Attachmetn RFI 115B - Hybrid Drawings 5-4-15.pdf
PDF 419 KB Posted
- Attached to
- Z1DA-- Renovate OR for Hybrid Installation
- Solicitation number
- 36C26126R0009
About this file
This is a technical drawing/equipment layout document for a hybrid operating room at VA Mather Medical Center in Mather, California (10535 Hospital Way, Mather, CA 95655). The drawing, designated CA-20154-0436_3, is dated April 29, 2015, and represents Approved Revision 3. It is prepared by Stryker and marked as confidential and proprietary information.
The document specifies the equipment configuration for Hybrid OR room 2A236 in Building 700, detailing four primary pieces of surgical equipment: (A) a Chromophare Lead Shield with F628 Surgical Light featuring dual FP arms with 1800-1700-1600-1300 arm lengths; (B) a Teletom TC Mount TF-422-C anesthesia boom with F628 surgical light and single FP arm configuration; (C) a Tandem Teletom TF-423-B with top tandem F628 surgical light and bottom tandem TS-724 MCS monitor boom accommodating two 19-inch Philips monitors; and (D) a Teletom TF-432 equipment boom with 1300-1000 arm lengths. The floor plan layout (20'-2" by 16'-11") includes detailed positioning of all surgical booms, equipment clearances, and critical installation notes indicating that boom arms and motor covers require careful positioning to avoid wall interference, with specific instructions to set boom stops toward the wall. Project contacts include Sales Rep Alec Greco (530.320.2527), Project Manager Joseph Melek (972.207.3766), and Engineer Gopesh Sharma (206.257.8310).
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L A
KE
S
ID
E
PA
RK
W A
Y, S
UI
TE
FL
O
W
ER
M O
UN
D
, T X
PH
O N
E:
(8
) 7
-8
E-
FA
X:
(4
) 7
-2 w w w .st ry ke r.c om
DISCLAIMER: THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY
INFORMATION OF STRYKER. NEITHER THIS DOCUMENT NOR THE
INFORMATION HEREIN MAY BE REPRODUCED, USED, OR DISCLOSED TO OR
FOR THE BENEFIT OF ANY THIRD PARTY WITHOUT THE PRIOR WRITTEN
CONSENT OF STRYKER.
DIRECTORY
TABLE OF CONTENTS
PM:
SHEET:
REP:
AUTOCAD DRAWING TEMPLATE | TEM100XX | REV. A
TITLE
PLOT STAMP:COURTNEY, STUART |DATE: 4/29/2015 3:41 PM
29APR15
VA MATHER MEDICAL CENTER
HYBRID BLD 700
HYBRID OR - 2A236
10535 HOSPITAL WAY
MATHER, CA 95655
APPROVED REVISION:
ENGINEERING APPROVAL
DRAWING#: CA-20154-0436_3
CA B
2A236A
(N)
SUB-STERILE
ROOM
2A236C
(N) CONTROL
ROOM
2A236B
(N)
EQUIPMENT
ROOM
2A236
(N) HYBRID
OR
W2.1
W2.1
W2.3
(E)
W2.3
NURSE STATION
+ 9' - 7"
SCALE: 1/2" = 1'-0"
NOTES: (UNLESS OTHERWISE SPECIFIED)
PM:
SHEET:
REP:
w w w .st ry ke r.c om
FL
O
W
ER
M O
UN
D
, T
EX
A S
L
A
KE
SI
D
E
PA
RK
W
A Y, S
UI
TE
PH
O
N E:
(8
) 7
-8
FA
X:
(9
) 4
-7
AUTOCAD DRAWING TEMPLATE | TEM100XX | REV. A
DI
SC
LA
IM
ER
TH
IS
D
O C
UM
EN
T C
O N
TA
IN
S C
O N
FI
D
EN
TIA
L A
N D
P
RO
PR
IE
TA
RY
IN
FO
RM
A
TIO
N
O F
ST
RY
KE
R.
N
EI
TH
ER
T H
IS
D
O C
UM
EN
T N
O R
TH
E
IN
FO
RM
A
TIO
N
H
ER
EI
N
M A
Y
BE
RE
PR
O D
UC
ED
, U
SE
D , O
R D
IS
C
LO
SE
D T
O O
R
FO
R
TH
E
BE
N
EF
IT
O
F A
N Y
TH
IR
D P
A
RT
Y W
ITH
O
UT
T
H E
PR
IO
R W
RI
TT
EN
C
O N
SE
N
T O
F
ST
RY
KE
R.
R-HY
PLOT STAMP:COURTNEY, STUART |DATE: 4/29/2015 3:41 PM
C
EQUIPMENT SCHEDULE
KEY
ITEM NAME QTY
A
CHROMOPHARE ® LEAD SHIELD / F628 SURGICAL LIGHT /
F628 SURGICAL LIGHT / DUAL FP ARM
- 1800-1700-1600-1300 ARMS
B
TELETOM TC MOUNT ® TF-422-C (F628/FP)
- ANESTHESIA BOOM
1300-850 ARMS
- TC F628 SURGICAL LIGHT/SINGLE FP
900-800 ARMS
C
TANDEM TELETOM ® TF-423-B & F628/FP-T
- TOP TANDEM F628 SURGICAL LIGHT/SINGLE FP
1800-1700 ARMS
- BOTTOM TANDEM TS-724 MCS MONITOR BOOM
1300 ARM
(TWO 19" MONITORS PROVIDED BY PHILIPS MOUNTED ON
BACK OF MCS)
D TELETOM ® TF-432 EQUIPMENT BOOM
- 1300-1000 ARMS 1
'-1
1"
'-1 1"
20'-2" 10'-0"7'-9"
7'-9"
9"
'-8
2'-6"
B
A
ARMS &
MOTOR COVER
WILL HIT WALL;
SET BOOM STOPS
TOWARDS WALL
ARMS
WILL HIT
WALL
TOP ARM
HITS WALL;
SET BOOM
STOPS
TOWARDS
WALL
D
'-1
1"
File details come from the government source that posted it. Updated .