Attachment 1 - Drawings.pdf

PDF 2 MB Posted

Attached to
H212--Fire Protection Testing, Inspection, and Maintenance/Repair
Solicitation number
36C26126Q0018
Issued by

About this file

This document contains a series of architectural floor plans for multiple buildings, all depicting 5 Year Fire Riser Testing Locations. The plans include buildings 1-CS6, 1-C0330, 1-CS1, 1A-DS1, 1D-HS1, 1D-GS1, 1D-GS3, 12-BS1, 12-BS2, 6-FS1, 6-FS2, 5-GS2, 1-CS5, and 1-CS2. Each floor plan shows detailed layouts of various rooms, stairwells, corridors, and elevator locations, with specific emphasis on marking the fire riser testing locations using a bowtie symbol. The buildings appear to be part of a medical or healthcare complex, with rooms including patient rooms, offices, nurse stations, equipment storage, restrooms, and various medical support spaces across different floors and wings.

The plans provide comprehensive visual documentation of fire safety infrastructure, specifically highlighting the precise locations where five-year fire riser testing will be conducted. These locations are consistently marked with a standardized bowtie symbol, ensuring clear identification for maintenance and safety personnel. The documents suggest a systematic approach to fire safety testing across multiple buildings, with careful attention to documenting the exact testing points within complex multi-story healthcare facilities.

View the file

Other files

File Type Posted
36C26126Q0018 0002.docx DOCX document
Floor Plans - Fire and Smoke Dampers - Working.pdf PDF
Reno VAMC-Building 1 Section C - Damper Inspection Report 2024.pdf PDF
975 Kirman Pre action 5 yr 7-20.pdf PDF
ANNUAL FWP 231130.pdf PDF
Semi-annual FM200 4-28-2025.pdf PDF
Reno VAMC-Area G - Damper Inspection Report 2025.pdf PDF
975 Kirman Ave. Reno Nv FSD 1.30.24.pdf PDF
VA Bldg. 12 Preaction 10-22-2024.pdf PDF
Reno VAMC-Building 1D - Damper Inspection Report 2025.pdf PDF
Semi-annual Ansul Testing Canteen 05-15-24.pdf PDF
QTRLY flow and tamper blank document.xlsx XLSX spreadsheet
Area D Fire Damper Inspection.xlsx XLSX spreadsheet
Semi-annual Ansul Testing NFS 05-15-24.pdf PDF
VA Bldg. 12 Preaction 1-6-2025.pdf PDF
36C26126Q0018 0001.docx DOCX document
2- Floor Plans - Fire and Smoke Dampers Bldg 1 1A 1D 5 6 10 12.pdf PDF
VA Bldg. 12 Preaction 4-28-2025.pdf PDF
Reno VAMC-Building 5 Section K - Damper Inspection Report 2024.pdf PDF
Reno VAMC-Building 12 - Damper Inspection Report 2025.pdf PDF
Bldg Sprinkler Inspections.pdf PDF
Reno VAMC-Building 6 - Damper Inspection Report 2025.pdf PDF
VA FSD Inspection Bldg 10 FD 5B-Fail 5.9.24.pdf PDF
Semi-annual FM200 10-22-2024.pdf PDF
Site Visit Information.docx DOCX document
36C26126Q0018.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 1-CS6-Center-Penthouse Riser

5 Year Fire Riser Testing Location

Location of Emergency Fire Pump

Building 1-C0330-Pipe Shop Emergency Fire Pump

Building 1-CS1-North Stairwell Riser

Building 1A-DS1-North Stairwell Riser

Building 1D-HS1-North West Riser

Building 1D-GS1-5th Floor Stairwell Riser

Building 1D-GS3-3rd Floor Riser

Building 12-BS1-North Stairwell 6th Floor

5 Year Fire Riser Test Location

Building 12-BS2-6th Floor South Stairwell Riser

Building 6-FS1-2nd Floor North West Stairwell Riser

Building 6-FS2-2nd Floor South East Stairwell Riser

Building 5-GS2-3rd Floor Stairwell

NOTE: Mental Health Riser is Located in Building 1D 3rd Floor Stairwell-GS2

Building 1-CS5-South Stairwell Riser

-----DSP----- 5 Year Fire Riser Testing Location

-----DSP-----

Building 1-CS2-North Stairwell Riser

-----DSP----- 5 Year Fire Riser Testing Location

-----DSP-----

Attachment 1 - Drawings
Drawing 1-Bldg 1-CS6-Center-Penthouse Riser.pdf
Blank Page
Drawing 1-Fire Pump Annual C0330.pdf
Blank Page
Drawing 2-Bldg 1-CS1-5th Floor North Stairwell Riser.pdf
Blank Page
Drawing 3-Bldg 1A-DS1-3rd Floor North Stairwell Riser.pdf
Blank Page
Drawing 4-Bldg 1D HS1-3rd Floor North West Riser.pdf
Blank Page
Drawing 5-Bldg 1D-GS1-5th Floor Stairwell Riser.pdf
Blank Page
Drawing 6-Bldg 1D-GS3-3rd Floor ICU Stairwell.pdf
Blank Page
Drawing #7-Bldg 12-BS1-6th Floor North Stairwell Riser.pdf
Blank Page
Drawing #8-Bldg 12-BS2-6th Floor South Stairwell Riser.pdf
Blank Page
Drawing #9-Bldg 6-FS1-2nd Floor North West Stairwell Riser.pdf
Blank Page
Drawing #10-Bldg 6-FS2-2nd Floor South East Stairwell Riser.pdf
Blank Page
Drawing #11-Bldg 5-GS2-3rd Floor Stairwell Riser-O.R. Stairwell.pdf
Blank Page
Drawing #12-Bldg 1-CS5-South Stairwell Riser.pdf
Drawing #13-Bldg 1-CS2-North Stairwell Riser.pdf

File details come from the government source that posted it. Updated .