This is a mechanical systems design document containing schedules, symbols legend, and general notes for HVAC equipment installation and coordination. The document specifies equipment selections, electrical requirements, and installation standards for a facility project involving heating, cooling, humidification, and air distribution systems.
The document includes detailed schedules for packaged heat pumps, humidifiers, split system heat pumps, air-cooled heat pump condensing units, air devices, and exhaust fans. Key equipment specified includes a Daikin FTX36NVJU heat pump unit (220V, 1-phase, 15.9 SEER rating, 38 lbs), a Condair EL-OC humidifier (230V, 3-phase, 200 lbs), and a Daikin RX36NMVJU outdoor unit (220V, 1-phase, 140 lbs) utilizing R410A refrigerant. Air device selections reference manufacturers including Krueger, Titus, and Price with MERV7 filtration. The mechanical symbols legend defines ductwork, piping, dampers, and air handling components. General notes establish contractor responsibilities for code compliance, permitting, equipment coordination with other trades, independent support systems, fire/smoke damper installation per IBC standards, and plenum-rated wiring requirements per NFPA 262. Critical coordination requirements include maintaining 6-foot center-to-center spacing between supply and exhaust/return grilles, providing insulated rigid duct where flexible duct penetrates fire-rated walls, and adjusting exhaust fan speed to maintain 350 CFM pressurization in surgery rooms while keeping corridors at 0.01 in-WC positive pressure relative to entry ramps.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL
ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE.
MECHANICAL SYMBOLS LEGEND
DESCRIPTION
X-X, Xø
DIFFUSER TAG
(X-X = DIFFUSER TYPE, Xø = NECK SIZE, ### = CFM VALUE)
VAV BOX - HW
VAV BOX - EH
VAV UNIT - PARALLEL POWERED
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
SUPPLY SLOT DIFFUSER
RETURN SLOT GRILLE
SUPPLY, RETURN, OR EXHAUST SIDEWALL DIFFUSER/GRILLE
FLEXIBLE ROUND DUCT
FLEXIBLE RECTANGULAR DUCT
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING UP
RETURN RECTANGULAR DUCT GOING UP
EXHAUST RECTANGULAR DUCT GOING UP
SUPPLY ROUND DUCT GOING DOWN
RETURN ROUND DUCT GOING DOWN
SUPPLY ROUND DUCT GOING DOWN
SUPPLY ROUND DUCT GOING UP
RETURN ROUND DUCT GOING UP
SUPPLY ROUND DUCT GOING UP
PIPE GOING DOWN
PIPE TEE GOING DOWN
PIPE GOING UP
PIPE TEE GOING UP
AIR VALVE FOR SUPPLY, RETURN, AND EXHAUST
M
SD
FSD
MANUAL DAMPER
SMOKE DAMPER
FD FIRE DAMPER
FIRE AND SMOKE DAMPER
MOTORIZED DAMPER
AM AIR FLOW MEASURING DAMPER
HUMIDIFIER GRIDH
REHEAT COIL
THERMOSTAT
HUMIDISTAT
CO2 SENSOR
PRESSURE MONITOR
PRESSURE SENSOR
T
H
CO2
BALANCING VALVE
R
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
GLOBE VALVE
PRESSURE REGULATING VALVE
STEAM TRAP - INVERTED VALVE
DUCT SMOKE DETECTOR
CONDENSATE LINE
WIILL BE 3/4" SW
COPPER
SUPPORT ON
3"x3"x5/16" ANGLE
ELECTRIC
HUMIDIFIER
HARD (STAINLESS)
PIPING W/ 2"
INSULATION DOWN
THRU ROOF
STAINLESS
STEEL DRAIN TEE
RETURN
DUCTWORK
INJECTION TUBECD
6" MI
N
6" MI
N
STRAINER
2" WATER SEAL OR
LOOP IN THE SUPPLY
LINE
2" 12"
3/4" PIPE THREAD TANK
DRAIN AND P-TRAP
PIPING RATED FOR 212° F
WATER SUPPLY LINE
3/4" PIPE THREAD FRAME
DRAIN AND P-TRAP
PIPING RATED FOR 212° F
HUB DRAIN
HUMIDIFIER
STEAM AND STEAM CONDENSATE PIPING DETAILSWATER SUPPLY AND DRAIN AND OVERFLOW PIPING DETAILS
DRAW
THRU
BLOW
THRU
2"
PLUS X
1"
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE DRAIN
PAN, PIPING SHALL BE RIGID COPPER TYPE L
OR TYPE M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN
OUT
FLOOR SINK
DRAIN
PAN
NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY
LOCAL VA AND IS INDOORS AND DOES NOT PASS THROUGH
RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR
METALS ARE TO BE
CONNECTED.
[25 mm
DIELECTRIC
FITTING
A B1"
AIR SPLIT DUCT TAKE-OFF
PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN
VIEW
SUPPLY REGISTER
TAKE-OFF PLAN VIEW
AIR
FLOW
AIR
FLOW
AI
R
FL
OW
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN SUPPLY DUCT
SEE FLOOR PLAN
FOR SPLIT DIMENSION
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
ADJUSTABLE
METAL ROD
OR LINKAGE
TOP REGISTER
MAIN
SUPPLY
DUCT
VOLUME EXTRACTOR; ADJUSTABLE
FROM FULLY CLOSED POSITION TO
CFM NOTED ON FLOOR PLANS
AIR
FLOW
AIR
FLOW
1/4 W OR 4"
[100mm] MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
AI
R
FL
OW
W
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /1
8-
2_
VA
_T
EM
P- _T
R
AI
LE
R
_M
EC
H .rv t 2/
/2
3:
:1
PM
M-001T
MECHANICAL LEGEND AND
ABBREVIATIONS
10535 HOSPITAL WAY MATHER, CA 95655
612A4-CSI-001
N/A
SEP. 30, 2025 AESUS AESUS
HYBRID TEMPORARY TRAILERS100% Submittal
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
ALL MECHANICAL, ELECTRICAL, AND PLUMBING WORK SHALL COMPLY WITH ALL
APPLICABLE STATE AND LOCAL BUILDING CODES. REFER TO SPECIFICATIONS FOR
MATERIALS AND METHODS FOR MECHANICAL CONSTRUCTION.
CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS, PAY ALL FEES, AND COMPLY
WITH ALL NATIONAL, STATE, AND MUNICIPAL LAWS, CODES, AND ORDINANCES
RELATING TO BUILDING AND PUBLIC SAFETY.
CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED
FOR A COMPLETE WORKING AND COORDINATED SYSTEM.
REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF WALLS WHICH EXTEND TO
STRUCTURE. EACH HVAC DUCT OR PIPE PENETRATION THROUGH THESE WALLS SHALL
BE INSTALLED AS DETAILED. WHERE FLEXIBLE DUCT WOULD PENETRATE A WALL
WHICH EXTENDS TO STRUCTURE, PROVIDE INSULATED RIGID DUCT EXTENDING 12
INCHES ON EITHER SIDE OF THE PARTITION.
COORDINATE THE EXACT LOCATION OF MECHANICAL EQUIPMENT WITH THE
LOCATIONS OF LIGHT FIXTURES, PIPING, CONDUIT AND OTHER CONSTRUCTION, TO
ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT.
COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES AND
PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED.
IT IS THE INTENT OF THESE DOCUMENTS TO ALLOW ALL CEILING CONSTRUCTION AND
HEIGHTS TO BE AS SHOWN ON THE ARCHITECTURAL DRAWINGS. COORDINATE THE
LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWORK AND
PIPING AS REQUIRED TO MEET THIS INTENT.
CONDUIT, PIPING, AND DUCTWORK SHALL BE INDEPENDENTLY SUPPORTED, AND EACH
SUPPORT SHALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEMS SUPPORTS.
REFER TO RISER DIAGRAMS AND FLOW DIAGRAMS FOR PIPE SIZES NOT SHOWN ON
THE PLANS.
INSTALL ALL FLOOR MOUNTED EQUIPMENT ON PADS AS SPECIFIED. PAD BY GENERAL
CONTRACTOR. COORDINATE REQUIREMENTS WITH GENERAL CONTRACTOR.
PROTECT EQUIPMENT FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL
COMPLETION OF CONSTRUCTION.
REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON
COMPLETION OF WORK. TOUCH UP WITH PAINT WHERE REQUIRED.
CONTRACTOR SHALL VISIT JOBSITE AND VERIFY SIZE AND LOCATION OF ALL EXISTING
ITEMS AND CONDITIONS.
ALL CONNECTIONS BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE WITH
DIELECTRIC UNIONS.
ALL EXISTING FACILITIES SHALL BE PROTECTED DURING THE CONSTRUCTION
ACTIVITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE
AND STORE ITEMS WHICH ARE SUBJECT TO DAMAGE.
ARCHITECT SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND
THERMOSTAT LOCATIONS.
COORDINATE ALL AIR DEVICE LOCATIONS AND MOUNTING FRAME STYLES WITH
LIGHTING PLANS AND ARCHITECTURAL REFLECTED CEILING PLANS. PROVIDE 6'-0"
FROM CENTER TO CENTER FROM SUPPLY TO EXHAUST/RETURN GRILLES FOR PROPER
AIRFLOW.
COORDINATE ALL WALL MOUNTED DEVICE LOCATIONS WITH ARCHITECTURAL INTERIOR
ELEVATIONS.
REFER TO ARCHITECTURAL LIFE SAFETY PLANS FOR COORDINATION OF FIRE, SMOKE,
AND COMBINATION FIRE/SMOKE DAMPERS. THE DESIGN INTENT IS TO PROVIDE THE
INDICATED DAMPERS IN ACCORDANCE WITH REQUIREMENTS OF THE INTERNATIONAL
BUILDING CODE. THE CONTRACTOR SHALL PROVIDE ANY ADDITIONAL LIFE SAFETY
DAMPERS, INCLUDING FIRE ALARM CONTROL WIRING AND MONITORING REQUIRED BY
THE IBC AND LOCAL ORDINANCES AND CODE INTERPRETATIONS.
ALL DUCT RUN-OUTS TO VAV TERMINAL BOXES SHALL BE 2" LARGER THAN INLET SIZE
IF BOX IS MORE THAN 15 FT. FROM MAIN SUPPLY DUCT.
ANY DEVIATIONS FROM SCHEDULED EQUIPMENT RESULTING IN ADDITIONAL COST DUE
TO THE LACK OF COORDINATION WITH DIMENSIONS AND WEIGHTS WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
ALL FIRE/SMOKE COMBINATION DAMPERS AND/OR FIRE DAMPERS SHALL BE INSTALLED
IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION DETAILS THAT WERE
TESTED AT U.L. LABORATORIES AND U.L. LISTED.
X. WIRING:
COMBUSTIBLE ELECTRICAL OR ELECTRONIC WIRING METHODS AND MATERIALS,
OPTICAL FIBER CABLE, AND OPTICAL FIBER RACEWAYS EXPOSED WITHIN A PLENUM
SHALL HAVE A PEAK OPTICAL DENSITY NOT GREATER THAN .50, AN AVERAGE OPTICAL
DENSITY NOT GREATER THAN 0.15 AND A FLAME SPREAD NOT GREATER THAN 5 FEET
WHEN TESTED IN ACCORDANCE WITH NFPA 262. ONLY TYPE OFNP (PLENUM RATED
NON-CONDUCTIVE FIBER CABLE) SHALL BE INSTALLED IN PLENUM-RATED RACEWAYS.
WIRING, CABLE, AND RACEWAYS ADDRESSED IN THIS SECTION SHALL BE LISTED AND
LABELED AS PLENUM RATED AND SHALL BE INSTALLED IN ACCORDANCE WITH ICC
ELECTRICAL CODE.
Y. PROVIDE VOLUME AND BALANCING DAMPERS AS REQUIRED BY IMC 603.17 FOR EACH
BRANCH OR DIFFUSER. . PROVIDE LINKAGE VOLUME DAMPERS TO
DAMPERS LOCATED ABOVE HARD-LID CEILINGS SIMILAR TO YOUNG REGULATOR
MODEL 927C OR EQUIVALENT SOLID LINKAGE DAMPER.
NOTES:
1. UNIT FURNISHED WITH HOT GAS REHEAT, ROOF CURB, ADJUSTABLE OUTSIDE AIR INTAKE ASSEMBLY.
PACKAGED HEAT PUMP SCHEDULE
MARK LOCATION SERVES TYPE
AIR FLOW
OUTSIDE
AIR FLOW
(CFM)
COOLING
FILTER
MERV
RATING
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN
REMARKS
FAN AIR
FLOW (CFM)
EXT STATIC
PRESSURE
(IN)
MIN TOTAL
CAPACITY
(MBH)
EAT
OSA DESIGN
TEMP (°F) VOLT PHASE
CIRCUIT
MANUFACTURER MODELDb (°F) Wb (°F) MCA MOCP
HP-1 ROOF HALLWAYS,
STORAGE
ROOFTOP HEAT
PUMP,
1800 0.5 250 60 80.0 °F 67.0 °F 95 MERV7,
MERV11
600 230 3 39.5 50 JCI J05ZRE30A2
NOTES:
1. FURNISH UNIT WITH ROOF CURB AND OUTDOOR RATED ENCLOSURE.
HUMIDIFIER SCHEDULE
MARK LOCATION SERVES HUMIDIFIER TYPE
AIRFLOW
(CFM)
EAT LAT GENERATOR
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN
REMARKSDb (°F) Wb (°F) Db (°F) Wb (°F)
INPUT WATER INPUT / OUTPUT OUTPUT
EFFICIENCY
(%) VOLT PHASE
CIRCUIT
MANUFACTURER MODEL
ELECTRICT HEAT
(ELEC KW) TYPE
FILL
CYCLE
(GPM)
DRAIN
CYCLE
(GPM)
MIN INLET
PRESSURE (PSI)
STEAM
(LBS/HR)
OUTLET
PRESSURE
(PSI) FLA MOCP POWER
H-1 ROOF HP-1 Electrode Steam
Humidifier 1800 68.0 °F 52.1 °F 68.0 °F 56.0 °F 8 CITY 1 2 35 18 0 N/A 200 230 3 19.2 25 8 Condair Group AG Condair EL-OC S NOTE 1
OPTIONS: DFK = DOWNFLOW KIT, DSC = DISCONNECT, RMT = REMOTE THERMISTOR, FR2 = 2" EXTERNAL FILTER RACK, STS = UL508 CONDENSATE OVERFLOW SWITCH.
SPECIFICATIONS: UNITS SHALL BE ARI LISTED, COMPY WITH FED SPEC A-A-50502, AND HAVE EPA ENERGY STAR LABEL. FURNISH UNIT WITH SINGLE-POINT POWER CONNECTION. COORDINATE THERMOSTAT/CONTROL OPTIONS WITH FLOOR PLANS AND CONTROL DIAGRAMS; IF
NOT OTHERWISE SPECIFIED, FURNISH UNIT WITH WIRED-THERMOSTAT W/ LCD DISPLAY.
SPLIT SYSTEM HEAT PUMP SCHEDULE
MARK LOCATION SERVES TYPE
AIR FLOW COOLING HEATING
EFFICIENCY (SEER /
HSPF)
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN
REMARKS
FAN AIR FLOW
(CFM)
MIN TOTAL
CAPACITY (MBH)
EAT MIN HEAT
CAPACITY
(MBH)
EAT Db
(°F) VOLT PHASE
CIRCUIT
MANUFACTURER MODELDb (°F) Wb (°F) MCA MOCP
SS-1 ELEC ELEC WALL MOUNT 512 34 80.0 °F 67.0 °F 36 43.0 °F 15.9 SEER, 9.6 EER,
2.8 COP, 9.2 HSPF
38 220 1 0.75 15 DAIKIN FTX36NVJU
OPTIONS: DST = ELECTRICAL DISCONNECT.
SPECIFICATIONS: UNITS SHALL BE ARI LISTED, COMPY WITH FED SPEC A-A-50502, AND HAVE EPA ENERGY STAR LABEL. UNIT SHALL BE EQUIPED WITH MEANS OF DEFROST MANAGEMENT, CORROSION-RESISTANT CONDENSER COIL (6000HR SALT SPRAY), CASING RATED FOR 1000HR SALT SPRAY AND 500HR UV RESISTANCE PER ASTM D4587-11. FURNISH UNIT WITH SINGLE-POINT POWER CONNECTION. REFER TO CONTROL DIAGRAMS FOR OPERATING CONTROLS OPTIONS.
AIR COOLED HEAT PUMP CONDENSING UNIT SCHEDULE
MARK LOCATION SERVES SYSTEM TYPE SIZE
COOLING HEATING
REFRIGERANT
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN
REMARKSCAPACITY (BTUH) AMBIENT (°F) CAPACITY (BTUH) AMBIENT (°F) VOLT PHASE
CIRCUIT
MANUFACTURER MODELMCA MOCP
CU-1 ROOF ELEC ELEC SS-1 AIR COOLED 36 33 95.0 °F 36 43.0 °F R410A 140 220 1 19.8 20 DAIKIN RX36NMVJU DST
AIR DEVICE SCHEDULE
MARK SERVES
PANEL/FRAME
SIZE (INxIN) NECK TYPE MOUNTING DAMPER FINISH
BASIS OF DESIGN
REMARKSMODEL MANUFACTURER
E1 RETURN 24"x24" NO WHITE ASPD / 5PLQ /
OMNI-AA
PRICE /
KRUEGER / TITUS
R1 RETURN 24"x24" SQUARE WHITE NO WHITE PRICE /
KRUEGER / TITUS
MERV7 FILTER
S1 SUPPLY 24"x24" ROUND WHITE NO WHITE ASPD / 5PLQ /
OMNI-AA
PRICE /
KRUEGER / TITUS
2-WAY PATTERN
S2 SUPPLY 24"x24" ROUND WHITE NO WHITE ASPD / 5PLQ /
OMNI-AA
PRICE /
KRUEGER / TITUS
NTS1 HUMIDIFIER DETAIL
NTS2 AIR HANDLING UNIT DRAIN TRAP DETAIL
NTS3 SUPPLY DUCTWORK TAKE-OFFS
NOTES:
1. DUCT EXHAUST DUCT UP THROUGH ROOF AND PROVIDE WEATHER CAP.
2. PROVIDE EXHAUST FAN WITH ROOF CURB, BACKDRAFT DAMPER (IN CURB), AND SPEED CONTROLLER (ECM MOTOR). CURRENT BALANCE PLAN INDICATES A SETPOINT OF 350 CFM TO MAINTAIN PRESSURIZATION OF SURGERY ROOMS. TEST AND BALANCE CONTRACTOR SHALL ADJUST FAN SPEED TO MAINTAIN SURGERY ROOM PRESSURIZATION AS WELL AS MAINTAINING THE CORRIDOR AT 0.01 IN-WC POSITIVE RELATIVE TO ENTRY RAMP.
FAN SCHEDULE
MARK LOCATION
AIR FLOW
(CFM) ESP (IN)
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN
REMARKSVOLT PHASE
MOTOR
MANUFACTURER MODELHP
EF-1 CEILING 150 0.5 25 120 1 128 W GREENHECK SP-B150 NOTE 1
EF-2 ROOF 700 0.35 100 120 1 1/4 (15A
MOP)
GREENHECK G-120-VG NOTE 2