This is a mechanical systems design document containing schedules, symbols legend, and general notes for HVAC equipment installation and coordination. The document specifies equipment selections, electrical requirements, and installation standards for a facility project involving heating, cooling, humidification, and air distribution systems.

The document includes detailed schedules for packaged heat pumps, humidifiers, split system heat pumps, air-cooled heat pump condensing units, air devices, and exhaust fans. Key equipment specified includes a Daikin FTX36NVJU heat pump unit (220V, 1-phase, 15.9 SEER rating, 38 lbs), a Condair EL-OC humidifier (230V, 3-phase, 200 lbs), and a Daikin RX36NMVJU outdoor unit (220V, 1-phase, 140 lbs) utilizing R410A refrigerant. Air device selections reference manufacturers including Krueger, Titus, and Price with MERV7 filtration. The mechanical symbols legend defines ductwork, piping, dampers, and air handling components. General notes establish contractor responsibilities for code compliance, permitting, equipment coordination with other trades, independent support systems, fire/smoke damper installation per IBC standards, and plenum-rated wiring requirements per NFPA 262. Critical coordination requirements include maintaining 6-foot center-to-center spacing between supply and exhaust/return grilles, providing insulated rigid duct where flexible duct penetrates fire-rated walls, and adjusting exhaust fan speed to maintain 350 CFM pressurization in surgery rooms while keeping corridors at 0.01 in-WC positive pressure relative to entry ramps.

View the file

Other files

File Type Posted
36C26126R0009 0007.docx DOCX document
36C26126R0009 0007.docx DOCX document
Wage Determination CA20260007 01.23.2026.pdf PDF
Attachment 169A EP.201T Corrected.pdf PDF
Hybrid OR RFIs Amendment 005.xlsx XLSX spreadsheet
Attachment 168C Trailer Drawings combined.pdf PDF
Attachment 169A EP.201T.pdf PDF
Attachment 170B- M-202T.pdf PDF
Attachment 170A -M-201T.pdf PDF
Site Walk 02.04.26.pdf PDF
Attachment RFI 55 - VA Mather Fire Alarm_AS-BUILT 8-27-2020.pdf PDF
Attachment RFI No. 56.docx DOCX document
Attachmetn RFI 115B - Hybrid Drawings 5-4-15.pdf PDF
Attachment RFI 168A -0062457 T0240DXWM VA 1248 NAS Submittal.pdf PDF
Hybrid OR RFIs Amendment 004.xlsx XLSX spreadsheet
36C26126R0009 0004.docx DOCX document
ATTACH RFI No.116 SLDAirFrame_ShopDrawings.pdf PDF
Attachment RFI 150 Physics Report.pdf PDF
SOW Hybrid OR Revised 01.27.2026.pdf PDF
Attachment RFI 006.pdf PDF
Attachment RFI 008.pdf PDF
36C26126R0009 0003.docx DOCX document
Hybrid OR RFIs Amendment 003.xlsx XLSX spreadsheet
Attachment RFI No. 17.docx DOCX document
Attachment RFI 104.pdf PDF
Attachment RFI 135 OR Laydown Area.pdf PDF
36C26126R0009 0002.docx DOCX document
36C26126R0009 Amendment 0001.docx DOCX document
IMG_5181.JPG JPG image
IMG_E5226.JPG JPG image
IMG_5182.JPG JPG image
IMG_5191.JPG JPG image
IMG_5260.JPG JPG image
IMG_5187.JPG JPG image
IMG_E5223.JPG JPG image
IMG_E5224.JPG JPG image
IMG_E5225.JPG JPG image
IMG_5250.JPG JPG image
IMG_5254 .JPG JPG image
36C26126R0009 Solicitation.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment C - Key Personnel Evaluation.docx DOCX document
612A4-25-004 _VA_Hybrid-OR_DRAWINGS_Bid Set_09-30-2025.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
612A4-25-004_VA_TRAILER_DRAWINGS_Bid Set_09-30-2025.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Specifcations 612A4-25-004_VA_Hybrid-OR and Trailer 10.23.2025.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOL

ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE.

MECHANICAL SYMBOLS LEGEND

DESCRIPTION

X-X, Xø

DIFFUSER TAG

(X-X = DIFFUSER TYPE, Xø = NECK SIZE, ### = CFM VALUE)

VAV BOX - HW

VAV BOX - EH

VAV UNIT - PARALLEL POWERED

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

SUPPLY SLOT DIFFUSER

RETURN SLOT GRILLE

SUPPLY, RETURN, OR EXHAUST SIDEWALL DIFFUSER/GRILLE

FLEXIBLE ROUND DUCT

FLEXIBLE RECTANGULAR DUCT

SUPPLY RECTANGULAR DUCT GOING DOWN

SUPPLY RECTANGULAR DUCT GOING DOWN

SUPPLY RECTANGULAR DUCT GOING DOWN

SUPPLY RECTANGULAR DUCT GOING UP

RETURN RECTANGULAR DUCT GOING UP

EXHAUST RECTANGULAR DUCT GOING UP

SUPPLY ROUND DUCT GOING DOWN

RETURN ROUND DUCT GOING DOWN

SUPPLY ROUND DUCT GOING DOWN

SUPPLY ROUND DUCT GOING UP

RETURN ROUND DUCT GOING UP

SUPPLY ROUND DUCT GOING UP

PIPE GOING DOWN

PIPE TEE GOING DOWN

PIPE GOING UP

PIPE TEE GOING UP

AIR VALVE FOR SUPPLY, RETURN, AND EXHAUST

M

SD

FSD

MANUAL DAMPER

SMOKE DAMPER

FD FIRE DAMPER

FIRE AND SMOKE DAMPER

MOTORIZED DAMPER

AM AIR FLOW MEASURING DAMPER

HUMIDIFIER GRIDH

REHEAT COIL

THERMOSTAT

HUMIDISTAT

CO2 SENSOR

PRESSURE MONITOR

PRESSURE SENSOR

T

H

CO2

BALANCING VALVE

R

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

GATE VALVE

GLOBE VALVE

PRESSURE REGULATING VALVE

STEAM TRAP - INVERTED VALVE

DUCT SMOKE DETECTOR

CONDENSATE LINE

WIILL BE 3/4" SW

COPPER

SUPPORT ON

3"x3"x5/16" ANGLE

ELECTRIC

HUMIDIFIER

HARD (STAINLESS)

PIPING W/ 2"

INSULATION DOWN

THRU ROOF

STAINLESS

STEEL DRAIN TEE

RETURN

DUCTWORK

INJECTION TUBECD

6" MI

N

6" MI

N

STRAINER

2" WATER SEAL OR

LOOP IN THE SUPPLY

LINE

2" 12"

3/4" PIPE THREAD TANK

DRAIN AND P-TRAP

PIPING RATED FOR 212° F

WATER SUPPLY LINE

3/4" PIPE THREAD FRAME

DRAIN AND P-TRAP

PIPING RATED FOR 212° F

HUB DRAIN

HUMIDIFIER

STEAM AND STEAM CONDENSATE PIPING DETAILSWATER SUPPLY AND DRAIN AND OVERFLOW PIPING DETAILS

DRAW

THRU

BLOW

THRU

2"

PLUS X

1"

MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE

SAME SIZE AS THE NIPPLE ON THE DRAIN

PAN, PIPING SHALL BE RIGID COPPER TYPE L

OR TYPE M UNLESS NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN

OUT

FLOOR SINK

DRAIN

PAN

NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY

LOCAL VA AND IS INDOORS AND DOES NOT PASS THROUGH

RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR

METALS ARE TO BE

CONNECTED.

[25 mm

DIELECTRIC

FITTING

A B1"

AIR SPLIT DUCT TAKE-OFF

PLAN VIEW

BRANCH DUCT TAKE-OFF PLAN

VIEW

SUPPLY REGISTER

TAKE-OFF PLAN VIEW

AIR

FLOW

AIR

FLOW

AI

R

FL

OW

SUPPLY REGISTER

OR BRANCH DUCT

TURNING VANES

MAIN SUPPLY DUCT

SEE FLOOR PLAN

FOR SPLIT DIMENSION

PROVIDE VOLUME

DAMPER

PROVIDE

VOLUME

DAMPER

ADJUSTABLE

METAL ROD

OR LINKAGE

TOP REGISTER

MAIN

SUPPLY

DUCT

VOLUME EXTRACTOR; ADJUSTABLE

FROM FULLY CLOSED POSITION TO

CFM NOTED ON FLOOR PLANS

AIR

FLOW

AIR

FLOW

1/4 W OR 4"

[100mm] MIN.

AIR

FLOW

MAIN SUPPLY

DUCT

AI

R

FL

OW

W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group

Au to de sk

D oc s:

//A

ES

U

S Pr oj ec ts /1

8-

2_

VA

_T

EM

P- _T

R

AI

LE

R

_M

EC

H .rv t 2/

/2

3:

:1

PM

M-001T

MECHANICAL LEGEND AND

ABBREVIATIONS

10535 HOSPITAL WAY MATHER, CA 95655

612A4-CSI-001

N/A

SEP. 30, 2025 AESUS AESUS

HYBRID TEMPORARY TRAILERS100% Submittal

GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

ALL MECHANICAL, ELECTRICAL, AND PLUMBING WORK SHALL COMPLY WITH ALL

APPLICABLE STATE AND LOCAL BUILDING CODES. REFER TO SPECIFICATIONS FOR

MATERIALS AND METHODS FOR MECHANICAL CONSTRUCTION.

CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS, PAY ALL FEES, AND COMPLY

WITH ALL NATIONAL, STATE, AND MUNICIPAL LAWS, CODES, AND ORDINANCES

RELATING TO BUILDING AND PUBLIC SAFETY.

CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED

FOR A COMPLETE WORKING AND COORDINATED SYSTEM.

REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF WALLS WHICH EXTEND TO

STRUCTURE. EACH HVAC DUCT OR PIPE PENETRATION THROUGH THESE WALLS SHALL

BE INSTALLED AS DETAILED. WHERE FLEXIBLE DUCT WOULD PENETRATE A WALL

WHICH EXTENDS TO STRUCTURE, PROVIDE INSULATED RIGID DUCT EXTENDING 12

INCHES ON EITHER SIDE OF THE PARTITION.

COORDINATE THE EXACT LOCATION OF MECHANICAL EQUIPMENT WITH THE

LOCATIONS OF LIGHT FIXTURES, PIPING, CONDUIT AND OTHER CONSTRUCTION, TO

ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT.

COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES AND

PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED.

IT IS THE INTENT OF THESE DOCUMENTS TO ALLOW ALL CEILING CONSTRUCTION AND

HEIGHTS TO BE AS SHOWN ON THE ARCHITECTURAL DRAWINGS. COORDINATE THE

LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWORK AND

PIPING AS REQUIRED TO MEET THIS INTENT.

CONDUIT, PIPING, AND DUCTWORK SHALL BE INDEPENDENTLY SUPPORTED, AND EACH

SUPPORT SHALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEMS SUPPORTS.

REFER TO RISER DIAGRAMS AND FLOW DIAGRAMS FOR PIPE SIZES NOT SHOWN ON

THE PLANS.

INSTALL ALL FLOOR MOUNTED EQUIPMENT ON PADS AS SPECIFIED. PAD BY GENERAL

CONTRACTOR. COORDINATE REQUIREMENTS WITH GENERAL CONTRACTOR.

PROTECT EQUIPMENT FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL

COMPLETION OF CONSTRUCTION.

REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON

COMPLETION OF WORK. TOUCH UP WITH PAINT WHERE REQUIRED.

CONTRACTOR SHALL VISIT JOBSITE AND VERIFY SIZE AND LOCATION OF ALL EXISTING

ITEMS AND CONDITIONS.

ALL CONNECTIONS BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE WITH

DIELECTRIC UNIONS.

ALL EXISTING FACILITIES SHALL BE PROTECTED DURING THE CONSTRUCTION

ACTIVITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE

AND STORE ITEMS WHICH ARE SUBJECT TO DAMAGE.

ARCHITECT SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND

THERMOSTAT LOCATIONS.

COORDINATE ALL AIR DEVICE LOCATIONS AND MOUNTING FRAME STYLES WITH

LIGHTING PLANS AND ARCHITECTURAL REFLECTED CEILING PLANS. PROVIDE 6'-0"

FROM CENTER TO CENTER FROM SUPPLY TO EXHAUST/RETURN GRILLES FOR PROPER

AIRFLOW.

COORDINATE ALL WALL MOUNTED DEVICE LOCATIONS WITH ARCHITECTURAL INTERIOR

ELEVATIONS.

REFER TO ARCHITECTURAL LIFE SAFETY PLANS FOR COORDINATION OF FIRE, SMOKE,

AND COMBINATION FIRE/SMOKE DAMPERS. THE DESIGN INTENT IS TO PROVIDE THE

INDICATED DAMPERS IN ACCORDANCE WITH REQUIREMENTS OF THE INTERNATIONAL

BUILDING CODE. THE CONTRACTOR SHALL PROVIDE ANY ADDITIONAL LIFE SAFETY

DAMPERS, INCLUDING FIRE ALARM CONTROL WIRING AND MONITORING REQUIRED BY

THE IBC AND LOCAL ORDINANCES AND CODE INTERPRETATIONS.

ALL DUCT RUN-OUTS TO VAV TERMINAL BOXES SHALL BE 2" LARGER THAN INLET SIZE

IF BOX IS MORE THAN 15 FT. FROM MAIN SUPPLY DUCT.

ANY DEVIATIONS FROM SCHEDULED EQUIPMENT RESULTING IN ADDITIONAL COST DUE

TO THE LACK OF COORDINATION WITH DIMENSIONS AND WEIGHTS WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

ALL FIRE/SMOKE COMBINATION DAMPERS AND/OR FIRE DAMPERS SHALL BE INSTALLED

IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION DETAILS THAT WERE

TESTED AT U.L. LABORATORIES AND U.L. LISTED.

X. WIRING:

COMBUSTIBLE ELECTRICAL OR ELECTRONIC WIRING METHODS AND MATERIALS,

OPTICAL FIBER CABLE, AND OPTICAL FIBER RACEWAYS EXPOSED WITHIN A PLENUM

SHALL HAVE A PEAK OPTICAL DENSITY NOT GREATER THAN .50, AN AVERAGE OPTICAL

DENSITY NOT GREATER THAN 0.15 AND A FLAME SPREAD NOT GREATER THAN 5 FEET

WHEN TESTED IN ACCORDANCE WITH NFPA 262. ONLY TYPE OFNP (PLENUM RATED

NON-CONDUCTIVE FIBER CABLE) SHALL BE INSTALLED IN PLENUM-RATED RACEWAYS.

WIRING, CABLE, AND RACEWAYS ADDRESSED IN THIS SECTION SHALL BE LISTED AND

LABELED AS PLENUM RATED AND SHALL BE INSTALLED IN ACCORDANCE WITH ICC

ELECTRICAL CODE.

Y. PROVIDE VOLUME AND BALANCING DAMPERS AS REQUIRED BY IMC 603.17 FOR EACH

BRANCH OR DIFFUSER. . PROVIDE LINKAGE VOLUME DAMPERS TO

DAMPERS LOCATED ABOVE HARD-LID CEILINGS SIMILAR TO YOUNG REGULATOR

MODEL 927C OR EQUIVALENT SOLID LINKAGE DAMPER.

NOTES:

1. UNIT FURNISHED WITH HOT GAS REHEAT, ROOF CURB, ADJUSTABLE OUTSIDE AIR INTAKE ASSEMBLY.

PACKAGED HEAT PUMP SCHEDULE

MARK LOCATION SERVES TYPE

AIR FLOW

OUTSIDE

AIR FLOW

(CFM)

COOLING

FILTER

MERV

RATING

WEIGHT

(LBS)

ELECTRICAL BASIS OF DESIGN

REMARKS

FAN AIR

FLOW (CFM)

EXT STATIC

PRESSURE

(IN)

MIN TOTAL

CAPACITY

(MBH)

EAT

OSA DESIGN

TEMP (°F) VOLT PHASE

CIRCUIT

MANUFACTURER MODELDb (°F) Wb (°F) MCA MOCP

HP-1 ROOF HALLWAYS,

STORAGE

ROOFTOP HEAT

PUMP,

1800 0.5 250 60 80.0 °F 67.0 °F 95 MERV7,

MERV11

600 230 3 39.5 50 JCI J05ZRE30A2

NOTES:

1. FURNISH UNIT WITH ROOF CURB AND OUTDOOR RATED ENCLOSURE.

HUMIDIFIER SCHEDULE

MARK LOCATION SERVES HUMIDIFIER TYPE

AIRFLOW

(CFM)

EAT LAT GENERATOR

WEIGHT

(LBS)

ELECTRICAL BASIS OF DESIGN

REMARKSDb (°F) Wb (°F) Db (°F) Wb (°F)

INPUT WATER INPUT / OUTPUT OUTPUT

EFFICIENCY

(%) VOLT PHASE

CIRCUIT

MANUFACTURER MODEL

ELECTRICT HEAT

(ELEC KW) TYPE

FILL

CYCLE

(GPM)

DRAIN

CYCLE

(GPM)

MIN INLET

PRESSURE (PSI)

STEAM

(LBS/HR)

OUTLET

PRESSURE

(PSI) FLA MOCP POWER

H-1 ROOF HP-1 Electrode Steam

Humidifier 1800 68.0 °F 52.1 °F 68.0 °F 56.0 °F 8 CITY 1 2 35 18 0 N/A 200 230 3 19.2 25 8 Condair Group AG Condair EL-OC S NOTE 1

OPTIONS: DFK = DOWNFLOW KIT, DSC = DISCONNECT, RMT = REMOTE THERMISTOR, FR2 = 2" EXTERNAL FILTER RACK, STS = UL508 CONDENSATE OVERFLOW SWITCH.

SPECIFICATIONS: UNITS SHALL BE ARI LISTED, COMPY WITH FED SPEC A-A-50502, AND HAVE EPA ENERGY STAR LABEL. FURNISH UNIT WITH SINGLE-POINT POWER CONNECTION. COORDINATE THERMOSTAT/CONTROL OPTIONS WITH FLOOR PLANS AND CONTROL DIAGRAMS; IF

NOT OTHERWISE SPECIFIED, FURNISH UNIT WITH WIRED-THERMOSTAT W/ LCD DISPLAY.

SPLIT SYSTEM HEAT PUMP SCHEDULE

MARK LOCATION SERVES TYPE

AIR FLOW COOLING HEATING

EFFICIENCY (SEER /

HSPF)

WEIGHT

(LBS)

ELECTRICAL BASIS OF DESIGN

REMARKS

FAN AIR FLOW

(CFM)

MIN TOTAL

CAPACITY (MBH)

EAT MIN HEAT

CAPACITY

(MBH)

EAT Db

(°F) VOLT PHASE

CIRCUIT

MANUFACTURER MODELDb (°F) Wb (°F) MCA MOCP

SS-1 ELEC ELEC WALL MOUNT 512 34 80.0 °F 67.0 °F 36 43.0 °F 15.9 SEER, 9.6 EER,

2.8 COP, 9.2 HSPF

38 220 1 0.75 15 DAIKIN FTX36NVJU

OPTIONS: DST = ELECTRICAL DISCONNECT.

SPECIFICATIONS: UNITS SHALL BE ARI LISTED, COMPY WITH FED SPEC A-A-50502, AND HAVE EPA ENERGY STAR LABEL. UNIT SHALL BE EQUIPED WITH MEANS OF DEFROST MANAGEMENT, CORROSION-RESISTANT CONDENSER COIL (6000HR SALT SPRAY), CASING RATED FOR 1000HR SALT SPRAY AND 500HR UV RESISTANCE PER ASTM D4587-11. FURNISH UNIT WITH SINGLE-POINT POWER CONNECTION. REFER TO CONTROL DIAGRAMS FOR OPERATING CONTROLS OPTIONS.

AIR COOLED HEAT PUMP CONDENSING UNIT SCHEDULE

MARK LOCATION SERVES SYSTEM TYPE SIZE

COOLING HEATING

REFRIGERANT

WEIGHT

(LBS)

ELECTRICAL BASIS OF DESIGN

REMARKSCAPACITY (BTUH) AMBIENT (°F) CAPACITY (BTUH) AMBIENT (°F) VOLT PHASE

CIRCUIT

MANUFACTURER MODELMCA MOCP

CU-1 ROOF ELEC ELEC SS-1 AIR COOLED 36 33 95.0 °F 36 43.0 °F R410A 140 220 1 19.8 20 DAIKIN RX36NMVJU DST

AIR DEVICE SCHEDULE

MARK SERVES

PANEL/FRAME

SIZE (INxIN) NECK TYPE MOUNTING DAMPER FINISH

BASIS OF DESIGN

REMARKSMODEL MANUFACTURER

E1 RETURN 24"x24" NO WHITE ASPD / 5PLQ /

OMNI-AA

PRICE /

KRUEGER / TITUS

R1 RETURN 24"x24" SQUARE WHITE NO WHITE PRICE /

KRUEGER / TITUS

MERV7 FILTER

S1 SUPPLY 24"x24" ROUND WHITE NO WHITE ASPD / 5PLQ /

OMNI-AA

PRICE /

KRUEGER / TITUS

2-WAY PATTERN

S2 SUPPLY 24"x24" ROUND WHITE NO WHITE ASPD / 5PLQ /

OMNI-AA

PRICE /

KRUEGER / TITUS

NTS1 HUMIDIFIER DETAIL

NTS2 AIR HANDLING UNIT DRAIN TRAP DETAIL

NTS3 SUPPLY DUCTWORK TAKE-OFFS

NOTES:

1. DUCT EXHAUST DUCT UP THROUGH ROOF AND PROVIDE WEATHER CAP.

2. PROVIDE EXHAUST FAN WITH ROOF CURB, BACKDRAFT DAMPER (IN CURB), AND SPEED CONTROLLER (ECM MOTOR). CURRENT BALANCE PLAN INDICATES A SETPOINT OF 350 CFM TO MAINTAIN PRESSURIZATION OF SURGERY ROOMS. TEST AND BALANCE CONTRACTOR SHALL ADJUST FAN SPEED TO MAINTAIN SURGERY ROOM PRESSURIZATION AS WELL AS MAINTAINING THE CORRIDOR AT 0.01 IN-WC POSITIVE RELATIVE TO ENTRY RAMP.

FAN SCHEDULE

MARK LOCATION

AIR FLOW

(CFM) ESP (IN)

WEIGHT

(LBS)

ELECTRICAL BASIS OF DESIGN

REMARKSVOLT PHASE

MOTOR

MANUFACTURER MODELHP

EF-1 CEILING 150 0.5 25 120 1 128 W GREENHECK SP-B150 NOTE 1

EF-2 ROOF 700 0.35 100 120 1 1/4 (15A

MOP)

GREENHECK G-120-VG NOTE 2