VA Bldg. 12 Preaction 1-6-2025.pdf

PDF 2 MB Posted

Attached to
H212--Fire Protection Testing, Inspection, and Maintenance/Repair
Solicitation number
36C26126Q0018
Issued by

About this file

This document is a Sprinkler Inspection Report for the VA Hospital's 12 Server Room 2267 in Reno, Nevada, completed by Western States Fire Protection Co. on 01/06/2025. The quarterly inspection covers a preaction fire suppression system (Valve System #OIT), with a Viking 3" G3000 model, and includes comprehensive testing of system components such as control valves, water supplies, alarms, and sprinklers. Key details include a water flow test conducted on 1/6/25 in the building's 12 server room, with a static pressure of 151 psi, and verification of air compressor operation. The inspection was performed in accordance with NFPA 25 2023 Edition, and the inspector noted no significant issues requiring immediate corrective action.

View the file

Other files

File Type Posted
36C26126Q0018 0002.docx DOCX document
Floor Plans - Fire and Smoke Dampers - Working.pdf PDF
Reno VAMC-Building 1 Section C - Damper Inspection Report 2024.pdf PDF
975 Kirman Pre action 5 yr 7-20.pdf PDF
ANNUAL FWP 231130.pdf PDF
Semi-annual FM200 4-28-2025.pdf PDF
Reno VAMC-Area G - Damper Inspection Report 2025.pdf PDF
975 Kirman Ave. Reno Nv FSD 1.30.24.pdf PDF
VA Bldg. 12 Preaction 10-22-2024.pdf PDF
Reno VAMC-Building 1D - Damper Inspection Report 2025.pdf PDF
Semi-annual Ansul Testing Canteen 05-15-24.pdf PDF
QTRLY flow and tamper blank document.xlsx XLSX spreadsheet
Area D Fire Damper Inspection.xlsx XLSX spreadsheet
Semi-annual Ansul Testing NFS 05-15-24.pdf PDF
36C26126Q0018 0001.docx DOCX document
2- Floor Plans - Fire and Smoke Dampers Bldg 1 1A 1D 5 6 10 12.pdf PDF
VA Bldg. 12 Preaction 4-28-2025.pdf PDF
Reno VAMC-Building 5 Section K - Damper Inspection Report 2024.pdf PDF
Attachment 1 - Drawings.pdf PDF
Reno VAMC-Building 12 - Damper Inspection Report 2025.pdf PDF
Bldg Sprinkler Inspections.pdf PDF
Reno VAMC-Building 6 - Damper Inspection Report 2025.pdf PDF
VA FSD Inspection Bldg 10 FD 5B-Fail 5.9.24.pdf PDF
Semi-annual FM200 10-22-2024.pdf PDF
Site Visit Information.docx DOCX document
36C26126Q0018.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

Owner's Signature

Date Signed:

Yes No

4. Explain any occupancy hazard changes since the previous inspection:

OWNER'S SECTION

(To be answered by the Owner, Occupant, or Customer)

1. Is the building occupied?

2. Are all systems in service?

3. Was the system(s) free of actuation of devices or alarms since the last inspection?

Yes No

Yes No

5. Describe any fire protection modifications made since the last inspection:

6. Describe any fires since the last inspection:

7. When was the system last checked for stoppage, corrosion, or foreign material?

10. When was the dry-piping system last checked for proper pitch?

11. Are dry valves adequately protected from freezing?

If yes, how many?

12. Does the system contain any low points? Yes No General Locations:

Title:

Printed Name:

8. Does there appear to be a minimum of 18 inches (457 mm) clearance between the top of storage and the sprinkler deflectors?

9. Does the hand hose on the sprinkler system(s) appear to be satisfactory?

Sprinkler Inspection Cover Sheet

Site Name:

Western States Fire Protection Co. | 1655 Marietta Way | Sparks, NV 89431 | 775.359.0396 | WSFP.com

Sprinkler Inspection Report

1. Control Valves (see item 14)

a. Do sprinkler system control valves appear to be in the appropriate open or closed position?

b. Are control valves in the open position locked, sealed or equipped with a tamper switch?

2. Water Supplies (see item 15)

a. Was a waterflow test of the main drain made at the sprinkler riser(s)?

3. Tanks, Pumps, Fire Department Connections

a. Are fire pumps, gravity tanks, reservoirs and pressure tanks in good condition and properly maintained?

b. Are fire department connections in satisfactory condition, couplings free, caps in place and check valves tight?

c. Are they accessible and visible?

4. Wet Systems # of Systems

a. Are cold weather valves (OS&Y) in the appropriate open or closed position?

b. Have anti-freeze solutions been tested?

c. Antifreeze test result: Type of solution: Glycerin Propylene Glycol Unknown

d. In areas protected by the wet system(s), does the building appear to be properly heated in all areas, including blind attics and perimeter areas where accessible?

e. Do all exterior openings appear to be protected against freezing?

5. Dry System (see items 10 thru 12) # of Systems

a. Are dry valve(s) in service?

b. Are the air pressures and priming water levels in accordance with the manufacturer's instructions?

c. Has the operation of the air or nitrogen supplies been tested?

Are they in service?

d. Were all known low points drained during this inspection? Total number of low points:

e. Did quick opening devices operate satisfactorily?

f. Did the dry valve(s) trip properly during the trip pressure test?

g. Did the heating equipment in the dry pipe valve room(s) operate at the time of the inspection?

6. Special Systems (see item 13)

a. Did the deluge or pre-action valves operate properly during testing?

b. Did the heat responsive devices operate properly during testing?

c. Did the supervisory devices operate properly during testing?

7. Alarms

a. Did water motor(s) and gong(s) test satisfactory?

b. Did electric alarm(s) test satisfactory?

8. Sprinklers

a. Do visible sprinklers appear to be free from corrosion, loading or obstruction to spray discharge?

b. Do sprinklers appear to be less than 50 years old? (Older sprinklers require sample testing)

c. Do quick response and residential sprinklers appear to be less than 20 years old? (Older sprinklers require sample testing)

d. Do dry sprinklers appear to be less than 10 years old? (Older sprinklers require sample testing)

e. Is stock of spare sprinklers available?

f. Does the exterior condition of sprinkler system appear to be satisfactory?

g. Do visible sprinklers appear to be of proper temperature rating for their location?

h. Does the building have a hydraulic placard?

Yes No N/A

Sprinkler Inspection Report

10. Date dry pipe valve tested (control valve partially open)

11. Date dry pipe valve tested (control valve fully open)

12. Date quick opening device tested

DRY PIPE

OPERATING

TEST TABLE

MAKE

With Q.O.D.

Without Q.O.D.

Time to trip though test pipe

Minutes Seconds

MODEL

Water Pressure

PSI

SERIAL NO.

Air Pressure

PSI

MAKE

Trip Point Air Pressure

PSI

MODEL

Time water Reached Test Outlet

Minutes Seconds

SERIAL NO.

Alarm Operated Properly?

Yes No

13. Date deluge or preaction valve tested

DELUGE &

PRE-ACTION

OPERATING

TEST TABLE

OPERATION

PNUEMATIC

ELECTRIC

HYDRAULIC

Piping Supervised? NoYesMAKE

MODEL

Detecting Media Supervised? NoYes

Does Valve Operate from the Manual Trip / or Remote Control Station? Yes No Is there an Accessible Facility in each Circuit for Testing? NoYes

Method of Testing Circuits Does Each Circuit Operate Supervision loss Alarm? NoYes

Does Each Circuit Operate Valves Release? Yes No Maximum Time to Operate Release? Yes No

14. Control Valve Maintenance Table

Control Valves Number Type Open Secured Closed Signs Explain Abnormal Conditions

Y NY N Y N Y N

Y NY N Y N Y N

Y NY N Y N Y N

NYNY NY NY

Y NY N Y N Y N

NYNY NY NY

Y NY N Y N Y N

NYNY NY NY

15. Water Flow Test at Sprinkler Riser Source: City PumpTank

16. Explain any "No" Answers and Comments:

(use additional notes if needed)

17. Adjustments or corrections made during this inspection:

Inspector's Signature

X

Residual (Flow) PressureStatic PressureSize of Test PipeTest Pipe LocationDate Last Flow Test This Flow Test

Quick Opening Device (If Applicable)

See Additional Pages for Multiple Dry, Deluge, or Preaction Systems.Valve System #

Valve System #

SIZE

SIZE

Inspector:

License #:

Date Signed:

18. Although the comments are not the result of an engineering review, please see the attached Non-Inspection Related Deficiencies form for additional items found during the course of the inspection. (Only attached if applicable)

See Additional Pages for Multiple Dry, Deluge, or Preaction Systems.

Danny Delta Fire

Explanation of any answers that may present a problem or impair the system (comments from the inspector).

Comment Sheet

Western States Fire Protection Co. | 1655 Marietta Way | Sparks, NV 89431 | 775.359.0396 | WSFP.com

Danny Delta Fire VA Hospital 975 Kirman Bldg. 12 Server Room 2267 Reno, NV Quarterly inspection

DFS reno Sprinkler Report_Short_Template.pdf
APi NSG Sprinkler Coversheet_Template
APi NSG Sprinkler Report_Short

Text1: Performed annual inspection and tests of Preaction system in accordance with NFPA 25 2023 Edition Table 13.1.1.2 and section 13.4

Air compressor operation verified.

151 psi water 31 psi air

Text2:
NSG BRANCH LOCATION: Sparks, NV
NSG SERVICE ORDER NUMBER: 5i2333
NSG DATE Field: 01/06/2025
Text1cover: VA Hospital 975 Kirman Bldg. 12 Server Room 2267 Reno, NV Quarterly
form1[0]:
CoverSheet[0]:
OS1Y[0]: Off
OS1N[0]: Off
OS2Y[0]: Off
OS2N[0]: Off
OS3Y[0]: Off
OS3N[0]: Off
OS4[0]:
OS5[0]:
OS6[0]:
OS7[0]: 2020
OS7[1]:
OS7[2]:
OS8[0]:
OS9[0]:
OS10LPY[0]: Off
OS10LPN[0]: Off
OS10HowManyLP[0]:
OS10GL[0]:
OwnersSignatureField[0]:
OwnersName[0]:
OwnersTitle[0]:
DateTimeQ10[0]:
RoI-pg1[0]:
NA[0]: Off
No[0]: Off
Yes[0]: 1
Yes[1]: 1
No[1]: Off
NA[1]: Off
NA[2]: Off
No[2]: Off
Yes[2]: 1
Yes[3]: Off
No[3]: Off
NA[3]: 1
NA[4]: Off
No[4]: Off
Yes[4]: 1
Yes[5]: 1
No[5]: Off
NA[5]: Off
NA[6]: 1
No[6]: Off
Yes[6]: Off
NA[7]: 1
No[7]: Off
Yes[7]: Off
Q5cText[0]:
Glycerin[0]: Off
PropyleneGlycol[0]: Off
Unknown[0]: Off
Yes[8]: Off
No[8]: Off
NA[8]: 1
NA[9]: 1
No[9]: Off
Yes[9]: Off
Yes[10]: Off
No[10]: Off
NA[10]: 1
NA[11]: 1
No[11]: Off
Yes[11]: Off
Yes[12]: Off
No[12]: Off
NA[12]: 1
Yes[13]: Off
No[13]: Off
NA[13]: 1
NA[14]: 1
No[14]: Off
Yes[14]: Off
Yes[15]: Off
No[15]: Off
NA[15]: 1
NA[16]: 1
No[16]: Off
Yes[16]: Off
Yes[17]: Off
No[17]: Off
NA[17]: 1
NA[18]: 1
No[18]: Off
Yes[18]: Off
Yes[19]: Off
No[19]: Off
NA[19]: 1
NA[20]: Off
No[20]: Off
Yes[20]: 1
Yes[21]: Off
No[21]: Off
NA[21]: 1
NA[22]: Off
No[22]: Off
Yes[22]: 1
Yes[23]: Off
No[23]: Off
NA[23]: 1
NA[24]: 1
No[24]: Off
Yes[24]: Off
Yes[25]: Off
No[25]: Off
NA[25]: 1
NA[26]: 1
No[26]: Off
Yes[26]: Off
Yes[27]: Off
No[27]: Off
NA[27]: 1
NA[28]: Off
No[28]: Off
Yes[28]: 1
Yes[29]: Off
No[29]: Off
NA[29]: 1
Yes[30]: Off
No[30]: Off
NA[30]: 1
Q5cText[1]:
Q5cText[2]: 0
Q5cText[3]: 0
RoI-pg2[0]:
DateTimeQ10[0]:
DateTimeQ11[0]:
DateTimeQ12[0]:
TextField1[0]:
DropDownList1[0]: []
NumericField4[0]:
NumericField3[0]:
NumericField2[0]:
NumericField1[0]:
NumericField10[0]:
NumericField9[0]:
TextField1[1]:
NumericField8[0]:
NumericField7[0]:
TextField1[2]:
NumericField6[0]:
NumericField5[0]:
DropDownList1[1]: []
NumericField4[1]:
NumericField3[1]:
NumericField2[1]:
NumericField1[1]:
TextField1[3]:
No[0]: Off
Yes[0]: Off
No[1]: Off
Yes[1]: Off
DateTimeQ13[0]: 10/22/24
CheckBox1[0]: 1
CheckBox1[1]: 1
CheckBox1[2]: Off
No[2]: Off
Yes[2]: 1
DropDownList2[0]: [Smoke]
TextField1[4]: G3000
DropDownList1[2]: [Viking]
No[3]: Off
Yes[3]: 1
Yes[4]: Off
No[4]: Off
No[5]: Off
Yes[5]: Off
No[6]: Off
Yes[6]: Off
Yes[7]: Off
No[7]: Off
Yes[8]: Off
No[8]: Off
Yes[9]: Off
No[9]: 1
Yes[10]: 1
No[10]: Off
Yes[11]: Off
No[11]: 1
Yes[12]: 1
No[12]: Off
TextField1[5]:
ControlValves[0]: [System Valves]
ControlValves[1]: [ ]
NumericField11[0]: 1
NumericField11[1]:
ControlValves[2]: [BFV]
ControlValves[3]: []
TextField1[6]:
Yes[13]: Off
No[13]: Off
Yes[14]: Off
No[14]: Off
Yes[15]: Off
No[15]: Off
Yes[16]: Off
No[16]: Off
ControlValves[4]: []
NumericField11[2]:
ControlValves[5]: []
TextField1[7]:
Yes[17]: Off
No[17]: Off
Yes[18]: Off
No[18]: Off
Yes[19]: Off
No[19]: Off
Yes[20]: Off
No[20]: Off
ControlValves[6]: []
NumericField11[3]:
ControlValves[7]: []
TextField1[8]:
No[21]: Off
Yes[21]: Off
No[22]: Off
Yes[22]: Off
No[23]: Off
Yes[23]: Off
No[24]: Off
Yes[24]: Off
ControlValves[8]: []
NumericField11[4]:
ControlValves[9]: []
TextField1[9]:
Yes[25]: Off
No[25]: Off
Yes[26]: Off
No[26]: Off
Yes[27]: Off
No[27]: Off
Yes[28]: Off
No[28]: Off
ControlValves[10]: []
NumericField11[5]:
ControlValves[11]: []
TextField1[10]:
No[29]: Off
Yes[29]: Off
No[30]: Off
Yes[30]: Off
No[31]: Off
Yes[31]: Off
No[32]: Off
Yes[32]: Off
ControlValves[12]: []
NumericField11[6]:
ControlValves[13]: []
TextField1[11]:
Yes[33]: Off
No[33]: Off
Yes[34]: Off
No[34]: Off
Yes[35]: Off
No[35]: Off
Yes[36]: Off
No[36]: Off
ControlValves[14]: []
NumericField11[7]:
ControlValves[15]: []
TextField1[12]:
No[37]: Off
Yes[37]: Off
No[38]: Off
Yes[38]: Off
No[39]: Off
Yes[39]: Off
No[40]: Off
Yes[40]: Off
CheckBox1[3]: Off
CheckBox1[4]: 1
CheckBox1[5]: Off
TextField1[13]:
TextField1[14]:
TextField27[0]:
DateTimeField2[0]:
TextField9[0]:
TextField7[0]:
TextField5[0]:
TextField3[0]:
DateTimeField1[0]: 1/6/25
TextField8[0]: Bldg. 12 server room
TextField6[0]: 1.25
TextField4[0]: 151
TextField2[0]:
DropDownList1[3]: []
DropDownList1[4]: []
DropDownList1[5]: []
DropDownList1[6]: []
TextField18[0]:
TextField17[0]: OIT
ValveSize[0]: []
ValveSize[1]: [3]
Table2[0]:
Row1[0]:
Cell2[0]: Danny Pellegrino
Row2[0]:
Cell2[0]: C-4525
Row3[0]:
Cell2[0]: 1/6/25

Text2_Sitename: VA Hospital 975 Kirman Bldg. 12 Server Room 2267 Reno, NV Quarterly

File details come from the government source that posted it. Updated .