Attachment RFI No. 123 Spanos Group_ VA Mather Pneumatic Tube System_ FINAL As-Built Set for VA_ 8.18.2023.pdf
PDF 9 MB Posted
- Attached to
- Z1DA-- Renovate OR for Hybrid Installation
- Solicitation number
- 36C26126R0009
About this file
This document is a final as-built drawing set dated August 18, 2023, for a Computerized Pneumatic Tube Delivery System (CTS-630) installation at Sacramento VA Medical Center in Mather, California, under project number W005240. The drawings provide comprehensive technical documentation for the pneumatic tube system's design, components, and installation specifications across two buildings (Building #650 and Building #700) at the facility.
The as-built package includes detailed system piping schematics showing the roof scope, interior scope, data network, and electrical power routing across both buildings, along with multi-level floor plans identifying station locations and transmission line paths. Technical sheets cover tubing and support details (16 gauge galvanized steel pneumatic tubes in 4" and 6" diameters), station specifications for various configurations (Recessed, Nexus, and Ultra stations with weight specifications of 200-375 lbs), transfer unit details with electromechanical drive mechanisms, blower specifications (3-10 HP motors at 208-575 VAC, 3-phase), and extensive installation requirements for tube supports, hangers, anchoring systems, floor penetrations, and seismic bracing. Power requirements include 110 VAC, 1-phase circuits for stations and transfer units, plus 3-phase motor power for blowers. The specifications emphasize joint installation procedures, material standards (ASTM A653 G90/G60 coating), environmental operating ranges (0-120°F), and maximum system pressure of 3.5-4 PSIG with vacuum capabilities. Structural bracing details reference California Building Code (2007/2016 editions) and ASCE/SEI 7-10 seismic requirements, with notes indicating pneumatic tube systems are classified as secondary non-essential systems per Policy Intent Notice 20.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FFINAL As-builts | Aug 18 2023
Kenneth Menicucci
= DATA NETWORK
Kenneth Menicucci
= ELECTRICAL POWER
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
MCC-2
Power Feeders
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
(6) Data Network Cables
Kenneth Menicucci
= ELECTRICAL POWER
Kenneth Menicucci
= DATA NETWORK
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
= DATA NETWORK
= ELECTRICAL POWER
= DATA NETWORK
Kenneth Menicucci
= ELECTRICAL POWER
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
= DATA NETWORK
= ELECTRICAL POWER
= DATA NETWORK
Kenneth Menicucci
= ELECTRICAL POWER
Kenneth Menicucci
Kenneth Menicucci
Kenneth Menicucci
SET SCREW WITH
LOCKNUT
MINIMUM ROD
INSERTION IS 1/2"
NOTES:
1. SUBSTITUTE BEAM CLAMP WHERE REQUIRED TO ANCHOR TO BEAMS, IN
LIEU OF ANCHORS THROUGH CONCRETE.
2. SET SCREW MUST BE TIGHTENED ONTO THE SLOPED SIDE OF THE I-BEAM,
CHANNEL OR ANGLE IRON FLANGE
JOINT INSTALLATION NOTES
• ENSURE TUBING JOINTS ARE STRAIGHT AND PROVIDE A GOOD SEAL. GAPS BETWEEN PIECES OF TUBING INDICATE THE TUBING IS NOT POSITIONED PROPERLY, AND CAN CAUSE THE OTHER END TO BE OUT OF ALIGNMENT OR CAN CAUSE CARRIERS TO BECOME
LODGED.
• ENSURE ALL JOINTS ARE PARALLEL AND COMPLETELY STRAIGHT, AND NO EDGES REMAIN THAT MAY DAMAGE CARRIERS OR
INTERFERE IN ANY WAY WITH CARRIER TRAVEL.
• REMOVE ANY BURRS FROM THE ENDS OF THE TUBING WITH A FILE.
• IF FLARING IS REQUIRED FOR A JOINT, ENSURE THE FLARE IS PREPARED BEFORE THE INSTALLATION.
• DRY-FIT EACH JOINT BEFORE APPLYING ADHESIVES OR TAPE, AND MARK THE POINT WHERE THE JOINT IS PROPERLY SEATED. IF A BOLTED COUPLING OR DRIVE SLEEVE IS USED, MARK THE LOCATION OF EITHER END OF THE COUPLING OR SLEEVE TO ENSURE THE
JOINT IS PROPERLY CENTERED.
• OBSERVE ALL WARNINGS AND INSTRUCTIONS ON THE ADHESIVE LABEL.
• DO NOT PERMIT EXCESS ADHESIVE TO COLLECT ON THE INSIDE OF THE TUBING (AFTER THE JOINT IS SECURED)
• AFTER SECURING THE JOINT, USE A GLUE BRUSH TO WIPE AWAY EXCESS ADHESIVE ON THE OUTSIDE OF THE JOINT.
• GLUE AND TAPE ALL SYSTEM TUBE JOINTS FOR A PROPER AIR SEAL. DO NOT GLUE JOINTS WHERE TUBING MEETS EQUIPMENT. ALL EQUIPMENT MUST BE ATTACHED WITH A BOLTED COUPLING TO ENSURE IT IS REMOVABLE FOR SERVICE.
• ENSURE TUBING REMAINS FREE OF ALL OBSTRUCTIONS. CHECK TUBING OR DEBRIS BEFORE MAKING FINAL CONNECTIONS.
• USE METALLIZED TAPE TO HOLD JOINTS TOGETHER WHILE THE ADHESIVE CURES.
• WARNING: NEVER USE HEAT TO RELEASE ADHESIVES. HEATING ADHESIVES MAY EMIT TOXIC FUMES. ONLY USE ADHESIVE REMOVAL
METHODS APPROVED BY THE ADHESIVE MANUFACTURER.
STRAIGHT END
OF TUBE
BELL END
OF TUBE
SEE NOTES FOR JOINT
REQUIREMENTS
48"-50"
RADIUS
4" TUBING IS USED FOR AIR LINE
PIPING
6" 90° ELBOW6" 45° ELBOW
6" INLINE TEE
6" 90° BEND (58 1136 01)
(36.70 LBS)
4" STRAIGHT TUBE (27.40 LBS)
6" STRAIGHT TUBE (41.20 LBS)
6" 50" SHOWN
120" TYPICAL
4" 6"
13 1/2"
6"
6"
3/ 4"
6"
9"
5"
5"
6"
45.00°
1/
2"
/2
16 1/2"
4" 90° BEND (58 1135 01)
24.48 LBS
69 15/16" MAX 6" (69 1/116" MAX 4")
/2 " M
AX
/4
" M
AX
45° AIR LINE
ELBOW
7"
4" INLINE TEE
3/
8"
7 3/4"
ALL TUBING 16 GAUGE GALVANIZED STEEL
16 GAUGE GALVANIZED STEEL (POST FORMED WALL THICKNESS
OF .062 NOMINAL) AND MEETING ASTM A 653 COATING
DESIGNATION G90 OR G60. MATERIAL TO HAVE A ROCKWELL
HARDNESS OF B45 MINIMUM AFTER FORMING AND WELDING
6 3/4"
6"/4" INLINE TEE
12"
4"
6" 9"
12"8"
3/
8"
6"
4"
9"
7"
90° AIR LINE
ELBOW
/1 6"
3 1 1/1
6"
4" DRIVE SLEEVE
6" DRIVE SLEEVE
6"
5"
6"Ø PTUBE6"Ø PTUBE
4"Ø PTUBE4"Ø PTUBE
6X4 REDUCER
5"
4"Ø6"Ø
STRAIGHT HUB
/2 "9"
1/
2"
69 1/2"
R 4'-2"
4" & 6" BOLTED COUPLING
3X 5/8-16 HEX NUT
3X 5/8-16 BOLT 2.0 MIN LENGTH
GROUND STRIP TO BE PLACED
BETWEEN GASKET AND TUBE
WITH TAB FOLDED TO THE INSIDE.
6" OR 4"
3/
4"
6"
3/
4" F
O R
4"
CO
UP
LI
N
G
6"/4" INLINE PRV ASSEMBLY
6" OR 4"
FIELD BORE HOLES
MIN 6' ABOVE STATION NIPPLE
FIELD BORE PRV HOLES. PRV
FLAP AND CLAMPS
ORIENT FLAP UP
INSTALL BYPASS PIPE END
WITH LABEL UP
STANDARD 4" OR 6"
TUBING, FIELD CUT
BOLTED COUPLING CONNECTION TO
TRANSFER UNIT
FIELD BORE (2) 2 3/4" Ø
HOLES FOR 6" BYPASS PIPE
9" MIN. FROM HOLES TO
TRANSFER UNIT
STORAGE/BYPASS PIPE ASSEMBLY
65" MIN AS SHOWN
FIELD BORE (2) 1 7/8"Ø HOLES
FOR 4" BYPASS PIPE
9" MIN
BOLTED COUPLING CONNECTION
PRV 90
ACCEPTABLE
PRV LOCATION
WHEN PRV IS REQUIRED TO BE RELOCATED DUE TO
FIELD CONDITIONS, RELOCATE IN UPPER HALF OF BEND.
START OF RADIUS
ACCEPTABLE PRV LOCATION
PLAN VIEW
ELEVATION VIEW
VACUUM BYPASS VALVE
(IF APPLICABLE)
TO BLOWER
ZERO-LEVEL
TRANSFER UNIT
REDUCER (USED ON 6" SYSTEM)
VACUUM TEE
BOLTED COUPLING
NOTES:
A. STOPPING CHAMBER PIPING: 12' MIN, 15' PREFERRED
1. WHEN USING 4" SYSTEM, 15' REQUIRED BEFORE USING 4" AIRLINE FITTINGS
B. 6' BETWEEN VBV AND VACUUM TEE
C. 6' BETWEEN VACUUM TEE AND ZERO LEVEL TU
4" AIRLINE PIPING STOPPING CHAMBER "A"
4" AIRLINE PIPING
SYSTEM PIPING
6" AIRLINE 90
GLUED JOINT
"B"
"C"
ELEVATION VIEW
1/2" GAP AT JOINT
4" OR 6"Ø PNEUMATIC TUBE,
16 GAUGE GALVANIZED STEEL
36" MAX.
TRANSVERSE BRACING & LONGITUDINAL
BRACING (TYP) EA SIDE OF JOINT
4" OR 6"Ø SLIP JOINT
3/8"Ø ALL THREAD HANGER
ROD W/ STIFFENER
10'-0" MAX (TYP)
PNEUMATIC TUBE SUPPORT
±42"
BUILDING SEPARATION
BOLTED
COUPLING
PRV FLAP AND CLAMPS
ORIENT FLAP UP
STANDARD 4" OR 6"
TUBING, FIELD CUT
FIELD BORE (2) 2 3/4" Ø
HOLES FOR 6" PRV
- 7
/8
FIELD BORE (2) 1 7/8"Ø
HOLES FOR 4" PRV
- 3
/8
FIELD INSTALL FOR PRV 90,
INLINE PRV, OR
STORAGE/BYPASS PIPES
3/8" ALL THREAD HANGER ROD
AND HARDWARE
STEEL TEAR DROP HANGER4" OR 6" PNEUMATIC
TUBE
3/8" DROP-IN ANCHOR, TYPICAL
(SUBSTITUTE BEAM CLAMP WHERE
REQUIRED TO ANCHOR TO STEEL BEAMS)
3/8" THREADED ROD & HARDWARE,
TYPICAL
TUBE CLAMP,
TYPICAL
THREADED RODS TO
STRUCTURE ABOVE
TEARDROP HANGER
TUBE SUPPORTS FROM STRUCTURE ABOVE
13/16 OR 1-5/8" STRUT SUPPORT, AS
REQUIRED BY INSTALLATION
3/8"-16 NC DROP IN ANCHOR,
TYPICAL
3/8"-16 NC DROP IN ANCHOR,
TYPICAL
BENDS TO BE
SUPPORTED AT EACH END
SUPPORT ON RADIUS OF BEND IF
FIELD CONDITIONS DICTATE
NOTES:
• TOP TUBE TO BE SUPPORTED IN TYPICAL APPROVED FASHION
• DOUBLE HANGER SHOULD BE WITHIN 18" FROM TOP TUBE SUPPORT
• RODS BETWEEN TEARDROP HANGERS ARE TO BE PLUMB AND LEVEL
• ATTAIN APPROVAL PRIOR TO HANGING
• ONLY HANG FROM PNEUMATIC TUBING, NO OTHER TRADES
PHD BAND HANGER
A
"A"
8"
12"
4" TUBE
6" TUBE
PHD BAND HANGER
6" TUBE/
4" TUBE
10"
BOTH 4" OR
BOTH 6"
4" OR 6"
FLOOR PENETRATION PLAN VIEWFLOOR PENETRATION SECTION VIEW
FIRE STOP
PENETRATION
AS REQUIRED
CORE DRILLED OR
SLEEVED HOLE
4" OR 6" O.D. STEEL PNEUMATIC TUBE
FIRE STOP PENETRATION
AS REQUIRED
ROW CLAMP
4" PNEUMATIC TUBE - 5" OR 6" TYPICAL SLAB PENETRATION
6" PNEUMATIC TUBE - 7" OR 8" TYPICAL SLAB PENETRATION
FLOOR PENETRATION PLAN VIEWFLOOR PENETRATION SECTION VIEW
FIRE STOP
PENETRATION
AS REQUIRED
1-5/8 X 1-5/8" STRUT
4 HOLE 90 BRACKET
3/8" ANCHOR BOLTS
CORE DRILLED OR
SLEEVED HOLE
4" OR 6" O.D. STEEL
PNEUMATIC TUBE
1-5/8 X 1-5/8" STRUT
3/8" ANCHOR BOLTS
FIRE STOP PENETRATION
AS REQUIRED
CHANNEL CLAMP
4" PNEUMATIC TUBE - 5" OR 6" TYPICAL SLAB PENETRATION
6" PNEUMATIC TUBE - 7" OR 8" TYPICAL SLAB PENETRATION
4 HOLE 90 BRACKET
/1 6"
MECHANICAL SHAFT
PLAN VIEW
MECHANICAL SHAFT
SECTION VIEW
SCHEDULED
SHAFT OPENING
4" OR 6" O.D. STEEL
PNEUMATIC TUBE
1-5/8 X 1-5/8" STRUT
3/8" ANCHOR BOLTS
CHANNEL CLAMP 3/8" ANCHOR BOLTS
1-5/8 X 1-5/8" STRUT
UNISTRUT OR EQUAL ANGLE FITTING
SCHEDULED SHAFT OPENING
4" OR 6" O.D. STEEL PNEUMATIC TUBE
OPENING
SCHEDULED
NOTES:
1.AS SHOWN:
4" TUBE = 24" - ADDITIONAL 6" PER EACH ADDITIONAL TUBE
6" TUBE = 34" - ADDITIONAL 8" PER EACH ADDITIONAL TUBE
2.AS SHOWN:
4" TUBE = 6"
6" TUBE = 8"
3.MAY VARY DUE TO STRUCTURAL REQUIREMENTS. VERIFY.
"A" "B"
4" 6"
5"
4" TUBE
6" TUBE 8"
"C"
NOTE 1
NOTE 1
"D"
NOTE 2
NOTE 2
C
A B
B B
A
D
"C" & "D" REPRESENT OVERALL
SHAFT OPENING SIZE
1" WD X 1/8" THICK GALVANIZED STEEL 4" OR 6"
TUBE CLAMP
3/8" THREADED ROD
NOTE:
TUBING TO BE SUPPORTED AT A MINIMUM OF EVERY 10'.
1 1/2" MIN
3" MIN FLUTE
3/8"16 NUT W/FLAT WASHER
1" WD X 1/8" THICK GALVANIZED STEEL 4" OR 6" ROW
CLAMP
3/8" THREADED ROD
3/8"16 NUT W/FLAT WASHER
3/8" 16 X 1" LG BOLT WITH FLAT WASHER
S H
E E
T N
U M
B E
R
SCALE
Phone: (800) 396-9666 www.swisslog-healthcare.com
As instruments of service, all designs, ideas, and information shown on these drawings are and shall remain the property of Swisslog Healthcare. No part thereof shall be copied, disclosed to others, or used in connection with any work or project other than the specific project for which they have been prepared and developed without the written consent of Swisslog Healthcare. Visual contact with these drawings shall constitute conclusive evidence of acceptance of these restrictions.
Not To Scale
S H
E E
T N
A M
E
S H
E E
T S
IZ
E
0X
9/4/2020 9:32:36 AM
C :\D ro pb ox
C ad
G ro up \L ib ra ry
R ev it\ D et ai ls \S w is sl og
D et ai ls
0x v
.r vt
PT-300
Tubing & Support Details
Beam Clamp
Adhesive Joint Connection Detail
Transmission Components
Bolted Coupling
Inline PRV
Storage/Bypass Pipe
PRV 90
System Piping
Expansion Joint Detail
Field Bore PRV
Typical Tube & Bend Supports
2 Band Hanger Support
Tube Supports at Floor Row Clamps
Tube Supports at Floor
Tube Supports at Shafts
1" = 1'-0"
Tube Supports Row Clamps
ORIENT STUDS WITH FLAT SIDE
AGAINST STATION HOUSING
FINISHED WALL AND FRAMING BY
OTHERS
TUBES SUPPORTED
AT FLOOR BY SWISSLOG
STATION HOUSING (TYPICAL), REFER TO
STATION DETAILS FOR DIMENSIONS
CORES MAY BE POSITIONED INSIDE STATION
ENCLOSURE. SEE PLANS FOR ADDITIONAL INFORMATION.
4" PNEUMATIC TUBE - 5" OR 6" TYPICAL SLAB PENETRATION
6" PNEUMATIC TUBE - 7" OR 8" TYPICAL SLAB PENETRATION
A
B
B
FROM HOUSING
10" CLEAR MIN TYP
MIN - MAY VARY DEPENDING ON
STRUCTURAL REQUIREMENTS
6" TUBE:
A=10" MIN
B=10" MIN
4" TUBE:
A=8" MIN
B=8" MIN
ADJUSTABLE LEG
ASSEMBLY
CARRIER
STORAGE RACKS
PRESSURE RELIEF VALVE
(PRV) BEND
8" MINIMUM CLEARANCE REQUIRED
AROUND PRV FLAP
AREA ABOVE STATIONS WITHIN STATION ENCLOSURE
SHALL BE CLEAR TO DECK/STRUCTURE ABOVE.
COORDINATE WITH SWISSLOG TO BE KEPT CLEAR OF
OBSTRUCTIONS TO TUBING
WALLS AND FRAMING BY
GENERAL CONTRACTOR OR
OWNER
STATION ANCHORED TO SLAB
INLINE PRESSURE RELIEVE VALVE (PRV)
ASSEMBLY: FOR STATIONS FED
VERTICALLY FROM THE FLOOR ABOVE.
G.C. TO NOTCH TRACK TO FIT
STATION LEGS
CORES MAY BE POSITIONED INSIDE STATION
ENCLOSURE. SEE PLANS FOR ADDITIONAL INFORMATION.
BOLTED COUPLING
TRIM
FRAME
RECEIVE BIN
DISPATCHER
NIPPLE
SIDE
FRONT
CONTROL
PANEL
STATION FURR-IN BY
OTHERS. STUDS TO BE
ORIENTED WITH FLAT SIDE
AGAINST STATION HOUSING
STATION HOUSING (TYPICAL), REFER TO
EQUIPMENT DETAILS FOR DIMENSIONS
32 3/8"
D
8"
R
EF
ER
EN
C E
C
EI
LI
N
G
/4
/8
/2
/8
" R
.O
F ROUGH OPENING
E (MIN CLEAR)
1/2" MIN FROM TRIM PLATE TO
WALL CORNER, TYP
TOP
/8
/2
/8 " R
O
TOP
POWER CONDUIT ENTRY
COMMUNICATION
CABLE/CONDUIT
ENTRY
A
B
/2
C
/4
BOTTOM
3/
4"9"
POWER CONDUIT TO
ELECTRICAL PANEL
SIZE
6" 4"
A 32 1/8" 26 1/8"
B 5 7/8" 4 7/8"
C 34 3/4" 28 3/4"
D 11' 8 1/8"
11' 10 1/8"
/8
A = STATION HOUSING WIDTH
B = STATION HOUSING EDGE TO CENTER OF NIPPLE
C = TRIM RING WIDTH
D = FLOOR TO TOP OF PRV BEND *NOTE 1
E = CLEAR STATION ENCLOSURE WIDTH
F = ENCLOSURE ROUGH OPENING WIDTH
NOTE 1: VARIES PER FIELD CONDITIONS/CEILING HEIGHT
X'-X" MIN, X'-X" PREFERRED
E 36" 28"
F 32 1/2" 26 1/4"
DECK/STRUCTURE ABOVE
PRESSURE RELIEF VALVE (PRV):
PRV TO BE CLEAR OF OBSTRUCTIONS AND
ACCESSIBLE. WHEN STATION ENCLOSURE WALLS
ARE TO DECK AN ACCESS PANEL IS REQUIRED TO
ALLOW ACCESS TO THE PRV
6' M
IN
IF MOVED TO FLOOR ABOVE,
ACCESS PANEL REQUIRED, BY
OTHERS
2 1/2" 1/2"
1/2"3 1/2"
1"
ANCHOR LOCATIONS
(2) #12 TEX SCREWS (1 EACH SIDE)
2" MIN FROM TRIM RING TO WALL CORNER, TYP
TOP
2" MIN
TRIM RING WIDTH
2" MIN
STATION HOUSING
S H
E E
T N
U M
B E
R
SCALE
Phone: (800) 396-9666 www.swisslog-healthcare.com
As instruments of service, all designs, ideas, and information shown on these drawings are and shall remain the property of Swisslog Healthcare. No part thereof shall be copied, disclosed to others, or used in connection with any work or project other than the specific project for which they have been prepared and developed without the written consent of Swisslog Healthcare. Visual contact with these drawings shall constitute conclusive evidence of acceptance of these restrictions.
Not To Scale
S H
E E
T N
A M
E
S H
E E
T S
IZ
E
0X
3/1/2021 12:09:06 PM
C :\D ro pb ox
C ad
G ro up \L ib ra ry
R ev it\ D et ai ls \S w is sl og
D et ai ls
0x v
.r vt
PT-301
Station Details
Station Furring Options
Recessed Station
Trim Ring Inside Corner Detail
STATION SPECIFICATIONS
POWER REQUIREMENTS
110 VAC, 1 PH, 3A, DEDICATED UNSWITCHED CIRCUIT,
TERMINATED INSIDE THE STATION-SUPPLIED DUPLEX
OUTLET, BY OTHERS
ULTRA STATION: (2) STATION-SUPPLIED DUPLEX
OUTLETS. (2) DATA DROPS
SWISSLOG RECOMMENDS THAT EACH ULTRA STATION
PORT BE PLACED ON SEPARATE CIRCUITS.
CONTROL REQUIREMENTS
ETHERNET STANDARD PROTOCOL. DATA DROP
REQUIRED LANDED IN EACH STATION HOUSING, BY
OTHERS.
ENVIRONMENTAL REQUIREMENTS
OPERATING TEMPERATURE: 0° TO 100° F
STORAGE TEMPERATURE: -20° TO 180° F
RELATIVE HUMIDITY: 0% TO 90%
ULTRA STATIONS MAY HAVE TWO (2) 6" NIPPLES, TWO
(2) 4" NIPPLES, OR ONE EACH OF 6" AND 4" NIPPLES.
WEIGHTS:
RECESSED/NEXUS STATION: 6" 240 LBS / 4" 200 LBS
NEXUS STATION: 6" 290 LBS
ULTRA STATION: 375 LBS
COUNTERTOP STATION: 150 LBS TRANSMITTED TO
COUNTERTOP
WALL MOUNT: 150 LBS TRANSMITTED TO FLOOR
THROUGH VERTICAL SUPPORTS
STATION ENCLOSURE FRAMING:
WALL FRAMING AND GWB AROUND STATION
ENCLOSURE TO STOP ABOVE CEILING TO ALLOW
ACCESS TO PRESSURE RELIEF VALVE (PRV). IF WALL(S)
ARE REQUIRED TO GO TO DECK, STOP GWB ABOVE
CEILING. IF GWB ALSO NEEDS TO GO TO DECK, ACCESS
PANEL REQUIRED TO ACCESS PRV. ACCESS PANEL
PROVIDED AND INSTALLED BY OTHERS
INSTALL A STRUT BRACE AT BETWEEN 30-60° (45°
PREFERRED) ANGLE TO THE AXIS OF THE
TRANSFER UNIT, TYP ONE EACH AXIS
3/8"-13NC THREADED ROD, ANCHORS,
AND HARDWARE AT (4) PLACES TYPICAL
3/8" DROP-IN ANCHOR, TYPICAL (SUBSTITUTE BEAM CLAMP
WHERE REQUIRED TO ANCHOR TO STEEL BEAMS - SEE DETAILS)
4 PORT SHOWN, 2 PORT AND 6 PORT SIMILAR
TRANSVERSE BRACE
LONGITUDINAL BRACE
1X4 Transfer Unit shown. 1x2 and 1x6 Units are similar.
COMMUNICATION CABLE
ENTRANCE
BACK VIEW
POWER CONDUIT ENTRANCE
BOTTOM
TOP
POWER ENTRY
COMMUNICATION
CABLE ENTRY
ACCESS PANEL MAY FACE
DOWN OR TO THE SIDE
SERVICE
ACCESS
B
F K
SERVICE
ACCESS
ACCESS PANEL:
TU MAY BE ROTATED VERTICAL.
SERVICE ACCESS AVAILABLE TO ONE
SIDE ONLY
FRONT BACK
SIDE
24"
ACCESS
TOP
SIZE
6" 4"
A 47" 43"
B 42" 38"
C 23 1/2" 18 1/2"
D 10 1/2"
8"
E 40 1/4" 36 1/4"
F 7 5/8" 5 5/8"
G 21" 16"
H 8"
5 1/2"
J 4 1/2" 3 3/4"
K 15" 12"
H G
H
A
E
D
C
J H
FR
O
N T
BA
C
K
BOTTOM
1/
2" 8"
7/8" 41 1/8"
TOP
SIDE
POWER ENTRY
COMMUNICATION
CABLE ENTRY
SERVICE ACCESS,
EITHER SIDE OR BOTTOM
C
A
M
IN
SERVICE ACCESS,
EITHER SIDE OR BOTTOM
SIDE ACCESS PREFERRED
G
H
D
E F
I
FRONT
BACK
FRONT
ROTATED 90 DEGREES FOR
BOTTOM ACCESS
24"
SIZE
6" 4"
A 58 7/8" 53 3/4"
B 53 11/16"
48 3/4"
C 24 1/2" 19 3/4"
D 26 5/8"
20 11/16"
E 14 5/8"
10 11/16"
F 4 15/16" 4 5/16"
G 13 1/8"
10 5/16"
H 6 5/16" 4 5/8"
I 7 5/8" 5 5/16"
B
J 20"
24 5/8"
K 3 3/8"
1"
K J
K
M L M
L 51 13/16" 51 15/16"
M 15/16" 7/8"
1/
8"
2 3/16"
BAND CLAMP
DRILL (2) 2"Ø HOLES
INSTALL ON ALL OPEN TU PORTS
INSTALL WITH HOLES ORIENTED VERTICALLY
S H
E E
T N
U M
B E
R
SCALE
Phone: (800) 396-9666 www.swisslog-healthcare.com
As instruments of service, all designs, ideas, and information shown on these drawings are and shall remain the property of Swisslog Healthcare. No part thereof shall be copied, disclosed to others, or used in connection with any work or project other than the specific project for which they have been prepared and developed without the written consent of Swisslog Healthcare. Visual contact with these drawings shall constitute conclusive evidence of acceptance of these restrictions.
Not To Scale
S H
E E
T N
A M
E
S H
E E
T S
IZ
E
0X
3/17/2020 1:42:30 PM
C :\D ro pb ox
C ad
G ro up \L ib ra ry
R ev it\ D et ai ls \S w is sl og
D et ai ls
0x v
.r vt
PT-302
Transfer Unit Details
Transfer Unit Support - (Sway Bracing)
Transfer Unit Wiring
Transfer Unit 1x2
Transfer Unit 1x6
6" TU Port Cap
TRANSFER UNIT SPECIFICATIONS
DRIVE MECHANISM
ELECTROMECHANICAL
POWER REQUIREMENTS
110 VAC, 1 PH, 3A, DEDICATED UNSWITCHED CIRCUIT,
TERMINATED INSIDE THE EQUIPMENT-SUPPLIED
DUPLEX OUTLET, BY OTHERS
CONTROL REQUIREMENTS
ETHERNET STANDARD PROTOCOL. DATA DROP
REQUIRED LANDED IN EACH TU, BY OTHERS.
ENVIRONMENTAL REQUIREMENTS
OPERATING TEMPERATURE: 0° TO 120° F
STORAGE TEMPERATURE: -20° TO 180° F
RELATIVE HUMIDITY: 0% TO 90%
MAXIMUM SYSTEM VACUUM/PRESSURE: 4 PSIG
HEAT OUTPUT: APPROXIMATELY 130 BTU/HR
WEIGHTS:
1X2 TRANSFER UNIT: 6" 165 LBS / 4" 125 LBS
1X4 TRANSFER UNIT: 6" 185 LBS / 4" 145 LBS.
1X4 MINI TRANSFER UNIT: 95 LBS. (6" ONLY)
1X6 TRANSFER UNIT: 6" 250 LBS. / 4" 205 LBS.
/4
8"
TRAFFIC ENHANCEMENT UNIT (TEU)
1. POWER AND DATA SUPPLIED TO CONTROL ENCLOSURE BY OTHERS
2. CONTROL ENCLOSURE MOUNTED BY SWISSLOG
3. DATA FROM CONTROL ENCLOSURE TO TEU BY SWISSLOG
4. SEE PRODUCT DATA SUBMITTAL FOR LOCATION OF DATA AND
POWER INTO ENCLOSURE
12 1/4"
TEU CONTROL ENCLOSURE
FRONT VIEW LEFT VIEW RIGHT VIEW
TEU SENSOR
9"
4 1/2" 4 1/2"
BOLTED COUPLING
EACH SIDE OF TEU
TEU - Traffic Enhancement Unit
PRESSURE SIDE VACUUM SIDE
A-A SECTION A-A
THROUGH BLOWER CONTROL CABINET
CONTROL
LOGIC AREA
DOOR SWINGS OPEN TO THE
LEFT
090-2675-01 BOARD
TB3
086-3493- ASSEMBLY
TB4
REV
12 VAC 5 VDC
GRN
SHIELD
BLK
WHT
TB1
RED
IN
TB2
OUT
A-A
208-230
22.6 11.3
3 PHASE
VOLTAGE
(VAC)
FULL LOAD
CURRENT
(AMPS)
HP
6" BLOWER POWER
208-230
12.0 5.5
3 PHASE
VOLTAGE
(VAC)
FULL LOAD
CURRENT
(AMPS)
HP
4" BLOWER POWER
4.5 4.5
4" SYSTEM:
WEIGHT: 395 LBS.
WITH VFD: 405 LBS.
HEAT OUTPUT: APPROX. 9,000 BTU/HR
MAXIMUM OPERATING RPM 3,500 OR 4,080 WITH VFD
6" SYSTEM:
WEIGHT: 285 LBS.
WITH VFD: 295 LBS.
HEAT OUTPUT: APPROX. 8,000 BTU/HR
MAXIMUM OPERATING RPM 3,520 OR 4,080 WITH VFD
575 10.7 10.1
3 PHASE
VOLTAGE
(VAC)
FULL LOAD
CURRENT
(AMPS)
HP
6" BLOWER POWER 575 VAC 6" SYSTEM:
WEIGHT: 395 LBS.
WITH VFD: 405 LBS.
HEAT OUTPUT: APPROX. 8,000
BTU/HR
MAXIMUM OPERATING RPM 3,540
OR 4,080 WITH VFD
FUSE
20A, 250V 10A, 600V
BREAKER
25A 15A
FUSE
45A, 250V 25A, 600V
BREAKER
60A 30A
4" SYSTEM:
WEIGHT: 395 LBS.
WITH VFD: 405 LBS.
HEAT OUTPUT: APPROX. 9,000
BTU/HR
MAXIMUM OPERATING RPM 3,500
OR 4,080 WITH VFD
208-230
12.0 5.5 4.5
3 PHASE
VOLTAGE
(VAC)
FULL LOAD
CURRENT
(AMPS)
HP
4.5 4.5 4.4
4" BLOWER POWER 575 VAC
/4
4" AIRLINE
4" AIRLINE
MUFFLER
SCREEN BOX
6"5 1/8"6"
FRONT SIDE
4" AIRLINE
4" AIRLINE
SCREEN BOX5"
6 7/8"
4" AIRLINE
7" 7"
5 1/4"
S H
E E
T N
U M
B E
R
SCALE
Phone: (800) 396-9666 www.swisslog-healthcare.com
As instruments of service, all designs, ideas, and information shown on these drawings are and shall remain the property of Swisslog Healthcare. No part thereof shall be copied, disclosed to others, or used in connection with any work or project other than the specific project for which they have been prepared and developed without the written consent of Swisslog Healthcare. Visual contact with these drawings shall constitute conclusive evidence of acceptance of these restrictions.
Not To Scale
S H
E E
T N
A M
E
S H
E E
T S
IZ
E
0X
7/15/2020 9:36:13 PM
C :\D ro pb ox
C ad
G ro up \L ib ra ry
R ev it\ D et ai ls \S w is sl og
D et ai ls
0x v
.r vt
PT-303
Blower Details
Blower Control Cabinet
Blower Muffler
Screen Box
Atmosphere Screen Box
BLOWER SPECIFICATIONS
POWER REQUIREMENTS
SHIFTER VALVE MOTOR: 110 VAC, 1 PHASE, 5.4 A, DEDICATED
UNSWITCHED CIRCUIT, TERMINATED INSIDE THE EQUIPMENT-
SUPPLIED DUPLEX OUTLET.
BLOWER MOTOR: 200-230, 460, OR 575 VAC, 3 PHASE
ELECTRICAL DISCONNECT REQUIRED, BY OTHERS
SIZE ALL CIRCUIT PROTECTION IN ACCORDANCE WITH LOCAL,
STATE, AND NATIONAL ELECTRICAL CODES
CONTROL REQUIREMENTS
ETHERNET STANDARD PROTOCOL. DATA DROP REQUIRED LANDED
IN EACH BLOWER CONTROL BOX, BY OTHERS.
ENVIRONMENTAL REQUIREMENTS
OPERATING TEMPERATURE: 0° TO 120° F (-17.8° - 49° C)
STORAGE TEMPERATURE: -20° TO 180° F (-29° - 65° C)
RELATIVE HUMIDITY: 0% TO 90%
MAXIMUM OPERATING RPM: 3,500
MAXIMUM SYSTEM VACUUM/PRESSURE AT 5000 FT / 1.5 KM: 3.5 PSIG
MAXIMUM OUTPUT @ ZERO PRESSURE AND 500 FT: 330 SCFM
THE GENERAL CONTRACTOR OR THE OWNER SHALL SUPPLY
ADEQUATE SUPPLY AND RELIEF AIR TO BLOWER LOCATIONS TO
ENSURE THAT ALL ENVIRONMENTAL AND AIRFLOW REQUIREMENTS
ARE MET.
SOUND LEVELS:
WITHOUT SOUND PACKAGE: 82 DBA
WITH SOUND PACKAGE: 72 DBA
SOUND PACKAGE AND VFD AVAILABLE AS FACTORY-INSTALLED
OPTION ONLY
MAX. VACUUM/PRESSURE: (AT 5000 FT)
3.5 PSIG
MAX. OUTPUT: (AT ZERO PRESSURE AND 500 FT)
165 SCFM FOR 4-INCH
330 SCFM FOR 6-INCH
NOTE:
BLOWERS MOUNTED TO SLAB WITHIN MECHANCIAL ROOM AND NOT ON ROOF.
FRONT VIEW
(E) DECK/SLAB
SIDE VIEW
WEIGHT = 240 lbs. MAX.
(2) - #12 TEK-SCREWS
(1 EA. SIDE), ERS'S 1976,
2196, 1730, OR 1408
SECURE TOP TRACK BY
OTHERS SEE J/PT-S10
4" x 16 GA. METAL STUDS AT 16" O.C. w/ 5/8" TYPE
"X" GYP. BOARD
3/8" DIA HILTI KB-TZ (ESR-1917)
OR KB-TZ2 (ESR-4266) WEDGE
ANCHOR 2" MIN EMBED TYP. AT 4
PLACES
C.L.
NOTCH BOTTOM TRACK
AS REQUIRED
1/
4" M
IN
EQ EQ
4" 4"
6"
3'
/8
2' - 6 3/8"
1'
1/ 4"
1'
/8
3'
/2
5'
/8
NOTE: STATION FOOT SECURES TRACK WITHOUT ADDED ANCHORS REQUIRED
PLAN VIEW
HANGER RODS
END VIEW SIDE VIEW
(E) SLAB/DECK
NOTES:
1. PROVIDE PT TRANSVERSE & LONGITUDINAL BRACE PER B/PT-S11 & C/PT-S11 WITHIN 35 FT. FROM TRANFER UNIT. SEE NOTE 4 ON DETAIL D/PT-S11
2. SEISMIC BRACES (2 IN EACH DIRECTION) CAN BE LOCATED AT ANY CORNER AND INSTALLED IN EACH DIRECTION.
3. HEIGHT VARIES DEPENDING ON MAX BRACE LENGTH & ANGLE.
4. ALL SEISMIC BRACING CAN BE ROTATED TO ± 5° MAXIMUM.
L
M
AX.)
3/8" DIA ROD TYP. AT EA.
CORNER OF TRANSFER
UNIT
ROD STIFFINER (TYP)
AT BRACED CONN.
ONLY SEE G/PT-S10
UNISTRUT P1000HS
DIAGONAL BRACE (TYP.)
DIAGONAL BRACE
LOCATIONS +/- 5
DEGREES TYPICAL
TRANSFER
UNIT
TUBE
SIZE
WEIGHT
1x2 6" 165#
1x4 6" 165#
1x6 6" 250#
DIMENSIONS
A B
40.25" 7.63"
47.25" 17.00"
50.25" 22.0"
A2
"H
(S E
E N
O T
E
A
DIAGONAL BRACE
LOCATIONS +/- 5
DEGREES TYPICAL
E Q
E Q
B/2
B
-6
T Y
P
D/PT-S10
E/PT-S10
E/PT-S10 D/PT-S10
F/PT-S10
TRANSFER
UNIT
TUBE
SIZE
WEIGHT
1x2 4" 125#
1x4 4" 145#
1x6 4" 177#
DIMENSIONS
A B
36.25" 5.63"
43.0" 15.25"
45.25" 17.5"
1x4 MINI 6" 95# 34.17" 15.40"
EXISTING ROOF
HANGER ROD
UNISTRUT P1000 HS
COUPLER TYP
(E) SLAB M. DECK
3/8" DIA HILTI KB-TZ (ESR-1917) OR
KB-TZ2 (ESR-4266) WEDGE ANCHOR
2" MIN EMBED (ICC ESR-1917) TYP.
NUT, SQ. FLAT PLATE
FITTING & CHANNEL NUT
1.
5"
M
IN
3" M
A X
3/8" DIA HILTI KB-TZ (ESR-1917)
OR KB-TZ2 (ESR-4266) WEDGE
ANCHOR 2" MIN EMBED
HANGER ROD
NOTE:
1. HORIZONTAL STRUT CAN BE INSTALLED AT ANY ANGLE IN RELATION TO DECK.
2. FOR ANTERNATIVE UPPER BRACE CONNECTION ONTO (E) Wx STEEL BEAM, SEE
DETAIL M/PT-S12
NUT & WASHER TYP
CL TYP
1" MAX OFFSET
3/8" HANGER ROD
NUT & STD. WASHER
NUT & STD. WASHER
UNISTRUT P1000HS
UNISTRUT P1546 OR P1843
ADJ. HINGE w/ 3/8" BOLT
CHANNEL NUT EA. END
WALL FINISH
(E) CONC. DECK
DETAIL FOR REFERENCE ONLY; REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL FRAMING INFORMATION.
#8 SELF TAPPING SMS
AT EACH SIDE OF EACH
STUD BY OTHERS
3/8" DIA HILTI KB-TZ (ESR-1917) OR KB-
TZ2 (ESR-4266) WEDGE ANCHOR 2" MIN
EMBED EA SIDE OF STN. BY OTHERS
16 GA. METAL STUD
MIN. BY OTHERS
CONT. 16 GA. FLR
TRACK BY OTHERS
3 5/8" x 1 5/8"x 20 GA. METAL
STUD BRACE BY OTHERS
ATTACH METAL STUD TO STRUCTURE
W/ 3/8" DIA HILTI KB-TZ (ESR-1917) OR
KB-TZ2 (ESR-4266) WEDGE ANCHOR 2"
MIN EMBED (BY OTHERS)
DETAIL FOR REFERENCE ONLY; REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL FRAMING INFORMATION.
#8 SELF TAPPING SMS AT EACH
SIDE OF STUD - BY OTHERS
LINE OF FINISH CLG.
16 GA. METAL STUD
MIN BY OTHERS
3 5/8" x 1 5/8" x 20 GA. METAL
STUD BRACE (L=108" MAX) AT 48"
O.C. (ALT.) SEE J-1PTS1.0 FOR
TOP CONNECTION BY OTHERS
2 MAX.
2 - #8 SMS, BRACE TO 16
GA TRACK BY OTHERS
1 MIN.
**NEW PARTITION FRAMING IS LIMITED TO FURRING IN ENCLOSURE AROUND THE NEW P.T. STATION;
STUDS TO BE 8' 6" MIN. IN HEIGHT AND KICK BRACED @ EACH CORNER. THE NEW PARTITIONS ARE
NON-BEARING OTHER THAN THEIR OWN WEIGHT INCLUDING THE WALL FINISH MATERIAL.
M
IN6"
2" M
AX
DETAIL FOR REFERENCE ONLY; REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL FRAMING INFORMATION.
(E) SLAB M. DECK
NOTE:
1. HORIZONTAL STRUT CAN BE INSTALLED AT ANY ANGLE IN RELATION BRACE ARM
2. FOR ANTERNATIVE UPPER BRACE CONNECTION ONTO (E) Wx STEEL BEAM, SEE
DETAIL M/PT-S12
3/8" DIA HILTI KB-TZ (ESR-1917)
OR KB-TZ2 (ESR-4266) WEDGE
ANCHOR 2" MIN EMBED
P1000HS
BRACE
UNISTRUT P1546 OR P1843
ADJ. HINGE w/ 3/8"Ø BOLT /
P3008 CHANNEL NUT (TYP.)
1.
5"
M
IN
3" M
A X
CL TYP
1" MAX OFFSET
P1000HS
BRACE
P1000HS, MAX
SPAN OF 36"
3/8" DIA HILTI KB-TZ (ESR-1917)
OR KB-TZ2 (ESR-4266) WEDGE
ANCHOR 2" MIN EMBED TYP
1. THE CONTRACTOR SHALL VERIFY DIMENSIONS, CONDITIONS AND ELEVATIONS BEFORE STARTING WORK. THE ARCHITECT
SHALL BE NOTIFIED, IMMEDIATELY, IF ANY DISCREPANCIES ARE FOUND.
2. THE TYPICAL NOTES AND DETAILS SHALL APPLY IN ALL CASES UNLESS SPECIFICALLY DETAILED ELSEWHERE. WHERE NO DETAIL IS SHOWN, CONSTRUCTION SHALL BE AS SHOWN FOR OTHER SIMILAR WORK AND AS REQUIRED BY BUILDING CODE.
3. GOVERNING CODE: THE 2007 CALIFORNIA BUILDING CODE (CBC), 2016 EDITION TITLE 24, PART 2. A COPY OF TITLE 24 PARTS 1, 2, 3, 4, AND 5 SHALL BE KEPT ON SITE.
4. EARTHQUAKE DESIGN DATA: RISK CATEGORY IV; Ie = 1.5 Ss = 1.668; S1 =.726;
SITE CLASS = D; SDS = 1.112; SD1 = 0.726
SEISMIC DESIGN CATEGORY = D
Ap & Rp = AS PER TABLE 13.6-1 OF ASCE/SEI 7-10 LATITUDE: 33.xxxxxx NORTH; LONGITUDE: 117.XXXXXXXX WEST
5. SEE SPECIFICATIONS FOR MATERIALS AND WORKMANSHIP REQUIREMENTS. SPECIFICATIONS ARE A PART OF THESE
DRAWINGS.
6. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATION OF OPENINGS OR SUPPORTS FOR THEIR RESPECTIVE ITEMS. NOTIFY ARCHITECT, PRIOR TO CONSTRUCTION OF ANY INTERFERENCE OR INCOMPATIBILITY.
ERECTION NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH CAL-OSHA CONSTRUCTION SAFETY ORDERS.
2. APPROVAL OF SHOP DRAWINGS BY THE ARCHITECT OR STRUCTURAL ENGINEER SHALL NOT BE CONSTRUED AS ACCEPTING
THIS RESPONSIBILITY.
3. ALL STRUCTURAL FRAMING MEMBERS SHALL BE ADEQUATELY SHORED AND BRACED DURING ERECTION AND UNTIL FULL
VERTICAL AND LATERAL SUPPORT IS PROVIDED BY ADJOINING MEMBERS.
EQUIPMENT ANCHORAGE NOTES:
1. SUPPORTS AND ATTACHMENTS OF ALL EQUIPMENT TO BE INSTAKKED AS A PART OF THIS PROJECT SHALL BE DETAILED ON
CONSTRUCTION DOCUMENTS, EXCEPT THOSE EXEMPT BY THE 2016 CBC SECTION 1616A.1.18:
A. FURNITURE (EXCEPT STORAGE CABINETS AS NOTED IN ASCE 7-10 TABLE 13.5-1).
B. TEMPORATY OR MOVEABLE (MOBILE) EQUIPMENT.
2. THE ENFORCEMENT AGENCY SHALL BE PERMITTED TO REQUIRE ATTACHMENTS FOR EQUIPMENT WITH HAZARDOUS CONTENTS
TO BE SHOWN ON CONSTRUCTION DOCUMENTS IRRESPECTIVE OF WEIGHT.
MATERIALS:
1. STRUCTURAL STEEL
A. ALL SHOP WELDING SHALL BE DONE BY QUALIFIED WELDERS IN THE SHOP OF AN APPROVED FABRICATOR AND APPROVED BY
OSHPD.
B. ALL SHOP AND FIELD WELDING SHALL HAVE CONTINUOUS INSPECTION, BY AN AWS CERTIFIED WELDING INSPECTOR.
C. MATERIAL SPECIFICATIONS.
1. BARS, PLATES, ANGLES, AND MISC STEEL, ASTM A36 (UNO.)
2. BOLTS - ASTM A307 UNLESS OTHERWISE NOTED.
3. WELDING ELECTRODES - E70XX.
4. LT. GA. STEEL - AS PER SSMA ICC-ESR-3046. ALL WELDING TO BE PERFORMED BY CERTIFIED LIGHT GAUGE WELDERS FOR ALL
APPROPRIATE DIRECTION COMPLYING WITH AWS D1.3 WELDING RODS TO CONFORM TO THE FOLLOWING:
A. 43 MIL AND LIGHTER - E60xx B. 54 MIL HAD HEAVIER - E70xx C. LT. GAUGE TO STRUCTURAL STEEL - E70xx LOW HYDROGEN
2. CONCRETE (EXISTING):
A. ALL METAL DECKS ARE MINIMUM 3" METAL DECKING WITH MINIMUM 3 1/4" LIGHT WEIGHT CONCRETE FILL (3000 PSI MIN.) UNO.
(SEOR TO VERIFY)
POST-INSTALLED ANCHOR NOTES:
1. POST-INSTALLED ANCHOR BOLTS SHALL BE HILTI KB-TZ (ESR-1917) & LARR# 25701 OR KB-TZ2 (ESR-4266). ANCHORS SHALL BE
PER CBC 1616A.1.19 & TESTED PER CBC 1910A.5.
2. MINIMUM EMBEDMENT & TORQUE TEST OF ALL BOLTS SHALL BE SHOWN BELOW:
TEST LOAD (WEDGE ANCHORS) HILTI KB-TZ
BOLT DIAMETER MINIMUM EFFECTIVE EMBEDMENT REQUIRED TORQUE (FT.-LBS.)
3/8" 2" 25 1/2" 3 1/4" 40
TEST LOAD (WEDGE ANCHORS) KB-TZ2
BOLT DIAMETER MINIMUM EFFECTIVE EMBEDMENT REQUIRED TORQUE (FT.-LBS.)
3/8" 2" 30 1/2" 3 1/4" 50
1. WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING N0N-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR AND/OR PIN.
2. WHEN POST-INSTALLED ANCHORS ARE USED FOR NONSTRUCTURAL APPLICATIONS SUCH AS EQUIPMENT ANCHORAGE, 50% OR ALTERNATE BOLTS IN A GROUP. INCLUDING AT LEAST ONE-HALF THE ANCHORS IN EACH GROUP, SHALL BE TESTED. IF THERE ARE ANY FAILURES, ALL ANCHORS OF THE SAME TTPE SHALL BE TESTED, WHICH ARE INSTALLED BT THE SAME TRADE, NOT PREVIOUSLY TESTED UNTIL TWENTY (20) CONSECUTIVE ANCHORS PASS, THEN RESUME THE INITIAL TEST FREQUENCY.
3. THE FOLLOWING CRITERIA APPLY FOR THE ACCEPTANCE OF INSTALLED ANCHORS.
A. HYDRAULIC RAM METHOD: THE ANCHOR SHOULD HAVE NO OBSERVABLE MOVEMENT AT THE APPLICABLE TEST LOAD. FOR
WEDGE AND SLEEVE TYPE ANCHORS, A PRATICAL WAY TO DETERMINE OBSERVABLE MOVEMENT IS THAT THE WASHER UNDER
THE NUT BECOMES LOOSE.
B. TORQUE WRENCH METHOD: THE APPLICABLE TEST TORQUE MUST BE REACHED WITHIN THE FOLLOWING LIMITS: WEDGE OR SLEEVE: ONE-HALF (1/2) TURN OF THE NUT (1/4 TURN OF THE NUT FOR 3/8" ANCHOR ONLY).
4. IF THE MANUFACTURER'S RECOMMENDED INSTALLATION TORQUE IS LESS THAN THE TEST TORQUE NOTED IN THE TABLE, THE MANUFACTURER'S RECOMMENDED INSTALLATION TORQUE SHALL BE USED IN LIEU OF THE TABULATED VALUES.
5. ALL TESTS SHALL BE PERFORMED IN THE PRESENSE OF THE INSPECTOR OR RECORD.
6. WHEN INSTALLED IN THE LOWER FLUTE OF THE COMPOSITE DECKS, ANCHORS SHALL NOT BE LOCATED MORE THAN 1" FROM
THE CENTER LINE OF THE LOWER FLUTE.
STRUT NOTES:
1. TIGHTEN CHANNEL NUTS AND BOLTS MOUNTED TO UNISTRUT CHANNELS TO THE LISTED TORQUE VALUES BELOW:
1/4" BOLT & P3006 CHANNEL NUT - 6 FT.-LBS.
3/8" BOLT & P3008 CHANNEL NUT - 19 FT.-LBS.
1/2" BOLT & P3010 CHANNEL NUT - 50 FT.-LBS.
5/8" BOLT & P1012 CHANNEL NUT - 100 FT.-LBS.
3/4" BOLT & P1023 CHANNEL NUT - 125 FT.-LBS.
SWAY BRACING NOTES:
THE PNEUMATIC TUBE SYSTEM (PTS) IS DEEMED AS SECONDARY, NON-ESSENTIAL SYSTEM PER THE PROJECT PLANS AND SPECIFICATIONS POLICY INTENT NOTICE PIN 20. PIN 20 STATES: "DETAILS FOR THE BRACING AND ANCHORAGE OF PIPING ASSOCIATED WITH THE INSTALLATION OF PNEUMATIC TUBE SYSTEMS NEED NOT BE PROVIDED TO OSHPD FOR REVIEW"
SWAY BRACING IS A REQUIREMENT OF THE PTS SPECIFICATION 14 92 00. SHEETS PT-S10 THROUGH PT-S14 PNEUMATIC SWAY BRACING DETAILS ARE FOR REFERENCE ONLY AND ARE INCLUDED FOR PROJECT CLARIFICATION ONLY AND OR INSTALLATION OF
SUCH BRACES.
P3008 NUT
UNISTRUT P2485
CRADLE CLIP
3/8" DIA HEX HEAD CUP
POINT SET SCREW
UNISTRUT P1000HS ROD STIFFENER
PLAN X-X
X X
3/8" DIA OR 1/2"
Ø HANGER ROD
6" M
A X
M
IN
2" "L
"L
6" M
A X
2" M
IN
HANGER ROD
SIZE:
MAX. CLIP/BOLT
SPACING "L"
MAX. TOTAL ROD
LENGTH
3/8"Ø 15" 12.2'
1/2"Ø 24" 13.0'
A1
NEXUS/RECESSED STATION ANCHORAGE DETAIL
B
TRANSFER UNIT ANCHORAGE DETAIL
E
DETAIL
F
DETAIL
H
BASE TRACK
J
BRACE CONNECTION
K
WALL BRACING
ROD STIFFENER DETAIL
D
DETAIL
3. SWISSLOG UNDERSTANDS THAT THE DECK IN BUILDING 650 IS COMPOSED
OF TAR AND GRAVEL
STRUCTURE SHOWN FOR REFRENCE ONLY.
PNEUMATIC TUBE BRACING REQUIREMENTS:
DETAILS FOR THE SEISMIC BRACING AND ANCHORAGE OF TRANSMISSION LINES (TUBING)
ASSOCIATED WITH THE INSTALLATION OF THE PNEUMATIC TUBE SYSTEM NEED NOT BE INCLUDED WITHIN THE SCOPE OF THE OSHPD PLAN REVIEW SUBMITTAL AND APPROVAL PROCESS. THE OSHPD
AREA COMPLIANCE OFFICER AND/OR DISTRICT STRUCTURAL ENGINEER SHALL REVIEW HANGING
DETAILS FOR THE INSTALLATION OF PNEUMATIC TUBING IN THE FIELD AS DESCRIBED IN POLICY
INTENT NOTICE 20 (P.I.N. 20) DATED AUG 25, 2004.
** SEISMIC BRACES ARE NOT REQUIRED FOR PNEUMATIC TUBE SYSTEM
TRANSMISSION LINES EXCEPT UNDER THE FOLLOWING CONDITIONS:
A. CONDITIONS WHERE THE PIPING IS WITHIN 6 INCHES OF THE SUSPENDED
CEILING LATERAL FORCE BRACING SYSTEM.
B. PT SUPPORTED 12 INCHES OR LESS
IN LENGTH FROM THE TOP OF THE PIPE TO THE BOTTOM OF STRUCTURAL
SUPPORT SHALL NOT NEED LONGITUDINAL & TRANSVERSE BRACE, PER
ASCE/SEI SECTION 13.6.8.1
D. IT IS DETERMINED BY THE
HOSPITAL THAT THE PNEUMATIC TUBE SYSTEM SHALL BE DESIGNED AS
AN " ESSENTIAL SYSTEM", FOR CONTINUED OPERATION FOLLOWING A
SEISMIC EVENT.
C. IT IS DETERMINED BY THE "PROFESSIONAL OF
RECORD" THAT THE PNEUMATIC TUBE SYSTEM SHALL BE BRACED AND
ANCHORED PER THE REQUIREMENTS OF THE APPROPRIATE EDITION OF
THE CALIFORNIA BUILDING CODE.
3/8" ALL-THREAD HANGER ROD
NOTE:
1) PROVIDE VERTICAL SUPPORT AT 10'-0" O.C. (U.N.O)
6" MAX. PNEUMATIC TUBE
16 GA. GALVANIZED STEEL
(E) SLAB/DECK
HILTI 00257364 OR PHD 180S
(6")/PHD 141 (4") ADJUSTABLE
SWIVEL RING HANGER (TYP.)
(HARDWARE INCLUDED BY MANUF.)
M A
X
1/ 4"
T Y
P
E/PT-S10
LOW FLUTE C/L
+ - 1" MAX TYP
LOW FLUTE C/L
+ - 1" MAX TYP
3/8" ALL THREAD HANGER ROD
AT 10'-0" TYP (ROD STIFFENER
AT BRACED CONNECTIONS
ONLY) SEE G/PT-S10
UNISTRUT P1000HS
6" MAX. PNEUMATIC TUBE, 16 GA
GALV STEEL w/P2070 CLAMP
ROD COUPLER (TYP.)
(E) SLAB/DECK
**UNISTRUT P1000HS TRANSVERSE
BRACING AT 40'-0" O.C. MAX. FOR
LOCATION SEE **
NOTES:
*HEIGHT VARIES DEPENDING ON MAX BRACE LENGTH & ANGLE. H=96" MAX.
**SEE PNEUMATIC TUBE BRACING REQUIREMENTS A/PT-S11
L BRACE= 120" (M
AX.)
UNISTRUT P1546 OR P1843
ADJ HINGE WITH 3/8"
BOLT, STD. WASHER &
CHANNEL NUT EACH END
*H
30 MIN
60 MAX
6" (TYP)
1 1/2" MIN
D/PTS1.0 E/PTS1.0
3/8" ALL THREAD HANGER ROD
AT 10'-0" TYP (ROD STIFFENER
AT BRACED CONNECTIONS
ONLY) SEE G/PT-S10
UNISTRUT P1000HS LONGITUDINAL
BRACING AT CENTER OF TUBE AT
40'-0" O.C. MAX.
FOR LOCATION AND SPACING SEE **
P2070 PIPE CLAMP
6" PNEUMATIC TUBE 16 GA. GALV. STEEL
COUPLER
L
BRACE =
M
AX.)
P1000HS
UNISTRUT P1546 OR P1843 ADJ
HINGE WITH 3/8" BOLT, STD. WASHER
& CHANNEL NUT EACH END
(E) SLAB/DECK
*H
NOTES:
*HEIGHT VARIES DEPENDING ON MAX BRACE LENGTH & ANGLE. H=96" MAX.
**SEE PNEUMATIC TUBE BRACING REQUIREMENTS A/PT-S11
D/PT-S1.0E/PT-S1.0
30 MIN60 MAX
TA
PIPE RUN "B"
T T T
48" CONTINUOUS
RADIUS BEND
END OF PRV BEND
P
IP
E R
U N
A
T
L
"TA" CAN BE USED AS LONGITUDINAL BRACE FOR PIPE
RUN "B" & "TB" AS LONGITUDINAL BRACE FOR PIPE RUN
"A" WHEN "d" IS WITHIN 60 INCHES (SEE NOTE 3)
PROVIDE TRANSVERSE BRACE AT LAST
VERTICAL SUPPORT
SEE NOTE 3
T
L
NOTE:
1) T - INDICATES TRANSVERSE BRACING @ 40'-0" O.C. MAX.
L - INDICATES LONGITUDINAL BRACING SINGLE TUBE RUN @ 40'-0" O.C. MAX.
**SEE PNEUMATIC TUBE BRACING REQUIREMENTS ON SHEET PT-S11
2) NO ADDITIONAL SEISMIC BRACES ARE REQUIRED ON SINGLE 6" P-TUBE OFFSETS LOCATED BETWEEN BRACED CONNECTIONS.
3) AT FULL RADIUS BENDS, "T" & "L" BRACING MAY BE INSTALLED AT ONE SIDE OF THE BEND IN LIEU OF PROVIDING (1)
TRANSVERSE BRACE AT EACH SIDE OF THE BEND AS INDICATED ABOVE.
4) SUM OF INDIVIDUAL P. TUBE BRACING DISTANCE FROM TRANSFER UNIT SHALL NOT TO EXCEED 180 FT (e.g. FOR 1x6 TRANSFER
UNIT, {1 TUBE IN & 6 TUBE OUT} 7 TUBES x 25 FT AVG. BRACE DISTANCE (40 FT MAX.) = 175 FT. (TOTAL)
5) ALL SEISMIC BRACING CAN BE ROTATED TO ± 5° MAXIMUM, TYPICAL AT PNEUMATIC TUBE SEISMIC BRACING.
L
T
NOTE 4
TRANSFER UNIT
SEE B/PT-S10
STATION SEE
A1/PT-S10 OR A2/PT-S10
24" MAX
MAX SPACING FOR TRANSVERSE
AND LONGITUDINAL BRACES (TYP.)
d
N O
T E
S E
E d N
O T
E
S E
E
SEE
TBT
(SEE NOTE 5)
L L L
(E) 3 METAL DECK WITH
3 1/4" LW CONC. FILL
MAX. 6"x 16 GA. STEEL
PNEUMATIC TUBE
P2070 PIPE CLAMP
STRUT/CLAMP ASSEMBLY W/P1000HS UNISTRUT, P1026 OR P1068 ANGULAR FITTING,
3/8" DIA HILTI KB-TZ (ESR-1917) OR KB-TZ2 (ESR-4266) WEDGE ANCHOR 2" MIN EMBED
& BOLT/WASHER & P3008 CHANNEL NUT TYP EA END..
ANGULAR FITTING MAY BE INSTALLED ON FRONT OR BACK SIDE OF RISER ASSEMBLY
TYP
8" MAX. CORE OR SLEEVE
THROUGH FLOOR SLAB OR WALL
SECTION VIEW PLAN VIEW
FIRE STOP PENETRATION
AS REQUIRED
NOTE: RISER CLAMP MAY BE INSTALLED ABOVE OR BENEATH THE FLOOR SLAB.
NEXT GRAVITY SUPPORT AT 10' HORIZONTAL. NEXT SEISMIC SUPPORT AT 40' MAX.
FOR MULTIPLE PNEUMATIC TUBE RISER, PROVIDE CONTINUOUS STRUT W/ ANGULAR FITTING,
BOLTS & EXPASION ANCHOR ASSEMBLY @ 24" MAXIMUM SPACING.
P1026 OR P1068 ANCULAR FITTING MAY BE INSTALLED ON FRONT OR BACK SIDE OF STRUT.
3" MIN. @ EDGE OF SLAB
OR @ MECHANICAL SHAFT
3" M
IN
1" M
IN
3" M
IN
P1000 OR P1000HS UNISTRUT TYP P1000 HS STRUT
ELEVATION VIEW
1/2" GAP AT JOINT
6" PNEUMATIC TUBE, 16
GA. GALV. STL. TYP.
PT COUPLER
TRANSVERSE &
LONGITUDINAL BRACING
TYP EACH SIDE OF JOINT
SEE C1 & C2/PT-S11
6" PNEUMATIC TUBE
SLIP JOINT
3/8" ALL THREAD HANGER
ROD WITH STIFFENERS
SEE G/PT-S10
PNEUMATIC TUBE SUPPORT
SEE A/PT-S11
BUILDING
SEPARATION
10'-0" MAX TYP 36" MAX TYP 42" (+/- 12")
(E) SLAB OR LWC OVER METAL DECK SEE E/PT-S-10 TYP
1" WD X 1/8" THICK GALVANIZED STEEL 4"
OR 6" TUBE CLAMP
3/8" THREADED ROD
1" MAX FROM CL TYP.
3" MIN FLUTE TYP.
3/8"-16 NUT W/FLAT WASHER
1" WD X 1/8" THICK GALVANIZED STEEL 4"
OR 6" ROW CLAMP
3/8" THREADED ROD
3/8"16 NUT W/FLAT WASHER
3/8" 16 X 1" LG BOLT WITH FLAT
WASHER
1" WD X 1/8" THICK GALVANIZED STEEL 4"
OR 6" TUBE CLAMP
3/8" THREADED ROD
3/8" EZ-RISER SOCKET ROD HANGER
ZORO SELECT #G0978175 OR EQUIVALENT
FOR SINGLE TUBE ONLY
NOTE:
1. STRUCTURAL ENGINEER OF RECORD SHALL PROVIDE OR VERIFY
THE (E) STRUCTURE DESIGNED TO SUPPORT WEIGHTS SHOWN.
2. TUBING TO BE SUPPORTED AT A MINIMUM OF EVERY 10'
SEE E/PT-S-10 TYP
ALL THREAD HANGER ROD AT 10'-0" O.C. TYP WITH ROD STIFFENER
AT BRACED CONNECTION ONLY PER G/PT-S10G.
(SEE TABLE FOR ANCHOR BOLT SIZE & EMBEDMENT AND ROD SIZE)
PNEUMATIC TUBE 16 GA.
GALV. STL. (6" MAX.)
STRUT (SEE TABLE) TRAPEZE
VERTICAL SUPPORT AT 10'-0"
O.C.
SECTION VIEW
TRANSVERSE BRACING
PER SCHEDULE BELOW
LONGITUDINAL BRACING
EACH SIDE OF TRAPEZE
ROD COUPLER
STRUT
MAX.
SPAN (FT)
TRANSVERSE LONGITUDINAL
2 6
REQUIRED BRACE SPACING (FT) O.C.
ALTERNATE PIPE POSITION
THREADED HANGER
ROD SIZE, (IN) DIA.
HILTI KB-TZ (ESR-1917) OR KB-TZ2
(ESR-4266) ANCHOR BOLT
EMBEDMENT
(IN) MIN.
SIZE
(IN) DIA.
NO. OF
TUBES
(E) SLAB OR M. DECK
5 8 1/2 30 1/2 3 1/4
3 5 3/8 40 3/8 2
3/8 3/8 2
6 7.5 1/2 30 1/2 3 1/4
4 8.5 1/2 40 1/2 3 1/4
3 9.5 3/8 40 3/8 2
P2070 CLAMP TYP
L=
0" M
AX
NOTE:
1. SEISMIC BRACING CAN BE LOCATED AT ANY CORNER AND INSTALLED OPPOSING DIRECTION.
2. HEIGHT VARIES PER MAXIMUM BRACE LENGTH & ANGLE.
3. PNEUMATIC TUBES CAN BE INSTALLED ANYWHERE ON STRUT TRAPEZE.
1/
4" T
Y P
MAX. SPAN (SEE TABLE)
H
S E
E N
O T
E
UNISTRUT P1546 OR P1843 ADJ. HINGE W/ 3/8"∅BOLT / P3008 CHANNEL NUT (TYP.)
1 P1000HS 8 403/8 3/8 2
4 4 1/2 40 1/2 3 1/4
ONE SIDE TWO SIDES
1 MIN.
P1000HS
P1000HS
P1000HS
P1001HS
P1001HS
P1001HS
P1001HS
CL TYP
1" MAX OFFSET
B
DETAIL AT TYPICAL TUBE SUPPORT
C1
DETAIL AT TUBE TRANSVERSE BRACE
C2
DETAIL AT TUBE LONGITUDINAL BRACE
A
TYPICAL LOCATION OF LATERAL BRACING FOR P-TUBES
D
PNEUMATIC TUBE RISER DETAIL
E
SLIP JOINT CONN. DETAIL AT BLDG SEPARATION
G
TUBE SUPPORTS ROW CLAMPS
F
TRAPEZE SUPPORT & LATERAL BRACES
DEET H
H
NOTE:
BLOWERS MOUNTED TO SLAB WITHIN MECHANCIAL ROOM AND NOT ON ROOF.
File details come from the government source that posted it. Updated .