1ARCH.pdf
PDF 24 MB Posted
- Solicitation number
- 36C25022B0031
About this file
This document provides details for a federal solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation seeks to renovate Primary Care Patient Aligned Care Team buildings 340 and 341, as outlined in the attached documents including plans for architecture, civil engineering, structural engineering, fire protection, plumbing, mechanical, and electrical work. The solicitation number is 36C25022B0031 and was last updated on June 7, 2022. Redacted documents are included as attachments related to specific equipment and systems for the renovation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NFPA 101 (2018)
PROJECT AREA:
EXISTING BUILDING 340: 22,154 SF
EXISTING BUILDING 341: 17,395 SF
NEW ADDITION: 1,890 SF
TOTAL: 41,439 SF
*37,500 SF ALLOWED (NFPA 5000 TABLE 7.4.1)
PER AREA INCREASE FOR BUILDING 341 CODE ANALYSIS, ALLOWABLE AREA IS 100,740 SF
OCCUPANCY (6.1.11):
EXISTING PRIMARY CARE CLINIC: BUSINESS
OCCUPANT LOAD FACTOR (BUSINESS USE, TABLE 7.3.1.2):
BUSINESS USE: 150 SF PER OCCUPANT
OCCUPANT LOAD BASED ON EXISTING DRAWINGS DATED 10/05/2009:
EXISTING BUILDING 341:
OCCUPANT LOAD: = 175 OCCUPANTS
OCCUPANT LOAD (ACTUAL):
EXISTING BUILDING 340 + ADDITION:
STAFF: = 136 OCCUPANTS
PATIENT: = 29 OCCUPANTS
ASSEMBLY / WAITING = 70 OCCUPANTS
TOTAL: = 410 OCCUPANTS
FIRE SUPPRESSION:
FULLY SPRINKLERED WITH SMOKE DETECTION
BUILDING HEIGHT (4.6.3)
ALLOWED PER NFPA 5000 (TABLE 7.4.1) 5 STORY / 57'-0"
ACTUAL: 1 STORY / 22'-6" (NO CHANGE)
EGRESS:
MINIMUM DOOR LEAF WIDTH: (7.2.1.2.3) 32" MINIMUM DOOR CLEAR WIDTH REQUIRED
36" MINIMUM DOOR LEAF WIDTH PROVIDED
MINIMUM CORRIDOR WIDTH:
TABLE 7.3.3.1 & SECTION 7.3.4.1: 0.2" PER PERSON, BUT NOT LESS THAN 36"
CORRIDOR CLEAR WIDTH (38.2.3.2) 44" MINIMUM REQUIRED
72" MINIMUM PROVIDED
TRAVEL DISTANCE:
BUSINESS USE:
DEAD-END LIMIT (38.2.5.1 AND TABLE A.7.6): 50 FEET MAX
COMMON PATH OF TRAVEL (38.2.5.3.1 AND TABLE A.7.6): 100 FEET MAX
TRAVEL DISTANCE LIMIT (38.2.6.3 AND TABLE A.7.6): 300 FEET MAX
ASSEMBLY USE:
DEAD-END LIMIT (TABLE A.7.6) 20 FEET MAX
COMMON PATH OF TRAVEL (TABLE A.7.6) 20 / 75 FEET MAX
20 FEET IF SERVING MORE THAN 50 PERSONS
75 FEET IF SERVING LESS THAN 50 PERSONS
TRAVEL DISTANCE LIMIT (TABLE A.7.6) 250 FEET MAX
TYPE OF CONSTRUCTION:
TYPE II-000
FIRE RESISTANCE RATING (TABLE A.8.2.1.2 AND NFPA 220 TABLE 4.1.4)
EXTERIOR BEARING WALLS: 0 HR
INTERIOR BEARING WALLS: 0 HR
STRUCTURAL COLUMNS: 0 HR
FLOOR-CEILING ASSEMBLIES: 0 HR
ROOF-CEILING ASSEMBLIES: 0 HR
INTERIOR NONBEARING WALLS: 0 HR
EXTERIOR NONBEARING WALLS: 0 HR
EXIT ACCESS CORRIDOR: (7.1.3.1)
CORRIDOR: 1 HR
NOTE: NOT REQUIRED FOR EXISTING BUILDING PROVIDED
THAT BUILDING OCCUPANCY CLASSIFICATION DOES NOT
CHANGE.
EXIT ENCLOSURE: (7.1.3.2.1) 1 HR
CONSTRUCTION AND COMPARTMENTATION: (8.2)
8.2.1.3 BUILDING SEPARATION COMPLIANT WITH ITEM (1):
(1) EXISTING 2 HR VERTICALLY ALIGNED FIRE BARRIER
WALL BETWEEN THE PORTIONS OF THE BUILDING
NOTE: EXISTING SEPARATION PREVIOUSLY APPROVED AND CONSTRUCTED
SHAFT ENCLOSURES: (8.6.5) 1 HR
PROTECTION FROM HAZARDS: (38.3.2)
HIGH HAZARD CONTENTS AREAS: 1 HR (38.3.2.2)*
(1) OPENINGS THEREIN PROTECTED BY SELF-CLOSING FIRE DOOR ASSEMBLIES
(2) AREA SHALL BE PROTECTED BY AN AUTOMATIC EXTINGUISHING SYSTEM PER 9.7.1.1(1) OR
9.7.1.2
MEDICAL GAS (NFPA 99 - 11.3): 5.1.3.3.2 AND 5.1.3.3.3
5.1.3.3.2 - (6) NONCOMBUSTIBLE INTERIOR FINISHES
5.1.3.3.2 - (7) 1 HR. SEPARATION
*WHERE PROTECTION IS PROVIDED WITH AUTOMATIC EXTINGUISHING
SYSTEMS WITHOUT FIRE-RESISTIVE SEPARATION, THE SPACE PROTECTED
SHALL BE ENCLOSED WITH SMOKE PARTITIONS PER SECTION 8.4 (8.7.1.2)
BUILDING CODES / PROJECT MANUALS
NFPA 10 PORTABLE FIRE EXTINGUISHERS 2018
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2019
NFPA 70 NATIONAL ELECTRICAL CODE 2020
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2019
NFPA 99 HEALTH CARE FACILITIES CODE 2018
NFPA 101 LIFE SAFETY CODE 2018
NFPA 5000 BUILDING CONSTRUCTION AND SAFETY CODE 2018
COMMUNITY BASED OUTPATIENT CLINIC (CBOC) PROTOTYPE PROPOSED LAYOUTS MAY 2014
PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES JULY 2004
PG-18-5 EQUIPMENT GUIDE LIST JANUARY 2019
PG-18-9 SPACE PLANNING CRITERIA OCTOBER 2015
PG-18-12 PACT SPACE MODULE DESIGN GUIDE JUNE 2015
PG-18-13 VA BARRIER FREE DESIGN STANDARD JANUARY 2017
PG-18-15 MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS MAY 2006
PG-18-10 HVAC DESIGN MANUAL MARCH 2020
PG-18-10 PLUMBING DESIGN MANUAL MAY 2018
PG-18-10 FIRE PROTECTION DESIGN MANUAL DECEMBER 2015
PG-18-10 PHYSICAL SECURITY DESIGN MANUAL JANUARY 2015
ASHRAE 90.1
NFPA 101 (2018) CONTINUED
INTERIOR FINISH: (38.3.3 AND TABLE A.10.2.2)
INTERIOR WALL & CEILING FINISH: CLASS A or B INTERIOR FLOOR FINISH: CLASS I or II EXITS: CLASS A or B EXIT ACCESS CORRIDORS: CLASS A or B OTHER SPACES: CLASS A, B, or C
*PER TABLE A.10.2.2, WHERE AUTOMATIC SPRINKLERS ARE INSTALLED, INTERIOR FINISH
CLASSIFICATIONS CAN BE REDUCED. WALL AND CEILING FINISH CLASS C IS PERMITTED TO BE USED IN LOCATION REQUIRING CLASS B, AND CLASS B IS PERMITTED TO BE USED IN LOCATION REQUIRING CLASS A. SIMILARLY, CLASS II INTERIOR FLOOR FINISH IS PERMITTED TO BE USED IN LOCATION REQUIRING CLASS I, AND NO FINISH CLASSIFICATION IS REQUIRED WHERE CLASS II IS REQUIRED.
CONSTRUCTION OF CORRIDOR WALLS (38.3.6): 1 HR UNLESS CONDITION 1, 2, OR 3 IS MET
CONDITION (3) IS MET (38.3.6.1):
(3) BUILDING PROTECTED THROUGHOUT BY APPROVED,
SUPERVISED AUTOMATIC SPRINKLER SYSTEM
PORTABLE FIRE EXTINGUISHERS (9.9):
NFPA 10 (TABLE 6.2.1.1):
TRAVEL DISTANCE : 75 FEET MAX
TYPE: 2-A
MAXIMUM FLOOR AREA: 11,250 SF
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:5
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-100
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
COVER
18110
FIRE PROTECTION
FJ-100 FIRE SUPPRESSION GENERAL NOTES, SYMBOL LEGEND AND DETAILS
FD-100 DEMOLITION - FIRST FLOOR PLAN - FIRE PROTECTION
FX-100 FIRST FLOOR PLAN - FIRE SUPPRESSION PHASE 1
FX-101 FIRST FLOOR PLAN - FIRE SUPPRESSION PHASE 2
FX-102 FIRST FLOOR PLAN - FIRE SUPPRESSION PHASE 3
PLUMBING
PJ-100 PLUMBING GENERAL NOTES, SYMBOL LEGEND AND SCHEDULES
PJ-101 PLUMBING DETAILS
PD-100 DEMOLITION - FIRST FLOOR PLAN - PLUMBING (SANITARY) PHASE 1
PD-101 DEMOLITION - FIRST FLOOR PLAN - PLUMBING (WATER) PHASE 1
PD-102 DEMOLITION - FIRST FLOOR PLAN - PLUMBING (SANITARY) PHASE 2
PD-103 DEMOLITION - FIRST FLOOR PLAN - PLUMBING (WATER) PHASE 2
PD-104 DEMOLITION - FIRST FLOOR PLAN - PLUMBING (SANITARY) PHASE 3
PD-105 DEMOLITION - FIRST FLOOR PLAN - PLUMBING (WATER) PHASE 3
PL-100 SANITARY - FIRST FLOOR PLAN - PLUMBING PHASE 1
PL-101 WATER - FIRST FLOOR PLAN - PLUMBING PHASE 1
PL-102 SANITARY - FIRST FLOOR PLAN - PLUMBING PHASE 2
PL-103 WATER - FIRST FLOOR PLAN - PLUMBING PHASE 2
PL-104 SANITARY - FIRST FLOOR PLAN - PLUMBING PHASE 3
PL-105 WATER - FIRST FLOOR PLAN - PLUMBING PHASE 3
MECHANICAL
MJ-100 MECHANICAL GENERAL NOTES AND SYMBOL LEGEND
MJ-101 MECHANICAL DETAILS
MJ-102 MECHANICAL DETAILS
MJ-103 MECHANICAL SCHEDULES
MI-100 MECHANICAL TEMPERATURE CONTROLS
MD-100 DEMOLITION - FIRST FLOOR PLAN - HVAC (DUCTWORK) PHASE 1
MD-101 DEMOLITION - FIRST FLOOR PLAN - HVAC (PIPING) PHASE 1
MD-102 DEMOLITION - FIRST FLOOR PLAN - HVAC (DUCTWORK) PHASE 2
MD-103 DEMOLITION - FIRST FLOOR PLAN - HVAC (PIPING) PHASE 2
MD-104 DEMOLITION - FIRST FLOOR PLAN - HVAC (DUCTWORK) PHASE 3
MH-100 DUCTWORK - FIRST FLOOR PLAN - HVAC PHASE 1
MH-101 ROOF PLAN - HVAC PHASE 1
MH-102 DUCTWORK - FIRST FLOOR PLAN - HVAC PHASE 2
MH-103 DUCTWORK - FIRST FLOOR PLAN - HVAC PHASE 3
MP-100 PIPING - FIRST FLOOR PLAN - HVAC PHASE 1
MP-101 PIPING - FIRST FLOOR PLAN - HVAC PHASE 2
MP-102 PIPING - FIRST FLOOR PLAN - HVAC PHASE 3
ELECTRICAL
EJ-100 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND
EJ-101 LIGHTING FIXTURE SCHEDULE AND DETAILS
EJ-102 MECHANICAL EQUIPMENT AND PANELBOARD SCHEDULE
EJ-103 PANELBOARD SCHEDULES
EJ-104 ELECTRICAL DETAILS
ED-100 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL PHASE 1
ED-101 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL PHASE 2
ED-102 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL PHASE 3
EL-100 LIGHTING - FIRST FLOOR PLAN - ELECTRICAL PHASE 1
EL-100A LIGHTING - FIRST FLOOR PLAN ALTERNATES - ELECTRICAL
EL-101 LIGHTING - FIRST FLOOR PLAN - ELECTRICAL PHASE 2
EL-102 LIGHTING - FIRST FLOOR PLAN - ELECTRICAL PHASE 3
EP-100 POWER - FIRST FLOOR PLAN - ELECTRICAL PHASE 1
EP-100A POWER - PARTIAL FIRST FLOOR PLAN - ELECTRICAL PHASE 1
EP-101 POWER - FIRST FLOOR PLAN - ELECTRICAL PHASE 2
EP-102 POWER - FIRST FLOOR PLAN - ELECTRICAL PHASE 3
EP-103 POWER - ROOF PLAN - ELECTRICAL PHASE 1
EY-001 AUXILIARY SYSTEMS DETAILS - ELECTRICAL
EY-100 AUXILIARY SYSTEMS - FIRST FLOOR PLAN - ELECTRICAL PHASE 1
EY-101 AUXILIARY SYSTEMS - FIRST FLOOR PLAN - ELECTRICAL PHASE 2
EY-102 AUXILIARY SYSTEMS - FIRST FLOOR PLAN - ELECTRICAL PHASE 3
ET-001 TELECOM DETAILS
ET-100 TELECOM - FIRST FLOOR PLAN - ELECTRICAL PHASE 1
ET-101 TELECOM - FIRST FLOOR PLAN - ELECTRICAL PHASE 2
ET-102 TELECOM - FIRST FLOOR PLAN - ELECTRICAL PHASE 3
GENERAL
GI-100 COVER
GI-101 ABBREVIATIONS, LEGENDS AND SYMBOLS
GI-102 LIFE SAFETY PLAN - PHASE 1
GI-103 LIFE SAFETY PLAN - PHASE 2 & 3
GI-104 FIRST FLOOR PHASING PLAN
GI-105 FIRST FLOOR PHASING PLAN - PHASE 1
GI-106 FIRST FLOOR PHASING PLAN - PHASE 2
GI-107 FIRST FLOOR PHASING PLAN - PHASE 3
GI-110 FIRE STOPPING DETAILS
GI-111 FIRE STOPPING DETAILS
GI-112 FIRE STOPPING DETAILS
GI-113 FIRE STOPPING DETAILS
GI-114 FIRE STOPPING DETAILS
GI-115 FIRE STOPPING DETAILS
CIVIL
TS TOPOGRAPHIC SURVEY
CD-100 DEMOLITION PLAN
CS-100 GEOMETRIC PLAN
CU-100 GRADING & UTILITY PLAN
CN-100 NOTES
CI-100 DETAILS
ARCHITECTURAL
AD-200 FIRST FLOOR DEMOLITION PLAN - PHASE 1
AD-201 FIRST FLOOR DEMOLITION PLAN - PHASE 2
AD-202 FIRST FLOOR DEMOLITION PLAN - PHASE 3
AD-203 FIRST FLOOR DEMOLITION CEILING PLAN - PHASE 1
AD-204 FIRST FLOOR DEMOLITION CEILING PLAN - PHASE 2
AD-205 FIRST FLOOR DEMOLITION CEILING PLAN - PHASE 3
AD-206 ROOF DEMOLITION PLAN
AD-210 DEMOLITION ELEVATIONS AND SECTIONS - PHASES 1 & 2
AE-300 FIRST FLOOR DIMENSION PLAN - PHASE 1
AE-301 FIRST FLOOR DIMENSION PLAN - PHASE 2
AE-302 FIRST FLOOR DIMENSION PLAN - PHASE 3
AE-303 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 1
AE-304 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 2
AE-305 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 3
AE-306 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 1 ATLERNATES
AE-307 ROOF PLAN
AE-308 FIRST FLOOR PATTERN PLAN
AE-309 FIRST FLOOR FURNITURE PLAN (FOR REFERENCE ONLY)
AE-310 FIRST FLOOR EQUIPMENT PLAN - PHASE 1
AE-311 FIRST FLOOR EQUIPMENT PLAN - PHASE 2
AE-312 FIRST FLOOR EQUIPMENT PLAN - PHASE 3
AE-313 FIRST FLOOR SIGNAGE PLAN
AE-314 ENLARGED PLANS
AE-400 EXTERIOR ELEVATIONS
AE-500 BUILDING SECTIONS
AE-501 WALL SECTIONS
AE-502 WALL SECTIONS
AE-503 WALL SECTIONS
AE-504 WALL SECTIONS
AE-510 TYPICAL INTERIOR DETAILS
AE-511 SECTION DETAILS
AE-512 SECTION DETAILS
AE-513 SECTION DETAILS
AE-514 SECTION DETAILS
AE-515 PLAN DETAILS
AE-516 PLAN DETAILS
AE-700 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS
AE-701 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS
AE-800 INTERIOR ELEVATIONS - PHASE 1
AE-801 INTERIOR ELEVATIONS - PHASE 1
AE-802 INTERIOR ELEVATIONS - PHASE 2
AE-810 MILLWORK & INTERIOR DETAILS
AE-811 INTERIOR PERSPECTIVES
AE-1000 DOOR SCHEDULES AND DETAILS
AE-1001 FINISH SCHEDULE AND DETAILS
AE-1002 INTERIOR SIGN SCHEDULE
AE-1010 PARTITION TYPES
STRUCTURAL
SS-001 GENERAL NOTES
SS-002 GENERAL NOTES
SS-100 FOUNDATION PLAN
SS-100A PHASE II FOUNDATION PLAN
SS-101 ROOF FRAMING PLAN
SS-200 TYPICAL FOUNDATION DETAILS
SS-201 FOUNDATION SECTIONS
SS-300 TYPICAL COLD FORMED FRAMING DETAILS
SS-400 TYPICAL STEEL FRAMING DETAILS
SS-401 FRAMING SECTIONS
PROJECT NUMBER:
SUBMITTAL FOR:
DRAWING INDEX: CODE DATA:LOCATION MAP:
RENOVATE PRIMARY CARE FOR PACT
BLDG 340, BLDG 341
552-20-104
ISSUED FOR BID
4100 WEST THIRD STREET,
DAYTON, OHIO 45428
PHASING DURATION SUMMARY
PHASE NO. DURATION (IN CALENDAR DAYS)
PHASE 1 444 DAYS TOTAL
1A 3 DAYS
MOBILIZATION / INSPECTION 28 DAYS
1B 115 DAYS
1B-1 (DEDUCT ALTERNATE) 31 DAYS
MOBILIZATION / INSPECTION 28 DAYS
1C 38 DAYS
MOBILIZATION / INSPECTION 28 DAYS
1D 94 DAYS
MOBILIZATION / INSPECTION 28 DAYS
1F 23 DAYS
MOBILIZATION / INSPECTION 28 DAYS
PHASE 2 446 DAYS TOTAL
2A 64 DAYS
MOBILIZATION / INSPECTION 28 DAYS
2B 190 DAYS
MOBILIZATION / INSPECTION 28 DAYS
2C 43 DAYS
MOBILIZATION / INSPECTION 28 DAYS
2D 37 DAYS
MOBILIZATION / INSPECTION 28 DAYS
PHASE 3 (DEDUCT ALTERNATE) 88 DAYS TOTAL
3 60 DAYS
MOBILIZATION / INSPECTION 28 DAYS
Revisions Date
CONSTRUCTION - ISSUED FOR BID 2/9/2021
FINISHED CONTOURS
EXISTING CONTOURS
CONTRACT LIMIT LINE
PROPERTY LINE
ELEVATION INDICATORS
FINISH ELEVATION
EXISTING ELEVATION
FENCE
STRUCTURAL GRID COLUMN TAG (NEW)
STRUCTURAL GRID COLUMN TAG (EXISTING)
CENTERLINE
REVISION INDICATOR
DRAWING BREAK LINE
MATCH LINE INDICATOR
HIDDEN LINE
1. ITEMS ABOVE OR BEYOND
2. ITEMS NOT IN CONTRACT (N.I.C.)
3. ITEMS BEING DEMOLISHED
ELEVATION DATUM
WINDOW & LOUVER SYMBOL
(SEE WINDOW SCHEDULE)
DOOR SYMBOL
(SEE DOOR SCHEDULE)
EQUIPMENT SYMBOL
(SEE EQUIPMENT SCHEDULE)
WALL TYPE SYMBOL
(SEE PARTITION TYPES)
PARTITION NUMBER
WORK POINT
ROOM NUMBER SYMBOL
ELEVATION VIEW INDICATOR
DETAIL INDICATOR
SECTION INDICATOR
DRAWING TITLE
1 View Name
SCALE:1/8" = 1'-0"A101
DETAIL NO.
DRAWING NO.
1'-0"
1'-0"
INTERIOR 01
INTERIOR 02
ELEVATION NO.
DRAWING NO. A101
ELEVATION NO.
A
A
NEW
EXISTING
SECTION NO.
DRAWING NO.
X
B
Room name
X
/1 A101
/1 A101
A101
A101
AREA NOT IN PHASED CONSTRUCTION
(INCLUDES AREA N.I.C. - SEE LIFE SAFETY
PLANS FOR EXTENT OF AREA N.I.C.)
NEW PARTITION
PATCH TO MATCH EXISTING PARTITION
EXISTING PARTITION TO REMAIN
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
NEW DOOR AND FRAME
POCKET DOOR
CASED OPENING
BIFOLD DOOR
SLIDING DOOR
Room name
Room name
AIR CONDITIONED
ACOUSTICAL CEILING TILE
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
ALTERNATE
AUDIO VISUAL
ARCHITECTURAL WOODWORK
AC
A.C.T.
A.C.U.
A.F.F.
ALT
A.V.
A.W.
BD
BLDG
BLK
BLKG
BOT
BR
BRG
BSMT
CONC
CAB
C.B.B.
C.C.T.
C.G.
C.J.
CLR
CLG
C.M.U.
COL
COMM
CONF
CONN
CONST
CONT
CONTR
COORD
CORR
C.R.
C.W.
CYL
DEPT
DET
D.F.
DIA
DIAG
DIM
DISP
DN
DR
D.S.
D.W.
DWG(S)
EXIST
E
EA EACH
EAST
EXISTING
DRAWING(S)
DUMBWAITER
DOWNSPOUT
DOOR
DOWN
DISPENSER
DIMENSION
DIAGONAL
DIAMETER
DRINKING FOUNTAIN
DETAIL
DEPARTMENT
CYLINDER
COLD WATER
CRASH RAIL
CORRIDOR
COORDINATE
CONTRACTOR
CONTINUOUS
CONSTRUCTION
CONNECTION
CONFERENCE
COMMUNICATION
COLUMN
CONCRETE MASONRY UNIT
CEILING
CLEAR
CONTROL JOINT
CORNER GUARD
CUBICAL CURTAIN TRACK
CEMENTITIOUS BACKER BOARD
CABINET
CONCRETE
BASEMENT
BEARING
BRICK
BOTTOM
BLOCKING
BLOCK
BUILDING
BOARD
POUND OR NUMBER #
DIAMETER OR ROUND
CENTERLINE
AT
ANGLE
AND
EXPANSION JOINT
ELECTRICAL
E.I.F.S.
E.J.
ELECT
EL
ELEV
EMER
ENCL
EQ
EQUIP
E.T.R.
EVAC
E.W.C.
EXT
F.B.
F.C.
F.C.U.
F.D.
F.D.V.C.
F.E.
F.E.C.
F.H.C.
FIN
FIXT
FLR
FLEX
FLUOR
F.R.T.
FT.
FTG
G
GA
GALV
G.C.
G.F.M.U.
GL
GR
GRND
GYP
H.B.
HD
HDWD
H.M.
HOSP
H.P.
HR
H.R.
HORIZ
HT
HTG
HTR
H.V.A.C.
H.W.
HW
HYD
I.D.
ILLUM
INCIN
INCAND
INCL
INFO
INSUL
INT
I.P.S.
ISOL
IV
JT
KITCH
K.O.
K.P.
K.S. KNEE SPACE
KICK PLATE
KNOCK OUT
KITCHEN
JOINT
INTRAVENOUS
ISOLATION
INSIDE PIPE SIZE
INTERIOR
INSULATION
INFORMATION
INCLUDE
INCINERATOR
INCANDESCENT
ILLUMINATION
INSIDE DIAMETER (DIM)
HYDRANT
HARDWARE
HOT WATER
HEATING, VENTILATION, AIR CONDITIONING
HEATER
HEATING
HEIGHT
HORIZONTAL
HANDRAIL
HOUR
HIGH POINT
HOSPITAL
HOLLOW METAL
HEAD
HOSE BIBB
GYPSUM
GROUND
GRADE
GLASS
GROUND FACE MASONRY UNITS
GENERAL CONTRACTOR
GALVANIZED
GAGE
GAS
FOOTING
FOOT OR FEET
FIRE RESISTANT TREATED
FLUORESCENT
FLEXIBLE
FLOOR
FIXTURE
FINISH
FIRE HOSE CABINET
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FIRE DEPARTMENT VALVE CABINET
FLOOR DRAIN
FAN COIL UNIT
FOOT CONTROL
FACE BRICK
EXTERIOR
ELECTRIC WATER COOLER
EVACUATION
EXISTING TO REMAIN
EQUIPMENT
EQUAL
ENCLOSURE
EMERGENCY
ELEVATOR
ELEVATION
L
LAB
LAM
LIB
LIN
LOC
L.P.
LT.WT.
LTG
MACH
MAS
MATL
MAX
MECH
MED
MED.CAB.
MEMB
MEZZ
MFR
MH
MIN
MISC
MKR.BD.
MLDG
M.O.
MOD
M.R.G.B.
MTD
MTL
N
N.C.
NEG
N.I.C.
NO
N.T.S.
O
O.C.
O.D.
OFF
OPNG
OPP
PART.BD.
P.C.
P.C.D.
PERIM
PERP
PLWD
PORT
PR
PREFAB
PREFIN
PROJ
PROP
P.T.
PTD
R
R.A.
REC
RECEP
RECT
REF REFRIGERATOR
RECTANGULAR
RECEPTACLE
RECESSED
RETURN AIR
RADIUS
PAINTED
PNEUMATIC TUBE
PROPERTY
PROJECT
PREFINISHED
PREFABRICATED
PAIR
PORTABLE
PLYWOOD
PERPENDICULAR
PERIMETER
PAPER CUP DISPENSER
PRECAST CONCRETE
PARTICLEBOARD
OPPOSITE
OPENING
OFFICE
OUTSIDE DIAMETER(DIM)
ON CENTER
OXYGEN
NOT TO SCALE
NOMINAL
NUMBER
NOT IN CONTRACT
NEGATIVE
NURSE CALL
NITROGEN/NORTH
METAL
MOUNTED
MOISTURE RESISTANT GYPSUM BOARD
MODIFIED, MODULAR
MASONRY OPENING
MOULDING
MARKERBOARD
MISCELLANEOUS
MINIMUM
MANHOLE
MANUFACTURER
MEZZANINE
MEMBRANE
MEDICINE CABINET
MEDICINE/MEDICAL
MECHANICAL
MAXIMUM
MATERIAL
MASONRY
MACHINE
LIGHTING
LIGHTWEIGHT
LOW POINT
LOCATION/LOCATE
LINEAR
LIBRARY
LAMINATE
LABORATORY
LOCK
REFL'D REFLECTED
REINF REINFORCED
REM REMOVABLE
REQ'D REQUIRED
REV REVISION
R.F. RADIO FREQUENCY
RM
RND
R.O.
R.S.T. RUBBER STAIR TREADS
ROUGH OPENING
ROUND
S
S.S.
S.A.
SAN
SCHED
S.C.R.
S.D.
SECT
S.F.
SH
SHR
SHT
SIM
S.O.G.
SPEC (S)
S.P.T.
SQ
S&R
SSM
S.T.C.
STD
STL
STOR
STRUCT
SURF
SUSP
T
T&B
T&G
TAN
TEL
TEMP
THRESH
THRU
TK.BD.
TLT
T.O.P.
TV
TYP
U.C.
UNFIN
U.O.N.
UTIL
V, VAC
VENT
VERT
VEST
VIT
W
W/
W/O
W.C.
W/C
WD
W.P.
YD YARD
WORKPOINT
WOOD
WHEEL CHAIR
WATER CLOSET
WITHOUT
WITH
WEST/WATER
VITREOUS
VESTIBULE
VERTICAL
VENTILATION
VACUUM
UTILITY
UNLESS OTHERWISE NOTED
UNFINISHED
UNDER COUNTER
TYPICAL
TELEVISION
TOP OF PAVEMENT
TOILET
TACKBOARD
THROUGH
THRESHOLD
TEMPERATURE
TELEPHONE
TANGENT
TONGUE AND GROOVE
TOP AND BOTTOM
THERMOSTAT
SUSPENDED
SURFACE
STRUCTURAL
STORAGE
STEEL
STANDARD
SOUND TRANSMISSION CLASS / COEFFICIENT
SOLID SURFACE MATERIAL
SHELF & ROD
SQUARE
SPECIMEN PASS-THRU
SPECIFICATION(S)
SLAB ON GRADE
SIMILAR
SHEET
SHOWER
SHELVING, SHELF
SQUARE FOOT
SECTION
SUPPLY DIFFUSER
SHOWER CURTAIN ROD
SCHEDULE
SANITARY
SUPPLY AIR
STAINLESS STEEL
SOUTH
LT LIGHT
LAV LAVATORY
W.W.F. WELDED WIRE FABRIC
EXTERIOR INSULATION FINISH SYSTEM
HARDWOOD
NOM.
ROOM
V.I.F. VERIFY IN FIELD
ALUMINUMAL
F.P. FIRE PROTECTION
F.P.G. FIRE PROTECTED GLAZING
CL
COR CONTRACTING OFFICER REPRESENTATIVE
GWB GYPSUM WALL BOARD
SGL SINGLE
S.I. SQUARE INCH
S.Y. SQUARE YARD
VC GOVERNMENT FURNISHED AND CONTRACTOR INSTALLED
VV GOVERNMENT FURNISHED AND INSTALLED
CC CONTRACTOR FURNISHED AND INSTALLED
FURN
FUT FUTURE
FURNITUREDBL DOUBLE
DEMO DEMOLITION
OTB OPEN TO BEYOND
NOTE: ALL ITEMS/MATERIALS MAY NOT OCCUR IN THIS PROJECT. LIST
PROVIDED FOR REFERENCE ONLY.
UNDISTURBED EEARTH OR
UNDISTURBED SUBGRADE
COMPACTED EARTH OR
COMPACTED SUBGRADE
ROCK
POROUS FILL OR SUBBASE
IMPERVIOUS FILL
DRAINAGE FILL
CAST-IN-PLACE CONCRETE
PRECAST CONCRETE
TOPSOIL
CEMENTITIOUS DECKS AND
TOPPINGS
GROUT
BRICK
GLAZED BRICK
STRUCTURAL CLAY TILE
UNIT MASONRY
GLAZED STRUCTURAL CLAY TILE
UNIT MASONRY
CONCRETE UNIT MASONRY
GLAZED CONCRETE UNIT MASONRY
GLAZED UNIT MASONRY
CUT STONE
FIREBRICK
CAST STONE
STEEL
ALUMINUM
ORNAMENTAL
METAL/STAINLESS STEEL
CONTINUOUS WOOD FRAMING
WOOD BLOCKING
PLYWOOD
PARTICLE BOARD
FINISHED LUMBER FOR
ARCHITECTURAL WORK
BATT INSULATION
RIGID INSULATION
LOOSE FILL INSULATION
EXTERIOR INSULATION AND
FINISH SYSTEM
FIBROUS FIRE SAFING
GLASS
CARPET
LATH AND PLASTER
GYPSUM BOARD
PLASTIC GLAZING
TERRAZZO
ACOUSTICAL CEILING
RESILIENT TILE
CERAMIC TILE
GRAPHIC SYMBOLS
FLOOR PLAN LEGEND
STANDARD ABBREVIATIONS
MATERIALS LEGEND
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:5
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-101
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
ABBREVIATIONS, LEGENDS AND SYMBOLS
18110
NON-RATED SMOKE PARTITION
2 HOUR FIRE SEPARATION
FIRE EXTINGUISHER CABINET
TRAVEL DISTANCE
EXIT SIGN
AREA INDICATES 2 HR
FIREPROOFING AT COLUMNS
AND FLOOR ABOVE
AREA N.I.C.
TEMPORARY OFFICE OR EXAM
ROOM CLOSURES (RELOCATE
OFFICES TO ROTUNDA AND
CLASSROOM)
TEMPORARY PARTITION
PHASE 1B.1 - DEDUCT
ALTERNATE 5
F.E.C.CONTRACTOR TO CONFIRM EACH CONSTRUCTION AREA IS
SEPARATED FROM ALL REMAINING INTERIOR SPACES BY PARTITIONS
(EXISTING, TEMPORARY, AND NEW) THAT RESIST THE PASSAGE OF
SMOKE.
ACCESS TO ALL AREAS OUTSIDE OF PHASE AND SUB-PHASE
CONSTRUCTION AREAS INDICATED TO BE FULLY ACCESSIBLE TO
STAFF AND PATIENTS THROUGHOUT NORMAL OPERATING HOURS.
ALL LIMITED SCOPE SUPPORTING ACTIVITIES TO BE COORDINATED
WITH VA COR. ALL WORK DEEMED DISRUPTIVE BY COR TO BE
CONDUCTED OUTSIDE OF NORMAL OPERATING HOURS (7:30 AM TO
5:00 PM).
65.14
0.2
0.2
0.1
0.1
0.3
0.3
0.38
0.38
0.39
0.39
0.40
0.40
0.5
0.5
0.48
0.48
A.aA.a
A.bA.b
AA
A.4A.4
B
B.3
B.6
B.7
C
C.5
D
E
F
G
F.6
F.3
D.7
D.6
C.9
C.3
B.4
A.7
0.9
0.9
0.77
0.77
0.760.8
0.8
0.71
0.71
0.7
0.7
0.6
0.6 6.2
6.4
6.4
6.5
6.5
6.7
6.7
6.9
6.9 7
F.E.C.
F.E.C.
F.E.C.
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
213'-4" TO EXIT
243'-8" TO EXIT
F.E.C.
6.1
E.7
E.7
T O
E X
IT
EXISTING ENTRANCE TO REMAIN
SOIL
CLEAN
MED
PACT
SUPPLY
EXAM
EXAM
EXAM
T.R.
WAITING
T.R.
VENDING
T.R.
PAC121
RECEPTION
TEMP.
LOCKERS 1
VESTIBULE
TEMP.
LOCKERS 2
MSA
121A
STAFF T.R.
HEALTH
BEHAV.
COORD.
DIETICIAN
TVC/FLOAT
EXAM
SCALES
STAFF T.R.
EXISTING WAITING
AREA
HAC
ELECT.
DATA
STAFF T.R.
KIOSK
/8
213'-11 1/2"
55'-9" COMMON PATH
47'-1" COMMON PATH
14'-6" COMMON PATH
DEAD END
12'-5"
C-1-12
CORRIDOR
C-1-4
CORRIDOR
C -1
-4
C O
R R
ID
O
R
C -1
-1
C O
R R
ID
O
R
MSA
SUPERVISOR
F.E.C.
F.E.C. 179
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
SOCIAL
WORK
IMAGING
TECH
MECH.
C-1-12
1 2
179 180 181 182 183 184 185 186
PAC121
C-1-12
CONSTRUCTION
LIMIT LINE
67'-8" COMMON PATH
EXISTING
ENTRANCE TO
REMAIN
191 192
121A
120 121
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
82'-10" COMMON PATH
DEAD END
35'-3"
T O
E X
IT
6'-0" MIN.
272'-3" TO EXIT
CONTRACTOR
ACCESS THROUGH
THIS LOCATION
RESTRICT ACCESS
THROUGH DOOR DURING
CONSTRUCTION PHASE 1C
C-1-4
CONSTRUCTION
LIMIT LINE
EXISTING
ENTRANCE TO
REMAIN
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
49'-11" COMMON PATH
50'-7" COMMON PATH
D E
A D
E N
D
/2
225'-5" TO EXIT
12'-7" COMMON PATH
T O
E X
IT
213'-4" TO EXIT
RESTRICT ACCESS THROUGH
DOOR DURING
CONSTRUCTION PHASE 1B
(PHASE 1B.1 IS DEDUCT ALTERNATE 5)
CONSTRUCTION
LIMIT LINE
EXISTING
ENTRANCE TO
REMAIN
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
13'-0" COMMON PATH
50'-7" COMMON PATH
47'-1" COMMON PATH
229'-1" TO EXIT
244'-10" TO EXIT
213'-4" TO EXIT
106'-6 1/4"
CONTRACTOR
ACCESS THROUGH
THIS LOCATION
RESTRICT ACCESS
THROUGH DOOR DURING
CONSTRUCTION PHASE 1C
CONSTRUCTION
LIMIT LINE
EXISTING
ENTRANCE TO
REMAIN
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
NOTE:
ALL ROOMS TO BE ACCESSIBLE DURING NORMAL
OPERATING HOURS BETWEEN 7:30AM AND 5:00PM.
PHASE 1E WORK TO BE COMPLETED AFTER HOURS.
C-1-11
C-1-4
C -1
-1
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:4
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-102
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
LIFE SAFETY PLAN - PHASE 1
18110
LIFE SAFETY LEGEND
SCALE: 1/16" = 1'-0"GI-102
5 LIFE SAFETY PLAN - PHASE 1
SCALE: 1/32" = 1'-0"GI-102
1 LIFE SAFETY PLAN - PHASE 1B & 1B.1
SCALE: 1/32" = 1'-0"GI-102
2 LIFE SAFETY PLAN - PHASE 1C
SCALE: 1/32" = 1'-0"GI-102
3 LIFE SAFETY PLAN - PHASE 1D
SCALE: 1/32" = 1'-0"GI-102
4 LIFE SAFETY PLAN - PHASE 1E
65.14
0.2
0.2
0.1
0.1
0.3
0.3
0.38
0.38
0.39
0.39
0.40
0.40
0.5
0.5
0.48
0.48
A.aA.a
A.bA.b
AA
A.4A.4
B
B.3
B.6
B.7
C
C.5
D
E
F
G
F.6
F.3
D.7
D.6
C.9
C.3
B.4
A.7
0.9
0.9
0.77
0.77
0.760.8
0.8
0.71
0.71
0.7
0.7
0.6
0.6 6.2
6.4
6.4
6.5
6.5
6.7
6.7
6.9
6.9 7
6.1
E.7
E.7
EX-107
MEN
EX-106
WOMEN
F.E.C.
F.E.C.
F.E.C.
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
CLASSROOM / CONF.
ROTUNDA / CONF.
61'-1" COMMON PATH
126'-1" TO EXIT
295'-8" TO EXIT
192'-7 1/8"
217'-3"
EXAM
EXAM
EXAM
EXAM
WPAFB
WPAFB
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
F.E.C.
F.E.C.
207'-6" TO EXIT
SMOKE
PARTITION
30'-6" COMMON PATH
F.E.C.
F.E.C.
NON-RATED SMOKE PARTITION
2 HOUR FIRE SEPARATION
FIRE EXTINGUISHER CABINET
TRAVEL DISTANCE
EXIT SIGN
AREA INDICATES 2 HR
FIREPROOFING AT COLUMNS
AND FLOOR ABOVE
AREA N.I.C.
TEMPORARY OFFICE OR EXAM
ROOM CLOSURES (RELOCATE
OFFICES TO ROTUNDA AND
CLASSROOM)
TEMPORARY PARTITION
PHASE 1B.1 - DEDUCT
ALTERNATE 5
F.E.C.CONTRACTOR TO CONFIRM EACH CONSTRUCTION AREA IS
SEPARATED FROM ALL REMAINING INTERIOR SPACES BY PARTITIONS
(EXISTING, TEMPORARY, AND NEW) THAT RESIST THE PASSAGE OF
SMOKE.
ACCESS TO ALL AREAS OUTSIDE OF PHASE AND SUB-PHASE
CONSTRUCTION AREAS INDICATED TO BE FULLY ACCESSIBLE TO
STAFF AND PATIENTS THROUGHOUT NORMAL OPERATING HOURS.
ALL LIMITED SCOPE SUPPORTING ACTIVITIES TO BE COORDINATED
WITH VA COR. ALL WORK DEEMED DISRUPTIVE BY COR TO BE
CONDUCTED OUTSIDE OF NORMAL OPERATING HOURS (7:30 AM TO
5:00 PM).
MSA
SUPERVISOR
TELEPHONE
NURSE
TRIAGE
PRIMARY
CARE CALL
CENTER
NURSE
MANAGER
EQUIP/SUPPLY
STORAGE
ADMIN OPEN
NURSE
MANAGER
NURSE
MANAGER
EXAM
EXAM
T.R.
EXAM
EXAM
EXAM
EXAM
EXAM
T.R.
T.R.
PROCEDURE
T.R.
EQUIP/SUPPLY
STORAGE
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
MENTAL
HEALTH
PHARMACY
PHARMACY
CHIEF
ASST. CHIEF
ADMIN.
OFFICER
CHIEF
NURSE
DIABETES ED
NURSE
PRACT./
DIABET.
NURSE
PRACT./
DIABET.
CONFERENCE/BREAK
LOCKERS
STAFF T.R.129
KITCHEN
MED
CLEAN
SOIL
PACT
SUPPLY
T.R.
EXAM
EXAM
EXAM
WAITING
VENDING
T.R.
T.R.
VESTIBULE
EXAM
SCALES 188
MSA
PAC121
RECEPTION
EXISTING WAITING
AREA
STAFF T.R.
HEALTH BEHAV.
COORD.
DIETICIAN
121A
STAFF T.R.
TVC/FLOAT
HAC
ELECT.
DATA
MSA
SUPERVISOR
CONSTRUCTION
LIMIT LINE
EXISTING
ENTRANCE TO
REMAIN
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE33'-7" COMMON PATH
159'-9" TO EXIT
80'-2" COMMON PATH
189'-2" TO EXIT
79'-11" COMMON
PATH
173'-5" TO EXIT
D E
A D
E N
D
/8
CONTRACTOR ACCESS
THROUGH THIS LOCATION
D E
A D
E N
D
/8
224'-3" TO EXIT
DEAD END
24'-11"
DEAD END
31'-10"
TEMP
OFFICE
SPACE
TEMP
OFFICE
SPACE
D E
A D
E N
D
/8
145146
C-1-8
C -1
-5
C-1-7
C-1-9
149 158
C-1-8 C -1
-5
C-1-7
C-1-9
C-1-2
C -1
-1
CONSTRUCTION
LIMIT LINE
EXISTING
ENTRANCE TO
REMAIN
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE29'-4" COMMON PATH
155'-11" TO EXIT
96'-1" COMMON
PATH
T O
E X
IT
76'-11" COMMON
PATH
T O
E X
IT
70'-2" COMMON PATH
207'-11" TO EXIT
NOTE:
PHASE 2B CORRIDORS TO BE COMPLETED
AFTER HOURS. ALL ROOMS TO BE ACCESSIBLE
DURING NORMAL OPERATING HOURS
BETWEEN 7:30AM AND 5:00PM.
RESTRICT ACCESS THROUGH
DOOR DURING
CONSTRUCTION PHASE 2B
CONTRACTOR ACCESS
THROUGH THIS LOCATION
C -1
-4
TEMP
OFFICE
SPACE
TEMP
OFFICE
SPACE
111 112 113 114 115 116 117
C-1-2
CONSTRUCTION
LIMIT LINE
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
97'-11" COMMON PATH
13'-0" COMMON PATH
229'-1" TO EXIT
176'-8" TO EXIT
36'-5" COMMON PATH
230'-1" TO EXIT
CONTRACTOR ACCESS
THROUGH THIS LOCATION
TEMP
OFFICE
SPACE
TEMP
OFFICE
SPACE
C-1-2
C -1
-6
CONSTRUCTION
LIMIT LINE
EXISTING
ENTRANCE TO
REMAIN
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
41'-9" COMMON PATH
T O
E X
IT
76'-11" COMMON
PATH
13'-0" COMMON PATH
234'-9" TO EXIT
T O
E X
IT
54'-8" COMMON PATHRESTRICT ACCESS THROUGH
DOOR DURING
CONSTRUCTION PHASE 2D
CONTRACTOR ACCESS
THROUGH THIS LOCATION
TEMP
OFFICE
SPACE
TEMP
OFFICE
SPACE
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:3
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-103
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
LIFE SAFETY PLAN - PHASE 2 & 3
18110
SCALE: 1/16" = 1'-0"GI-103
5 LIFE SAFETY PLAN - PHASES 2 & 3
LIFE SAFETY LEGEND
SCALE: 1/32" = 1'-0"GI-103
1 LIFE SAFETY PLAN - PHASE 2A
SCALE: 1/32" = 1'-0"GI-103
2 LIFE SAFETY PLAN - PHASE 2B
SCALE: 1/32" = 1'-0"GI-103
4 LIFE SAFETY PLAN - PHASE 2D
SCALE: 1/32" = 1'-0"GI-103
3 LIFE SAFETY PLAN - PHASE 2C
0.2
0.2
0.1
0.1
0.3
0.3
0.38
0.38
0.39
0.39
0.40
0.40
0.5
0.5
0.48
0.48
A.aA.a
A.bA.b
AA
A.4A.4
B
B.3
B.6
B.7
C
C.5
D
E
F
G
F.6
F.3
D.7
D.6
C.9
C.3
B.4
A.7
6.2
6.4
6.4
6.5
6.5
6.7
6.7
6.9
6.9 7
6.1
6.1
E.7E.7
TEMP WAITING
PHASE 3
PHASE 1
PHASE 1
PHASE 2
PHASE 1
PHASE 3 PHASE 3
PHASE 1
N.I.C.
N.I.C.
N.I.C.
PHASE 1
PHASE 2
PHASE 3
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:4
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-104
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
FIRST FLOOR PHASING PLAN
18110
SCALE: 1/8" = 1'-0"GI-104
1 FIRST FLOOR PHASING PLAN
PHASING LEGEND
0.2
0.2
0.1
0.1
0.3
0.3
0.38
0.38
0.39
0.39
0.40
0.40
0.5
0.5
0.48
0.48
A.aA.a
A.bA.b
AA
A.4A.4
B
B.3
B.6
B.7
C
C.5
D
E
F
G
F.6
F.3
D.7
D.6
C.9
C.3
B.4
A.7
6.2
6.4
6.4
6.5
6.5
6.7
6.7
6.9
6.9 7
PHASE 1B
PHASE 1A
TEMP
WAITING
6.1
E.7E.7
SOIL
CLEAN
MED
PACT
SUPPLY
EXAM
EXAM
EXAM
T.R.
C-1-11
CORRIDOR
WAITING
T.R.
VENDING
T.R.
PAC121
RECEPTION
TEMP. LOCKERS 1
VESTIBULE
TEMP. LOCKERS 2
MSA
121A
STAFF T.R.
HEALTH BEHAV.
COORD. 120
DIETICIAN
TVC/FLOAT
EXAM
SCALES
STAFF T.R.
PHASE 1C
PHASE 1B
PHASE 1D
PHASE 1D
STAFF T.R.
CONTRACTOR
ACCESS THROUGH
THIS LOCATION
1B
1D
1D
PHASE 1E
C-1-12
CORRIDOR
C -1
-4
C O
R R
ID
O
R
C-1-4
CORRIDOR
P H
A S
E
E
PHASE 1E
1B
1D
1D
1D
1D
1D
RESTRICT ACCESS
THROUGH DOOR
DURING
CONSTRUCTION
PHASE 1
1B 1C
PHASE 1E
TEMP
WAITING
MSA SUPERVISOR
N.I.C.
N.I.C.
N.I.C.
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
SOCIAL WORK
IMAGING TECH
MECH.
1B
PHASE 1B.1
PHASE 1A - CONSTRUCT TEMPORARY LOCKERS
PHASE 1B - CONSTRUCT LOBBY/WAITING/CONNECTOR/VESTIBULE
PHASE 1B.1 - DEDUCT ALTERNATE 5
REFRESH EXAM ROOMS / OFFICES
PHASE 1C - CONSTRUCT REMAINING LOBBY AND WAITING
ALT. DEDUCT: CONSTRUCT REGISTRATION/KIOSKS
PHASE 1D - CONSTRUCT PACT CLINICAL SPACE/EXAM
ROOMS/CLINICAL SUPPORT OFFICES/MSAs
PHASE 1E - CONSTRUCT CORRIDORS
TEMPORARY EXAM ROOM CLOSURES (6)
CONTRACTOR ACCESS
TEMPORARY PARTITION
1. CONTRACTOR TO COMPLETE CEILING WORK IN
COORDINATION WITH REMOVAL OF CONSTRUCTION
BARRIERS AND COMPLETE OUTSIDE OF FACILITY
OPERATING HOURS TO ENSURE SEPARATION IS
PROVIDED FOR AND ALL WORK IS COMPLETED PRIOR
TO STAFF AND PUBLIC ACCESS TO SPACES.
2. CONTRACTOR TO CONFIRM EACH CONSTRUCTION
AREA IS SEPARATED FROM ALL REMAINING INTERIOR
SPACES BY PARTITIONS (EXISTING, TEMPORARY, AND
NEW) THAT RESIST THE PASSAGE OF SMOKE.
3. ACCESS TO ALL AREAS OUTSIDE OF PHASE AND SUB-
PHASE CONSTRUCTION AREAS INDICATED TO BE FULLY
ACCESSIBLE TO STAFF AND PATIENTS THROUGHOUT
NORMAL OPERATING HOURS. ALL LIMITED SCOPE
SUPPORTING ACTIVITIES TO BE COORDINATED WITH VA
COR. ALL WORK DEEMED DISRUPTIVE BY COR TO BE
CONDUCTED OUTSIDE OF NORMAL OPERATING HOURS
(7:30 AM TO 5:00 PM).
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:4
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-105
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
FIRST FLOOR PHASING PLAN - PHASE 1
18110
SCALE: 1/8" = 1'-0"GI-105
1 FIRST FLOOR PHASING PLAN - PHASE 1
PHASE 1 LEGEND
NOTE: ALL SPACES OUTSIDE OF EACH PHASE AND
SUB-PHASE ARE TO REMAIN IN FULL OPERATION
AND ACCESSIBLE TO PATIENTS AND VA STAFF
INCLUDING SPACES IDENTIFIED IN PREVIOUS
PHASES, FUTURE PHASES, AND OUTSIDE OF
PROJECT SCOPE. COORDINATE STAGING AREAS,
MOVEMENT AND STORAGE OF EQUIPMENT, ETC.
WITH THE VA COR.
NOTE PHASE 1E: ALL ROOMS TO BE ACCESSIBLE
DURING NORMAL OPERATING HOURS BETWEEN
7:30AM AND 5:00PM. ALL WORK TO BE COMPLETED
AFTER HOURS.
PHASING PLAN GENERAL NOTES
0.2
0.2
0.1
0.1
0.3
0.3
0.38
0.38
0.39
0.39
0.40
0.40
0.5
0.5
0.48
0.48
A.aA.a
A.bA.b
AA
A.4A.4
B
B.3
B.6
B.7
C
C.5
D
E
F
G
F.6
F.3
D.7
D.6
C.9
C.3
B.4
A.7
6.2
6.4
6.4
6.5
6.5
6.7
6.7
6.9
6.9 7
6.1
E.7E.7
PHASE 2D
PHASE 2A
PHASE 2B
TEMP
OFFICE
SPACE
PHASE 2C
MSA SUPERVISOR
TELEPHONE NURSE
TRIAGE
PRIMARY CARE CALL
CENTER
NURSE MANAGER
EQUIP/SUPPLY
STORAGE
ADMIN OPEN
NURSE MANAGER
NURSE MANAGER
EXAM
EXAM
T.R.
EXAM
EXAM
EXAM
EXAM
EXAM
T.R.
T.R.
PROCEDURE
T.R.
EQUIP/SUPPLY
STORAGE
MENTAL HEALTH
MENTAL HEALTH
MENTAL HEALTH
MENTAL HEALTH
PHARMACY
PHARMACY
CHIEF
ASST. CHIEF
ADMIN. OFFICER
CHIEF NURSE
DIABETES ED
NURSE PRACT./
DIABET.
NURSE PRACT./
DIABET.
CONFERENCE/BREAK
LOCKERS
STAFF T.R.
KITCHEN
C-1-8
CORRIDOR
C-1-6
CORRIDOR
P H
A S
E
B
C-1-9
CORRIDOR
C -1
-5
C O
R R
ID
O
R
C-1-7
CORRIDOR
PHASE 2B
CONTRACTOR
ACCESS THROUGH
THIS LOCATION
2A
2A C-1-2
CORRIDOR
2C
2B
P H
A S
E
B
PHASE 2B 2B
2D
2A
2A 2A
2A
P H
A S
E
B
P H
A S
E
B P
H A
S E
B
P H
A S
E
B
P H
A S
E
B
PHASE 2C
C -1
-1
C O
R R
ID
O
R
2B 2B 2B
2C
2C
2D
2D
N.I.C.
N.I.C.
N.I.C.
PHASE 2A - CONSTRUCT EXAMS / SUPPLY
PHASE 2B - CONSTRUCT CLINICAL SUPPORT OFFICE / ADMIN
OFFICE SPACE
PHASE 2C - CONSTRUCT CLINICAL SUPPORT OFFICES
PHASE 2D - CONSTRUCT BREAK ROOM / LOCKERS
CONTRACTOR ACCESS
TEMPORARY PARTITION
1. CONTRACTOR TO COMPLETE CEILING WORK IN
COORDINATION WITH REMOVAL OF CONSTRUCTION
BARRIERS AND COMPLETE OUTSIDE OF FACILITY
OPERATING HOURS TO ENSURE SEPARATION IS
PROVIDED FOR AND ALL WORK IS COMPLETED PRIOR
TO STAFF AND PUBLIC ACCESS TO SPACES.
2. CONTRACTOR TO CONFIRM EACH CONSTRUCTION
AREA IS SEPARATED FROM ALL REMAINING INTERIOR
SPACES BY PARTITIONS (EXISTING, TEMPORARY, AND
NEW) THAT RESIST THE PASSAGE OF SMOKE.
3. ACCESS TO ALL AREAS OUTSIDE OF PHASE AND SUB-
PHASE CONSTRUCTION AREAS INDICATED TO BE FULLY
ACCESSIBLE TO STAFF AND PATIENTS THROUGHOUT
NORMAL OPERATING HOURS. ALL LIMITED SCOPE
SUPPORTING ACTIVITIES TO BE COORDINATED WITH VA
COR. ALL WORK DEEMED DISRUPTIVE BY COR TO BE
CONDUCTED OUTSIDE OF NORMAL OPERATING HOURS
(7:30 AM TO 5:00 PM).
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:5
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-106
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
FIRST FLOOR PHASING PLAN - PHASE 2
18110
SCALE: 1/8" = 1'-0"GI-106
1 FIRST FLOOR PHASING PLAN - PHASE 2
PHASE 2 LEGEND
NOTE: ALL SPACES OUTSIDE OF EACH PHASE AND
SUB-PHASE ARE TO REMAIN IN FULL OPERATION
AND ACCESSIBLE TO PATIENTS AND VA STAFF
INCLUDING SPACES IDENTIFIED IN PREVIOUS
PHASES, FUTURE PHASES, AND OUTSIDE OF
PROJECT SCOPE. COORDINATE STAGING AREAS,
MOVEMENT AND STORAGE OF EQUIPMENT, ETC.
WITH THE VA COR.
NOTE PHASE 2B: CORRIDOR WORK TO BE
COMPLETED AFTER HOURS. OPERATING HOURS
ARE BETWEEN 7:30AM AND 5:00PM.
PHASING PLAN GENERAL NOTES
0.2
0.2
0.1
0.1
0.3
0.3
0.38
0.38
0.39
0.39
0.40
0.40
0.5
0.5
0.48
0.48
A.aA.a
A.bA.b
AA
A.4A.4
B
B.3
B.6
B.7
C
C.5
D
E
F
G
F.6
F.3
D.7
D.6
C.9
C.3
B.4
A.7
6.2
6.4
6.4
6.5
6.5
6.7
6.7
6.9
6.9 7
6.1
6.1
E.7E.7
EXAM
EXAM
EXAM
WPAFB
WPAFB
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
C-1-1
CORRIDOR
N.I.C.
N.I.C.
N.I.C.
PHASE 3
P H
A S
P H
A S
P H
A S
PHASE 3 - REFRESH EXAM ROOMS / OFFICES
VA FORM 08 - 6231
F
E
D
C
B
A
987654321 10
F
E
D
C
B
A
987654321 10
CONSTRUCTION - ISSUED FOR BID
Project Number
Building Number
Drawing Number
340, 341
VA Building 340, 341
Project Title
Location
Issued Date Checked Drawn
Drawing Title
Approved:
PHILIP P. KIRK
CHIEF ENGINEER
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORD
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
CONSULTANTS
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PARKWAY, UNIONTOWN, OH 44685
THORSON BAKER + ASSOCIATES
3030 W STREESTBORO, RICHFIELD, OH 44286
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEERS
CIVIL & STRUCTURAL ENGINEERS
Arch. Proj. No.:
/2
/2
:4
:5
P
M C
R e v it L o c a l\ R
P ri m a ry
C a re
C e n tr a l_ m s e rd i n a k .r v t
GI-107
552-20-104
MS CE
RENOVATE PRIMARY CARE FOR
PACT BLDG 340, BLDG 341
2/9/2021
4100 WEST THIRD STREET, DAYTON, OH 45428
FIRST FLOOR PHASING PLAN - PHASE 3
18110
SCALE: 1/8" = 1'-0"GI-107
1 FIRST FLOOR PHASING PLAN - PHASE 3
PHASE 3 LEGEND
C R
CLASSIFIED BY
UNDERWRITERS
LABORATORIES, INC.
TO UL 1479 AND CAN/ULC-
S115
US
CIRCULAR BLANK OPENINGS
SYSTEM NO. C-AJ-0055
ANSI/UL1479 (ASTM E814) CAN/ULC S115
F RATING - 3 HR
FT RATING - 0 HR
FH RATINGS - 3 HR
FTH RATING - 0HR
F RATING - 3 HR
T RATING - 0 HR
1. FLOOR OR WALL ASSEMBLY- MIN 4-112 IN. (114 MM) THICK REINFORCED LIGHTWEIGHT OR
NORMAL WEIGHT (100-150 PEL) CONCRETE. WALL MAY ALSO BE CONSTRUCTED OF ANY UL
CLASSIFIED CONCRETE BLOCKS'. MAX DIAM OF OPENING IS 4 IN. (102 MM).
SEE CONCRETE BLOCKS (CAZT) CATEGORY IN THE FIRE RESISTANCE DIRECTORY FOR NAMES
OF MANUFACTURERS.
2. METALLIC SLEEVE- NOM 4 IN. (102 MM) DIAM (OR SMALLER) SCHEDULE 40 (OR HEAVIER) STEEL
PIPE CAST OR GROUTED INTO FLOOR OR WALL ASSEMBLY, FLUSH WITH
FLOOR OR WALL SURFACES. SLEEVE MAY EXTEND MAX 3 IN. (76 MM) ABOVE TOP SURFACE OF
FLOOR.
3. FILL, VOID OR CAVITY MATENAL'- FIRE BLOCK MIN 2 IN. (51 MM) THICK CUT TO A DIAM 1/2 IN. (13
MM) LARGER THAN THE OPENING, FLUSH WITH BOTTOM SURFACE
OF FLOOR OR WITH BOTH SURFACES OF WALL.
'BEARING THE UL CLASSIFICATION MARK
A
A
SECTION A-A
1. REFER TO SECTION 078413 OF THE SPECIFICATIONS.
FOR QUALITY CONTROL REQUIREMENTS.
2. DETAILS SHOWN ARE FOR TYPICAL APPLICATIONS AND MAY NOT
BE INCLUSIVE OF ALL PROJECT REQUIREMENTS. SOME DETAILS
COULD BE USED FOR EITHER WALL OR FLOOR APPLICATIONS. IF
FIELD CONDITIONS DO NOT MATCH REQUIREMENTS OF TYPICAL
DETAILS, CONTRACTOR SELECTED MANUFACTURER APPROVED
ALTERNATE DETAILS SHALL BE UTILIZED. FIELD CONDITIONS AND
DIMENSIONS NEED TO BE VERIFIED FOR COMPLIANCE WITH THE
DETAILS, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: *
MINIMUM AND MAXIMUM WIDTH OF JOINTS * TYPE AND
THICKNESS OF FIRE-RATED CONSTRUCTION. THE MINIMUM
ASSEMBLY RATING OF THE FIRESTOP ASSEMBLY SHALL MEET OR
EXCEED THE HIGHEST RATING OF THE ADJACENT CONSTRUCTION.
3. IF ALTERNATE DETAILS MATCHING THE FIELD CONDITIONS ARE
NOT AVAILABLE, MANUFACTURER'S ENGINEERING JUDGMENT
DRAWINGS ARE ACCEPTABLE. DRAWINGS SHALL FOLLOW THE
INTERNATIONAL FIRESTOP COUNCIL (IFC) GUIDELINES FOR
EVALUATING FIRESTOP SYSTEMS ENGINEERING JUDGMENTS.
PROVIDE ARCHITECT WITH REQUIRED SUBMITTALS.
4. FIRESTOP SYSTEM INSTALLATION MUST MEET REQUIREMENTS OF
ASTM E-814 (UL 1479) TESTED ASSEMBLIES THAT PROVIDE A FIRE
RATING EQUAL TO THAT OF CONSTRUCTION BEING PENETRATED.
5. ALL RATED THROUGH-PENETRATION ASSEMBLIES
SHALL BE PROMINENTLY LABELED.
6. FOR OUTLET BOXES REQUIRING PROTECTION, USE ONLY WALL
OPENING PROTECTIVE MATERIALS, CATEGORY CLIV AS CLASSIFIED
BY UNDERWRITER'S LABORATORIES, FIRE RESISTANCE
DIRECTORY.
++ L RATING APPLIES ONLY TO CP 680-P DEVICES AND ONLY WHEN THE NOM DIAM OF PIPE EQUALS SIZE OF DEVICE (2 IN. DIAM PIPE IN 2" DEVICE ETC.) L RATING DOES NOT APPLY TO CP 680N DEVICES.
4. FIRESTOP DEVICE* — (NOT SHOWN) -TOP SEAL PLUG FOR USE WITH CP 680-75/2.5"N DEVICES AND NOM PIPE OR CONDUIT SIZES 3/4 IN. (19 MM) TO 2 IN. (51 MM), INSTALLED IN ACCORDANCE WITH THE MANUFACTURER\'S INSTRUCTIONS. THE TOP SEAL PLUG IS OPTIONAL FOR NOM 1-1/2 IN. (38 MM) PIPES AND CONDUITS. TOP SEAL PLUGS ARE REQUIRED FOR ALL PIPES AND CONDUITS LESS THAN NOM 1-1/2 IN. (38
MM). W RATING APPLIES ONLY WHEN THE CPS OR IPS TOP SEAL PLUGS ARE USED.
4A. FIRESTOP DEVICE* - WATER BARRIER MODULE — (OPTIONAL, NOT SHOWN) - APPLIES TO NOM 2", 3" AND 4" WATER BARRIER MODULES USED IN COMBINATION WITH THE CP 680-P 2", CP 680-P 3" AND CP 680-P 4" DEVICES, RESPECTIVELY, AND SUPPLIED BY DEVICE MANUFACTURER. MODULE IS THREADED ONTO TOP OF
DEVICE. W RATING APPLIES ONLY WHEN WATER BARRIER MODULE IS USED.
*BEARING THE UL CLASSIFICATION MARK
+BEARING THE UL LISTING MARK
1. FLOOR ASSEMBLY — MIN 2-1/2 IN. (64 MM) THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100-150
PCF OR 1600-2400 KG/M3) CONCRETE.
1A. FLOOR ASSEMBLY - (OPTIONAL - NOT SHOWN) — THE FIRE RATED UNPROTECTED CONCRETE AND STEEL FLOOR ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL D900 SERIES DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND AS SUMMARIZED BELOW:
A. CONCRETE — MIN 2-1/2 IN (64 MM) THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PCF OR
1600-2400 KG/M3) CONCRETE.
B. STEEL FLOOR AND FORM UNITS* — COMPOSITE OR NON-COMPOSITE MAX 3 IN. (76 MM) DEEP GALV STEEL
FLUTED UNITS AS SPECIFIED IN THE INDIVIDUAL FLOOR-CEILING DESIGN.
2. FIRESTOP DEVICE* — CAST IN PLACE FIRESTOP DEVICE PERMANENTLY EMBEDDED DURING CONCRETE PLACEMENT OR GROUTED IN CONCRETE ASSEMBLY IN ACCORDANCE WITH ACCOMPANYING INSTALLATION INSTRUCTIONS. THE 3, 4 AND 6 IN. DEVICES MAY EXTEND A MAX 2 IN. (51 MM) ABOVE THE TOP SURFACE OF THE CONCRETE. THE MAX EXTENSION ABOVE THE SLAB FOR THE 2 AND 2.5 IN. DEVICES IS NOT RESTRICTED.
3. THROUGH PENETRANTS — ONE NONMETALLIC PIPE OR CONDUIT TO BE INSTALLED WITHIN THE FIRESTOP SYSTEM. PIPE OR CONDUIT TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR ASSEMBLY. FOR W RATING WITH WATER BARRIER MODULE, PIPE SHALL BE INSTALLED FROM BOTTOM OF DEVICE. THE
FOLLOWING TYPES AND SIZES OF NONMETALLIC PIPES OR CONDUITS MAY BE USED:
A. POLYVINYL CHLORIDE (PVC) PIPE — NOM 6 IN. (152 MM) DIAM (OR SMALLER) SCHEDULE 40 SOLID OR CELLULAR CORE PVC PIPE FOR USE IN CLOSED (PROCESS OR SUPPLY) OR VENTED (DRAIN, WASTE OR
VENT) PIPING SYSTEMS.
B. CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPE — NOM 6 IN. (152 MM) DIAM (OR SMALLER) SDR11 OR
SDR13.5 CPVC PIPE FOR USE IN CLOSED (PROCESS OR SUPPLY) PIPING SYSTEMS.
C. RIGID NONMETALLIC CONDUIT+ — NOM 6 IN. (152 MM) DIAM (OR SMALLER) SCHEDULE 40 PVC CONDUIT
INSTALLED IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE (NFPA NO. 70).
THE FIRESTOP DEVICES AND NONMETALLIC PENETRANTS SHALL BE SIZED AS FOLLOWS:
NOM PIPE DIAMETER FIRESTOP DEVICE
CP 680-75/2.5"N
CP 680 -P 2"
CP 680-P 3"
CP 680-1 10/4"N
CP 680-P 4"
CP 680-160/6"N
CP 680-P 6"
1/2 IN. TO 2 IN. (19 MM TO 51 MM)
3 IN.(76 MM)
3 IN. TO 4 IN. (76 MM TO 102 MM)
6 IN. (152 MM)
2 3
A
A
SECTION A-A
C R
CLASSIFIED BY
UNDERWRITERS
LABORATORIES, INC.
TO UL 1479 AND CAN/ULC-
S115
US SYSTEM NO. F-A-2053
F RATING - 2 HR
T RATING - 0 HR
L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT (SEE ITEM 3)
L RATING AT 400 F - LESS THAN 1 CFM/SQ FT (SEE ITEM 3)
W RATINGS - CLASS 1 (SEE ITEMS 3, 4, AND 4A)
SINGLE NON-METALLIC PIPE OR CONDUIT
C R
CLASSIFIED BY
UNDERWRITERS
LABORATORIES, INC.
TO UL 1479 AND CAN/ULC-
S115
US
MIXED PENETRANTS
ANSI/UL1479 (ASTM E814) CAN/ULC S115
F RATING - 3 HR
FT RATING - 0 HR
FH RATING - 3 HR
FTH RATING - 0HR
L RATING AT AMBIENT - 5 CFM/SQ FT
L RATING AT 400 F - 2 CFM/SQ FT
F RATING - 3 HR
T RATING - 0 HR
L RATING AT AMBIENT - 5 CFM/SQ FT
L RATING AT 400 F - 2 CFM/SQ FT
1. FLOOR OR WALL ASSEMBLY- 4-1/2 IN. (114 MM) THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PEL) CONCRETE. WALL MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE BLOCKS*.
MAX AREA OF OPENING IS 1296 IN. SQ (8361 CM2) WITH MAX DIMENSION OF 36 IN. (914 MM). SEE CONCRETE BLOCKS (CAZT) CATEGORY IN THE FIRE RESISTANCE DIRECTORY FOR NAMES OF MANUFACTURERS.
2. CABLE TRAY*- MAX 18 IN. (457 MM) WIDE BY MAX 6 IN. (152 MM) DEEP OPEN-LADDER OR SOLID-BACK CABLE TRAY WITH CHANNEL-SHAPED SIDE RAILS FORMED OF 0.060 IN. (1.52 MM) THICK ALUMINUM OR STEEL AND WITH 1-1/2 IN. (38 MM) WIDE BY 1 IN. (25 MM) CHANNEL SHAPE RUNGS SPACED 9 IN. (229 MM) OC OR A 0.029 IN.
(0.74 MM) THICK STEEL SOLID BACK, RESPECTIVELY. ONE CABLE TRAY TO BE INSTALLED IN THE OPENING. THE MAX ANNULAR SPACE BETWEEN THE CABLE TRAY AND ADJACENT PENETRANTS IS 9 IN. (229 MM) AND
BETWEEN THE CABLE TRAY AND PERIPHERY OF THE OPENING SHALL BE MIN 1-112 IN. (38 MM) TO MAX 4-1/2 IN. (114 MM). CABLE TRAY TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.
3. CABLES -AGGREGATE CROSS-SECTIONAL AREA OF CABLES IN CABLE TRAY TO BE MAX 30 PERCENT OF THE CROSS-SECTIONAL AREA OF THE CABLE TRAY BASED ON A MAX 3 IN. (76 MM) CABLE LOADING DEPTH WITHIN THE CABLE TRAY. ANY COMBINATION OF THE FOLLOWING TYPES AND SIZES OF COPPER CONDUCTOR OR
FIBER OPTIC CABLES MAY BE USED:
A. 7/C NO. 12 AWG WITH POLYVINYL CHLORIDE (PVC) INSULATION AND PVC JACKET.
B. 300 PAIR- NO. 24 AWG CABLE WITH PVC INSULATION AND JACKET.
C. 1/C, 350 KCMIL WITH CROSS-LINKED POLYETHYLENE (XLPE) INSULATION AND JACKET.
D. 1/C, 500 KCMIL WITH THERMO PLASTIC INSULATION AND POLYVINYL CHLORIDE (PVC) JACKET.
E. TWENTY FOUR FIBER OPTIC CABLE WITH PVC SUB UNIT AND JACKET.
4. THROUGH-PENETRANTS- ONE OR MORE PIPE, CONDUIT OR TUBE TO BE INSTALLED WITHIN THE OPENING.
THE TOTAL NUMBER OF THROUGH-PENETRANTS IS DEPENDENT ON THE SIZE OF THE OPENING AND TYPES AND SIZES OF THE PENETRANTS. ANY COMBINATION OF THE PENETRANTS DESCRIBED BELOW MAY BE USED PROVIDED THAT THE FOLLOWING PARAMETERS RELATIVE TO THE ANNULAR SPACES AND THE SPACINGS BETWEEN THE PIPES ARE MAINTAINED. THE SPACE BETWEEN PIPES, CONDUITS OR TUBING AND BETWEEN THE PERIPHERY OF THE OPENING AND THE PIPES OR CONDUITS SHALL BE MIN 1 IN. (25 MM) TO MAX 4-1/2 IN.
(114 MM). PIPE, CONDUIT OR TUBE TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.
THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:
A. NOM 6 IN. (152 MM) DIAM (OR SMALLER) RIGID GALV STEEL CONDUIT.
B. NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING.
C. NOM 4 IN. (102 MM) DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.
D. NOM 4 IN. (102 MM) DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBE.
E. NOM 6 IN. (152 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.
F. NOM 6 IN. (152 MM) DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.
5. PIPE COVERING- NOM 1-1/2 IN. (38 MM) THICK HOLLOW CYLINDRICAL HEAVY DENSITY (MIN 3.5 PEL) GLASS FIBER UNITS JACKETED ON THE OUTSIDE WITH AN ALL SERVICE JACKET. LONGITUDINAL JOINTS SEALED WITH METAL FASTENERS OR FACTORY APPLIED SELF-SEALING LAP TAPE. TRANSVERSE JOINTS SECURED WITH METAL FASTENERS OR WITH BUTT TAPE SUPPLIED WITH THE PRODUCT. SEE PIPE AND EQUIPMENT COVERING
AND MATERIALS (BRGU) CATEGORY IN THE BUILDING MATERIALS DIRECTORY FOR NAMES OF
MANUFACTURERS. ANY PIPE
COVERING MATERIAL MEETING THE ABOVE SPECIFICATIONS AND BEARING THE UL CLASSIFICATION MARKING WITH A FLAME SPREAD INDEX OF 25 OR LESS AND A SMOKE DEVELOPED INDEX OF 50 MAY BE USED.
6. CABLES- MAX 2 IN. (51 MM) DIAM TIGHT BUNDLE OF CABLES CENTERED IN OPENING AND RIGIDLY SUPPORTED ON BOTH SURFACES OF FLOOR AND WALL. ANY COMBINATION OF THE FOLLOWING TYPES AND
SIZES OF CABLES MAY BE USED:
A. 7/C NO. 12 AWG WITH POLYVINYL CHLORIDE (PVC) INSULATION AND PVC JACKET.
B. 25 PAIR- NO. 24 AWG CABLE WITH PVC INSULATION AND JACKET.
C. 2/C NO. 10 AWG WITH PVC INSULATION AND JACKET.
D. 3/C NO. 8 AWG ALUMINUM CLAD CABLE WITH CROSS-LINKED POLYETHYLENE (XLPE) INSULATION AND
PVC JACKET.
E. TYPE RC- 62 AIU COAXIAL CABLE WITH AIR CORE AND PVC JACKET.
F. 24 FIBER OPTIC CABLE WITH PVC SUB UNIT AND OUTER JACKET.
7. FIRESTOP SYSTEM- THE FIRESTOP SYSTEM SHALL CONSIST OF THE FOLLOWING:
A. FILL, VOID OR CAVITY MATERIAL'- FIRE BLOCKS INSTALLED WITH LONG DIMENSION PASSED THROUGH
THE OPENING AND CENTERED WITHIN THE THICKNESS OF THE FLOOR OR WALL. BLOCKS TO BE FIRMLY PACKED AND COMPLETELY FILL THE ENTIRE AREA AND THICKNESS OF OPENING. EITHER ONE OR A
COMBINATION OF THE BLOCK TYPES SPECIFIED BELOW MAY BE USED.
B. FILL, VOID OR CAVITY MATERIAL'- (NOT SHOWN) FILL MATERIAL TO BE FORCED INTO INTERSTICES OF CABLES AND BETWEEN CABLES AND CABLE TRAYS TO MAX EXTENT POSSIBLE ON BOTH SURFACES OF THE
PENETRATION.
C. WIRE MESH (NOT SHOWN)- WHEN THE ANNULAR SPACE EXCEEDS 4-1/2 IN. (114 MM) TO THE PERIPHERY, A NOM 2 IN. SQ (51 MM SQ.) WIRE FENCING SHALL BE USED TO KEEP THE FIRE BLOCKS IN PLACE. THE WIRE FENCING IS FABRICATED FROM MIN NO. 16 SWG (0.060 IN.) (1.52 MM) GALV STEEL WIRE. THE WIRE IS CUT TO FIT THE CONTOUR OF THE PENETRATING ITEM WITH A MIN 3 IN. (76 MM) LAP BEYOND THE PERIPHERY OF THE OPENING. WIRE FENCING SECURED TO TOP SURFACE OF FLOOR AND BOTH SURFACES OF WALL ASSEMBLY BY MEANS OF 1/4 IN. (6 MM) DIAM BY 1 IN. (25 MM) LONG CONCRETE ANCHORS AND 1/4 IN. (6 MM) BY 1-112 IN. (38
MM) DIAM FENDER WASHERS SPACED MAX 8 IN. (203 MM) OC.
'BEARING THE UL CLASSIFICATION MARK
SYSTEM NO. C-AJ-8056
A
A
2 5
SECTION A-A
C R
CLASSIFIED BY
UNDERWRITERS
LABORATORIES, INC.
TO UL 1479 AND CAN/ULC-
S115
US SYSTEM NO. F-A-2054
F RATING - 3 HR
T RATING - 0 AND 3 HR (SEE ITEM 3)
L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT (SEE ITEM 3)
L RATING AT 400 F - LESS THAN 1 CFM/SQ FT (SEE ITEM 3)
W RATINGS - CLASS 1 (SEE ITEMS 3, 4, AND 4A)
1. FLOOR ASSEMBLY — MIN 4-1/2 IN. (114 MM) THICK REINFORCED LIGHTWEIGHT OR NORMAL
WEIGHT (100-150 PCF OR 1600-2400 KG/M3) CONCRETE.
1A. FLOOR ASSEMBLY - (OPTIONAL - NOT SHOWN) — THE FIRE RATED UNPROTECTED CONCRETE AND
STEEL FLOOR ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER
SPECIFIED IN THE INDIVIDUAL D900 SERIES DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND AS
SUMMARIZED BELOW:
A. CONCRETE — MIN 4-1/2 IN (114 MM) THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT
(100-150 PCF OR 1600-2400 KG/M3) CONCRETE.
B. STEEL FLOOR AND FORM UNITS* — COMPOSITE OR NON-COMPOSITE MAX 3 IN. (76 MM)
DEEP GALV STEEL FLUTED UNITS AS SPECIFIED IN THE INDIVIDUAL FLOOR-CEILING DESIGN.
2. FIRESTOP DEVICE* — CAST IN PLACE FIRESTOP DEVICE PERMANENTLY EMBEDDED DURING
CONCRETE PLACEMENT OR GROUTED IN CONCRETE ASSEMBLY IN ACCORDANCE WITH
ACCOMPANYING INSTALLATION INSTRUCTIONS. THE DEVICES MAY EXTEND A MAX 2 IN. (51 MM) ABOVE
THE TOP SURFACE OF THE CONCRETE.
3. THROUGH PENETRANTS — ONE NONMETALLIC PIPE OR CONDUIT TO BE INSTALLED WITHIN THE
FIRESTOP SYSTEM. PIPE OR CONDUIT TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .