) (Printed Name)

Engineer of Record Project Manager

(Title) (Title) (Title)

(Date) (Date) (Date)

6/30/25 8/4/25 jplamondon Text Box Kurt E. Judd jplamondon Text Box Senior Network Implementation Engineer jplamondon Text Box 02/18/2025

Project: Fort King Rd (Hester Rd to Coleman Ave and Morningside Dr to Pasco High School Main Entrance) Sidewalk

County, FLWork Order Number: SDW004126.00

Project ID: 44550313801

Road Name / No.: Fort King Rd

B. Special Conditions / Constraints

Locate: Utilizing electromagnetic and other energy fields for determining the existence and approximate horizontal location of underground utility facilities. Underground facilities will be marked by stakes, flags, paint or other suitable materials in varying combinations dependent upon surface conditions using American Public Works Association Utility Location Coordination Council Color Codes.

Protect: Shall include permittee’s use of an onsite representative during active construction operations. During Excavation Operations, Representative may be required to physically expose underground facilities, provide any necessary support to the facilities, and/or cover aerial facilities as deemed necessary to aid construction.

Adjust: Shall include permittee's use of an onsite representative during active construction operations. During Excavation Operations, Representative may adjust the location of Lumen facilties either horizontally or vertically to address conflicts of proposed road facilities.

1) Contact John Plamondon, Roadmoves field Rep. @ 352.425.4444, 5 business days prior to start of construction and 5 business days prior to required work by Lumen at each of its locations requiring attention.

2) This work schedule is based on calendar days as shown in sections below. Lumen working hours are (5) day work week, Monday thru Friday, 8 hours a day. Any request for work activities outside that time frame will need to be coordinated at least 48 hours in advance of required work.

3) Locate, Protect & Adjust activities to be provided by Lumen master contractor who will work closely with the Roadway contractor to eliminate conflicts.

All existing cable and facilities shown on the plans are to remain and will not be adjusted unless otherwise detailed in Section C.

Project: Fort King Rd (Hester Rd to Coleman Ave and Morningside Dr to Pasco High School Main Entrance) Sidewalk

Work Order Number: SDW004126.00

Project ID: 44550313801

Road Name / No.: Fort King Rd

C. Disposition of Facilities (List All Existing & Proposed) on Project:

UTILITY FACILITIES BY STATUS/

TYPE/SIZE/MATERIAL/OFFSET TO

BASELINE FROM STA TO STA

DESCRIPTION

OF

UTILITY WORK

DEPENDENT

ACTIVITIES

M.O.T.

PHASE

NUMBER

CONSECUTIVE

CALENDAR

DAYS

Pedestal 20+32 / 28’ LT Adjust Pedestal to final grade Staking of sidewalk grade by road contractor

NA 1

F

LO

R

ID

A 'S

FT LAUDERDALE

MIAMI

NAPLES

KEY WEST

BEE LINE

EXPRESSWAY

T U

R N P

IK

E

PENSACOLA FORT WALTON

BEACH

PANAMA

CITY

CHIPLEY

TALLAHASSEE

JACKSONVILLE

ST AUGUSTINE

GAINESVILLE

OCALA DAYTONA BEACH

DELAND

NEW PORT RICHEY

TAMPA

LAKELAND

MELBOURNE -

COCOA

ORLANDO

BARTOWST PETERSBURG

SARASOTA -

BRADENTON

FT PIERCE

FT MYERS

WEST PALM

BEACH

CITY

LAKE

LOCATION OF PROJECT

DECEMBER 2024

60% PLANS SUBMITTAL

ENGINEER OF RECORD:

ROADWAY PLANS

(813) 978-8688

TAMPA, FL 33637

8875 HIDDEN RIVER PKWY, SUITE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

PASCO COUNTY PROJECT MANAGER: ERIN SWANSON

http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:

Florida Department of Transportation, FY 2024-25 Standard Specifications

GOVERNING STANDARD SPECIFICATIONS:

following website: http://www.fdot.gov/design/standardplans

Standard Plans for Road Construction and associated IRs are available at the

Bridge Construction and applicable Interim Revisions (IRs).

Florida Department of Transportation, FY2024-25 Standard Plans for Road and

GOVERNING STANDARD PLANS:

CONTRACT PLANS

PASCO COUNTY (14091)

ENTRANCE) SIDEWALK DESIGN

MORNINGSIDE DR TO PASCO HIGH SCHOOL MAIN

FORT KING RD (HESTER RD TO COLEMAN AV AND

(FEDERAL FUNDS)

FINANCIAL PROJECT ID 445503-1-38-01

NO.

SHEET

YEAR

FISCAL

I

\0

R o a d w a y \6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \K

E Y

S R

D .d g n

/1

/2

:3

:3

P

M S u ll iv a n

R

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

INDEX OF ROADWAY PLANS

REINFORCING BAR SCHEDULE

BOX CULVERT DATA TABLE

UTILITY ADJUSTMENTS

DRIVEWAY & SIDE STREET HALF SECTIONS

CROSS SECTIONS

CULVERT CROSS SECTION

ROADWAY PLANS

TYPICAL SECTIONS

GENERAL NOTES

SUMMARY OF PAY ITEMS

SIGNATURE SHEET

KEY SHEET

SHEET DESCRIPTION

B2-B3

B1

44 - 51

41 - 43

15 - 40

6 - 13

SHEET NO.

PASCO COUNTY BOARD OF COUNTY COMMISSIONERS

COUNTY ATTORNEY: JEFFREY STEINSNYDER

COUNTY ADMINISTRATOR: MIKE CARBALLA, P.E.

DISTRICT 5: JACK MARIANO, VICE CHAIR

DISTRICT 4: LISA YEAGER

DISTRICT 3: KATHRYN STARKEY, CHAIR

DISTRICT 2: SETH WEIGHTMAN, 2ND VICE CHAIR

DISTRICT 1: RON OAKLEY

PASCO COUNTY

STATE OF FLORIDA

PROJECT LOCATION URL:

NONE

NONE

PROJECT LIMITS:

EXCEPTIONS:

BRIDGE LIMITS:

RAILROAD CROSSING:

NONE

WORK ORDER NO: SDW004126.00

https://maps.app.goo.gl/Y87TPhwKdCmEHqpC6 jplamondon Rectangle jplamondon Text Box RED (Exist; to be Removed or Placed Out of Service)

GREEN (Exist; to Remain)

DARK GREEN (Out of Service)

CYAN (Exist conduit, CANNOT be removed or adjusted)

BROWN (Proposed to be placed)

BLUE (Proposed changes to Agency Plans) jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Text Box RGB Legend jplamondon Text Box Project Info:

TERR-1016024, P.271377

Wire Center: Dade City County: Pasco Cons Start Date: 9/1/2025

Reviewed by:

Terra Technologies John Plamondon 6302179384 Jplamondon@congruex.com

Contact:

Lumen Engineer Kurt Judd kurt.judd@lumen.com

Project:

Pasco Medical Plaza Condo Dade City, FL 33525, USA

W A T E R

W A T E R

10 11 12 13 14 15

STA. 11+43.53

BEGIN CONSTRUCTION

BEGIN PROJECT

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

� FORT KING RDFORT KING RD.

H E

S T

E R

D

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

HANDHOLE/PROPOSED

CENTURYLINK/BY OTHERS

PED/TO REMAIN

CENTURYLINK

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

SPAN GUY/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

LP/TO REMAIN

TECO

120V OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

120V OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS

UNK SIZE SERVICE LINE/TO REMAIN

TECO PGS

FH/TO REMAIN

CITY OF DADE CITY

VALVE COVER/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

WM/TO REMAIN

CITY OF DADE CITY

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

2-400 BT/TO REMAIN

CENTURYLINK

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:3

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d g n

FORT KING - PLAN 1 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:32 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (1)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon

EXIST HH

HH

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Callout

CTL HH

#568790 jplamondon Callout

CTL PED

#513826 jplamondon Callout

CTL PED

#6499 jplamondon Callout

CTL PED

#552847 jplamondon Text Box ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

jplamondon

12951 Fort King Rd, Dade City, FL 33525

S

W A T E R

W A T E R W

A T E R

16 17 18 19 20 21

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

FORT KING RD.

M O

R N I N

G S I

� FORT KING RD

PED/TO REMAIN

CENTURYLINK

HANDHOLE/PROPOSED

CENTURYLINK/BY OTHERS

PED/TO REMAIN

CENTURYLINK

M A

R L

U

L

N

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

120V OE/TO REMAIN

TECO

AS IT IS BEING DONE BY OTHERS.

IS EXEMPT FROM UTILITY COORDINATION

OF THIS SIDEWALK PROJECT. THIS AREA

INFORMATION ONLY AND IS NOT PART

PROPOSED ROUNDABOUT SHOWN FOR

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS

4" PE SERVICE LINE/TO REMAIN

TECO PGS

UNK SIZE SERVICE LINE/TO REMAIN

TECO PGS

WM/TO REMAIN

CITY OF DADE CITY

WATER VALVE COVER/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

WATER VALVE COVER/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

WATER VALVE COVER/TO REMAIN

CITY OF DADE CITY

WM/TO REMAIN

CITY OF DADE CITY

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:3

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d

FORT KING - PLAN 2 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:33 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (2)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon

EXIST HH

HH

jplamondon Rectangle jplamondon Line jplamondon Line jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Callout

CTL HH

#569474 jplamondon Callout

CTL PED

#552846 jplamondon Callout

ADJUST PED

#515796 TO FINAL GRADE

jplamondon Text Box ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Callout

CTL PED

NOT SHOWN IN RECORDS

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:5

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

I

\0

R o a d w a y \6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \R

D X

S R

D .d g n

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WMBFOC GM

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WMBFOC GM

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WMBFOC GM

19+50.00STA.

100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100

95 95

100 100

105 105

110 110

WMBFOC GM

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WMBFOC GM

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WMBFOC GM

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

E X

IS

T

IN

G

R /W

L

IN

E

WMBFOC GM

19+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

WMBFOC GM

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOC GM

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOC GM

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOC GM

20+00.00STA.

100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100

100 100

105 105

110 110

WM

BFOC GM

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOC GM

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOC GM

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

E X

IS

T

IN

G

R /W

L

IN

E

WM

BFOC GM

20+00.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

WM

BFOC GM

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOCGM

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOCGM

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOCGM

20+50.00STA.

100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100

95 95

100 100

105 105

110 110

WM

BFOCGM

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOCGM

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

WM

BFOCGM

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

E X

IS

T

IN

G

R /W

L

IN

E

WM

BFOCGM

20+50.00STA.

1" = 10' Vertical

1" = 20' Horizontal

SCALE

100 80 60 40 20 0 20 40 60 80 100

100 100

110 110

E X

IS

T

IN

G

R /W

L

IN

E

E X

IS

T

IN

G

R /W

L

IN

E

WM

BFOCGM

CROSS SECTIONS (6)

jplamondon Text Box 20+32 jplamondon Rectangle jplamondon Callout Adjust Pedestal to final grade

T E R

W A T E R

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

FORT KING RD.

� FORT KING RD

HANDHOLE/PROPOSED

CENTURYLINK/BY OTHERS

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

G R

A S

Y

H

IL

L

L

N

LP/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

LP/TO REMAIN

TECO

120V OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS

WM/TO REMAIN

CITY OF DADE CITY

WATER VALVE COVER/TO REMAIN

CITY OF DADE CITY

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:3

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d

FORT KING - PLAN 3 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:34 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (3)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon

EXIST HH

HH

jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon PolyLine jplamondon Callout

CTL HH

#568792 jplamondon Callout

CTL PED

#509448

VERIFY IN FIELD

jplamondon Callout

CTL PED

#563470 jplamondon Callout

CTL PED

#552845 jplamondon Callout

CTL PED

#552844 jplamondon

ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

T E R

W A T E R

29 30 31 32 33

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

S T

A D

IU

M

D R

FORT KING RD.

� FORT KING RD

PED/TO REMAIN

CENTURYLINK TEL POLE/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

TEL POLE/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

HANDHOLE/PROPOSED

CENTURYLINK/BY OTHERS

PED/TO REMAIN

CENTURYLINK

R O

Y

L

O

K

L N

69kV & 13.2kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO 13.2kV BE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

240V OE/TO REMAIN

TECO

240V OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

240V OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS 2" PE GM/TO REMAIN

TECO PGS

2" PE SERVICE LINE/TO REMAIN

TECO PGS

WM/TO REMAIN

CITY OF DADE CITY

WATER VALVE COVER/TO REMAIN

CITY OF DADE CITY

FH/TO REMAIN

CITY OF DADE CITY

WATER VALVE COVER/TO REMAIN

CITY OF DADE CITY

BFOC/TO REMAIN

SPECTRUM

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:3

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d

FORT KING - PLAN 4 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:35 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (4)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Ellipse jplamondon Ellipse jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon

EXIST HH

HH

jplamondon Rectangle jplamondon Line jplamondon Line jplamondon PolyLine jplamondon PolyLine jplamondon Callout

CTL PED

#552843 jplamondon Callout

CTL PED

#552840 jplamondon Callout

CTL PED

#552838 jplamondon Callout

CTL PED

#518826 jplamondon Callout

CTL PED

#5872 jplamondon Callout

POLE #150

jplamondon Callout

POLE #140

jplamondon Callout

CTL HH

#568794 jplamondon

ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

N

W A T E R

B A C

K

F L

O W

W A T E R

B A C

K

F L

O W

B A C

K

F L

O W

W A T E R

S A

N

S A

N

G A S34

36 37

S6677S6678

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

FORT KING RD.

� FORT KING RD

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

D

IX

IE

A

V E

69kV & 13.2kV OE/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

240V OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

SPAN GUY/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

69kV OE/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS

GAS VALVE COVER/TO REMAIN

TECO PGS

4" PE GM/TO REMAIN

TECO PGS

WM/TO REMAIN

CITY OF DADE CITY

WM/TO REMAIN

CITY OF DADE CITY

SAN FM /TO REMAIN

CITY OF DADE CITY

SAN FM MH/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

SAN FM MH/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:3

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d

FORT KING - PLAN 5 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:36 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (5)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Callout

CTL PED

#552837 jplamondon Callout

CTL PED

#552849 jplamondon

ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

N

S A

N

W A T E R

S A

N

41 42

S1936

S5421

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

P O

IN

S

E T

T

IA

A V

E

FORT KING RD.

� FORT KING RD

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

HANDHOLE/PROPOSED

CENTURYLINK/BY OTHERS

PED/TO REMAIN

CENTURYLINK

69kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

13.2kV OE/TO REMAIN

TECO

LP/TO REMAIN

TECO

120V OE/TO REMAIN

TECO

7.6 kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

7.6 kV OE/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS

WATER VALVE COVER/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

WM/TO REMAIN

CITY OF DADE CITY

FH/TO REMAIN

CITY OF DADE CITY

SAN FM /TO REMAIN

CITY OF DADE CITY

SAN FM /TO REMAIN

CITY OF DADE CITY

SAN FM MH/TO REMAIN

CITY OF DADE CITY

SAN FM /TO REMAIN

CITY OF DADE CITY

SAN FM MH/TO REMAIN

CITY OF DADE CITY

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:3

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d

FORT KING - PLAN 6 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:37 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (6)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon

EXIST HH

HH

jplamondon PolyLine jplamondon PolyLine jplamondon Callout

CTL PED

#552834 jplamondon Callout

CTL PED

#552831 jplamondon Callout

CTL PED

#552828 jplamondon Callout

CTL PED

#506358 jplamondon Callout

CTL PED

#565600 jplamondon Callout

CTL HH

#568796 jplamondon Ellipse jplamondon Callout

POLE #240

jplamondon

ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

N

W A T E R

W A T E R

S A

N

45 46 47 48 49 50

ST2239

S2073

S2159

ST2238

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

FORT KING RD.

O L

D S

A N

A N

N R

D

W E

S T

V

IE

W A

V E

� FORT KING RD

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

TEL POLE/TO REMAIN

CENTURYLINK

TEL POLE/TO REMAIN

CENTURYLINK

S O

U T

H V

IE

W

A V

E

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

240V OE/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

240V OE/TO REMAIN

TECO

240V OE/TO REMAIN

TECO

13.2 kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

PP/TO REMAIN

TECO

SPAN GUY/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS

WM/TO REMAIN

CITY OF DADE CITY

WATER VALVE COVER/TO REMAIN

CITY OF DADE CITY

FH/TO REMAIN

CITY OF DADE CITY

WM/TO REMAIN

CITY OF DADE CITY

SAN FM/TO REMAIN

CITY OF DADE CITY

SAN FM MH/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

SAN FM MH/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

SAN FM /TO REMAIN

CITY OF DADE CITY

SAN FM /TO REMAIN

CITY OF DADE CITY

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:3

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d

FORT KING - PLAN 7 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:39 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (7)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Rectangle jplamondon Line jplamondon Line jplamondon Ellipse jplamondon Ellipse jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Callout

CTL PED

#552827 jplamondon Callout

CTL PED

#544782 jplamondon Callout

CTL PED

#552826 jplamondon Callout

POLE #140

jplamondon Callout

POLE #120

jplamondon

ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

T E

L

S A

N

S D

S D

W A T E R

W A T E R

S D

S A

N

W A T E R

53 53

S6677

RIM 81.57'

N 10" PVC 70.86'

S 10" PVC 70.80'

N 10" PVC 71.40'

ST1149

ST1156

ST1626

ST1775

ST1862

S1148

ST1146

ST1061

EXIST. R/W LINE

EXIST. R/W LINE

10 40

Feet

N

17TH ST.

C O

L E

M

N

V

E

� FORT KING RD

STA. 51+93.74

END CONSTRUCTION

END PROJECT

PED/TO REMAIN

CENTURYLINK

MANHOLE/TO REMAIN

CENTURYLINK

PED/TO REMAIN

CENTURYLINK

C O

L E

M A

N

A

V E

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

69kV & 13.2kV OE/TO REMAIN

TECO

PP/TO REMAIN

TECO

SPAN GUY 120V OE/TO REMAIN

TECO

PP & GUY/TO REMAIN

TECO

120V OE/TO REMAIN

TECOLP/TO REMAIN

TECO

4" PE GM/TO REMAIN

TECO PGS

WATER VALVE COVER/TO BE ADJUSTED

CITY OF DADE CITY/BY OTHERS

WM/TO REMAIN

CITY OF DADE CITY

WM/TO REMAIN

CITY OF DADE CITY

FH/TO REMAIN

CITY OF DADE CITY

WATER METER & VALVE COVER/TO REMAIN

CITY OF DADE CITY

SAN FM/TO REMAIN

CITY OF DADE CITY

SAN FM/TO REMAIN

CITY OF DADE CITY

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

BFOC/TO REMAIN

SPECTRUM

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:5

:4

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \U

T A

D R

D .d

FORT KING - PLAN 8 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\UTADRD01.dgn

2:51:40 PM12/18/2024SullivanR

UTILITY ADJUSTMENTS (8)

jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon

EXIST HH

MH

jplamondon PolyLine jplamondon Rectangle jplamondon Line jplamondon Line jplamondon PolyLine jplamondon Callout

CTL PED

#552825 jplamondon Callout

CTL MH

#303011 jplamondon Callout

CTL PED

#565602

EMPTY

jplamondon Callout

6-4"DUCTS EWOMGR

48 BFO

288 BFO

36 BFO

300 BT

24 BT

900 BT

jplamondon Callout

6-4"DUCTS EWOMGR

48 BFO

288 BFO

12 BFO

600 BT

600 BT

300 BT

900 BT

jplamondon Text Box ALL CENTURYLINK FACILITIES (PEDS, MH, CABLE AND FIBER OPTIC) LOCATIONS ARE FROM "LEVEL D RECORDS ONLY". CALL 811 FOR LOCATES BEFORE DIGGING.

jplamondon

13724 17th St, Dade City, FL 33525

July 3, 2025 8/4/25

T E R

W A T E R

10 11 12 13 14 15

P C

S

T A

.9

P T

S

T A

.3

H E

S T

FORT KING RD.

N

10 40

Feet

CONST. 6' - SWK.

EXIST CONC. PAD (BUS STOP)

EXIST. R/W LINE

EXIST. R/W LINE

STA. 11+43.53

BEGIN CONSTRUCTION

BEGIN PROJECT

+63.03

21.78' RT.

+32.20

20.88' RT.

+41.85

24.19' RT.

+48.02

27.15' RT.

+36.77

27.16' RT.

+01.47

26.98' RT.

+08.12

25.86' RT.

+66.42

22.81' RT.

+54.67

26.43' RT.

+38.49

22.91' RT.

.0

R 2 .0

R

� FORT KING RD

SEDIMENT BARRIER

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:0

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \P

L A

N R

D .d

FORT KING - PLAN 1 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

2:48:05 PM12/18/2024SullivanR

ROADWAY PLANS (1)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

SIDEWALK (6" THICK)

W A T E R

W A T E R W

A T E R

16 17 18 19 20 21

FORT KING RD.

M E

D I C

M A

R L

U

L

N

M O

R N I N

G S I

N

10 40

Feet

CONST. 6' - SWK.

CONST. 6' - SWK.

EXIST. R/W LINE

EXIST. R/W LINE

CR-F CR-F

ADJUSTED CURVE RADIUS

MILL & RESURFACE

+39.94

23.22' RT.

+95.57

22.87' RT.

+01.64

22.30' RT.

+84.48

11.87' RT.

+35.36

11.92' RT.

+17.13

25.89' RT.

+25.08

24.05' RT.

+29.11

23.70' RT. +44.35

23.24' RT.

+99.98

23.19' RT.

.0

R

.0

R

.5

R 2 .0

R

� FORT KING RD

+66.94

30.01' LT.

+78.01

28.19' LT.

+74.32

28.46' LT.

+91.66

28.05' LT.

+23.02

28.21' LT.

+25.88

27.91' LT.

+33.04

26.45' LT.

+36.13

26.15' LT.

.0

R

.0

R

R .0

TIE INTO EXIST. ROUNDABOUT

TIE INTO EXIST. ROUNDABOUT

TIE INTO EXIST. ROUNDABOUT

FORT KING RD.

SEDIMENT BARRIER

SAW CUT +06.41

12.06' RT.

+36.98

11.72' RT.

+61.99

39.82' RT.

+81.44

39.82' RT.

RADIUS TYP.

NOTE - ROUNDABOUT IS SHOWN FOR REFERENCE ONLY

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:0

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \P

L A

N R

D .d

FORT KING - PLAN 2 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

2:48:06 PM12/18/2024SullivanR

ROADWAY PLANS (2)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

SIDEWALK (6" THICK)

MILLING & RESURFACING

T E R

W A T E R

P C

S

T A

.0

G R

A S

I L L

L

N

FORT KING RD.

N 10 40

Feet

CONST. 6' - SWK.

CONST. 6' - SWK.

EXIST. R/W LINE

EXIST. R/W LINE

ADJUSTED CURVE RADIUS

EXIST. DUMPSTER

MILL & RESURFACE

+97.70

24.04' RT.

+66.42

23.71' RT.

+80.42

28.43' RT.

+03.61

29.50' RT.

+79.82

33.78' RT.

+04.64

35.42' RT.

� FORT KING RD

+17.36

29.39' LT.

SEDIMENT BARRIER

+66.76

39.43' LT.

+47.85

14.22' LT.

20.00'

R

+48.35

14.48' LT.

9X12 R10-25

1 AS0654-2-22

24X12

W16-07PR

30X30 W11-2

24X12

W16-07PL

30X30 W11-2

9X12 R10-25

1 AS0654-2-22

24X12

W16-07PR

30X30 W11-2

24X12

W16-07PL

30X30 W11-2

LI

G

HT

S

W

AR

N

IN

G

TU

R N

O N

BU

TT

O N

T O

PU

SH

LIG

H T S

W A R

N

IN

G T U

R N O

N B U T T O

N T

O P U S H

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:0

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \P

L A

N R

D .d

FORT KING - PLAN 3 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

2:48:08 PM12/18/2024SullivanR

ROADWAY PLANS (3)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

SIDEWALK (6" THICK)

DRIVEWAY (6" THICK)

T E R

W A T E R

29 30 31 32 33

P T

S

T A

.2

FORT KING RD.

S T

A D

IU

M

D R

R O

Y A

L O

A K

L N

N 10 40

Feet

CONST. 6' - SWK.

EXIST. R/W LINE

EXIST. R/W LINE

MILL AND RESURFACE

+34.43

44.88' RT.

+14.56

45.91' RT.

+52.66

45.30' RT.

+93.96

44.65' RT. +89.59

43.14' RT.

+24.16

42.59' RT.

+66.10

41.93' RT.

+21.99

35.05' RT.

+49.50

20.61' RT.

+39.41

24.41' RT.

+21.79

41.05' RT.

+61.32

26.71' RT.

.0

R

.0

R

� FORT KING RD

SEDIMENT BARRIER

+13.63

39.40' RT.

+82.82

39.40' RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:0

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \P

L A

N R

D .d

FORT KING - PLAN 4 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

2:48:09 PM12/18/2024SullivanR

ROADWAY PLANS (4)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

SIDEWALK (6" THICK)

DRIVEWAY (6" THICK)

N

W A T E R

B A C

K

F L

O W

W A T E R

B A C

K

F L

O W

B A C

K

F L

O W

W A T E R

S A

N

S A

N

G A S34

36 37

P C

S

T A

.2

S6677S6678

FORT KING RD.

D

IX

IE

A

V E

N

10 40

Feet

D I X

E

CONST. 6' - SWK.EXIST. R/W LINE

EXIST. R/W LINE

ADJUSTED CURVE RADIUS

MILL AND RESURFACE

+06.00

0.00' RT.

+06.00

132.44' LT.

+03.07

144.96' LT.

+02.66

147.82' LT.

+02.74

152.41' LT.

+10.01

142.11' LT.

+10.94

162.48' LT.

+08.20

185.92' LT.

+03.49

194.91' LT.

+22.61

538.51' LT.

.0

R 9 .0

R

.0

R

.0

R 1 .0

R

.0

R

� FORT KING RD

SEDIMENT BARRIER

+60.72

12.10' RT.

+38.90

12.02' RT.

+51.53

12.14' RT.

+69.65

35.41' RT.

+94.99

32.08' RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:1

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \P

L A

N R

D .d

FORT KING - PLAN 5 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

2:48:10 PM12/18/2024SullivanR

ROADWAY PLANS (5)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

SIDEWALK (6" THICK)

N

S A

N

W A T E R

S A

N

41 42

P T

S

T A

.7

S1936

S5421

D I X

E

P O

IN

S

E T

T

IA

A V

E

FORT KING RD.

E M

B A

S S

Y P

A R

K C

T

N

10 40

Feet

CONST. 6' - SWK.

EXIST. R/W LINE

EXIST. R/W LINE

CULVERT & HEADWALL

EXTEND EXIST.

ADJUSTED CURVE RADIUS

ADJUSTED CURVE RADIUS

+00.84

26.90' RT.

+22.36

26.75' RT.

+26.75

27.91' RT.

+48.05

40.46' RT.

+60.41

43.14' RT.

+82.51

37.34' RT.

+96.85

31.56' RT.

+03.32

28.11' RT.

+48.18

27.68' RT.

+22.42

28.15' RT.

+97.42

12.23' RT.

+35.04

50.73' RT.

+62.71

50.03' RT.

.0

R

.0

R

.0

R

.0

R

.0 'R

.0

'R

.0 'R

� FORT KING RD

SEDIMENT BARRIER

TURBIDITY BARRIER

CONST. 64 LF OF FLOATING

CONC. BOX CULVERT

CONST. 9.4 LF OF (2) 6'X5'

+89.31

12.12' RT.

+34.90

35.20' RT.

+13.27

35.72' RT.

.0

R

+64.19

12.01' RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:1

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \P

L A

N R

D .d

FORT KING - PLAN 6 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

2:48:12 PM12/18/2024SullivanR

ROADWAY PLANS (6)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

SIDEWALK (6" THICK)

N

W A T E R

W A T E R

S A

N

45 46 47 48 49 50

P C

S

T A

.9

ST2239

S2073

S2159

ST2238

FORT KING RD.

S O

U T

H V

IE

W

A V

E

W E

S T

V

IE

W A

V E

O

L D

S A

N A

N N

R D

N

10 40

Feet

CONST. 6' - SWK.

EXIST. R/W LINE

EXIST. R/W LINE

ADJUSTED CURVE RADIUS

ADJUSTED CURVE RADIUS

ADJUSTED CURVE RADIUS

ADJUSTED 24" STOP BAR & STOP SIGN

MILL AND RESURFACE

RECONSTRUCT DRIVEWAY

+97.61

14.87' RT.

+77.89

28.67' RT.

+70.00

28.54' RT.

+82.00

40.71' RT.

+94.57

40.14' RT.

+06.45

28.63' RT.

+39.74

28.72' RT.

+68.78

28.80' RT.

+72.58

28.81' RT.

+86.91

25.35' RT.

+00.08

43.15' RT.

+20.45

43.34' RT.

+36.64

23.89' RT.

+43.46

26.95' RT.

+65.58

35.82' RT.

+98.03

36.75' RT.

.0

R 2

.0

'R

.0 'R 2

.0

R 2

.0 'R 2

.0

R

.0

'R

� FORT KING RD

� FORT KING RD

SEDIMENT BARRIER

3' CURB TRANSITION

+48.81

39.93' RT.

+58.81

34.89' RT.

+17.77

12.64' RT.

+54.98

13.41' RT.

+75.62

36.59' RT.

+80.20

42.42' RT.

+92.90

42.78' RT.

+40.49

14.87' RT.

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:4

:1

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

IC

IA

L R

E C

O R

D O

F T

H

IS

S H

E E

T I

S T

H E

E L

E C

T R

O N

IC

F

IL

E

D

IG

IT

A

L L

Y S

IG

N

E D

A N

D S

E A

L E

D U

N D

E R

R U

L E

G

-2

.0

F

.A .C

I:

\6

\0

R o a d w a y \6

F o rt

K in g R d S id e w a lk

\C A

D D

\r o a d w a y \P

L A

N R

D .d

FORT KING - PLAN 7 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

2:48:14 PM12/18/2024SullivanR

ROADWAY PLANS (7)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

SIDEWALK (6" THICK)

DRIVEWAY (6" THICK)

MILLING & RESURFACING

RECONSTRUCT EXIST. STREET

T E

L

S A

N

S D

S D

W A T E R

W A T E R

S D

S A

N

W A T E R

53 53

P T

S

T A

.3

P C

S

T A

.1

S6677

RIM 81.57'

N 10" PVC 70.86'

S 10" PVC 70.80'

N 10" PVC 71.40'

ST1149

ST1156

ST1626

ST1775

ST1862

S1148

ST1146

ST1061

FORT KING RD.

CR-E

C O

L E

M

E

C O

L E

M

E

17TH ST.

N

10 40

Feet

CONST. 6' - SWK.

EXIST. R/W LINE

EXIST. R/W LINE

STA. 51+93.74

END PROJECT

CONST. EXISTING DRIVEWAY

CONST. TYPE E. CURB & GUTTER 100 LF

+51.50

25.65' RT.

+52.34

27.71' LT.

+62.88

37.06' RT.

+77.24

40.77' RT.

.0

R

.0

R

CONST. 6' - SWK.

SEDIMENT BARRIER

WITH CONCRETE JACKET

OF 24" RCP

CONST. 4 LF

WITH CONCRETE JACKET

OF 15" RCP

CONST. 4 LF

WITH CONCRETE JACKET

OF 18" RCP

CONST. 4 LF

3' CURB TRANSITION

END CONSTRUCTION

STA. 42+26.16

BEGIN TYPE E. CURB

STA. 40+76.45

12.62' RT.

END TYPE E. CURB

STA. 41+67.77

14.10' RT.

S-1

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:2

:1

P

M S u ll iv a n

R

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

engineering services pasco county

PASCO SDW004126.00

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

I

\0

R o a d w a y

\6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y

\P L

A N

R D

.d

FORT KING - PLAN 8 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

4:29:17 PM12/18/2024SullivanR

ROADWAY PLANS (8)

DETECTABLE WARNING

LEGEND

SIDEWALK (4" THICK)

CONST. NEW DRIVEWAY

SIDEWALK (6" THICK)

FDOT INDEX NO. 425-021

EX W 24" RCP EL = 81.26

EX E 15" RCP EL = 82.27

EX N 18" RCP EL = 82.11

EOP EL = 86.41 (FROM SURVEY EXD. ST 1775-VERIFY)

CONST. FDOT CURB INLET TYPE 6

STA. 51+86.42, 19.92 (RT) (VERIFY STA/OFFSET)

July 3, 2025 8/4/25

R

ID

A 'S

FT LAUDERDALE

MIAMI

NAPLES

KEY WEST

BEE LINE

EXPRESSWAY

T U

R N P

IK

E

PENSACOLA FORT WALTON

BEACH

PANAMA

CITY

CHIPLEY

TALLAHASSEE

JACKSONVILLE

ST AUGUSTINE

GAINESVILLE

OCALA DAYTONA BEACH

DELAND

NEW PORT RICHEY

TAMPA

LAKELAND

MELBOURNE -

COCOA

ORLANDO

BARTOWST PETERSBURG

SARASOTA -

BRADENTON

FT PIERCE

FT MYERS

WEST PALM

BEACH

CITY

LAKE

LOCATION OF PROJECT

https://maps.app.goo.gl/5Xu3wkVahy1mgpTo9

SEPTEMBER 2024

CONCEPT SUBMITTAL

ENGINEER OF RECORD:

ROADWAY PLANS

(813) 978-8688

TAMPA, FL 33637

8875 HIDDEN RIVER PKWY, SUITE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

PASCO COUNTY PROJECT MANAGER: ERIN SWANSON

http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:

GOVERNING STANDARD SPECIFICATIONS:

following website: http://www.fdot.gov/design/standardplans

Standard Plans for Road Construction and associated IRs are available at the

Bridge Construction and applicable Interim Revisions (IRs).

Florida Department of Transportation, FY2024-25 Standard Plans for Road and

GOVERNING STANDARD PLANS:

CONTRACT PLANS COMPONENTS

SIGNING AND PAVEMENT MARKING PLANS

ROADWAY PLANS

KEY SHEET OF EACH COMPONENT

A DETAILED INDEX APPEARS ON THE

CONTRACT PLANS

PASCO COUNTY (14091)

PASCO COUNTY

ENTRANCE) SIDEWALK DESIGN

MORNINGSIDE DR TO PASCO HIGH SCHOOL MAIN

FORT KING RD (HESTER RD TO COLEMAN AV AND

WORK ORDER NO.: SDW004126.00

NO.

SHEET

YEAR

FISCAL

I

\0

R o a d w a y

\6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y

\K E

Y S

R D

.d g n

/1

/2

:4

:5

P

M lo u k a ta r is d

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

INDEX OF SIGNALIZATION PLANS

ROADWAY PLANS

KEY SHEET

SHEET DESCRIPTION

2 - 10

SHEET NO.

PASCO COUNTY BOARD OF COUNTY COMMISSIONERS

COUNTY ATTORNEY: JEFFREY STEINSNYDER

COUNTY ADMINISTRATOR: MIKE CARBALLA, P.E.

DISTRICT 5: JACK MARIANO, CHAIR

DISTRICT 4: LISA YEAGER

DISTRICT 3: KATHRYN STARKEY, VICE CHAIR

DISTRICT 2: SETH WEIGHTMAN

DISTRICT 1: RON OAKLEY, CHAIR

https://maps.app.goo.gl/5Xu3wkVahy1mgpTo9 jfaraher

Charter Spectrum UG Coax and Fiber Green Lines

11 12 13 14 15

P C

S

T A

.9

P T

S

T A

.3

S T

A

.0

W A T E R

W A T E R

H E

S T

FORT KING RD.

N

10 40

Feet

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:0

:0

A

M lo u k a ta r is d

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

public works department pasco county

PASCO SDW004126.00

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

I

\0

R o a d w a y

\6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y

\P L

A N

R D

.d

FORT KING - PLAN 1 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

10:00:09 AM9/16/2024loukatarisd

PLAN SHEET (1)

jfaraher PolyLine jfaraher PolyLine jfaraher PolyLine jfaraher Callout UG Coax .625 jfaraher Callout UG Coax .625 & .715 UG Fiber 24 ct.

jfaraher Callout UG Coax .625 UG Fiber 12 & 48 ct.

jfaraher Callout UG Coax .715 UG Fiber 2-12 ct.

jfaraher Image jfaraher Rectangle jfaraher

All the cables are 3/4" or smaller, if they are in conduit then it would be 1.5/2" hdpe orange, not sure if any of the lines are direct buried or not. I also added vaults and peds.

16 17 18 19 20 21

D

W A T E R

W A T E R

W A T E R

FORT KING RD.

M E

D I C

M A

R L

U

L

N

M O

R N I N

G S I

N

10 40

Feet

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:0

:0

A

M lo u k a ta r is d

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

public works department pasco county

PASCO SDW004126.00

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

I

\0

R o a d w a y

\6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y

\P L

A N

R D

.d

FORT KING - PLAN 2 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

PLAN SHEET (2)

jfaraher PolyLine jfaraher PolyLine jfaraher PolyLine jfaraher Callout UG Coax .715 UG Fiber 2-12 ct.

jfaraher Callout UG Fiber 6 ct.

jfaraher Callout UG Coax .500 jfaraher Callout UG Coax 2-.715 UG Fiber 6 & 2-12 ct.

jfaraher Rectangle jfaraher Image jfaraher

All the cables are 3/4" or smaller, if they are in conduit then it would be 1.5/2" hdpe orange, not sure if any of the lines are direct buried or not. I also added vaults and peds.

P C

S

T A

.0

W A T E R

W A T E R

G R

A S

L L

L

N

FORT KING RD.

N 10 40

Feet

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:0

:1

A

M lo u k a ta r is d

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

public works department pasco county

PASCO SDW004126.00

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

I

\0

R o a d w a y

\6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y

\P L

A N

R D

.d

FORT KING - PLAN 3 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

10:00:10 AM9/16/2024loukatarisd

PLAN SHEET (3)

jfaraher PolyLine jfaraher PolyLine jfaraher Callout UG Coax .625 jfaraher Callout UG Coax .715 UG Fiber 6, 2/12, 24 ct.

jfaraher Callout UG Coax 2-.715 UG Fiber 6, 2/12, 24 ct.

jfaraher Rectangle jfaraher Rectangle jfaraher Rectangle jfaraher Image jfaraher

All the cables are 3/4" or smaller, if they are in conduit then it would be 1.5/2" hdpe orange, not sure if any of the lines are direct buried or not. I also added vaults and peds.

29 30 31 32 33

P T

S

T A

.2

W A T E R

W A T E R

FORT KING RD.

S T

A D I U

M

R O

Y

K

L

N

N

10 40

Feet

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:0

:1

A

M lo u k a ta r is d

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

public works department pasco county

PASCO SDW004126.00

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

I

\0

R o a d w a y

\6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y

\P L

A N

R D

.d

FORT KING - PLAN 4 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

10:00:11 AM9/16/2024loukatarisd

PLAN SHEET (4)

jfaraher PolyLine jfaraher PolyLine jfaraher Callout UG Coax .500 UG Fiber 24 ct.

jfaraher Callout UG Coax .500 & .715 UG Fiber 6, 2/12, 24 ct.

jfaraher Rectangle jfaraher Rectangle jfaraher Rectangle jfaraher Rectangle jfaraher

All the cables are 3/4" or smaller, if they are in conduit then it would be 1.5/2" hdpe orange, not sure if any of the lines are direct buried or not. I also added vaults and peds.

36 37

P C

S

T A

.2

G A S

S A

N

W A T E R

W A T E R

B A C

K

F L

O W

W A T E R

B A C

K

F L

O W

B A C

K

F L

O W

S A

N

S A

N

FORT KING RD.

N

10 40

Feet

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:0

:1

A

M lo u k a ta r is d

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER 39196

JEFFREY SIEWERT, P.E.

COUNTY WORK ORDER NO.

public works department pasco county

PASCO SDW004126.00

T H

E O

F F

I C

I A

L R

E C

O R

D O

F T

H I S

S H

E E

T I

S T

H E

E L

E C

T R

O N

I C

F I L

E D

I G

I T

A L

L Y

S I G

N E

D A

N D

S E

A L

E D

U N

D E

R R

U L

E

G

.0

F

.A .C

I

\0

R o a d w a y

\6

F o r t

K in g R d S id e w a lk

\C A

D D

\r o a d w a y

\P L

A N

R D

.d

FORT KING - PLAN 5 [SHEET] : I:\62\00 Roadway\62022302 Fort King Rd Sidewalk\CADD\roadway\PLANRD01.dgn

10:00:12 AM9/16/2024loukatarisd

PLAN SHEET (5)

jfaraher PolyLine jfaraher PolyLine jfaraher Callout UG Coax 2/.500 UG Fiber 18 & 24 ct.

jfaraher Callout UG Coax .500 UG Fiber 18 ct.

jfaraher Callout UG Coax 2/.500 UG Fiber 18 ct.

jfaraher Rectangle jfaraher Rectangle jfaraher Rectangle jfaraher

All the cables are 3/4" or smaller, if they are in conduit then it would be 1.5/2" hdpe orange, not sure if any of the lines are direct buried or not. I also added vaults and peds.

41 42

P T

S

T A

.7

S A

N

S A

N

W A T E R

D I X

E

P O I N

S E

T T

E

FORT KING RD.

E M

B A

S S

Y

P

A

K

C T

N

10 40

Feet

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

/1

/2

:0

:1

A

M lo u k a ta r is d

TAMPA, FLORIDA 33637

8875 HIDDEN RIVER PARKWAY, STE 200

AYRES

P.E. LICENSE NUMBER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .