This solicitation is for the renovation of Primary Care PACT Buildings 340 and 341 located in Dayton, Ohio. Key requirements include mechanical, electrical, and plumbing work as well as fire protection, security, and communication systems. The solicitation includes specifications for items such as faucets, switches, door hardware, fire alarms, nurse call systems, security cameras, radios, and other equipment. The work is to be completed by the awarded contractor in coordination with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Pricing terms and the response deadline are not provided in this document, which appears to be an appendix containing product specifications rather than a full solicitation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3030 West Streetsboro Road Richfield, Ohio 44286
(330) 659-6688 Ph.
(330) 659-6675 Fax
Thorson Baker Associates+
C GO N S U L T I N E SN G I N E E R
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341 Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved: Project Director
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANT
PHILIP P. KIRK
CHIEF ENGINEER
C :\R ev it
Lo ca l F ile s\
-0
9_
St ru ct _R
_k du ke
.rv t
2/ 4/
:5
2:
P M
SS-001
552-20-104
TBA TBA
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
02/09/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
GENERAL NOTES
GENERAL NOTES
Design Criteria
WALLS - WINDWARD COMPONENTS AND CLADDING
Effective Area(sq.ft.)
Height Interior Zone Exterior Zone
10 20 50 100 0-16 21.6 20.8 19.5 18.7
WALLS - LEEWARD COMPONENTS AND CLADDING
10 20 50 100
26.6 24.9 22.4 20.8
Effective Area(sq.ft.)
Height Interior Zone Exterior Zone
10 20 50 100 0-16 19.9 19.1 17.8 17.0
10 20 50 100
19.9 19.1 17.8 17.0
Effective Area(sq.ft.)
Zone Gross Net (Roof Joists)
10 20 50 100 Interior Zone 21.7 21.3 20.4 19.9
ROOF UPLIFT - COMPONENTS AND CLADDING
10 20 50 100
17.7 17.3 16.4 15.9
Perimeter (5.3' Wide) 36.5 32.8 27.3 23.6 32.5 28.8 23.3 19.6
Corner (5.3'x5.3') 54.9 45.7 32.8 23.6 50.9 41.7 28.8 19.6
Applicable Building Code: IBC 2018
1. Design live loads
A. Floor loads
a. First floor =100 psf
B.
Roof loads
a. Minimum roof snow or live load dictated by Building Official = N/A psf
b. Minimum roof live load by code = 20 psf
c. Ground snow load = 20 psf
• Snow exposure factor (Ce) = I
• Snow importance factor (Is) = I
• Thermal Factor (Ct) = I
d. Flat roof snow load (Pf) = 15 psf
e. Rain on snow = 5 psf
f. Total design snow load = 20 psf + drifting
g. Roof design is governed by the minimum roof live load or total design snow load
+ drifting whichever is more stringent.
2. Design wind loads
A. Basic wind speed (3 second gust) (Ultimate) = 110 mph
a. Exposure = B
b. Risk Category = II
c. Internal pressure coefficient (GCpi) = 0.18
B. Components and Cladding Wind Loads (PSF) (Ultimate)
C. Components and cladding: use the most stringent wind load obtained from code, underwriter criteria (Factory Mutual, etc.), and the project specifications. Cladding manufacturer shall consider increased pressure coefficients at building perimeter, corners, eaves, and rakes. Loads noted in general notes are obtained from code.
3. Seismic
SS = 0.144
S1 = 0.071
SDS = 0.154
SD1 = 0.114
Seismic importance factor (le) 1.00 Risk Category II Seismic site class D Seismic design category B Building modifications do not modify or effect the existing seismic resisting system or wind resisting system.
4. Frost depth = 36"
1. The term General Contractor (G.C.) as used in these documents refers to the Contractor / Construction Manager in responsible charge of the project in terms of coordination, scheduling, subcontractor coordination, etc. This term refers to, but is not limited to, General Contractor, Construction Manager, Design Build Contractor, Prime Contractor, etc. The term is referencing the entity that coordinates the work of other trades.
2. All referenced standards, such as codes, specifications, and other publications noted herein, are intended to refer to the edition of said standard as referenced by the applicable building code or the latest edition published as of the date on the contract documents.
3. The structure or its modifications are designed to be self-supporting and stable after the building or its modifications are fully completed. It is solely the contractor's responsibility to determine erection procedure and sequence and insure the safety of the construction personnel, public, building and its component parts, and adjacent buildings and properties. This includes the addition of whatever temporary shoring, bracing, needling, underpinning, etc. that may be necessary to brace new construction, adjacent buildings, existing walls, and framing to remain so that the structure is braced for wind, seismic, gravity, construction loads, etc. and so that no horizontal or vertical settlement or any damage occurs to the adjacent existing structures. Temporary supports shall be maintained in place until permanent supports and/or shoring and bracing are installed. Design of these supports shall be by an engineer registered in the state where the project is located in the employ of the contractor.
4. Fall protection support from perimeter of structure shall be provided in accordance with OSHA requirements as required. Such material shall remain the contractor's property after completion of the project.
5. It is the contractor's responsibility to enforce all applicable safety codes and regulations during all phases of construction.
6. The contractor shall perform all construction for the project in a manner and sequence that are based on accepted industry standards that recognize the interaction of the components that comprise the structure, without causing distress, unanticipated movements or irregular load paths as a result of the construction means and methods employed.
7. Construction loads shall not exceed design live loads. The contractor shall be responsible for all design required to support construction equipment used in constructing this project. Shoring and re-shoring is the responsibility of the contractor.
8. Principal openings through the structure are shown on these drawings. The general contractor shall examine the structural and mechanical, electrical, plumbing, and other trades drawings for the required openings and shall verify size and location of all openings with the appropriate trade contractor.
Providing all openings required for mechanical, electrical, plumbing, or other trades shall be a part of the general contract, whether or not shown in the structural drawings. Any deviation from the openings shown on the structural drawings shall be brought to the engineer's attention for review.
9. The existing conditions shown on these documents are based upon existing drawings prepared by Champlin/Haupt, Inc. dated 05/30/2001. The drawings illustrate the existing structure, structural elements and framing details based on either the original construction, drawings and/or site observation. Prior to initiating material procurement and construction it is the contractor's responsibility to verify existing conditions are consistent with the contract documents. This may required the removal of existing finishes and possible selective demolition to verify the as-built conditions. The contractor is responsible for field verifying all existing conditions; any discrepancies are to be immediately reported to the engineer and architect prior to proceeding with any of the work in question.
10. Contractor shall field verify slab on grade floor construction type prior to cutting. Under no circumstances shall the contractor cut a structural floor slab thicker than four (4") inches without prior written approval from Engineer of Record. Notify Engineer of Record of any slab thickness greater than four (4") inches prior to proceeding with any saw cutting.
11. All mechanical and electrical duct work, plumbing, piping, wiring, lighting and all architectural items that need to be removed during the modification of, or reinforcing of, existing structure shall be replaced in kind. The contractor shall keep all existing systems in operation during the construction phase of the project.
12. All contractors are required to examine the drawings and specifications carefully, visit the site and fully inform themselves as to all existing conditions and limitations, prior to agreeing to perform the work.
Failure to visit the site and familiarize themselves with the existing conditions and limitations will in no way relieve the contractor from furnishing any materials or performing any work in accordance with drawings and specifications without additional cost to the owner.
13. Details labeled "Typical Details" on drawings apply to situations occurring on the project that are the same or similar to those specifically detailed. Such details apply whether or not details are referenced at each location. Notify engineer for clarifications regarding applicability of "Typical Details".
14. Work these drawings with architectural, mechanical, electrical, and plumbing drawings, along with all other drawings and specifications included in the contract documents.
General
15. Do not scale drawings.
16. Any discrepancies between structural and architectural drawings shall be brought to the attention of the architect and structural engineer.
17. Should any of the general notes conflict with any details or instructions on plans, or in the specifications, the strictest provision shall govern.
18. Shop drawings and submittals:
A. These drawings shall be checked and coordinated with other materials and contracts by the general contractor and shop drawings and submittals shall bear the contractor's review stamp with the checker's initials before being submitted to the architect for approval.
B. When the fabricator has been authorized to use the architect's and engineer's drawings as erection drawings, the fabricator must remove all title blocks, professional seals and any other references to the architect and engineer from that erection drawing. The fabricator's name and title shall be placed on the erection drawings.
C. Where dimensions and elevations of existing construction could affect the new construction, it is the contractor's responsibility to make field measurements in time for their incorporation in the shop drawings.
General (cont.)
1. All concrete construction shall conform to ACI 301, "Specifications for Structural Concrete", ACI 305.1, and ACI 306.1 unless noted otherwise.
2. All detailing, fabrication and placing of reinforcing bars, unless otherwise noted, shall conform to ACI 318, "Building Code Requirements for Structural Concrete", ACI 117, and the ACI Detailing Manual.
3.
A. All cement shall be Type I or Type III Portland Cement per ASTM C150. Types IA and IP are not acceptable. Use one brand of cement throughout the project.
B. Minimum cementitious content shall consist of 100% cement or a combination of cement and Fly Ash per Note C, or a combination of cement and ground granulated blast furnace slag (GGBFS) per Note D. Fly Ash shall not be used in combination with GGBFS as a substitute for cement.
C. Fly Ash is permitted and shall conform to ASTM C618 Type C or F, but shall not exceed 20% of cementitious content by weight indicated above on a substitution basis and shall be included in the water-to-cement ratio. If Fly Ash is used, the mix design submittals shall have tests using the same amount of Fly Ash. The contractor's schedule shall account for the use of Fly Ash.
D. Ground granulated blast furnace slag (GGBFS) is permitted and shall conform to ASTM C989, but shall not exceed 15% of cementitious content by weight indicated above on a substitution basis and shall be included in the water-to-cement ratio. If GGBFS is used, the mix design submittals shall have tests using the same amount of GGBFS. The contractor's schedule shall account for the use of GGBFS.
E. Concrete used for floors shall have 1800 psi, 3 day strength. Mixes to be pumped shall be so identified on the mix design submittal. All pumped mixes shall have a mid-range or high-range water reducer.
Concrete
Minimum Cementitious
Content (lb./cu.yd.)
Maximum Water/ Cement Ratio
(by weight)
Specified 28-day
Compressive Strength (psi)
Specified Slump Range for
Placement with W.R.
(inches)
Specified Air Content Range
(% by volume)
Maximum Size
Aggregate (inches)
Concrete Types Schedule Type of Concrete
• Spread footings
• Piers below grade 470
0.60
0.48
0.45 4500
3000 5
3-5
5-6 6 ±1.5%
0-3 Entrapped
0-3 Entrapped
1 1/2
• Interior concrete
• Concrete permanently exposed to the weather or vulnerable to de-icers or freeze thaw cycles
• Exterior slabs
F. All admixtures other than superplasticizers shall be added at the batch plant. Superplasticizers, designed for addition to the mix at the plant, may be added at the batch plant with verifications from the structural engineer and verifications that the water-to-cement ratio has not been exceeded. Superplasticizers added at the site shall be sent in pre-measured containers from the batch plant.
G. All concrete used for cast-in-place concrete slabs shall contain the specified water reducing or water reducing/retarding admixture. All concrete slabs, placed at air temperature below 50°F shall contain the specified non-corrosive, non-chloride accelerator. All concrete placed at air temperature above 80° shall contain specified water-reducing/retarder admixture. All concrete required to be air-entrained shall contain an approved air-entraining admixture. All pumped concrete shall contain the specified high-range water-reducing admixture. Concrete with a water-cement ratio above 0.40 to 0.60 shall contain the specified water reducer.
H. All concrete requiring a high slump for placement (e.g. pumping, drilled piers, etc.) shall contain mid-range and high-range superplasticizer. Increased slump may not be achieved by exceeding the specified maximum water cement ratio. Maximum slump is 8 inches with use of water reducing admixture (ASTM C494).
I. Calcium chloride shall not be permitted, nor shall any admixture containing calcium chloride be permitted.
4. All pipe sleeve openings through concrete slabs shall be formed with standard steel pipe.
5. No electrical conduit shall be placed above the welded wire fabric or top reinforcing of slabs. Conduit embedded in slabs on composite metal deck are subject to additional restrictions and shall be coordinated with the structural engineer. Where slab thickness on metal deck contributes to fire rating, embedded conduit is prohibited.
6. All aluminum in contact with concrete or dissimilar metals shall be coated with two coats coal tar epoxy, approved by the architect, unless otherwise noted.
7. Concrete shall be discharged at the site within 1 1/2 hours after water has been added to the cement and aggregates. Addition of water to the mix at the project site will not be permitted. All water must be added at the batch plant. Slump may be adjusted only through the use of additional water reducing admixture or high range water reducing admixture.
8. All concrete shall be placed without horizontal construction joints, except where specifically noted.
Horizontal reinforcement shall be continuous through vertical construction joints.
9. Construction joint locations other than shown on the drawings are permitted subject to prior approval of the engineer. Expansion joint and control joint locations are mandatory as shown. Contractor shall submit drawings showing intended placing sequences and location of construction joints to the engineer for approval. At poured in place walls, construction joints shall be located so as to provide a 60'-0" maximum horizontal length of concrete placement in any direction.
10. All exposed edges of concrete members shall be chamfered 3/4" unless shown otherwise on architectural drawings.
11. See architectural drawings for concrete finishes, masonry anchors, and for miscellaneous embedded plates, bolts, anchors, angles, etc.
12. The placement of sleeves, outlet boxes, box-outs, anchors, etc., for the mechanical, electrical and plumbing trades is the responsibility of the trade involved; however, any box-outs not covered by typical details in the structural drawings shall be submitted for approval.
13. The general contractor shall coordinate locations and dimensions of all openings and sleeves required for mechanical, electrical, and plumbing penetrations before concrete is placed. Shop drawings of all slab openings and sleeves shall be submitted for review by structural engineer. Openings shall not be cut or drilled in slabs without prior approval by structural engineer.
14. Reinforcing bars shall conform to ASTM A615, grade 60. No tack welding of reinforcing in the field will be permitted.
15. Reinforcing bars for welded applications shall conform to ASTM A706, 60 ksi yield strength.
16. Deformed bar anchors (DBA) shall conform to ASTM A496, 70 ksi yield strength.
17. Welded wire fabric reinforcing shall conform to ASTM A1064 and be furnished in flat sheets and installed on chairs.
18. Reinforcing bar sizes #3 through #5 may be bent cold the first time, provided reinforcing bar temperature is above 32°. For other bar sizes, preheat reinforcing bars before bending. See procedures as outlined in
ACI 301.
19. Wire bar supports shall be furnished for all reinforcing within slabs, inclusive of welded wire fabric. Bottom bars in slabs on grade may be supported by other suitable supports. Reinforcing shall be properly positioned prior to concrete placement and may not be re-positioned once concrete operations have begun. Wire bar and other types of supports shall be in accordance with the Concrete Reinforcing Steel Institute Manual of Standard Practice.
20. Reinforcement shall be continuous through all construction joints unless otherwise noted on drawings.
21. All hooks shown on drawings shall be standard hooks unless otherwise noted.
22. Where continuous bars are called for, they shall run continuously around corners and be lapped at necessary splices, or hooked at discontinuous ends. Lap lengths shall be as given in the splice and development table. Lap beam top bars at mid-span and beam bottom bars at supports, unless otherwise noted.
23. Provide additional reinforcing at the sides and corners of all openings in concrete in accordance with the typical details. Extend bars a minimum of 2'-0" beyond openings, hook where extension is not possible.
Minimum additional requirements are as follows:
• (2)-#5 top and bottom in slabs
• (2)-#5 each face in walls
• (2)-#5 x 4'-0" long diagonally each corner of opening
24. In reinforced concrete walls and footings provide corner dowels of same size and spacing as horizontal reinforcing. Dowels shall have a class "b" lap with horizontal reinforcing in each direction.
25. Moisture curing method of curing concrete shall not be used inside existing buildings or where a potential for water damage exists.
Minimum Lap Splice and Anchorage Dimension Table
1. 3000 psi normal weight concrete, Fy=grade 60,non-coated bars
Top Bars Other Bars Bar size Lap Anchorage Bar Size Lap Anchorage #3 28" 22" #3 22" 17" #4 37" 29" #4 29" 22" #5 47" 36" #5 36" 28" #6 56" 43" #6 43" 33" #7 81" 63" #7 63" 48" #8 93" 72" #8 72" 55"
2. 4000 psi normal weight concrete, Fy=grade 60, non-coated bars
Top Bars Other Bars Bar Size Lap Anchorage Bar Size Lap Anchorage #3 24" 19" #3 19" 15" #4 33" 25" #4 25" 19" #5 41" 31" #5 31" 24" #6 49" 37" #6 37" 29" #7 71" 54" #7 54" 42"
3. "Top Bars" as noted in the tables indicates the condition where horizontal bars are so placed that more than 12 inches of fresh concrete is cast below the splice.
4. When lapping two different size bars, use the lap dimension of the smaller bar or the anchorage dimension of the larger bar. Use whichever dimension is larger.
Minimum Concrete Cover for Reinforcing
1. Unless noted otherwise, concrete reinforcing shall be placed with proper cover to provide protection in accordance with ACI 318, and within deviation tolerances listed in ACI 117.
Concrete (cont.)
• Location Minimum Cover
• Footings cast against and permanently exposed 3" to earth
• Slabs on grade (W.W.F.) 1/3 slab thickness from top of slab
• Interior slabs and stairs 3/4"
• Exterior slabs and stairs: #5 and smaller 1 1/2" #6 and larger 2"
• Walls interior face 3/4"
• Walls exterior face: #5 and smaller 1 1/2" #6 and larger 2"
CONCRETE ANCHORS
(CRACKED AND UNCRACKED CONCRETE)
ANCHOR TYPE ADHESIVE TYPE ROD TYPE
Adhesive Hilti HIT-HY200 SafeSet System Hilti HIT-Z Rod
Mechanical - Hilti KWIK HUS-EZ
Mechanical - Hilti KWIK Bolt-TZ Mechanical Safe-Set with AT tool
ANCHOR TYPE ADHESIVE TYPE REINFORCING
Medium Duty Adhesive Hilti HIT-HY100 SafeSet System As indicated on drawings.
Heavy Duty Adhesive Hilti HIT-HY200 SafeSet System As indicated on drawings.
CONCRETE REINFORCING
(CRACKED AND UNCRACKED CONCRETE)
1. Steel joist design, fabrication and erection shall conform to the latest specifications and code of standard practice of the Steel Joist Institute, the requirements of OSHA section 1926.757, and as shown on the drawings.
2. All steel joists shall receive one standard shop coat of white or light gray oxide paint unless noted otherwise on drawings. Asphaltic paints are not acceptable.
3. All steel joists shall be designed to resist net uplift forces shown at beginning of general notes.
4. Ends of every joist which rests on steel supports shall be welded per SJI requirements.
5. General contractor shall verify all structural steel joist locations, mechanical unit weights and opening sizes and locations with mechanical contractor and vendor's drawings for actual mechanical units purchased.
6. No light gage framing, mechanical, electrical, or other equipment shall be suspended from or attached to any interior bridging.
7. Where lighting, ductwork or mechanical equipment is located in joist spaces, contractor shall remove horizontal and/or diagonal bridging interferring with duct or equipment installation once joists are erected and deck is installed. Once ductwork or equipment is installed, horizontal bottom chord bridging shall be reinstalled. Coordinate all proposed removal locations with E.O.R. and joist supplier prior to removing.
8. Field modifications to joists are prohibited without the written consent from the joist manufacturer. The contractor shall copy the architect and engineer on all correspondence.
Steel Joists
1. Detailing, fabrication, and erection shall conform to the latest edition as referenced by the applicable building code, of the AISC "Steel Construction Manual" and AISC 360 "Specification for Structural Steel Buildings", herein referred to as "AISC Manual" and "AISC Specification".
Structural Steel: (W shapes) ASTM A992 (Fy=50ksi) (M, S, C shapes) ASTM A36 uno (Plate, Angles) ASTM A36 uno
HSS: (tubular shapes) ASTM A500 grade C (Fy=50ksi)
All anchor rods shall be ASTM F1554 grade 36, uno.
All structural steel not to receive spray fire-proofing shall be primed white or light gray; asphaltic paints are not acceptable.
All column base plates shall have a minimum of four anchor rods.
2. Connections shown on these drawings are generally schematic. They are intended to define the spatial relationship of the framed members and show a feasible method of making the connection. Any connection that is not shown or is not completely detailed on the structural drawings shall be designed by a registered professional engineer, retained by the fabricator. Details and connections may be designed to conform to AISC Manual. Completely detailed means the following information is shown on the shop detail drawings:
A. All plate dimensions and grade.
B. All weld sizes, lengths, pitches and returns.
C. All hole sizes and spacings.
D. Number and type of bolts: where bolts are shown but no number is given, the connection has not been completely detailed.
E. Where partial information is given, it shall be the minimum requirement for connection.
F. Method of design.
3. Submit calculations stamped & signed by an engineer registered in the appropriate jurisdiction of the project including, but not limited to, moment connections (flexible and fully restrained moment connections), bracing gusset plates and connection to beam/column assembly, web-to-chord connection at trusses, and any unique connections that are not completely detailed on these drawings.
4. Details and connections completely detailed in the contract drawings may not be altered without written approval by the engineer. Where approved, altered connections shall be completely detailed by the fabricator's engineer clearly on the shop drawings.
5. Alterations of schematic connection details may impact architectural concept and shall not be made without prior written approval of the engineer.
6. Minimum connection plate thickness shall be 3/8", unless otherwise indicated in the contract drawings.
Structural Steel
7. For W, M, S, and C shapes, unless otherwise noted, beam to beam connections and beam to column connections shall be one of the following double angle (t min=5/16") framed beam connections:
A. Shop welded per Table 10-2, AISC Manual for using weld A, and using 3/4"diameter A325-N bolts in standard or horizontally slotted holes for the field connection.
B. All bolted connections per Table 10-1, AISC Manual. Controlling strength of connection shall be least of bolt / angle strength or beam web strength taking into account coped flanges.
The minimum length of connection angles shall be equal to one-half the depth of the member to be supported.
8. Unless otherwise noted, all connections at HSS sections shall be designed and detailed in accordance with the AISC Manual and AISC Specification.
9. Where the reactions of uniformly loaded beams and girders are not shown on the drawings, the connections shall be designed to support the reactions due to the maximum allowable uniform load as indicated in the load tables of the AISC Manual, Part 3 for the given beam size and span. For beams and girders not uniformly loaded see plan for reaction; if no reaction is shown, contact Engineer of Record for reactions.
10. All bolts shall be considered bearing bolts. Do not over tighten bearing bolts, especially for beams to support concrete slabs. Tighten bearing bolts to a snug condition only, per AISC specifications.
11. Twist-off type tension control bolts are not permitted to be used as bearing bolts.
12. All moment plate connections shall be designed for the full moment capacity (as tabulated in the AISC Manual, Part 3) of the beam, unless noted otherwise. Local stresses at bolt holes do not govern. All connections to tubes and pipes shall use thru plates unless noted otherwise.
13. All welding shall be done using E-70xx electrodes in accordance with the latest AWS specifications.
14. Work these drawings with architectural drawings for nailer holes and architectural clearances.
15. General contractor shall verify all structural beam locations, mechanical unit weights and opening sizes and locations with mechanical contractor and vendor's drawings for actual mechanical unit purchased.
16. Splicing of structural members where not detailed on the drawings is prohibited without prior approval of the structural engineer.
17. Cuts, holes, coping, etc. required for work of other trades shall be shown on the shop drawings and made in the shop. Cuts or burning of holes in structural steel members in the field will not be permitted, unless specifically approved in each case by the structural engineer.
18. All HSS shapes (round, square, rectangular, etc.) are to have a 1/4" cap plate at all exposed ends.
Cap plates to be seal welded all around, uno. Provide 3/8"Ø weep holes in the center of the plate.
19. All weld sizes not shown in details herein shall be the minimum required size based on thickness of thinner part as per AISC Specification, Tables J2.3 & J2.4. Exception: At member splices welds or bolts shall develop full strength of the member or components being connected.
20. All around welds indicated herein shall be discontinuous at the flange tips of open sections.
21. All structural steel, including base plates and tops of anchor bolts, to be exposed to soil are to be coated with an approved coal tar epoxy, 16 mils minimum thickness.
22. Any alteration made by the detailer on the structural steel shop drawings to schematic or completely detailed connections shown on the contract drawings must be clearly identified by clouding or by direct note on the shop drawing by the detailer prior to submission to the engineer.
23. Any member sizes shown on the plans, and currently listed in the AISC Manual, which are not currently available must be brought to the architect's and structural engineer's attention prior to award of steel contract. No claim for additional cost will be accepted after the award, for member/built up member substitutions for these sizes.
24. Filler beams shall be spaced equally between established dimensions, unless noted otherwise.
25. All supplemental steel angles required for roof units and roof openings over 12"x12" to be supplied by structural steel fabricator and be coordinated by general contractor with the joist fabricator, mechanical drawings and mechanical equipment supplier.
26. Hot dip galvanize per ASTM A123 after fabrication the following structural steel members:
A. Items identified on the architectural and structural drawings. All steel permanently exposed to weather shall be hot dipped galvanized unless specified otherwise on the architectural drawings. For members shown to be galvanized, all connection material shall also be galvanized.
27. The steel decks are part of the stability system for a completed structure. The contractor shall provide temporary erection bracing to maintain structural steel in proper position until permanently secured.
Remove temporary bracing and their connections only after erection of permanent members is complete and steel decks are properly fastened. A completed structure has its boundaries defined by the building exterior and/or interior expansion joints where they exist between building segments.
Architecturally Exposed Structural Steel
1. Steel tube framing which is architecturally exposed, requires special care be taken during fabrication, handling and erection. The following requirements from Section 10 of the AISC code of standard practice for architecturally exposed structural steel shall apply. Additional requirements of Section 10 do not apply.
2. Fabrication shall be done in accordance with the details shown on the structural drawings. All copes, miters and butt cuts in surfaces shall be made with uniform gaps as shown on the drawings, or in reasonable contact if shown without a gap. Welds shall be reasonably smooth and uniform. Finishing and grinding is not required except where necessary for fit clearance, or when specifically noted on the contract drawings.
3. The fabricator shall use special care to avoid bending, twisting or otherwise distorting of individual members or assemblies.
4. Erection shall be performed so as to provide a close fit and neat appearance of the structure.
5. Unloading, handling and erection shall be executed with care to minimize damage to any shop paint. If temporary braces or erection clips are used, upon removal, steel surfaces shall be ground smooth and holes filled with weld metal or body solder and smoothed by grinding or filing. Touch up abrasions of the shop coat shall be performed by the painting contractor.
6. Primer coats shall be compatible and may be part of the architectural paint system for architecturally exposed structural steel. Coordinate with architectural requirements.
Structural Steel (cont.)
1. All metal roof decking shall comply with the provisions of the latest edition of SDI-RD "Standard for Steel Roof Deck" and underwriter requirements (Factory Mutual, etc.).
2. Deck and accessories shall be shop primed with white or light gray rust inhibitive primer.
3. Deck and accessories that are to receive spray fireproofing shall be galvanized.
4. No light gage framing, mechanical, electrical or other equipment shall be suspended from or attached to any metal roof deck.
5. See plans for deck attachment.
Metal Roof Decking
1. Design of anchors, adhesives, and embedments specified on the drawings is based on Hilti products. Any substitutions shall meet or exceed the allowable shear and allowable tension values published in the Hilti North American Product Technical Guide.
2. The contractor shall submit ICC ES Evaluation reports and manufacturer installation instructions for all post-installed anchors being used on the project.
3. The contractor shall ensure the installers of post-installed anchors shall have at least three (3) years of experience installing anchors in similar installations. If installers do not have the required experience with similar installations they must conduct a thorough training with the manufacturer's representative. Training shall consist of but not be limited to, proper hole drilling procedures, hole preparation and cleaning techniques, adhesive injection techniques and dispenser training / maintenance, rebar dowel preparation and installation and proof loading/torquing.
4. The contractor shall provide manufacturer product information for any requests for substitution for review to the EOR for compliance with the contract documents.
5. The contractor shall submit the specific product information, for each application, for any product requesting substitution. For each application being substituted, provide anchor type, embedment depth, adhesive type, edge distances, etc.; along with the allowable shear and tension capacity for the requested applications. Do not provide generic product data; only specific values for each substitution will be reviewed. If this information is not fully provided, the submittal will be immediately rejected.
6. Post-installed anchors and dowels shall be used only where specifically indicated on the drawings or for specific conditions approved by the engineer. Items indicated to be cast-in-place shall not be substituted with post-installed methods or products unless prior approval is given by the engineer. When requesting a substitution of a post-installed anchor in lieu of cast-in-place anchor, calculations, for a post-installed alternate, shall be provided by an engineer registered in the appropriate jurisdiction of the project.
7. Fastener and anchor material shall be as follows:
• Bolts and Studs: ASTM A307; ASTM A449 (where inidcated as 'High Strength')
• Carbon and Alloy Steel Nuts: ASTM A563
• Carbon Steel Washers: ASTM F436
• Carbon Steel Threaded Rod: ASTM F1554, GR.36
• Wedge Anchors: ASTM A510 or ASTM A108
• Stainless Steel Bolts, Hex Cap Screws, and Studs: ASTM F593
• Stainless Steel Nuts: ASTM F594
• Zinc Plating: ASTM B633
• Hot-Dip Galvanizing: ASTM A153
• Reinforcing Dowels: ASTM A615
8. The following anchors shall only be used where indicated on the drawings, unless specifically noted otherwise in sections or details in the drawings:
Post-Installed Anchors and Reinforcing Dowels
1. All building pad preparation shall follow the recommendations of the geotechnical report (uno).
2. Foundation design is based upon the removal of unsuitable material and replacement with engineered fill per the geotechnical report.
3. All trees, brush, roots, topsoil, rubble, organically contaminated or otherwise objectionable materials encountered are to be removed from structural areas of the site per the geotechnical report.
4. Subgrade sectors which will exist in cut and those which are to support fill structures are to be proof rolled. Areas exhibiting instability are to be undercut and back filled on a lift-by-lift basis with each lift carefully compacted.
5. If unstable subgrade sectors cannot be stabilized by excavation and recompaction, then crushed stone or similar coarse aggregate materials shall be rolled into the subgrade until a firm subgrade reaction is achieved.
6. The geotechnical engineer shall determine on site or off site imported material that can be used for engineered fill. All fill material shall be approved by the geotechnical engineer.
7. The proposed engineered fill materials are to be placed in lifts not exceeding eight (8) inches in loose measured thickness. Each lift is to be compacted as follows:
A. Slab on grade: Minimum of 95% maximum density by ASTM D698.
B. Footings bearing on fill: Minimum of 98% maximum density by ASTM D698.
8. The earthwork program shall be conducted under the supervision of a soils testing laboratory. The in-place densities achieved are to be verified by tests.
Building Pad Preparation
1. The contractor shall familiarize themselves with the survey and the geotechnical investigation report before starting construction. All foundation work shall be in accordance with the recommendations of the geotechnical report by S & ME dated 4/2/2020 except where noted otherwise on drawings or specifications.
2. A soils testing laboratory shall be retained by the owner to provide construction review to insure conformance with the construction documents during the excavation, back fill, and foundation phases of the project.
3. The soils testing laboratory shall:
• Discuss with the engineer the design intent of the construction documents and the testing procedures used to ensure conformance with the construction documents before construction begins.
• Inform the engineer of any variance in these procedures.
4. It shall be the responsibility of the soils testing laboratory to:
• Determine topsoil and excavation stripping depth;
• Inspect all subsoil exposed during stripping, site grading, and excavation operations;
• Approve fill materials, perform density tests of fills to insure placement per specification requirements;
• Inspect foundation bearing surfaces.
5. Foundation design is based on 2,000 psf bearing pressure on firm, undisturbed soil.
6. Top of footing elevations, footing steps and thickness of footings are shown on the drawings and are based upon the information from the geotechnical report and the civil drawings available at the time of design. The top and bottom of footing may vary depending on the conditions encountered at the site.
Frost depth shall be maintained and coordinated with final grading and location of footing steps. If proper foundation bearing is found to be deeper than that shown on the drawings then foundations shall be thickened maintaining the top of footing elevation to assure proper foundation bearing. The contractor shall submit unit prices for such work and shall qualify the extent of work in the base bid. If top of footing elevations need to vary for final site conditions then the general contractor shall coordinate the effort of other trades.
7. Step footings, where required, at a ratio of one (1) vertical to two (2) horizontal with a maximum vertical step of 2'-0" unless noted otherwise.
8. Inundation and long term exposure of bearing surfaces, which will result in deterioration of bearing formations, shall be prevented. Footings shall be placed immediately following footing excavations and bearing surface inspection.
9. All fill materials shall be free of organic contaminations and other deleterious matter.
10. For back fill against retaining walls, footings, etc., place in 8" thick layers, with each lift compacted at near optimum moisture content, until a minimum in place density of 95% of the maximum density as determined by ASTM D698 is achieved.
11. All soil surrounding and under footings shall be protected from frost action and freezing during the course of construction.
12. Notify structural engineer of any unusual soil conditions that are in variance with the geotechnical report.
Foundation
Revisions Date
CONSTRUCTION - ISSUED FOR BID 2/09/2021
3030 West Streetsboro Road Richfield, Ohio 44286
(330) 659-6688 Ph.
(330) 659-6675 Fax
Thorson Baker Associates+
C GO N S U L T I N E SN G I N E E R
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341 Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved: Project Director
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANT
PHILIP P. KIRK
CHIEF ENGINEER
C :\R ev it
Lo ca l F ile s\
-0
9_
St ru ct _R
_k du ke
.rv t
2/ 4/
:5
2:
P M
SS-002
552-20-104
TBA TBA
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
02/09/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
GENERAL NOTES
1. Special inspection is to be provided in addition to the inspections conducted by the department of building safety and shall not be construed to relieve the owner or his authorized agent from requesting the periodic and called inspections required by the applicable building code. G.C. shall engage and pay for a qualified testing agency to perform special inspections.
Required Special Inspections
1. In addition to the regular inspections, the following items will also require special inspection in accordance with the applicable building code.
A. Soils compliance prior to foundation inspection (compacting fill, special grading) B. Structural concrete over 2,500 psi C. Structural steel fabrication D. Field welding E. High strength bolts F. Cold Formed Steel Deck
2. Special inspector shall meet the qualifications as stated in the applicable building code and shall perform the duties and responsibilities as outlined in the applicable building code. The special inspector shall provide written documentation to the building official demonstrating his or her competence and relevant experience or training.
Experience or training shall be considered relevant when the documented experience or training is related in complexity to the same type of special inspection activities for projects of similar complexity and material qualities. These qualifications are in addition to qualifications specified in others sections of the applicable building code.
3. Special inspection shall meet the requirements of the applicable building code. Special inspector(s) shall be hired by the owner to perform the required special inspections. The names of persons or firms who are to perform the special inspections shall be forwarded to the building official for approval. The special inspector(s) shall complete and submit all forms required by the building department having jurisdiction.
4. Access for special inspection: The construction or work for which special inspection is required shall remain accessible and exposed for special inspection purposes until completion of the required special inspections.
5. The special inspector(s) shall:
A. Observe the work assigned for conformance to the approved drawing and specifications.
B. Furnish inspection reports to the engineer of record and building department. Discrepancies shall be brought to the immediate attention of the contractor for correction, then, if not corrected to the engineer and the building department.
C. Submit to the engineer of record and the building department a signed final report stating that the work was in conformance with the approved drawings and specifications and the applicable workmanship provisions of the applicable building code.
6. Special Inspection Notes:
A. Continuous special inspection is always required during the performance of the work unless specifically noted below.
B. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator's shop, continuous special inspection is required during the performance of the work except as allowed in the applicable building code and unless specifically noted below.
C. It is the responsibility of the contractor to provide the special inspector(s) with advance notice, no less than one working day, of the initiation of any work required to have special inspections. All work performed without required special inspection will be subject to removal.
7. Types of work requiring special inspections are:
A. Structural steel elements of buildings and structures as required by AISC 360 as referenced in the applicable building code, see Table 1.
1. Exceptions include:
a. Special Inspection of steel fabrication process shall not be required where the fabricator does not perform any welding, thermal cutting or heating operation of any kind as part of the fabrication process. In such cases, the fabricator shall be required to submit a detailed procedure for material control that demonstrates the fabricator's ability to maintain suitable records and procedures such that, at any time during the fabrication process, the material specification, and grade for the main stress-carrying elements are capable of being determined. Mill test reports shall be identifiable to the main stress-carrying elements required by the approved construction documents.
B. Cold formed steel deck as required by SDI (Steel Deck Institute) QA/QC as reference in the applicable building code,see Table 2.
C. Open web steel joists and joist girders as required per Table 3.
D. Concrete construction as required by applicable building code and Table 4. Exceptions are as follows:
1. Concrete patios, driveways and sidewalks, on grade.
E. Special inspection for existing site soil conditions, during site preparation and fill placement, to ensure load-bearing requirements in compliance with applicable building code and Table 7 except as allowed in applicable building code.
Special Inspections
X 1. MATERIAL TEST REPORTS AND CERTIFICATIONS AS LISTED IN AISC 360
FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. X --
2. INSPECTION PRIOR TO WELDING:
X b. WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE. X --
X c. MANUFACTURERS CERTIFICATIONS FOR WELDING
CONSUMABLES AVAILABLE. X --
X d. MATERIAL IDENTIFICATION (TYPE/GRADE) -- X
X e. WELDER IDENTIFICATION SYSTEM. -- X
X
f. FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
- JOINT PREPARATION
- DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE,
BEVEL)
- CLEANLINESS (CONDITION OF STEEL SURFACES)
- TACKING (TACK WELD QUALITY AND LOCATION)
- BACKING TYPE AND FIT (IF APPLICABLE)
-- X
X h. CONFIGURATION AND FINISH OF ACCESS HOLES. -- X
X
i. FIT-UP OF FILLET WELDS
- DIMENSIONS (ALIGNMENT, GAPS AT ROOT)
- CLEANLINESS (CONDITION OF STEEL SURFACES)
- TACKING (TACK WELD QUALITY AND LOCATION)
X --
X j. CHECK WELDING EQUIPMENT. -- X
3. INSPECTIONS DURING WELDING
X a. USE OF QUALIFIED WELDERS -- X
X
b. CONTROL AND HANDLING OF WELDING CONSUMABLES
- PACKAGING
- EXPOSURE CONTROL
-- X
X c. NO WELDING OVER CRACKED TACK WELDS -- X
X
d. ENVIRONMENTAL CONDITIONS
- WIND SPEED WITHIN LIMITS
- PRECIPITATION AND TEMPERATURE
X
e. WPS FOLLOWED
- SETTINGS ON WELDING EQUIPMENT
- TRAVEL SPEED
- SELECTED WELDING MATERIALS
- SHIELDING GAS TYPE/FLOW RATE
- PREHEAT APPLIED
- INTERPASS TEMPERATURE MAINTAINED (MIN/MAX.)
- PROPER POSITION (F, V, H, OH)
-- X
X
f. WELDING TECHNIQUES
- INTERPASS AND FINAL CLEANING
- EACH PASS WITHIN PROFILE LIMITATIONS
- EACH PASS MEETS QUALITY REQUIREMENTS
-- X
4. INSPECTIONS AFTER WELDING
X a. WELDS CLEANED -- X
X b. SIZE, LENGTH AND LOCATION OF WELDS X --
X
c. WELDS MEET VISUAL ACCEPTANCE CRITERIA
- CRACK PROHIBITION
- WELD/BASE-METAL FUSION
- CRATER CROSS SECTION
- WELD PROFILES
- WELD SIZE
- UNDERCUT
- POROSITY
X --
X d. ARC STRIKES X --
X e. k-AREA X --
X g. BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED) X --
X h. REPAIR ACTIVITIES X --
X i. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED
JOINT OR MEMBER X --
X
5. WHEN REQUIRED BY AISC 360 APPENDIX 3, SECTION N WELDED JOINTS
REQUIRING WELD SOUNDNESS TO BE ESTABLISHED BY RADIOGRAPHIC
OR ULTRASONIC INSPECTION SHALL BE TESTED BY SPECIAL INSPECTOR
AS PRESCRIBED IN AISC 360.
X --
6. INSPECTIONS PRIOR TO BOLTING
X a. MANUFACTURERS CERTIFICATIONS AVAILABLE FOR FASTENER
MATERIALS X --
X b. FASTENERS MARKED IN ACCORDANCE WITH ASTM
REQUIREMENTS -- X
X
c. CORRECT FASTENERS SELECTED FOR THE JOINT DETAIL
(GRADE, TYPE, BOLT LENGTH, IF THREADS ARE TO BE
EXCLUDED FROM SHEAR PLANE)
-- X
X d. CORRECT BOLTING PROCEDURE SELECTED FOR JOINT DETAIL -- X
X
e. CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE
FAYING SURFACE CONDITION AND HOLE PREPARATION, IF
SPECIFIED, MEET APPLICABLE REQUIREMENTS
-- X
X
f. PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION
PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER
ASSEMBLIES AND METHODS USED.
-- X
X g. PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS
AND OTHER FASTENER COMPONENTS -- X
7. INSPECTIONS DURING BOLTING
X
a. FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN
ALL HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS
REQUIRED
-- X
X b. JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO
THE PRE-TENSIONING OPERATION -- X
X c. FASTENER COMPONENT NOT TURNED BY THE WRENCH
PREVENTED FROM ROTATING -- X
X
d. FASTENERS ARE PRE-TENSIONED IN ACCORDANCE WITH THE
RCSC SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM
THE MOST RIGID POINT TO THE FREE EDGES.
-- X
8. INSPECTIONS AFTER BOLTING
X a. DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED
CONNECTIONS X --
9. INSPECTION OF STEEL ELEMENTS OF COMPOSITE CONSTRUCTION
PRIOR TO CONCRETE PLACEMENT
X a. PLACEMENT AND INSTALLATION OF DECK X X
X b. PLACEMENT AND INSTALLATION OF STEEL HEADED STUD
ANCHORS X X
X c. DOCUMENT ACCEPTANCE OR REJECTION OF STEEL ELEMENTS X X
1. INSPECTION OR EXECUTION TASKS PRIOR TO DECK PLACEMENT:
X
a. VERIFY COMPLIANCE OF MATERIALS (DECK AND DECK
ACCESSORIES) WITH CONSTRUCTION DOCUMENTS, INCLUDING
PROFILES, MATERIAL PROPERTIES, AND BASE METAL
THICKNESS.
X --
X b. DOCUMENT ACCEPTANCE OR REJECTION OF DECK AND DECK
ACCESSORIES. X --
2. INSPECTION OR EXECUTION TASTS AFTER DECK PLACEMENT:
X a. VERIFY COMPLIANCE OF DECK AND ALL DECK ACCESSORIES
INSTALLATION WITH CONTRUCTION DOCUMENTS X --
X
b. VERIFY DECK MATERIALS ARE REPRESENTED BY THE MILL
CERTIFICATIONS THAT COMPLY WITH THE CONSTRUCTION
DOCUMENTS.
X --
X c. DOCUMENT ACCEPTANCE OR REJECTION OF INSTALLATION OF
DECK AND DECK ACCESSORIES. X --
3. INSPECTION OR EXECUTION TASKS PRIOR TO WELDING:
X a. WELDING PROCEDURE SPECIFICATION (WPS) AVAILABLE -- X
X b. MANUFACTUREER CERTIFICATIONS FOR WELDING
CONSUMABLES AVAILABLE -- X
X c. MATERIAL IDENTIFICATION (TYPE / GRADE) -- X
X d. CHECK WELDING EQUIPMENT -- X
4. INSPECTION OR EXECUTION TASKS DURING WELDING:
X a. USE OF QUALIFIED WELDERS -- X
X b. CONTROL AND HANDLING OF WELDING CONSUMABLES -- X
X c. ENVIRONMENTAL CONDITIONS (WIND SPEED, MOISTURE, TEMPERATURE) -- X
X d. WPS FOLLOWED -- X
5. INSPECTION OR EXECUTION TASKS AFTER WELDING:
X a. VERIFY SIZE AND LOCATION OF WELDS, INCLUDING SUPPORT, SIDELAP, AND PERIMETER WELDS. X --
X b. WELDS MEET VISUAL ACCEPTANCE CRITERIA X --
X c. VERIFY REPAIR ACTIVITIES X --
X d. DOCUMENT ACCEPTANCE OR REJECTION OF WELDS X --
6. INSPECTION OR EXECUTION TASKS PRIOR TO MECHANICAL FASTENING:
X a. MANUFACTURER INSTALLATION INSTRUCTIONS AVAILBALE FOR
MEC…