36C25519R0017-008.pdf
PDF 625 KB Posted
- Attached to
- Correct workplace & Life Safety Issues, abate asbestos and improve wayfinding Project NO : 657-18-110
- Solicitation number
- 36C25519R0017
About this file
36C25519R0017 VOL 1_JB dwg Asbestos.pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
Dwg: Of:10 49
Revisions: Date:
BID DOCUMENTS FULLY SPRINKLERED
NOT TO SCALE
GENERAL ASBESTOS ABATEMENT NOTES
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
General Notes:
THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION
OF ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINT (LBP)
SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT
GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE
REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE
SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE
RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL LOCATIONS AND
REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS. NO CONTRACT
MODIFICATIONS WILL BE CONSIDERED FOR UNEXPECTED SITE CONDITIONS
OR ABATEMENT QUANTITIES. BY BIDDING THE PROJECT, THE ABATEMENT
CONTRACTOR ACKNOWLEDGES AND ACCEPTS ALL RISKS ASSOCIATED WITH
SITE CONDITIONS AND CONCEALED ACMS.
ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF
THE PROJECT AREAS. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE
WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE
APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS
ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE
NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE, AND LOCAL REGULATIONS; PROJECT SPECIFICATIONS, THE
APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN
REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT
REQUIREMENT SHALL APPLY. ALL WORK SHALL BE CRAFTSMAN-LIKE AND
SUBJECT TO INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND
REGULATORY PERSONNEL.
DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO
ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO,
CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR
WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET,
CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM
MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT,
AND FOR COORDINATING THE LIMITS OF DEMOLITION AND ABATEMENT
WITH THE GENERAL CONTRACTOR.
ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION
OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE
INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS
WORK.
ASBESTOS NOTES:
THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE
HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI
ENVIRONMENTAL, REVISED JUNE 22, 2018, FOR MORE INFORMATION ABOUT
ACMS IDENTIFIED IN THE PROJECT AREA.
CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS AND
CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH
DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME
EXPLORATORY DEMOLITION MAY BE REQUIRED TO DETERMINE IF
CONCEALED ACM IS PRESENT.
ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES
(NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE
SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS
ABATEMENT; SEC 02 82 11, TRADITIONAL ASBESTOS ABATEMENT; SEC 02 82
13-19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT; 02 82 13-31
ASBESTOS TRANSITE AND CLASS II ABATEMENT. FINALIZE LIMITS OF
REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM),
PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE
DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST
PRACTICES AND PHASING REQUIREMENTS.
ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR
ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER
THAN WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO
MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE
NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR,
OWNER'S REPRESENTATIVE , AND VPIH, IF NEEDED.
TSI ABATEMENT FROM SECTIONS OF PIPE AND FITTINGS TO BE DEMOLISHED
MAY BE PERFORMED USING WRAP AND CUT METHODS IF APPROVED BY THE
GENERAL CONTACTOR. COORDINATE WITH MECHANICAL DEMOLITION
DRAWINGS AND THE MECHANICAL CONTRACTOR.
ALL WASTE LOADOUT SHALL OCCUR AFTER HOURS. COORDINATE LOADOUT
ROUTES AND TIMES WITH THE GENERAL CONTRACTOR, OWNER'S
REPRESENTATIVE, AND VPIH.
ASBESTOS ABATEMENT PHASING:
THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL
CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S
REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN
ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING
REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE
REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE
CONDITIONS AND FACILITY OPERATIONS.
ASBESTOS ABATEMENT SHALL BE INITIATED AND COMPLETED AT ALL JOHN
COCHRAN CAMPUS WORK AREAS PRIOR TO BEGINNING ABATEMENT AT THE
JEFFERSON BARRACK CAMPUS WORK AREAS. THE ABATEMENT CONTRACTOR
MAY HAVE POSSESSION OF NOT MORE THAN THREE ROOMS
SIMULTANEOUSLY. ABATEMENT IN JEFFERSON BARRACK, BUILDING 1, 2ND
FLOOR, EAST WING WORK AREAS SHALL BE PERFORMED LASTLY.
PAINT CONTAINING LEAD:
LEAD-BASED PAINT (LBP) ARE PAINTS THAT CONTAIN LEAD PERCENT BY
WEIGHT. PAINT CONTAINING LEAD (PCL) IS PAINT WITH A DETECTABLE LEVEL
OF LEAD. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS,
COMPONENTS, AND SURFACES THAT MAY BE DISTURBED, PENETRATED,
REFINISHED, OR DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND
COMPONENTS WITH LBP AND/OR PCL IN ACCORDANCE WITH APPLICABLE
REGULATIONS AND THE APPROVED WORK PLAN.
FLAKING AND PEELING LBP AND/OR PCL ON SURFACES TO REMAIN SHALL BE
REMOVED AND STABILIZED USING METHODS IN ACCORDANCE WITH SECTION
02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY
AMI ENVIRONMENTAL, REVISED JUNE 22, 2018, FOR INFORMATION
CONCERNING THE PRESENCE OF LBP AND PCL IN THE PROJECT AREAS.
WDF
LEGEND:
PROPOSED LOCATION OF PERSONAL DECONTAMINATION
FACILITY (PDF)
PROPOSED LIMITS OF MAJOR AND MINOR
DECONTAMINATION AREAS (REGULATED AREAS)
PROPOSED LOCATION OF NEGATIVE AIR MACHINE (NAM)
PROPOSED LOCATION OF WASTE DECONTAMINATION
FACILITY (WDF)
TABLE 1 - ESTIMATED TSI ABATEMENT QUANTITIES
SHEET NO. DESCRIPTION FRIABLE
EST. QTY. OF
ABATEMENT
1-1-HA-101E TSI ON PIPES YES TBD
1-1-HA-101E TSI PIPE FITTINGS YES TBD
1-2-HA-102E TSI ON PIPES YES 1,110 LF
1-2-HA-102E TSI PIPE FITTINGS YES 224 EA
52-0-101N TSI ON PIPES YES 120 LF
52-0-101N TSI PIPE FITTINGS YES 40 EA
TOTAL: PIPE INS. 1,230 LF
TOTAL: FITTINGS 264 EA
TABLE 2 - ESTIMATED CLASS II ABATEMENT QUANTITIES
SHEET NO. DESCRIPTION FRIABLE
EST. QTY. OF
ABATEMENT
1-2-HA-101E FLOORING + MASTIC NO 2,079 SF
1-2-HA-101E SHEET FLOORING YES 40 SF
1-2-HA-101E SINK UNDERCOATING NO 2 EA
1-2-HA-101E FIRE DOORS NO 2 EA
52-0-101N TRANSITE PEGBOARD PANELS, 2'x2' NO 525 SF
52-0-101N FLOORING + MASTIC NO 760 SF
52-0-101N LAB COUNTER TOPS, BLACK + GREEN NO 188 SF
TOTAL: TRANSITE 525 SF
TOTAL: FLOORING + MASTIC 2,879 SF
TOTAL: SINK UNDERCOATING 2 EA
TOTAL: LAB COUNTER TOP 188 SF
TOTAL: FIRE DOORS 2 EA
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
6.
1.
2.
1.
2.
3.
VETERANS
HEALTH
ADMINISTRATION
Revisions: Date:
n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
Dwg: Of:11 49
Revisions: Date:
BID DOCUMENTS FULLY SPRINKLERED
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
OFFICE
1E19
1E04
1E02
1E17A
1E18
H101
1E01
H102
CORRIDOR
H103A
H104
STAIRWELL
NO.
1E125
1E40A
1E22
1E39 1E24
1E40
VACANT
C123C
HAC
1E23
CHASE
CH-E1-1
E2
D.W.
CH-E-2
STAIRS TO
BASEMENT
LEVEL
NOT TO SCALE
1-1-HA-101E-Hazardous Material Plan-Bldg. 1 / 1 East Wing-Center
TRUE
1-1-HA-101E-Hazardous Material Plan-Bldg. 1 / 1 East
Wing-Center
ASBESTOS KEYED NOTES:
ESTABLISH REGULATED AREA(S) (RA) WITH FULL-CONTAINMENT NEGATIVE PRESSURE ENCLOSURE(S) (NPE) AS
REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG ABATEMENT METHODS AS
REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT
FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE
TSI USING GLOVEBAG ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS
ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82
11, TRADITIONAL ASBESTOS ABATEMENT. COORDINATE STEAM SHUTDOWN, IF NECESSARY, WITH GENERAL
CONTRACTOR, OWNER OR OWNER'S REPRESENTATIVE, AND THE VPIH. IF STEAM CANNOT BE SHUT DOWN, PLAN
AND IMPLEMENT APPROPRIATE SAFETY PRECAUTIONS AND PROCEDURES TO PROTECT WORKER SAFETY AND
HEALTH.
CONDUCT EXPLORATORY DEMOLITION AS NEEDED TO ENSURE THAT ALL TSI IN THE PROJECT AREA IS IDENTIFIED
AND ABATED FROM INSIDE ALL CHASES AND WALLS AND ABOVE CEILINGS. ESTABLISH RA(S) WITH
FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE
GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL
ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AND REMOVE ASBESTOS FLOORING AND MASTIC AS REQUIRED
BY SECTION 02 82 13-19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. ALL FLOOR TILE MASTIC IS TO BE
REMOVED AS ACM.
ESTABLISH RA WITH FULL-CONTAINMENT NPE AND REMOVE TRANSITE PEGBOARD PANELS AND/OR LAB COUNTER
TOPS AS REQUIRED BY SECTION 02 82 13-31, ASBESTOS TRANSITE AND CLASS II ABATEMENT.
REMOVE SINK WITH ASBESTOS UNDERCOATING INTACT IN ACCORDANCE WITH SECTION 02 82 13-31, ASBESTOS
TRANSITE AND CLASS II ABATEMENT. COORDINATE PLUMBING DISCONNECTS WITH GENERAL CONTRACTOR.
INSTALL AND MAINTAIN RIGID PROTECTIVE BARRIER AROUND PDF.
ESTABLISH RA(S) WITH FULL-COMTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND
REMOVE TSI FROM PIPES AND FITTINGS DESIGNATED FOR DEMOLITION USING GLOVEBAG METHODS AS REQUIRED
BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL ASBESTOS ABATEMENT. TSI ABATEMENT
FROM SECTIONS OF PIPE TO BE DEMOLISHED MAY BE PERFORMED USING WRAP AND CUT METHODS IF APPROVED
BY THE GENERAL CONTRACTOR. REFER TO PLUMBING AND/OR MECHANICAL DEMOLITION DRAWING TO IDENTIFY
PIPES DESIGNATED FOR DEMOLITION. COORDINATE LIMITS OF ABATEMENT/DEMOLITION WITH THE MECHANICAL
CONTRACTOR. COORDINATE ACCESS TO THE SPACE AND, IF NECESSARY, UTILITY SHUTOFFS WITH THE GENERAL
CONTRACTOR AND THE OWNER OR OWNER'S REPRESENTATIVE.
PAINT CONTAINING LEAD KEYED NOTES
REMOVE AND DISPOSE OF LOOSE AND PEELING PAINT CONTAINING LEAD (PCL) FROM SURFACES TO REMAIN IN
ACCORDANCE WITH SECTION 02 83 33-13, LEAD-BASED PAINT REMOVAL AND DISPOSAL, AND APPLY AN APPROVED
PRIMER TO ENCAPSULATE AFFECTED AREAS. WORK TO BE PERFORMED INSIDE A NPE. COORDINATE WITH ASBESTOS
ABATEMENT TO UTILIZE NPES ESTABLISHED FOR ASBESTOS ABATEMENT, WHERE POSSIBLE.
A
WDF
LEGEND:
PROPOSED LOCATION OF PERSONAL DECONTAMINATION
FACILITY (PDF)
PROPOSED LIMITS OF MAJOR AND MINOR
DECONTAMINATION AREAS (REGULATED AREAS)
PROPOSED LOCATION OF NEGATIVE AIR MACHINE (NAM)
PROPOSED LOCATION OF WASTE DECONTAMINATION
FACILITY (WDF)
Description Friable Est. Qty.
TSI ON PIPES AND PIPE FITTINGS YES TBD
Summary of Asbestos Materials to be Abated
Hatching
ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION
IS PRESENT ABOVE HARD CEILINGS AND IN
WALLS AND CHASES.
NOTE:
VETERANS
HEALTH
2E07 2E07A
2E07C
2E07B
2E06A
2E082E06
2E05B
H201
2E09
2E10
2E05
2E05A
2E11
2E04
2E12A
CH-E-9
2E02
2E12
2E01 2E03
2E13
CH-E-3
CH-E-8
S201
2E15A
2E15
CH-E-4
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
Dwg: Of:12 49
Revisions: Date:
BID DOCUMENTS FULLY SPRINKLERED
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
1-2-HA101E-Hazardous Material Plan-bldg. 1 / 2 East-South Wing
+ Center / Rooms 2E01 thru 2E19, 2E30 & 2E31-Class II
Abatement
NOT TO SCALE
1-2-HA101E-Hazardous Material Plan-Bldg. 1 / 2 East-South Wing + Center / Rooms 2E01 thru 2E19, 2E30 & 2E31-Class II Abatement
TRUE
MATCH LINEMATCH LINE
2C05
2C06
E3
E2
2E31
H210
2E16A
2E16
2E17
2E18
CH-E-7
2E19
CH-E-1
2E30
2E20
2E21
2E29
MATCH LINEMATCH LINE
4 4
Summary of Asbestos Materials to be Abated
Description Friable Est. Qty.
FLOORING + MASTIC NO 2,079 SF
SHEET FLOORING + ADHESIVE YES 40 SF
SINK UNDERCOATING NO 2 EA
ASBESTOS KEYED NOTES:
ESTABLISH REGULATED AREA(S) (RA) WITH FULL-CONTAINMENT NEGATIVE PRESSURE ENCLOSURE(S) (NPE) AS
REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG ABATEMENT METHODS AS
REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT
FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE
TSI USING GLOVEBAG ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS
ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82
11, TRADITIONAL ASBESTOS ABATEMENT. COORDINATE STEAM SHUTDOWN, IF NECESSARY, WITH GENERAL
CONTRACTOR, OWNER OR OWNER'S REPRESENTATIVE, AND THE VPIH. IF STEAM CANNOT BE SHUT DOWN, PLAN
AND IMPLEMENT APPROPRIATE SAFETY PRECAUTIONS AND PROCEDURES TO PROTECT WORKER SAFETY AND
HEALTH.
CONDUCT EXPLORATORY DEMOLITION AS NEEDED TO ENSURE THAT ALL TSI IN THE PROJECT AREA IS IDENTIFIED
AND ABATED FROM INSIDE ALL CHASES AND WALLS AND ABOVE CEILINGS. ESTABLISH RA(S) WITH
FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE
GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL
ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AND REMOVE ASBESTOS FLOORING AND MASTIC AS REQUIRED
BY SECTION 02 82 13-19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. ALL FLOOR TILE MASTIC IS TO BE
REMOVED AS ACM.
ESTABLISH RA WITH FULL-CONTAINMENT NPE AND REMOVE TRANSITE PEGBOARD PANELS AND/OR LAB COUNTER
TOPS AS REQUIRED BY SECTION 02 82 13-31, ASBESTOS TRANSITE AND CLASS II ABATEMENT.
REMOVE SINK WITH ASBESTOS UNDERCOATING INTACT IN ACCORDANCE WITH SECTION 02 82 13-31, ASBESTOS
TRANSITE AND CLASS II ABATEMENT. COORDINATE PLUMBING DISCONNECTS WITH GENERAL CONTRACTOR.
INSTALL AND MAINTAIN RIGID PROTECTIVE BARRIER AROUND PDF.
REMOVE FIRE DOOR INTACT IN ACCORDANCE WITH SECTION 02 82 13-31, ASBESTOS TRANSITE AND CLASS II
ABATEMENT.
PAINT CONTAINING LEAD KEYED NOTES
REMOVE AND DISPOSE OF LOOSE AND PEELING PAINT CONTAINING LEAD (PCL) FROM SURFACES TO REMAIN IN
ACCORDANCE WITH SECTION 02 83 33-13, LEAD-BASED PAINT REMOVAL AND DISPOSAL, AND APPLY AN APPROVED
PRIMER TO ENCAPSULATE AFFECTED AREAS. WORK TO BE PERFORMED INSIDE A NPE. COORDINATE WITH ASBESTOS
ABATEMENT TO UTILIZE NPES ESTABLISHED FOR ASBESTOS ABATEMENT, WHERE POSSIBLE.
A
WDF
LEGEND:
PROPOSED LOCATION OF PERSONAL DECONTAMINATION
FACILITY (PDF)
PROPOSED LIMITS OF MAJOR AND MINOR
DECONTAMINATION AREAS (REGULATED AREAS)
PROPOSED LOCATION OF NEGATIVE AIR MACHINE (NAM)
PROPOSED LOCATION OF WASTE DECONTAMINATION
FACILITY (WDF)
Hatching
ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION
IS PRESENT ABOVE HARD CEILINGS AND IN
WALLS AND CHASES.
NOTE:
FIRE DOORS (ASSUMED) NO 2 EA
VETERANS
HEALTH
2E07 2E07A
2E07C
2E07B
2E06A
2E08
2E06
2E05B
H201
2E09
2E10
2E05
2E05A
2E11
2E04
2E12A
CH-E-9
2E02
2E12
2E01 2E03
2E13
CH-E-3
CH-E-8
S201
2E15A
2E15
CH-E-4
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
Dwg: Of:13 49
Revisions: Date:
BID DOCUMENTS FULLY SPRINKLERED
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
1-2-HA102E-Hazardous Material Plan-Bldg. 1 / 2 East-South Wing
+ Center / Rooms 2E01 thru 2E19, 2E30 & 2E31-TSI Abatement
NOT TO SCALE
1-2-HA102E-Hazardous Material Plan-Bldg. 1 / 2 East-South Wing + Center / Rooms 2E01 thru 2E19, 2E30 & 2E31-TSI Abatement
TRUE
MATCH LINEMATCH LINE
2C05
2C06
E3
E2
2E31
H210
2E16A
2E16
2E17
2E18
CH-E-7
2E19
CH-E-1
2E30
2E20
2E21
2E29
MATCH LINEMATCH LINE
Description Friable Est. Qty.
TSI ON PIPES AND PIPE FITTINGS YES 1,110 LF / 224 EA
Summary of Asbestos Materials to be Abated
Hatching
ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION
IS PRESENT ABOVE HARD CEILINGS AND IN
WALLS AND CHASES.
NOTE:
ASBESTOS KEYED NOTES:
ESTABLISH REGULATED AREA(S) (RA) WITH FULL-CONTAINMENT NEGATIVE PRESSURE ENCLOSURE(S) (NPE) AS
REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG ABATEMENT METHODS AS
REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT
FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE
TSI USING GLOVEBAG ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS
ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82
11, TRADITIONAL ASBESTOS ABATEMENT. COORDINATE STEAM SHUTDOWN, IF NECESSARY, WITH GENERAL
CONTRACTOR, OWNER OR OWNER'S REPRESENTATIVE, AND THE VPIH. IF STEAM CANNOT BE SHUT DOWN, PLAN
AND IMPLEMENT APPROPRIATE SAFETY PRECAUTIONS AND PROCEDURES TO PROTECT WORKER SAFETY AND
HEALTH.
CONDUCT EXPLORATORY DEMOLITION AS NEEDED TO ENSURE THAT ALL TSI IN THE PROJECT AREA IS IDENTIFIED
AND ABATED FROM INSIDE ALL CHASES AND WALLS AND ABOVE CEILINGS. ESTABLISH RA(S) WITH
FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE
GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL
ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AND REMOVE ASBESTOS FLOORING AND MASTIC AS REQUIRED
BY SECTION 02 82 13-19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. ALL FLOOR TILE MASTIC IS TO BE
REMOVED AS ACM.
ESTABLISH RA WITH FULL-CONTAINMENT NPE AND REMOVE TRANSITE PEGBOARD PANELS AND/OR LAB COUNTER
TOPS AS REQUIRED BY SECTION 02 82 13-31, ASBESTOS TRANSITE AND CLASS II ABATEMENT.
REMOVE SINK WITH ASBESTOS UNDERCOATING INTACT IN ACCORDANCE WITH SECTION 02 82 13-31, ASBESTOS
TRANSITE AND CLASS II ABATEMENT. COORDINATE PLUMBING DISCONNECTS WITH GENERAL CONTRACTOR.
INSTALL AND MAINTAIN RIGID PROTECTIVE BARRIER AROUND PDF.
PAINT CONTAINING LEAD KEYED NOTES
REMOVE AND DISPOSE OF LOOSE AND PEELING PAINT CONTAINING LEAD (PCL) FROM SURFACES TO REMAIN IN
ACCORDANCE WITH SECTION 02 83 33-13, LEAD-BASED PAINT REMOVAL AND DISPOSAL, AND APPLY AN APPROVED
PRIMER TO ENCAPSULATE AFFECTED AREAS. WORK TO BE PERFORMED INSIDE A NPE. COORDINATE WITH ASBESTOS
ABATEMENT TO UTILIZE NPES ESTABLISHED FOR ASBESTOS ABATEMENT, WHERE POSSIBLE.
A
WDF
LEGEND:
PROPOSED LOCATION OF PERSONAL DECONTAMINATION
FACILITY (PDF)
PROPOSED LIMITS OF MAJOR AND MINOR
DECONTAMINATION AREAS (REGULATED AREAS)
PROPOSED LOCATION OF NEGATIVE AIR MACHINE (NAM)
PROPOSED LOCATION OF WASTE DECONTAMINATION
FACILITY (WDF)
VETERANS
HEALTH
n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
Dwg: Of:14 49
Revisions: Date:
BID DOCUMENTS FULLY SPRINKLERED
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
52-0-HA101E-Hazardous Material Plan-Bldg. 52 / Ground
Floor-North / Room GN30, GN31
NOT TO SCALE
52-0-HA101E-Hazardous Material Plan-Bldg. 52 / Ground Floor-North / Room GN30, GN31TRUE
Description Friable Est. Qty.
TRANSITE PEGBOARD PANELS, 2'x2' NO
FLOORING + MASTIC, BLACK *NO
TRANSITE VENEER LAB COUNTER TOP, GREEN NO
LAB COUNTER TOP, BLACK NO
Summary of Asbestos Materials to be Abated
Hatching
ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION
IS SUSPECTED ABOVE RIGID CEILINGS AND IN WALLS
AND CHASES.
NOTE:
ASBESTOS KEYED NOTES:
ESTABLISH REGULATED AREA(S) (RA) WITH FULL-CONTAINMENT NEGATIVE PRESSURE ENCLOSURE(S) (NPE) AS
REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG ABATEMENT METHODS AS
REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT
FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE
TSI USING GLOVEBAG ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS
ABATEMENT. WHERE GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82
11, TRADITIONAL ASBESTOS ABATEMENT. COORDINATE STEAM SHUTDOWN, IF NECESSARY, WITH GENERAL
CONTRACTOR, OWNER OR OWNER'S REPRESENTATIVE, AND THE VPIH. IF STEAM CANNOT BE SHUT DOWN, PLAN
AND IMPLEMENT APPROPRIATE SAFETY PRECAUTIONS AND PROCEDURES TO PROTECT WORKER SAFETY AND
HEALTH.
CONDUCT EXPLORATORY DEMOLITION AS NEEDED TO ENSURE THAT ALL TSI IN THE PROJECT AREA IS IDENTIFIED
AND ABATED FROM INSIDE ALL CHASES AND WALLS AND ABOVE CEILINGS. ESTABLISH RA(S) WITH
FULL-CONTAINMENT NPE(S) AS REQUIRED FOR CLASS I ASBESTOS ABATEMENT AND REMOVE TSI USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT. WHERE
GLOVEBAG METHODS ARE NOT FEASIBLE, REMOVE TSI IN ACCORDANCE WITH SECTION 02 82 11, TRADITIONAL
ASBESTOS ABATEMENT.
ESTABLISH RA(S) WITH FULL-CONTAINMENT NPE(S) AND REMOVE ASBESTOS FLOORING AND MASTIC AS REQUIRED
BY SECTION 02 82 13-19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. ALL FLOOR TILE MASTIC IS TO BE
REMOVED AS ACM.
ESTABLISH RA WITH FULL-CONTAINMENT NPE AND REMOVE TRANSITE PEGBOARD PANELS AND/OR LAB COUNTER
TOPS AS REQUIRED BY SECTION 02 82 13-31, ASBESTOS TRANSITE AND CLASS II ABATEMENT.
REMOVE SINK WITH ASBESTOS UNDERCOATING INTACT IN ACCORDANCE WITH SECTION 02 82 13-31, ASBESTOS
TRANSITE AND CLASS II ABATEMENT. COORDINATE PLUMBING DISCONNECTS WITH GENERAL CONTRACTOR.
INSTALL AND MAINTAIN RIGID PROTECTIVE BARRIER AROUND PDF.
PAINT CONTAINING LEAD KEYED NOTES
REMOVE AND DISPOSE OF LOOSE AND PEELING PAINT CONTAINING LEAD (PCL) FROM SURFACES TO REMAIN IN
ACCORDANCE WITH SECTION 02 83 33-13, LEAD-BASED PAINT REMOVAL AND DISPOSAL, AND APPLY AN APPROVED
PRIMER TO ENCAPSULATE AFFECTED AREAS. WORK TO BE PERFORMED INSIDE A NPE. COORDINATE WITH ASBESTOS
ABATEMENT TO UTILIZE NPES ESTABLISHED FOR ASBESTOS ABATEMENT, WHERE POSSIBLE.
A
WDF
LEGEND:
PROPOSED LOCATION OF PERSONAL DECONTAMINATION
FACILITY (PDF)
PROPOSED LIMITS OF MAJOR AND MINOR
DECONTAMINATION AREAS (REGULATED AREAS)
PROPOSED LOCATION OF NEGATIVE AIR MACHINE (NAM)
PROPOSED LOCATION OF WASTE DECONTAMINATION
FACILITY (WDF)
A
A
525 SF
760 SF
74 SF
114 SF
*May become friable during abatement.
TSI ON PIPES AND PIPE FITTINGS YES 120 LF/40 EA
VETERANS
HEALTH
File details come from the government source that posted it.