36C25519R0017 VOL 2_JC dwg General - Asbestos.pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
NOTES:
1. FOR MOST-CURRENT CAMPUS PLAN CONTACT COR.
INDEX OF VOLUMES
VOLUME 1 - JEFFERSON BARRACKS CAMPUS
VOLUME 2 - JOHN COCHRAN CAMPUS
VOLUME 3 - WAYFINDING - JEFFERSON BARRACKS &
JOHN COCHRAN CAMPUSES
DRAWING INDEX DRAWING INDEX
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
AUGUST 6, 2018
VETERANS AFFAIRS MEDICAL CENTER
VA PROJECT NUMBER: 657-18-110
JOHN COCHRAN (JC) & JEFFERSON BARRACKS (JB) DIVISION
SAINT LOUIS, MISSOURI
CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, &
IMPROVE WAYFINDING
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:5 :2
P
M
G-001
COVER SHEET & SHEET INDEX
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJFAHT
1 & 7
OVERALL JC CAMPUS SITE PLAN
VOLUME 2 - JOHN COCHRAN DIVISION CAMPUS
1-2-RA-101A EXISTING CONDITION PLAN & PHOTOS
1-6-RA-101A EXISTING CONDITION PLAN & PHOTOS
1-6-RA-102A EXISTING CONDITION PLAN & PHOTOS
1-7-RA-101A EXISTING CONDITION PLAN & PHOTOS
1-8-RA-101A EXISTING CONDITION PLAN & PHOTOS
7-1-RA-101 EXISTING CONDITION PLAN, SCHEDULE & PHOTOS
E-001 ELECTRICAL COVER SHEET
1-2-ED-101A SECOND FLOOR - ELECTRICAL DEMOLITION PLAN
1-6-ED-101A SIXTH FLOOR - ELECTRICAL DEMOLITION PLAN
1-2-EL-101A SECOND FLOOR - ELECTRICAL LIGHTING RENOVATION PLAN
1-2-EP-101A SECOND FLOOR - ELECTRICAL RENOVATION PLAN
1-6-EL-101A SIXTH FLOOR - ELECTRICAL LIGHTING RENOVATION PLAN
1-6-EP-101A SIXTH FLOOR - ELECTRICAL RENOVATION PLAN
1-9-EP-101A NINTH FLOOR - ELECTRICAL RENOVATION PLAN
1-10-EP-101A TENTH FLOOR - ELECTRICAL RENOVATION PLAN
7-1-ED-101 FIRST FLOOR - ELECTRICAL DEMOLITION PLAN
7-1-EL-101 FIRST FLOOR - ELECTRICAL LIGHTING RENOVATION PLAN
7-1-EP-101 FIRST FLOOR - ELECTRICAL RENOVATION PLAN
1-9-MH-101A NINTH FLOOR - HVAC RENOVATION PLAN
1-10-MH-101A TENTH FLOOR - HVAC RENOVATION PLAN
7-1-MH-101 FIRST FLOOR - HVAC RENOVATION PLAN
7-R-MH-101 ROOF - HVAC RENOVATION PLAN
MH-300 VENTILATION DETAILS
MH-400 CONTROL DIAGRAMS
MH-500 VENTILATION SCHEDULES
M-001 MECHANICAL COVER SHEET
1-2-MD-101A SECOND FLOOR - MECHANICAL DEMOLITION PLAN
1-6-MD-101A SIXTH FLOOR - MECHANICAL DEMOLITION PLAN
1-7-MD-101A SEVENTH FLOOR - MECHANICAL DEMOLITION PLAN
1-8-MD-101A EIGHT FLOOR - MECHANICAL DEMOLITION PLAN
7-1-MD-101 FIRST FLOOR - MECHANICAL DEMOLITION PLAN
7-R-MD-101 ROOF - MECHANICAL DEMOLITION PLAN
1-2-MH-101A SECOND FLOOR - HVAC RENOVATION PLAN
1-6-MH-101A SIXTH FLOOR - HVAC RENOVATION PLAN
1-7-MH-101A SEVENTH FLOOR - HVAC RENOVATION PLAN
1-8-MH-101A EIGHTH FLOOR - HVAC RENOVATION PLAN
P-001 PLUMBING COVER SHEET
1-2-PD-101A SECOND FLOOR - PLUMBING DEMOLITION PLAN
1-6-PD-101A SIXTH FLOOR - PLUMBING DEMOLITION PLAN
7-B-PD-101 BASEMENT - PLUMBING DEMOLITION PLAN
7-1-PD-101 FIRST FLOOR - PLUMBING DEMOLITION PLAN
1-6-PL-101 SIXTH FLOOR - PLUMBING RENOVATION PLAN
7-B-PL-101 BASEMENT - PLUMBING RENOVATION PLAN
7-1-PL-101 PLUMBING RENOVATION PLAN
FP-001 FIRE PROTECTION COVER SHEET
1-2-FD-101A SECOND FLOOR - FIRE PROTECTION DEMOLITION PLAN
1-6-FD-101A SIXTH FLOOR - FIRE PROTECTION DEMOLITION PLAN
1-2-FP-101A SECOND FLOOR - FIRE PROTECTION RENOVATION PLAN
1-6-FP-101A SIXTH FLOOR - FIRE PROTECTION RENOVATION PLAN
AD-001 ARCHITECTURAL DEMOLITION GENERAL NOTES, KEYNOTE & LEGEND
AE-001 ARCHITECTURAL RENOVATION PLAN GENERAL NOTES & KEYNOTE LEGEND
1-2-AE-101A ARCHITECTURAL DEMOLITION & RENOVATION PLAN & DETAILS
1-6-AE-101A ARCHITECTURAL DEMOLITION & RENOVATION PLAN
1-R-AE-101A ARCHITECTURAL RENOVATION PLAN - ROOF - AREA A - ROOF DETAILS
1-AE-301 BLDG. SECTION + PARTIAL WALL SECTION
1-AE-302 BUILDING SECTION DETAILS
1-AE-501 ARCHITECTURAL DETAILS
1-AE-601 SCHEDULES & DIAGRAMS
AC-001 REFLECTED CEILING DEMOLITION & RENOVATION GENERAL NOTES, KEYNOTES & LEGEND
1-2-AC-101A REFLECTED CEILING DEMOLITION & RENOVATION PLAN & DETAILS
1-6-AC-101A REFLECTED CEILING DEMOLITION & RENOVATION PLAN & DETAILS
1-2-AF-101A ARCHITECTURAL FINISH PLAN, SCHEDULE & DETAILS
1-6-AF-101A ARCHITECTURAL FINISH PLAN & SCHEDULE
7-1-AD-101 ARCHITECTURAL DEMOLITION PLAN & NOTES
7-1-AE-101 ARCHITECTURAL RENOVATION PLAN, DETAILS & NOTES
7-1-AE-901 INTERIOR ELEVATIONS, DETAILS & SECTIONS
7-R-AE-101 ARCHITECTURAL ROOF PLAN
7-1-AC-101 REFLECTED CEILING RENOVATION PLAN, DETAIL & LEGEND
7-1-AF-101 ARCHITECTURAL FINISH PLAN & SCHEDULES
HA-001 GENERAL ASBESTOS ABATEMENT NOTES - JOHN COCHRAN DIVISION
1-6-HA-101A HAZARDOUS MATERIAL PLAN - LEVEL 6
7-1-HA-101 HAZARDOUS MATERIAL PLAN
G-001 COVER SHEET & SHEET INDEX - CORRECT WORKPLACE - LIFE SAFETY ISSUES, ASBESTOS ABATEMENT -
JOHN COCHRAN DIVISION
G-002 ABBREVIATIONS, SYMBOLS & GENERAL NOTES
GI-001 CODE REVIEW & LIFE SAFETY PLAN - LEGEND & CODE INFORMATION
1-2-GI-101A CODE REVIEW & LIFE SAFETY PLAN - LEVELS 2 & 6
1-9-GI-101 CODE REVIEW & LIFE SAFETY PLAN - LEVEL 9
7-1-GI-101 CODE REVIEW & LIFE SAFETY PLAN - LEVEL 1
1-6-GC-101A PHASING PLANS, NOTES & LEGEND - LEVELS 2, 6, 7, 8 & 9
(NOT TO SCALE)
SEPTEMBER 12, 2018
A
ACOUST. ACOUSTICAL
ACT ACOUSTIC TILE
ADP ART DISPLAY PANEL
ADT ART DISPLAY TRACK
ADJ ADJACENT, ADJUSTABLE
AFC ABOVE FINISH CEILING
AFF ABOVE FINISH FLOOR
AFP ACCORDION FOLDING PARTITION
AFS ACCESS FLOOR SYSTEM
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AFS ACCESS FLOOR SYSTEM
APPROX APPROXIMATE
ARCH ARCHITECTURE, ARCHITECT
ABBREVIATIONS - SEE ADDITIONAL FINISH MATERIAL ABBREVIATIONS IN THE ROOM FINISH SCHEDULE MATERIAL LEGEND
B
B BENCH
BM BEAM
BD BOARD, BLAST DOOR
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BP BULLET PROOF
C
CAB CABINET
CID COMPREHENSIVE INTERIOR DESIGN
CMU CONCRETE MASONRY UNIT
CJ CONTROL JOINT,
CONSTRUCTION JOINT
C CENTER LINE
CLG CEILING
COL COLUMN
CONC CONCRETE
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACT, CONTRACTOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPT CARPET
CR CHAIR RAIL
CT CARPET TILE
CUP CENTRAL UTILITY PLANT
D
DBL DOUBLE
DC DISPLAY CASE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DML DEMOLITION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E
EA EACH
EEWS EMERGENCY EYEWASH & SHOWER
EF EXHAUST FAN
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
EQUIP EQUIPMENT
EQ. EQUAL
ETC AND SO FORTH (ETCETERA)
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F
FD FLOOR DRAIN
FDN FOUNDATION
FEB FIRE EXTINGUISHER
& WALL BRACKET
FEC FIRE EXTINGUISHER CABINET
FFL FINISH FLOOR LEVEL
FHC FIRE HOSE CABINET
(WITH EXTINGUISHER & BRACKET)
FHR FIRE HOSE REEL
(WITH EXTINGUISHER & BRACKET)
FIN FINISHED, FINISH
FFEL FINISHED FLOOR ELEVATION
FLR FLOOR
FV FIELD VERIFY
G
GA GAUGE
GALV GALVANIZED
GEJ GUTTER EXPANSION JOINT
GL GRADE LINE, GLASS
GRTG GRATING
GYP GYPSUM
GYP BD GYPSUM BOARD
H
HD HAND
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HT. HEIGHT
HVAC HEATING, VENTILATION & AIR
CONDITIONING
I
I.D. INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
J
JC JANITOR'S CLOSET
JT JOINT
L
LAM LAMINATE
LAV LAVATORY
LBL LABEL
LVR LOUVER
LVR LP LOUVER LOW POINT
LP LOW POINT
M
MACH MACHINE
MAINT MAINTENANCE
MANUF MANUFACTURE
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
M.R. MIRRORED
MTD MOUNTED
MTL METAL
N
NIC NOT IN CONTRACT
NGVD NATIONAL GEODETIC
VERTICAL DATUM
NO NUMBER
NTS NOT TO SCALE
O
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OFF OFFICE
OPP OPPOSITE
OPP. HD. OPPOSITE HAND
OPNG OPENING
OTS OPEN TO STRUCTURE
P
P PAINT (e.g. P-1)
PTD PAINTED
PRTN PARTITION
PLAM PLASTIC LAMINATE
P. PLATE
PNL PANEL
PR PAIR
PLYWD PLYWOOD
R
R OR RAD RADIUS
RA RETURN AIR
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
RECP RECEPTACLE
REG REGULAR
REINF REINFORCED
REQ'D REQUIRED
RGH ROUGH
S
SAPF SPECIAL ACCESS PROGRAM FACILITY
SCHED. SCHEDULE
SECT SECTION
SHT SHEET
SID STRUCTURAL INTERIOR DESIGN
SIM SIMILAR
SPEC SPECIFICATION
SPS SYNTHETIC PANEL SYSTEM
SS STAINLESS STEEL
SSMA STEEL STUD MANUFACTURERS
ASSOCIATION WWW.SSMA.COM
STC SOUND TRANSMISSION
COEFFICIENT
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUPP. SUPPORT
SUSP SUSPENDED
T
TECH TECHNICAL
THK THICK
THRU THROUGH
TLT TOILET
T & B TOP & BOTTOM
T.O.P. TOP OF PARAPET
T.O.S. TOP OF STEEL
TYP TYPICAL
U
U.N.O. UNLESS NOTED OTHERWISE
UL UNDERWRITERS LABORATORY
V
VENT VENTILATE, VENTILATOR
VERT VERTICAL
VOL VOLUME
W
W WIDTH
W/ WITH
WD WOOD
WT WEIGHT
FOR MEDICAL
FACILITIES ONLY
CS CENTRAL STERILE
CT COMPUTED TOMOGRAPHY
ER EMERGENCY ROOM
ICU INTENSIVE CARE UNIT
LDRP LABOR-DELIVERY-RECOVERY-POST
PARTUM
LTC LONG TERM CARE
MRI MAGNETIC RESONANCE IMAGING
MICU MEDICAL INTENSIVE CARE UNIT
OR OPERATING ROOM
OT OCCUPATIONAL THERAPY
PACU POST ANESTHETIC CARE UNIT
PT PHYSICAL THERAPY
RT RESPIRATORY THERAPY
SICU SURGICAL INTENSIVE CARE UNIT
MATERIAL SYMBOLS
CAST-IN-PLACE CONCRETE
EARTH
EXISTING CONSTRUCTION
BRICK
GYPSUM
RIGID INSULATION
STEEL
GENERAL NOTES
1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS IN ORDER TO BE FAMILIAR W/ COORDINATION OF WORK REQUIRED IN THIS DOCUMENT PACKAGE AND EXISTING
CONDITIONS.
2. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
3. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.
4. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE OWNER. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH MINIMUM INTERRUPTION. SCHEDULE ALL
ELECTRICAL/MECHANICAL OUTAGES 15 DAYS IN ADVANCE WITH THE OWNER.
5. PROTECT ALL WORK, MATERIALS AND EQUIPMENT. CAP OR PLUG TEMPORARY OPENINGS. DELIVER ALL WORK TO THE
OWNER CLEAN AND IN GOOD CONDITION.
6. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS SHALL BE KEPT CLEAR OF DEBRIS. CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED BY NEW WORK SHALL BE INCLUDED AS WORK
PROVIDED UNDER THIS CONTRACT.
7. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING EQUIPMENT, CONNECTIONS, CONTROLS, ETC.
DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY CONTRACTOR AT
NO COST TO THE OWNER.
8. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.
9. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED.
10. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.
11. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND
SATISFACTORY INSTALLATION.
12. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND WALLS SHALL BE PATCHED WITH LIKE
MATERIALS TO MATCH THE SURROUNDING SURFACES.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK
UNDER THIS CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION.
14. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT RATED CONSTRUCTION.
14.A. FIRE STOP ALL PENETRATIONS WHERE NEW DEVICES/LINES RELOCATING EXISTING DEVICES/LINES
PENETRATING FLOORS, CEILINGS AND OTHER RATED BARRIERS.
14.B. FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE EXISTING DEVICES/LINES PENETRATE
FLOOR, CEILINGS AND OTHER RATED BARRIERS.
15. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.
16. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD OR AS INDICATED ON DRAWINGS.
17. PROVIDE 16 GA. METAL BACKING PLATES, UNLESS OTHERWISE SHOWN, IN ALL WALLS TO RECEIVE EQUIPMENT, SHELVING AND ACCESSORIES, DOOR STOPS AND OTHER ITEMS REQUIRING REINFORCEMENT. NO WOOD BLOCKING IS
TO BE USED PER VASTLHCS.
18. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES, CONVENIENCE OUTLETS, DOOR STOPS AND OTHER FINISH HARDWARE, ETC., SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF EXISTING WALLS
INDICATED TO REMAIN.
19. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE OWNER. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:
19.A. OWNER'S EQUIPMENT REQUIREMENTS.
19.B. CEILING SUPPORT SYSTEM.
19.C. MECHANICAL DUCTWORK SYSTEM
19.D. LIGHTING FIXTURES, ELECTRICAL WIRING AND CONDUIT SYSTEMS
19.E. PLUMBING AND PIPING SYSTEMS.
19.F. COMMUNICATIONS SYSTEMS.
20. OPTAIN PERMIT FOR AND CONSTRUCT FIRE-RESISTANT ANTE CHAMBER WITH DOOR AND APPOVED HARDWARE TO SEAL OFF CONSTRUCTION AREA FROM CORRIDOR. SEAL ANTE CHAMBER TO EXISTING CONSTRUCTION. PROVIDE WALK-OFF MATS OUTSIDE CORRIDOR AND ROOM SIDES OF CHAMBER. ANTE CHAMBER TO COMPLY WITH REQ'TS.
FOR ICRA LEVEL 4 PROTECTION - REVIEW & COORDINATE PERMIT & CONTSTRUCTION REQ'TS W/ COR AND STATION'S
INFECTION CONTROL OFFICER.
21 AT THE COMPLETION OF DEMOLITION THE CONTRACTOR SHALL HAVE A SITE MEETING WITH THE VA TO REVIEW AS-
BUILT CONDITIONS OF THE EXISTING STRUCTURE.
22. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN QUESTION CONTRACTOR SHALL NOTIFY
THE VA IMMEDIATELY.
23. THE OWNER SHALL BE RESPONSIBLE FOR REMOVING, STORING AND REINSTALLATION OF ALL OF THE OWNER'S EQUIPMENT AND FURNITURE, TO INCLUDE BOTH WALL MOUNTED ITEMS AND MOVABLE ITEMS. THIS COORDINATION OF
OWNER'S ITEMS IS REQUIRED FOR ALL PHASES OF CONSTRUCTION.
24. CONTRACTOR TO USE CONNECTING CORRIDOR EXTERIOR ENTRANCE FOR REMOVAL AND NEW MATERIAL DELIVERY.
CONTRACTOR TO PROVIDE NECESSARY EQUIPMENT TO PROTECT EXISTING FINISHES.
25. WORK THAT REQUIRES ACCESS TO SPACES OUTSIDE DESIGNATED AREA OF WORK SHALL BE COORDINATED WITH THE VA. WORK IN THOSE AREAS SHALL TAKE PLACE OUTSIDE REGULAR BUSINESS HOURS AND THE AREAS SHALL BE
CLEANED AND RETURNED TO SERVICE AT THE END OF EACH SHIFT.
26. UPON COMPLETION OF THE PROJECT. ALL AREAS AVAILABLE FOR CONSTRUCTION MATERIALS, VEHICLES, AND TRASH
RECEPTICLES MUST BE RETURNED TO THEIR ORIGINAL CONDITION.
FIRE PROOFING / FIRE STOPPING GENERAL NOTES:
1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL PENETRATIONS. CONSTRUCTION TO CONFORM TO
MANUFACTURER'S FIRE RATED/TEST ASSEMBLIES.
2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS/PARTITIONS AND FLOORS. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL WITH U.L. DESIGN NUMBER AND
ASTM. FIRE RATED WALLS SHOWN ON PLAN.
3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION.
4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-LABEL EXISTING WALL IF NECESSARY.
5. MAINTAIN 2-HR FIRE RATED FLOOR AT PENETRATIONS, EXISTING FLOOR SLAB, AND 2-HR DECK WITH
FIREPROOFING. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY.
ARCHITECTURAL SYMBOLS
A101
DETAIL NUMBER
0 COLUMN NUMBER/GRID LINE
SHEET NUMBER
ARCHITECTURAL SECTION
WINDOW TYPE
1 Ref
R e f
1 Ref
R e f
ARCHITECTURAL ELEVATION
A888
DETAIL NUMBER
SHEET NUMBER
CENTER LINE
DIMENSION LINE
DOOR NUMBER SYMBOL
1"
EXISTING TO REMAIN
NEW CONSTRUCTION
EXISTING TO BE REMOVED
EXISTING TO REMAIN
1i
KEYNOTE - FLOOR PLAN
KEYNOTE - DEMOLITION PLAN
X
X
PHASING LIST
PHASE 1 - ABATEMENT JC & JB CAMPUSES
PHASE 2 - JC B1 - 2A18C
PHASE 3 - JC B1 - 6 FL ENDO
PHASE 4 - (DEDUCT ALT) JC-B7
PHASE 5 - JB-B1 - 2 EAST-SOUTH/CTR RENOVATION
- REFER TO PROJECT MANUAL & PHASING PLANS FOR DETAILED INFO.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
AUGUST 6, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:5 :2
P
M
G-002
ABBREVIATIONS, SYMBOLS, & GENERAL NOTES
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJFAHT
1 & 7
ASBESTOS AND LEAD BASED PAINT
1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING MATERIALS (ACM) PRIOR TO ANY
DEMOLITION.
2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF ASBESTOS AND LEAD BASED PAINT
REPORTS. REFER TO DIVISION 2 IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD BASED
PAINT ENCAPSULATION OR REMOVAL SPECIFICATIONS.
3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS OBTAINED FROM THE COR FOR DETAILED INFORMATION AND LOCATIONS. IF THE CONTRACTOR ENCOUNTERS
MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS CONTAINING (ACMs) ARE TO
BE PROVIDE WITH APPROPRIATE OSHA ASBESTOS TRAINING PRIOR TO START OF WORK.
4. REFER TO PHASING PLAN SHEETS IN THESE DRAWINGS. ABATEMENT AND LBP REMOVAL ACTIVITIES
SHALL BE CONDUCTED IN GENERAL ACCORDANCE WITH THE PROJECTS PHASING STRATEGY.
HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA OF FACILITY IN QUESTION TO ABATEMENT SPECIFICATIONS FOR HANDLING OF MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT SHOULD BE EXPECTED BY THE
ABATEMENT CONTRACTOR
SEPTEMBER 12, 2018
APPLICABLE CODES & DESIGN STANDARDS:
CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):
1. Occupancy – Use Group Classification – JB Bldg. 1 & 52; JC Bldgs. 1:
a. Use Group Classification
1) IBC - Existing Building: I-2 Institutional, Hospital
2) NFPA – Health Care (New & Existing)
b. Occupancy separation:
1) Healthcare requires a 1-hour smoke barrier every 22,500sf, 200ft travel, 30sf net on each side.
2) If entire building healthcare, then:
i. Corridor wall can be smoke partition.
c. Common Path Limit: 100ft.
d. Dead End Limit: 30ft.
e. Travel Distance Limit: 200ft.
f. Fire door and glazing in 1-hour wall: 45 min.
g. Corridor Widths: 8ft corridors for gurney traffic. 44” clear for remainder.
h. Doors required to be 3’-0” wide minimum, with openings to be sized appropriate to accommodate room functions.
i. Intervening rooms not permitted, unless they are accessory to the space served.
j. 1-hour hazardous areas: storage over 100sf, 1-hour rated fire-smoke barrier.
k. Suite walls shall be smoke partitions, no fire rating.
2. Construction Type:
a. Construction Type
1) JB Building 1:
i. IBC - Type I-A (Assumed based on 1920 construction)
ii. NFPA – Type I (332).
2) JB Building 52:
i. IBC - Type I-A (Assumed based on 19xx construction)
ii. NFPA – Type I (332).
3) JC Building 1:
i. IBC - Type I-A (Assumed based on 1950 construction)
ii. NFPA – Type I (332).
3. Seismic Design:
a. VA H-18-8 / July 2008 / Design Category = Table 1: Critical Facility (Hospital)
1) Spectral Response Accelerations:
i. SS (VA H-18-8) – Table 3 0.596
ii. SI (VA H-18-8) – Table 3 0.171
b. IBC Seismic (Chpt. 1613):
1) Hospital with Emergency Room - Seismic Risk Category IV (Table T1604.5)
2) Seismic Design Category – Short Period (0.2-second) Response Acceleration based on IBC SDS @ 0.183g = C (1613.3.4, Table T1613.3.5(1))
3) Seismic Design Category- 1-Second Period Response Acceleration based on IBC
SD01 @ 0.596g = D (1613.3.4, Table T1613.3.5(2))
c. Renovation project will require seismic design considerations for installation of new suspended acoustical ceilings and FMEPT items. Campuses are located in Zone 1. Need to review with VASTLHCS Engineering for current methods used in renovations.
4. Fire Resistive Requirements:
a. International Building Code – Table 601 – Type I-B
1) Structural Frame (Columns, Girders, Trusses)
i. Supporting Floor 2 Hr
ii. Supporting Roof only 1-1/2 Hr
2) Bearing Walls
i. Exterior (not less than Fire Separation) 3 Hr
ii. Interior 3 Hr
iii. Interior (Support Roof only) 2 Hr
3) Nonbearing Walls and Partitions (Table 602 – Group 1)
i. Exterior (Fire Separation: X < 5 Ft) 1 Hr
ii. Exterior (Fire Separation: 5 < X < 10 Ft) 1 Hr
iii. Exterior (Fire Separation: 10 < X < 30 Ft) Hr
iv. Exterior (Fire Separation: 30 < X Ft) 1 Hr
4) Nonbearing Walls and Partitions
i. Interior (Except as noted below) 0 Hr
ii. Fire Walls (Table 705.4) 3 Hr
iii. Fire Barriers (Table 70.3.7) 2 Hr
iv. Shaft Enclosure (Figure 707.4)
Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr
v. Fire Partitions (708.3) 1 Hr
vi. Smoke Barriers (708.3) 1 Hr
vii. Smoke Partitions (403.3 & 710.3) 0 Hr
viii. Corridors (with Fire Sprinklers Table 1016.1) 0 Hr
ix. Vertical Exit Enclosures (Section 1019.1)
Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr
x. Exit Passageways (Section 1020.3) Walls/Floor/Ceiling (Separately) 1 Hr Walls/Floor/Ceiling Connecting (Exit Encl.) 2 Hr
xi. Horizontal Exits (Figure 1021.1) 2 Hr
5) Floor Construct (Incl. Support Beams & Joists) 2 Hr
6) Roof Construct (Incl. Support Beams & Joists) 2 Hr
b. NFPA 101/Life Safety Code – Table A.8.2.1.2 – Type I (3.3.2)
1) Exterior Bearing Walls
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 3 Hr
iii. Supporting Roof Only 3 Hr
2) Interior Bearing Walls
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
3) Columns
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
4) Beams, Girders, Trusses and Arches
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
5) Floor Construct (Incl. Support Beams & Joists) 2 Hr
6) Roof Construct (Incl. Support Beams & Joists) 1-1/2 Hr
7) Exterior Non-Bearing Walls 0 Hr
CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):
5. Fire Protection: Fully Sprinkled
6. Building Project Data:
Approximate Project Area JB – Bldg. 1 (Abatement + Renovation) 6,802sf JB – Bldg. 52 (Abatement Only) 1,644sf JC – Bldg. 1 (Abatement + Renovation) 2,958sf
7. Building Envelope/ Opaque Thermal Requirements:
a. ASHRAE 90.1-2010, Zone 4:
1) Roof: Attic R-20ci.
2) Exterior Walls: Mass R-9.5ci.
3) Wall below grade: Not required.
4) Unheated Slabs: Not required.
5) Opaque Doors: Swinging U-0.700, Non swinging U-0.500.
6) Fenestration/ Vertical Glazing, 0% - 40% of wall:
i. Curtainwall/ Storefront: U-0.50
ii. Entrance Door: U-0.85
iii. SHGC: 0.40
b. IECC 2012: Zone 4
1) Roof: Attic R-30ci.
2) Exterior Walls: Mass R-9.5ci.
3) Wall below grade: R-7.5ci.
4) Unheated Slabs: R-10 for 24” below.
5) Opaque Doors: Swinging U-0.77, Non-swinging R-4.75
6) Fenestration/ Vertical Glazing, 0% - 30% of wall:
i. Fixed: U-0.38
ii. Operable: U-0.45
iii. Entrance Doors: U-0.77
MEANS OF EGRESS TO
EXTERIOR OF BUILDINGS
FIRE EXTINGUISHER LOCATION
EXIT
FIRE BARRIER
SMOKE BARRIER
PATIENT NON-SLEEPING UNIT
HAZARDOUS AREAS
EQUIVALENCY AREAS
SYMBOL LEGEND
E
CODE INFORMATION
4. NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
5. Occupational, Safety and Health Administration (OSHA) Standards.
6. Joint Commission on Accreditation of Healthcare Organizations (JCAHO) Requirements.
7. National Electrical Code (NEC)
8. International Plumbing Code (IPC)
9. ASME Boiler and Pressure Vessel Code
10. ASME Code for Pressure Piping
11. American with Disabilities Act (ADA), Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
12. State of Missouri Department of Health and Senior Services
13. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification.
14. Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2004.
15. Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.
16. American Society of Heating, Refrigeration and Air- Conditioning Engineers (ASHRAE) Standard 90.1-2010, except where 90.1-2004 or 90.1-2007 are referenced or adopted by specific Veterans Affairs Design and Construction Procedures.
17. Energy Policy Act of 2005 (EPAct) and American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) Standard 90.1-2004 Appendix G.
18. Extended Industry- Standard Architecture (EISA) 2007 for new facility fossil fuel generated energy consumption reduction.
B. Authorities Having Jurisdiction:
1. VA must function as the Authority Having Jurisdiction (AHJ).
VA is not subject to local imposition of code enforcement procedures.
2. Joint Commission on the Accreditation of Healthcare Organizations (JCAHO)
3. US Department of Health & Human Services (H&HS)
A. Building Codes and Regulations (Latest Editions)
1. Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
a. Master Construction Specifications, Program
Guide, PG‐18‐1
b. Design and Construction Procedures,PG‐18‐3
c. Standard Details, PG‐18‐4
d. Equipment Guide List, PG‐18‐5
e. Equipment Reference Manual, PG‐18‐6
f. Design Manuals for applicable disciplines, PG-18-10
g. Design Guides for graphics, PG-18-12
h. Barrier Free Design Guide, PG-18-13 (See item A.11 below)
i. Environmental Compliance Manual, PG-18-17
j. VA Sustainable Design Guide
k. VA Directives, Design Manuals and Design
Guides
1) VHA Directive 1116(2) – Sterile
Processing Services (SPS)
2) VHA Directive 1761(1) –
Supply Chain Management (SCM)
l. VA Design Alerts
m. VA Quality Alerts
n. VA National CAD Standard Application Guide and BIM Guide
o. VA Drawing Title Box Layout
p. VA AE Design Submission Requirements
q. VA Design Review Checklists
r. Minimum Requirements for A/E Submissions for
Minor and Minor Miscellaneous projects, Handbook H‐18‐15 Volume C
s. Office of Construction & Facilities Management Design Manual, Architectural Design Manual
t. VA Medical Center Memorandums (MCM) (request from COR)
u. Manual for Preparation and Issuance of ConstructionSolicitation and Contract Documents
v. Technical Summaries
w. National Codes and Standards (NFPA, NEC, Natl. Plumbing Code, EPA, OSHA, etc.)
x. Uniform Accessibility Standards
y. Asbestos Abatement Design Manual
z. Electrical Design Manual for Hospital Project
aa. Fire Protection Design Manual
bb. Estimating Manual
cc. Seismic Requirements
dd. VA Form 10-6238 Estimate
Worksheet.
2. NFPA and VA Fire Projection Manual for fire protection.
3. NFPA 101 Life Safety Code: addresses life safety and fire protection features.
a. International Building Code (IBC): Items not addressed in NFPA 101, including structural s trength, seismic stability, sanitation, adequate light and ventilation, and energy conservation.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:1 :4
P
M
GI-001
CODE REVIEW & LIFE SAFETY PLAN - LEGEND & CODE INFORMATION
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
T
MEANS OF EGRESS TO
EXTERIOR OF BUILDINGS
FIRE EXTINGUISHER LOCATION
EXIT
FIRE BARRIER
SMOKE BARRIER
PATIENT NON-SLEEPING UNIT
HAZARDOUS AREAS
EQUIVALENCY AREAS
SYMBOL LEGEND
E
J
I
H
G
F
E
D
A
B
C
7 6 5 489
E
E
J
I
H
G
F
E
7 6 5 2 13489
E
E
CORRIDOR
H202
CORRIDOR
H203
MRI EQUIPMENT
A201
SUPPLIES
A202D
CHEST X-RAY
A203
MULTI-PURPOSE
RM.
A210
TOILET
A210A
HAC
A212
IMAGING
NURSES
A202A
CLEAN UTILITY
A202B
TOILET
A202C
FILM VIEW
A216
RADIOGRAPHIC
AND
FLUOROSCOPIC
A217
TOILET
A218
RADIOGRAPHIC
A219
X-RAY
A220
CONTROL
A221
CT CONTROL
A222
RADIOGRAPHIC
AND
FLUOROSCOPIC
A215
TOILET
A216C
CONTROL
A217AEQUIPMENT
STORAGE
A218C
TOILET
A219E
CONTROL
A219D
LASER PRINT
A219B FILM STORAGE
A219C
DUMB WAITER
LOBBY
A219A
ELEC. CLOSET
A220A
STAIRWELL NO. 2
S202
CT SCAN
A224
TOILET, FEMALE
A225A
TOILET, MALE
A226A
OI&T
A227
STAIRWELL NO. 1
S201
CONTROL
A215A
LOCKER RM,
MALE
A226
LOCKER RM,
FEMALE
A225
ELEVATOR
LOBBY
H210
F.E. CLOSET
H210B
CHASE
CH-A-7
CHASE
CH-A-6
ELEC. CLOSET
A228
F.E. CLOSET
H202B LOUNGE
A601
OFFICE
A602
HAC
A603
NURSE
MANAGER
A604
MED. PREP.
A605
NURSE STATION
A606
NOUR.
A607
GI PROCEDURE
ROOM
A608
PROCEDURE RM.
A609 PROCEDURE RM.
A610
SCOPE
A610A
PROCEDURE RM.
A611PROCEDURE RM.
A612
SCOPE
CLEANING
A613B
CLEAN
A614
SOILED
A615
MED RM.
A613A
CLEAN UTILITY
A611ASCOPE
CLEANING DIRTY
SIDE
A613
CORRIDOR
H601
NURSE BREAK
RM.
A616
STAIRWELL NO. 2
S602
CORRIDOR
H602
TOILET
A626A
OFFICE
A629
TOILET
A627A
TOILET
A628
OI&T
A629B
OI&T
A629C
BED RM.
A626
CORRIDOR
H606
CORRIDOR
H603
STAIRWELL NO. 1
S601
BED RM.
A627
F.E. CLOSET
H606B
CHASE
CH-A-8
CHASE
CH-A-10
CHASE
CH-A-7
CHASE
CH-A-11
CHASE
CH-A-18
CHASE
CH-A-17
F.E. CLOSET
H602A
CHASE
CH-A-12
CHASE
CH-A-6
ELEC. CLOSET
A629A
CHASE
CH-A-19
CHASE
CH-A-9
CODE INFORMATION & DESIGN STANDARDS GENERAL NOTES
1. REFER TO SHEET GI-001.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:0 :4
P
M
1-2-GI-101A
CODE REVIEW & LIFE SAFETY PLAN - LEVEL 2 & 6 - AREA A
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
TRUE
1/8" = 1'-0"1
LEVEL 2 - CODE REVIEW & LIFE SAFETY PLAN - SECTION A
1/8" = 1'-0"2
LEVEL 6 - CODE REVIEW & LIFE SAFETY PLAN - SECTION A
TRUE
A
B
C
D
KEY PLAN
ARARE
Q
P
O
M
L
K K
J J
I I
H
G
F
E
D
B
C
N
3-A 2.5-A 2-A
1-A 0.9-A 15 7 6 5 2 1348911121314
10161719 18
E-A
D-A
C-A
B-A
S
R
E
E
E
EXAM
TREATMENT
A938A
ORAL SURGERY
A936A
EXAM
TREATMENT
A938B
ORAL SURGERY
A936B
STAIRWELL NO. 5
S905
EXAM
TREATMENT
A938C
OFFICE
A935
BREAK RM.
A934
F.E. CLOSET
H904C
DENTAL
HYGIENE
A938D
EXAM
TREATMENT
A939
STORAGE
A940
X-RAY PANO
A941
SOILED UTILITY
A942
HAC
A943B
LAB
A933
OFFICE
A932
CLOSET
A930A
MECH. RM.
A930
OFFICE
A931
LOBBY
H905
TOILET, MALE
A945ATOILET, FEMALE
A945B
WAITING RM.
A944
RECEPTION
A943
CORRIDOR
H904
TOILET
A945
HAC
A945C
TRAINING RM.
A926
HAC
A924
MECH. RM.
A923
TOILET, FEMALE
A925
HAC
A929
STORAGE
A928A
HAC
A928
CORRIDOR
H906
STAIRWELL NO. 1
S901
STORAGE
A917
OI&T
A916
OFFICE
A919OFFICE
A920A
OFFICE
A920
OFFICE
A921
ELEVATOR
LOBBY
H907
STORAGE
A927A
IDENTIFICATION
AND BADGING
A927
CORRIDOR
H908
CORRIDOR
H909
OFFICE
B907
OFFICE
B906
STORAGE
B905
TOILET
A921A
OFFICE
A922
OFFICE
B901
OFFICE
B902
OFFICE
B903
MECH. RM.
B904A
MECH. RM.
B904
MECH. RM.
B904E
STORAGE
CLOSET
A915
OFFICE
A914
CLOSET
A912B
LAB
A912
CLOSET
A913
LAB
A911
STAIRWELL NO. 2
S902
LAB
A909
CLOSET
A909A
F.E. CLOSET
H901A
CORRIDOR
H901
LAB
A901
CONFERENCE
RM.
A908
OFFICE
A908B
LAB
A905
LAB
A906
OFFICE
A908A
OFFICE
A903
LAB
A902
STORAGE
A912A
INSTR. PREP
H904A
CORRIDOR
H904B
CORRIDOR
H903
CORRIDOR
H902
CORRIDOR
H902A
DARK RM.
A907
STORAGE
B904B
STORAGE
B904C
OFFICE
B904D
ELEC PANELS
A904
ELEVATOR NO. 1
E1
ELEVATOR NO. 2
E2ELEVATOR NO. 3
E3
ELEVATOR NO. 4
E4 ELEVATOR NO. 5
E5
ELEVATOR NO. 6
E6
CHASE
CH-A-1
CHASE
CH-A-2
CHASE
CH-A-3
F.E. CLOSET
H907A
TOILET
A937ASTORAGE
A943A
CHASE
CH-A-4
CHASE
CH-A-5
CHASE
CH-A-6
CHASE
CH-A-7
CHASE
CH-A-8
CHASE
CH-A-9
CHASE
CH-A-10
CHASE
CH-A-11
MEANS OF EGRESS TO
EXTERIOR OF BUILDINGS
FIRE EXTINGUISHER LOCATION
EXIT
FIRE BARRIER
SMOKE BARRIER
PATIENT NON-SLEEPING UNIT
HAZARDOUS AREAS
EQUIVALENCY AREAS
SYMBOL LEGEND
E
CODE INFORMATION & DESIGN STANDARDS GENERAL NOTES
1. REFER TO SHEET GI-001.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:1 :2
P
M
1-9-GI-101
CODE REVIEW & LIFE SAFETY PLAN - LEVEL 9 & ROOF OVERALL
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
1/16" = 1'-0"1
LEVEL 9 - OVERALL CODE REVIEW & LIFE SAFETY PLAN
TRUE
A B
KEY PLAN
B
C
D
E
F
G
A
2 1
E
E
E
E
OFFICE
OFFICE
1A
OFFICE
2A
OFFICE
EMERGENCY
MANAGEMENT
ELEC. CLOSET
OI&T
MECH. RM.
ACCESS
SAFETY &
OCCUPATIONAL
HEALTH
EQUIPMENT RM.
CORRIDOR
C101
OFFICE
3A
INDUSTRIAL
HYGIENIST
CORRIDOR
C101
OFFICE
OFFICE
5A
STORAGE
BREAK ROOM
HAC
TOILET, MALE
TOILET, FEMALE
CALL CENTER
CORRIDOR
C101
MECH. RM.
ACCESS
OFFICE
MULTI-PURPOSE
RM.
CORRIDOR
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
SAFETY &
OCCUPATIONAL
HEALTH MGR.
CALL CENTER
OFFICE
6A
OFFICE
7A
CALL CENTER
CHASE
CH-1
OI&T
1B
MEANS OF EGRESS TO
EXTERIOR OF BUILDINGS
FIRE EXTINGUISHER LOCATION
EXIT
FIRE BARRIER
SMOKE BARRIER
PATIENT NON-SLEEPING UNIT
HAZARDOUS AREAS
EQUIVALENCY AREAS
SYMBOL LEGEND
E
CODE INFORMATION & DESIGN STANDARDS GENERAL NOTES
1. REFER TO SHEET GI-001.
APPLICABLE CODES & DESIGN STANDARDS:
CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):
A. Building Classification – JC Building 7
1. Occupancy – Use Group Classification – JC Bldg. 7 (Non-Sprinkled):
a. Use Group Classification
1) IBC - Existing Building: B Business
2) NFPA – B Business (New & Existing)
b. Number of occupants (Bldg. 7+7A):
1) Business - 100gsf/person x 9,311gsf = 94 occupants
2) Accessory (Mech.) – 300sf/person = 1,448sf = 3 occupants
(Basement – Bldg. 7 + 2nd Floor – Bldg. 7A)
c. Occupancy separation:
1) No subdivision required (NFPA 38.3.7)
2) Corridor walls are not required to be rated - single tenant (NFPA 38.3.6)
d. Common Path Limit: 75ft (100ft. if sprinkled)
e. Dead End Limit: 50ft. existing, 20ft. new (50ft. if sprinkled) (NFPA Table T7.6)
f. Travel Distance Limit: 200ft. (300ft. if sprinkled)
g. Egress Remoteness Diagonal (NFPA 7.5.1.3): ½ the diagonal length of the building.
h. Fire door and glazing in 1-hour wall: 45 min.
i. Egress Corridor Width (NFPA 7.3, Table T7.3.3.3.1):
1) Minimum = 36” minimum;
2) Calculated - 0.2” x 97 occupants = 19.4”;
3) Provided – 48” (Bldg. 7A corridor)
j. Doors required to be 3’-0” wide minimum, with openings to be sized appropriate to accommodate room functions.
k. Intervening rooms not permitted, unless they are accessory to the space served.
l. 1-hour hazardous areas: storage over 100sf, 1-hour rated fire barrier, with self-closing 45min door (NFPA 38.3.2.2.)
m. Suite walls shall have no fire rating; corridor walls shall be 1-Hr unless single tenant or sprinkled or open plan (NFPA 38.3.6).
n. Fire Alarm required if > 3 stories, 50+ occ. Above 1st Floor, or 300+ occupants total (NFPA 38.3.4.1)
o. Fire Extinguisher = Portable (NFPA 38.3.5)
2. Construction Type:
a. Construction Type
1) JC Building 7:
i. IBC - Type I-A (Assumed based on 1950 construction)
ii. NFPA – Type I (332).
3. Seismic Design:
a. VA H-18-8 / July 2008 / Design Category = Table 1: General Administration Office
1) Spectral Response Accelerations:
i. SS (VA H-18-8) – Table 3 0.596
ii. SI (VA H-18-8) – Table 3 0.171
b. IBC Seismic (Chpt. 1613):
1) Business - Seismic Risk Category II (Table T1604.5)
2) Seismic Design Category – Short-Period (0.2-sec.) Response
Acceleration based on IBC SDS @ 0.183g = B (1613.3.4, Table T1613.3.5(1))
3) Seismic Design Category – 1-Second Period Response
Acceleration based on IBC SD01 @ 0.596g = D (1613.3.4, Table 1613.3.5(2))
c. Renovation project will require seismic design considerations for installation of new suspended acoustical ceilings and FMEPT items. Campuses are located in Zone 1.
Need to review with VASTLHCS Engineering for current methods used in renovations.
4. Fire Resistive Requirements:
a. International Building Code – Table 601 – Type I-B
1) Structural Frame (Columns, Girders, Trusses)
i. Supporting Floor 2 Hr
ii. Supporting Roof only 1-1/2 Hr
2) Bearing Walls
i. Exterior (not less than Fire Separation) 3 Hr
ii. Interior 3 Hr
iii. Interior (Support Roof only) 2 Hr
3) Nonbearing Walls and Partitions (Table 602 – Group 1)
i. Exterior (Fire Separation: X < 5 Ft) 1 Hr
ii. Exterior (Fire Separation: 5 < X < 10 Ft) 1 Hr
iii. Exterior (Fire Separation: 10 < X < 30 Ft) 1 Hr
iv. Exterior (Fire Separation: 30 < X Ft) 1 Hr
4) Nonbearing Walls and Partitions
i. Interior (Except as noted below) 0 Hr
ii. Fire Walls (Table 705.4) 3 Hr
iii. Fire Barriers (Table 70.3.7) 2 Hr
iv. Shaft Enclosure (Figure 707.4)
Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr
v. Fire Partitions (708.3) 1 Hr
vi. Smoke Barriers (708.3) 1 Hr
vii. Smoke Partitions (403.3 & 710.3) 0 Hr
viii. Corridors (with Fire Sprinklers Table 1016.1) 0 Hr
ix. Vertical Exit Enclosures (Section 1019.1)
Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr
x. Exit Passageways (Section 1020.3) Walls/Floor/Ceiling (Separately) 1 Hr Walls/Floor/Ceiling Connecting (Exit Encl.) 2 Hr
xi. Horizontal Exits (Figure 1021.1) 2 Hr
5) Floor Construct (Incl. Support Beams & Joists) 2 Hr
6) Roof Construct (Incl. Support Beams & Joists) 2 Hr
CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):
b. NFPA 101/Life Safety Code – Table A.8.2.1.2 – Type I (3.3.2)
1) Exterior Bearing Walls
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 3 Hr
iii. Supporting Roof Only 3 Hr
2) Interior Bearing Walls
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
3) Columns
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
4) Beams, Girders, Trusses and Arches
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
5) Floor Construct (Incl. Support Beams & Joists) 2 Hr
6) Roof Construct (Incl. Support Beams & Joists) 1-1/2 Hr
7) Exterior Non-Bearing Walls 0 Hr
5. Fire Protection: Extinguisher-Portable (NFPA 38.3.4)
a. Existing building has standpipe and fire hose.
b. Fire alarm required if > 3 stories, 50+ occupants above
1st floor, or 300+ occupants total (NFPA 38.3.4.1)
6. Building Project Data:
Approximate Project Area JC – Bldg. 7 (Renovation – Restrooms + Hall) 255sf
Area – Basement (Bldg. 7 Mech)-excluding Crawl Space 947sf Area – 1st Floor (Bldg. 7+7A) 9,311sf Area – 2nd Floor (Bldg.7A Mech) 501sf Total Bldg. Area (Bldg. 7+7A) 10,759sf
7. Building Envelope/ Opaque Thermal Requirements:
a. ASHRAE 90.1-2010, Zone 4:
1) Roof: Attic R-20ci.
2) Exterior Walls: Mass R-9.5ci.
3) Wall below grade: Not required.
4) Unheated Slabs: Not required.
5) Opaque Doors: Swinging U-0.700, Non-swinging U-0.500.
6) Fenestration/ Vertical Glazing, 0% - 40% of wall:
i. Curtainwall/ Storefront: U-0.50
ii. Entrance Door: U-0.85
iii. SHGC: 0.40
b. IECC 2012: Zone 4
1) Roof: Attic R-30ci.
2) Exterior Walls: Mass R-9.5ci.
3) Wall below grade: R-7.5ci.
4) Unheated Slabs: R-10 for 24” below.
5) Opaque Doors: Swinging U-0.77, Non-swinging R-4.75
6) Fenestration/ Vertical Glazing, 0% - 30% of wall:
i. Fixed: U-0.38
ii. Operable: U-0.45
iii. Entrance Doors: U-0.77
8. Minimum Number of Required Plumbing Fixtures
a. Bldg. 7+7A = 9,311gsf = 94 occupants + 3/Mech = 97 occupants
b. Water Closets – 1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50
1) Required = 3 minimum - Provided = 5 (3 exist + 2 new)
c. Lavatories – 1 per 40 for the first 80 and 1 per 80 for the remainder exceeding 80; 97 people = 3 lavatories/minimum req’d.
1) Required = 3 minimum – Provided = 4 (2 exist + 2 new)
d. Urinals (IPC Sec 419.2) – Urinals shall not be substituted for more than 50% of req’d. water closets.
Provided = 1 (0 exist. + 1 new)
e. Drinking Fountains – 1 per 100
1) Required = 1 - Provided = 1 (1 exist) th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
LESS THAN 10% SPRINKLED
DEDUCT ALTERNATE #1
VETERANS
HEALTH
ADMINISTRATION
BID DOCUMENTS
Stamp
/1
/2
:4 :4
P
M
7-1-GI-101
CODE REVIEW & LIFE SAFETY PLAN - LEVEL 1
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 7
AHT
1/8" = 1'-0"1
LEVEL 01 - CODE REVIEW & LIFE SAFETY PLAN
TRUE
H
G
F
E
2 134
PHASE 3D
PHASE 3E
PHASE 3D
PHASE 3E
PHASE 3D
PHASE 3E
PHASING NOTES & LEGEND
GENERAL PHASING NOTE:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION
CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO THE ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION. COPIES OF THE MOST-CURRENT ASBESTOS REPORT AND LEAD-BASED PAINT
REPORT ARE TO BE OBTAINED FROM THE COR.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC.) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE POTENTIAL TO
DISRUPT THE ADJACENT DEPARTMENTS.
PHASE 3A:
GENERAL DESCRIPTION #
2. PHASE 2 – PARTIAL DEMOLITION AND RENOVATION OF JOHN COCHRAN BUILDING 1-2ND FLOOR SECTION A – SOUTH
ROOM A218C FOR CLEAN STORAGE.
A. AREA TO BE CORDONED OFF IN THE CORRIDOR BY CONSTRUCTION BARRIER/DOOR TO ALLOW WORK TO
PROGRESS FROM START (DEMOLITION) TO FINISH (COMPLETION OF FINISHES).
B. PLACEMENT OF THE TEMPORARY BARRIER SHALL ALLOW FOR ACCESS TO ROOM A219. ENTRY TO A219 AND
ADJACENT ROOMS SHALL NOT BE RESTRICTED DURING REGULAR WORKING HOURS.
3. PHASE 3 - PARTIAL DEMOLITION AND RENOVATION OF JOHN COCHRAN BUILDING 1-6TH FLOOR SECTION A – SOUTH
ENCOSCOPY PROCEDURE & DECONTAMINATION WING FOR NEW HVAC.
A. SUBPHASE ‘A’: WORK TO BEGIN ON 8th and 9th FLOOR ROOFS FOR HVAC REWORK, EXHAUST DUCT AND AIR
HANDLING UNIT INSTALLATION, AND PROGRESS DOWNWARD FROM ROOF THROUGH 8TH AND 7TH
FLOORS TO 6TH FLOOR. HVAC INFRASTRUCTURE WILL NEED TO BE INSTALLED FIRST. 6TH FLOOR CEILINGS AND FINISHES WILL HAVE TO BE COMPLETED LAST. OCCUPANTS OF ROOMS ADJACENT TO ROOF WORK AREA ON 9TH FLOOR (i.e. A902, A903) TO BE TEMPORARILY RELOCATED DURING WORK ON
ROOF.
B. SUBPHASE ‘B’: WORK ON 8TH AND 7TH FLOORS FOR ROUTING OF DUCTWORK TO 6TH FLOOR ENDOSCOPY AREA –
AFTER-HOURS WORK TO REMOVE PORTIONS OF ROOF. WALLS AND FLOORS FOR DUCT CHASE
BETWEEN PATIENT BEDROOMS A710-A711 AND AT THE END OF CORRIDOR H803. OCCUPANTS OF EXAM ROOMS A813, A814, PATIENT BEDROOMS A710 and A711 IN WORK AREA TO BE RELOCATED DURING DEMOLITION, INSTALLATION OF DUCTWORK, ENCLOSURE AND FINISHING OF CHASES.
a. PORTIONS OF ROOMS A610 AND A611 ARE TO BE PARTITIONED OFF WITH TEMPORARY CONSTRUCTION
PARTITIONS DURING SUBPHASE B TO ALLOW FOR DEMOLITION AND CONSTRUCTION OF NEW DUCT
CHASE AND INFRASTRUCTURE INCLUDING HVAC, PLUMBING, AND RELATED WORK.
C. SUBPHASES ‘C’ & ‘D’: CEILINGS IN 6TH FLOOR ROOMS DESIGNATED FOR WORK MAY BE PARTIALLY OR FULLY REMOVED AND REPLACED FOR INSTALLATION OF NEW HVAC EQUIPMENT AND CEILINGS COMPLIANT WITH
REQUIREMENTS FOR PROCEDURE AND DECONTAMINATION ROOMS.
D. SUBPHASE ‘C’: ROOMS A608, A609 AND A610 ARE TO BE COMPLETED FIRST, WITH WORK ON NIGHTS AND WEEKENDS. WORK IN CORRIDOR H601 TO BE COMPLETED DURING NIGHTS/WEEKENDS AND RETURNED TO
USABLE CONDITION BY STAFF AND PATIENTS PRIOR TO THE START OF NORMAL WORK DAYS.
E. SUBPHASE ‘D’: ROOMS A611, A611A, A612, A613, A613A AND A613B ARE TO BE RENOVATED AFTER COMPLETION OF SUBPHASE ‘C’, STARTING IN PROCEDURE ROOMS AND PROGRESSING UNTIL REACHING SCOPE AND
DECONTAMINATION ROOMS.
PHASE 3B:
GENERAL DESCRIPTION #
APPLICABLE NOTES
1. WORK AS PART OF SUBPHASE 3A TO TAKE PLACE CONCURRENTLY WITH SUBPHASE 3B.
2. AT LEAST TWO PROCEDURE ROOMS MUST BE IN OPERATION DURING RENOVATION, INCLUDING ONE ROOM
FOR MODERATE ANESTHESIA AND ONE ROOM FOR FULL ANESTHESIA.
3. SCOPE AND DECONTAMINATION ROOMS TO REMAIN IN OPERATION DURING SUBPHASE ‘C’ RENOVATION. VA
WILL TEMPORARILY RELOCATE SCOPE AND DECONTAMINATION TO ELSEWHERE IN THE BUILDING OUTSIDE OF THE PROJECT AREA PRIOR TO BEGINNING OF SUBPHASE ‘D’ TO ALLOW FOR FULL ACCESS TO ROOMS
DURING RENOVATION.
4. REMOVAL OF EXISTING RADIATORS AT EXTERIOR WALLS WOULD BE DONE AT SAME TIME AS HVAC WORK.
5. TEMPORARY CONSTRUCTION BARRIERS (POLY) MAY BE PLACED AT INDIVIDUAL ROOM ENTRANCES. ROOMS
TO HAVE STICKY WALK-OFF MATS DURING CONSTRUCTION.
6. A TEMPORARY CONSTRUCTION BARRIER MAY BE PLACED ON THE WEST END OF CORRIDOR H601 ENTRANCE
TO PROCEDURE/DECONTAMINATION SUITE TO ALLOW FOR THE CORRIDOR TO BE WORKED ON IN ITS ENTIRETY DURING WEEKENDS. BARRIER WOULD NEED TO BE REMOVED PRIOR TO THE START OF REGULAR
HOURS ON MONDAY.
7. TEMPORARY RELOCATION MAY BE CONSIDERED FOR SCOPE CLEANING/PROCESSING DURING SUBPHASE ‘C’ IF SWING SPACE CAN BE FOUND ELSEWHERE IN HOSPITAL TO TEMPORARILY LOCATE DEPARTMENT OR
PROCESSING/DECONTAMINATION FUNCTIONS.
PHASE 3C:
GENERAL DESCRIPTION #
PHASE 3D:
GENERAL DESCRIPTION #
PHASE 3E:
GENERAL DESCRIPTION #
PHASE 2A:
GENERAL DESCRIPTION #
PHASE 2B:
GENERAL DESCRIPTION #
ALL WORK TO FOLLOW PROTOCOLS FOR UNCOVERING OF AND ABATEMENT OF HAZARDOUS MATERIALS AS CEILINGS, WALLS AND CHASES ARE REMOVED AS WORK PROGRESSES.
NURSE STATION
A606
NOUR.
A607
GI PROCEDURE
ROOM
A608
PROCEDURE RM.
A609
PROCEDURE RM.
A610
SCOPE
A610A
PROCEDURE RM.
A611PROCEDURE RM.
A612
SCOPE
CLEANING
A613B
CLEAN
A614
MED RM.
A613A
CLEAN UTILITY
A611A
SCOPE
CLEANING DIRTY
SIDE
A613
CORRIDOR
H601
CHASE
CH-A-8
CHASE
CH-A-10
CHASE
CH-A-7
CHASE
CH-A-11
CHASE
CH-A-6
CHASE
CH-A-9
H
G
F
E
2 134
CONTRACTOR ACCESS
TO ROOF
EXISTING ROOF TOP UNIT -
REFER TO MECH.
EXISTING ROOF TOP UNIT -
REFER TO MECH.
H
G
F
E
H
G
F
E
3 BED PATIENT
RM.
A710
3 BED PATIENT
RM.
A711
CHASE
CH-A-5
EXAM
A810
EXAM
810A
CORRIDOR
H803
EXAM
A811
EXAM
A811A
LAB
A905
OFFICE
A903
LAB
A902
A
B
7 6 5
CORRIDOR
H202
FILM VIEW
A216
RADIOGRAPHIC
AND
FLUOROSCOPIC
A217
TOILET
A218
RADIOGRAPHIC
A219
CONTROL
A217A
EQUIPMENT
STORAGE
A218C
TOILET
A219E
CONTROL
A219D
LASER PRINT
A219B
FILM STORAGE
A219C
DUMB WAITER
LOBBY
A219A th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:0 :3
P
M
1-6-GC-101A
PHASING PLAN, NOTES & LEGEND - LEVELS 2, 6, 7, 8 & 9 - AREA A
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
1/4" = 1'-0"2
PARTIAL LEVEL 6 PHASING PLAN
TRUE
A
B
C
D
KEY PLAN
1/4" = 1'-0"5
PARTIAL LEVEL 8 ROOF PHASING PLAN
1/4" = 1'-0"3
PARTIAL LEVEL 7 PHASING PLAN
1/4" = 1'-0"4
PARTIAL LEVEL 8 PHASING PLAN
1/4" = 1'-0"1
PARTIAL LEVEL 2 PHASING PLAN -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.