Attachment 10 - SF330 Technical Questions - Underground Parking Dallas.pdf

Standard Form PDF 553 KB Posted

Attached to
549-090 Build Out Underground Parking Area Minor Design - Dallas, TX
Solicitation number
36C77625R0036
Issued by

About this file

This is a technical question tracker document containing three questions and answers related to SF330 form submission requirements for a VA underground parking area design project in Dallas.

The questions clarify that offerors must use the standard fillable SF330 form from GSA.gov without modifying the default font, font size, or formatting, and all content must be in black ink without grays or colors. The document also addresses specialized experience requirements, confirming that certain elements from the original solicitation are no longer required (duct bank/direct boring operations, multi-building OIT systems, and data center reconfiguration), though other infrastructure requirements remain unchanged including cabling, electrical distribution, UPS systems, and IT room capabilities to support Biomedical and administration functions in what was previously a vacant storage space.

View the file

Other versions and copies of SF 330

File Revision Posted Attached to
Atch 1 - SF330 (blank).pdf Revision not stated AE IDIQ 2027 Request for Qualifications Davis Monthan Air Force Base
Standard Form 330.pdf Revision not stated 2027 Construction Inspection Services Multiple Award Task Order Contract (MATOC)
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
SF 330-Revised 7-21 1.pdf Revision not stated Repair Nose Dock 7 B1232
Standard Form 330 - Architect-Engineer Qualifications.pdf Revision not stated Advertisement for A&E Services - IDIQ
M- SF 330 Architect Engineer Qualifications.rtf Revision not stated El Paso Community Based Outreach Clinic (CBOC)
12 GSA Standard Form 330 Franklin County OH 36C10F25R0057 Architect Engineer Qualifications.pdf Revision not stated Franklin County Outpatient Clinic, OH. 97,449 ANSI/BOMA Square Feet
36C24126Q0518_Request for SF330.docx Revision not stated C1AZ--FY27 NRM 631-21-011 Build Elevator Tower for Building 25
1-Standard Form 330 Part II.pdf.pdf Revision not stated Pavement Management Engineering Support Services
12 - GSA Standard Form 330 - Architect Engineer Qualifications.pdf Revision not stated X1DB--Macon GA Health Care Clinic HCC 168,332 ANSI/BOMA
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
1-Standard Form 330 Part II.pdf.pdf Revision not stated Waters Avenue Force Main Replacement CEI Services
Standard_Form_330-21b_-_Architect-Engineering_Qualifications.pdf Revision not stated Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
SF330-21b.pdf Revision not stated PARAMARIBO: A&E Services, MSGR
15. Exhibit M - SF330 - Architect-Engineer Qualifications_VA-GP.pdf Revision not stated Request for Lease Proposals (RLP) for Olympia, WA CBOC
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Subsurface Investigation & Testing
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Construction Engineering and Inspection (CEI) Services - CDBG-DR
1-Standard Form 330 Part II.pdf.pdf Revision not stated Misc. Professional Stormwater Services
SF-330 AE Qualifications.pdf Revision not stated IDIQ For Architect Engineer (A/E) Services for Central Office
Show all 20

Who attaches SF 330

State Files
Florida 98
Maryland 41
Pennsylvania 23
Washington 21
Texas 19

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF330 Technical Question Tracker - 549-090 Build Out Underground Parking Area Minor Design Dallas # Date received Question Answer

1 2/13/2025 On page 10, under the Format of Submissions section, we noticed you would like the SF 330s to be in default font and size. Can you please clarify the font and size that is required for the submission?

The full guidance provided on this page states that you must use the fillable SF 330 form provided on GSA.gov's website and that no alternations should be made to the formatting. Meaning that the form should be used as is and no change to the font or font size should be made: "GSA.gov provides a standard fillable SF 330. The formatting of the SF submission shall follow that of the standard form and cannot be manipulated or changed, meaning each page shall be:

1. In the default font and default font size

2. In black ink (no gray, no colors)"

2 2/13/2025

Also on page 10 in the Format of Submissions section, item 2 in the list states that submissions should not include gray or colors.

When we convert our documents to black and white, some elements, such as charts we include in Section H, appear in shades of gray to differentiate information. Would this be acceptable?

These guidelines are referring to the fillable SF 330 form found on the GSA.gov website: "GSA.gov provides a standard fillable SF 330. The formatting of the SF 330 submission shall follow that of the standard form and cannot be manipulated or changed, meaning each page shall be:

1. In the default font and default font size

2. In black ink (no gray, no colors)"

3 2/13/2025

Under the Specialized Experience and Technical Competence section of the solicitation, the first paragraph reads as follows:

“Projects experience should include upgrading large scale (multi-building with multiple generational OIT systems) fiber optics, data cable, structured cabling, electrical distribution design, electrical upgrades, uninterruptable power systems (UPS), electrical bonding, building management systems/building automation systems (BMS/BAS), HVAC, IT room renovations/expansion/relocations, Data Centers/Server Rooms reconfiguration, and physical security upgrades, duct bank and direct boring operations.”

We believe this may be a carryover from a previous solicitation.

Will you please confirm that we should demonstrate Data and Server room experience in our Section F projects?

The following info has been hereby removed and is no longer required in the Specialized Experience and Technical Competence evaluation factor:

• Duct bank and direct boring operations experience

• Multi-building with multiple generational OIT systems experience

• Data center/server room reconfiguration experience

Please note: This design/construction will still require all of the other cabling and electrical distribution experience requirements mentioned, and it will need to integrate with the existing equipment. An IT room will also likely be needed due to added vital services into a previously vacant storage space.

All other experience requirements listed remain unchanged as we are expecting all infrastructure will need to be upgraded to support Biomedical and administration, including UPS, which Biomedical will need for their shop.

File details come from the government source that posted it. Updated .