About this file

36C25519R0017 0002 7-1-AE-101-19-02-25.pdf

View the file

Other files

File Type Posted
36C25519R0017-0003000.docx DOCX document
36C25519R0017-0002005.pdf PDF
36C25519R0017-0002004.pdf PDF
36C25519R0017-0002000.docx DOCX document
36C25519R0017-0002003.pdf PDF
36C25519R0017-0002001.jpg JPG image
36C25519R0017-0001000.docx DOCX document
36C25519R0017-0001001.pdf PDF
36C25519R0017-018.pdf PDF
36C25519R0017-000.docx DOCX document
36C25519R0017-007.pdf PDF
36C25519R0017-022.pdf PDF
36C25519R0017-005.pdf PDF
36C25519R0017-023.pdf PDF
36C25519R0017-010.pdf PDF
36C25519R0017-015.pdf PDF
36C25519R0017-024.pdf PDF
36C25519R0017-011.pdf PDF
36C25519R0017-012.pdf PDF
36C25519R0017-027.pdf PDF
36C25519R0017-028.pdf PDF
36C25519R0017-017.pdf PDF
36C25519R0017-026.pdf PDF
36C25519R0017-003.pdf PDF
36C25519R0017-001.pdf PDF
36C25519R0017-013.pdf PDF
36C25519R0017-025.pdf PDF
36C25519R0017-016.pdf PDF
36C25519R0017-004.pdf PDF
36C25519R0017-020.pdf PDF
36C25519R0017-008.pdf PDF
36C25519R0017-002.pdf PDF
36C25519R0017-014.pdf PDF
36C25519R0017-019.pdf PDF
36C25519R0017-009.pdf PDF
36C25519R0017-021.pdf PDF
36C25519R0017-006.pdf PDF
36C25519R0017_3.docx DOCX document
36C25519R0017_2.docx DOCX document
36C25519R0017_1.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7-1-AE-101

B

C

D

E

F

G

A

2 1

7-1-AE-901

19'-1 1/8"

8' -7

7/

8"

2' -1

1/

2" 8'

-4

/4

7'-0 1/8" 5'-0 5/8"

C

ADA

R 2'-9"

7/

8"

7'-5 3/8" 6"

34 43

ADA

R 2'-9"

7-1-AE-901

7-1-AE-901 2

TOILET, MALE

A

A

C1

A

B

C1

18A

HALL

18B

TOILET, FEMALE

18A

7-1-AE-901 10

OFFICE

OFFICE

1A

OFFICE

2A

OFFICE

EMERGENCY

MANAGEMENT

ELEC. CLOSET

OI&T

MECH. RM.

ACCESS

SAFETY &

OCCUPATIONAL

HEALTH

EQUIPMENT RM.

CORRIDOR

C101

OFFICE

3A

INDUSTRIAL

HYGIENIST

CORRIDOR

C101

OFFICE

OFFICE

5A

STORAGE

BREAK ROOM

HAC

TOILET, MALE

TOILET, FEMALE

CALL CENTER

CORRIDOR

C101

MECH. RM.

ACCESS

OFFICE

MULTI-PURPOSE

RM.

CORRIDOR

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SAFETY &

OCCUPATIONAL

HEALTH MGR.

CALL CENTER

OFFICE

6A

OFFICE

7A

CALL CENTER

OI&T

1B

ELEC. CLOSET

OI&T

MECH. RM.

ACCESS

SAFETY &

OCCUPATIONAL

HEALTH

CORRIDOR

C101

OFFICE

CHASE

CH-1

A B

STRUCTURE ABOVE

HEAD SLIP

CONNECTOR

FINISHED CEILING

ACOUSTIC BATTS

3 5/8" METAL STUDS

@ (16" O.C.)

1 LAYER 5/8" ABUSE-

RESISTANT GWB

EA. SIDE

PAF (.145) @ (32" O.C.)

TRACK - T&B

STRUCTURE ABOVE

HEAD SLIP

CONNECTOR

FINISHED CEILING

ACOUSTIC BATTS

EXISTING 4" METAL

STUDS @ (16" O.C.)

1 LAYER 5/8" ABUSE-

RESISTANT GWB

EA. SIDE

PAF (.145) @ (32" O.C.)

TRACK - T&B

C1

STRUCTURE ABOVE

FIRE RATED SEALANT,

EA. SIDE, T&B

HEAD SLIP

CONNECTOR

FINISHED CEILING

ACOUSTIC BATTS

3 5/8" METAL STUDS

@ (16" O.C.)

1 LAYER 5/8" ABUSE-

RESISTANT GWB

EA. SIDE

PAF (.145) @ (32" O.C.)

TRACK - T&B

EXISTING GWB

1 HOUR FIRE BARRIER

UL 263 DESIGN U419

6" ABOVE

FINISHED CEILING

BID ALTERNATE

A. DEDUCT ALT #1: ALL WORK IN BASE BID WITH THE FOLLOWING EXCEPTIONS / DEDUCTIONS:

1. WORK IN JOHN COCHRAN BUILDING 7 DELETE

DOUBLE MTL STUD

HEADER W/ TRACK

5/8" GWB

H.M. DOOR FRAME

W/ DOOR PER SCHEDULE

SEALANT, ALL SIDES

CONTINOUS - TYP.

PHASE GENERAL NOTES

1. REFER TO SHEET 7-1-AD-101.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

LESS THAN 10% SPRINKLED

DEDUCT ALTERNATE #1

VETERANS

HEALTH

ADMINISTRATION

BID DOCUMENTS

Stamp

/1

/2

:4 :5

P

M

7-1-AE-101

ARCHITECTURAL RENOVATION PLAN, DETAILS & NOTES- LEVEL 1

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

JJG/TJF

BUILDING 7

AHT

1/8" = 1'-0"1

LEVEL 01 - ARCHITECTURAL RENOVATION PLAN

TRUE

RENOVATION GENERAL NOTES

1 REFER TO GENERAL ARCHITECTURAL NOTES ON SHEET G-002 FOR ADDITIONAL ITEMS NOT COVERED BY THESE NOTES.

2 REFER TO HA – DRAWINGS AND REPORTS ON FILE WITH VA STLHCS – ENGINEERING FOR KNOWN EXTENTS OF HAZARDOUS

MATERIALS IN PROJECT AREA.

3 REFER TO ARCHITECTURAL DEMO PLANS FOR EXTENTS OF DEMOLITION WORK IN PROJECT AREA.

4 REFER TO ROOM FINISH SCHEDULE FOR FINISHES.

5 REFER TO MECHANICAL DWGS FOR RELATED MECHANICAL REMODELING.

6 REFER TO ELECTRICAL DWGS FOR RELATED ELECTRICAL REMODELING.

7 REFER TO FIRE PROTECTION DWGS FOR RELATED FIRE PROTECTION REMODELING.

8 FILL ALL LOCATIONS WHERE MASONRY WALLS HAVE BEEN REMOVED.

9 PATCH TO MATCH EXISTING WHERE DAMAGED BY DEMOLITION.

10 REINSTALL SIGNAGE IN ORIGINAL LOCATION OR WHERE DIRECTED BY COR.

11 REINSTALL PICTURES/ARTWORK IN ORIGINAL LOCATION OR WHERE DIRECTED BY COR.

12 REINSTALL HANDRAILS AND CORNER GUARDS. PATCH TO MATCH EXISTING WHERE REQUIRED DUE TO REMODELING.

13 DEMOLITION WASTE TO BE REMOVED TO DUMPSTER.

14 DISRUPTIVE ACTIVITIES IN OCCUPIED SPACES TO BE LIMITED AS DIRECTED BY COR. COORDINATE WELL IN ADVANCE WITH COR PRIOR

TO BEGINNING WORK.

15 REFER TO AI-100-SERIES DRAWINGS FOR FURNITURE AND EQUIPMENT.

16 REFER TO AE-100-SERIES DRAWINGS FOR DIMENSIONS AND NOTES FOR NEW CONSTRUCTION.

17 EXISTING EXTERIOR WALL SURFACES VARY IN DEPTH: CONTR TO LAY OUT AND INSTALL NEW EXTERIOR WALLS TO PROVIDE FINISH FACE OF WALL WITHOUT ENCROACHING ON FINISH CLEAR ROOM DIMENSIONS SHOWN ON ENLARGED FLOOR PLAN.

18 NO WOOD BLOCKING ALLOWED.

19 ALL WALLS AND CHASES TO BE INSULATED - SEE WALL TYPES AND ARCHITECTURAL GENERAL NOTES.

20 CONTRACTOR TO VERIFY LOCATION OF EXISTING PIPING AND RELATED ITEMS PRIOR TO START OF WORK. COORDINATE ALL EXISTING AND NEW MECHANICAL AND ELECTRICAL WORK TO FIT WITHIN WALLS AND CHASES SHOWN; WHERE EXISTING OR NEW MECHANICAL AND ELECTRICAL WORK FALLS OUTSIDE OF THE PROVIDED WALLS AND CHASES, THE CONTRACTOR SHALL NOTIFY THE COR FOR

REVISIONS TO THE LAYOUT OF WALLS OR CHASE AT NO ADDITIONAL COST TO THE OWNER.

21 DEMO WORK AND NEW WORK INDICATE APPROXIMATE AREA TO BE REMOVED. CONTRACTOR TO FIELD VERIFY ACTUAL AREA TO BE REMOVED - REMOVAL EXTENTS MAY DEPEND ON LOCATION OF AND DIRECTION OF SUSPENDED ACOUSTICAL CEILING GRID MAIN-TEE.

CONTRACTOR TO COORDINATE WORK AREA WITH MEP DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR

WORK AS NECESSARY, FIELD VERIFY.

22 MAINTAIN ALL EXISTING FIRE RATINGS. FIELD VERIFY.

23 WORK AREA SHOWN DOES NOT DISTINGUISH BETWEEN PHASES BUT ONLY SHOWS AREA TO BE REMOVED AND REINSTALLED.

CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING PHASING OF WORK; SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN MULTIPLE

PHASES. SEE PHASING REQUIREMENTS ON SHEET GI-002 AND GC-100.

24 REMOVE AND REINSTALL ALL ITEMS LOCATED IN CEILING (LIGHTS, DIFFUSERS, SPRINKLER HEADS, EXIT SIGNS, SIGNS, FANS, AHU, ALARMS, ANTENNAS, OCCUPANCY SENSORS, SPEAKERS, NURSE CALL, CODE LIGHTS, EMERGENCY SHOWER, CAMERA, CURTAIN TRACK, PATIENT LIFT OR ACCESS HATCHES, ETC.) AS REQUIRED. ALL ITEMS MAY NOT BE INDICATED ON DRAWINGS. FIELD VERIFY FOR

FULL SCOPE OF WORK.

25 ANY CONTRACTOR DISTURBED FINISHES MUST BE RESTORED TO MATCH THE EXISTING FINISH. COORDINATE WITH VA TO MATCH

EXISTING FINISHES.

26 COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO THAT THE FUNCTION AND APPEARANCE IS NOT AFFECTED BY CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT, MATERIALS, OR ANY INVOLVED ACTIONS.

27 A 1 HR MINIMUM FIRE-RATED SEPARATION IS REQUIRED BETWEEN ALL OCCUPIED SPACE AND CONSTRUCTION AREAS. THIS

PROTECTION INCLUDES ANY EXISTING PENETRATIONS AND OPENINGS.

28 PATCH FLOOR SLABS AT PENETRATIONS AND OPENINGS RESULTING FROM REMOVAL OF PIPING AS NECESSARY TO MAINTAIN

EXISTING FIRE SEPARATION AND FINISH.

29 AT PIPING AND EQUIPMENT REMOVAL LOCATIONS PATCH TO MATCH ADJACENT EXISTING FLOOR, WALLS, & CEILINGS.

30 PATCH PARTITION WALLS AND FILL/PATCH OPENINGS RESULTING FROM REMOVAL OF PIPING. MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR, WALL MOUNTED EQUIPMENT AND ACCESSORIES, ETC.) TYP. WALL CONDITION: GWB OR PLASTER. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE, REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE WORK AND MEET THE REQUIRED STANDARDS FOR VA CONSTRUCTION. COORDINATE REMOVAL AND REINSTALLATION OF WALL MOUNTED EQUIPMENT, ETC. FIELD VERIFY. MAINTAIN EXISTING FIRE RATINGS. VERIFY EXISTING CONDITIONS WITH COR DURING

PRE-CONSTRUCTION WALK THRU, ADDITIONAL COSTS WILL NOT BE ALLOWED.

31 PATCH PARTITION WALLS AT NEW PENETRATIONS RESULTING FROM INSTALLATION OF NEW PIPING. SEAL AGAINST NEW PIPING TO MATCH EXISTING WALL CONDITION. MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR, WALL MOUNTED EQUIPMENT AND ACCESSORIES, ETC.) TYP. WALL CONDITION: GWB OR PLASTER. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE, REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE WORK AND MEET THE REQUIRED STANDARDS FOR VA CONSTRUCTION. COORDINATE REMOVAL AND REINSTALLATION OF WALL MOUNTED EQUIPMENT, ETC. FIELD VERIFY. MAINTAIN EXISTING FIRE RATINGS. VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU, ADDITIONAL COSTS WILL

NOT BE ALLOWED.

1/4" = 1'-0"2

PARTIAL LEVEL 01 ARCHITECTURAL RENOVATION PLAN

RENOVATION KEYNOTES

29 REFER TO ASBESTOS ABATEMENT DRAWINGS FOR ADDITIONAL

INFORMATION RELATED TO EXISTING FLOORING AND/OR CEILING

REMOVAL THIS ROOM.

30 REMOVE & REPLACE ACCESS HATCH-SEE SHEET AE-500 FOR DETAILS.

31 SEE AF-100 SERIES SHEETS FOR NEW TOILET ACCESSORIES

LOCATIONS, SCHEDULE AND MOUNTING HEIGHTS.

32 NEW 5/8” TYPE “X” MR GWB OVER EXISTING LT. GA. METAL STUD

FRAMING.

33 6” LT. GA. METAL CEILING JOISTS W/ TWO LAYERS 5/8” TYPE “X” MR GWB

CEILING.

34 LT. GA. METAL STUD PARTITION FRAMING TO BOTTOM OF LT. GA.

CEILING JOISTS W/ ONE LAYER 5/8” TYPE “X” MR GWB EACH SIDE.

35 6” MTL STUD WALL MATCH ADJ. WALL STUD HEIGHT WITH 1 LAYER 5/8”

TYPE “X” MOISTURE-MOLD RESISTANT GWB EA SIDE.

36 CEILING-HUNG METAL TOILET PARTITION.

37 FURR OUT EXTERIOR WALLS WITH EXTRUDED INSULATION BEHIND

METAL STUDS WITH BATT INSULATION, VAPOR BARRIER, AND DRYWALL

SHEATHING.

38 LIMITS OF FUTURE OCCUPANCY SHELL SPACE.

39 EXISTING CHASE WALL TO REMAIN.

40 PATCH FLOOR AND WALLS WHERE RADIATORS AND CONVECTORS

WERE REMOVED.

RENOVATION KEYNOTES

18 WINDOW POCKET - SEE WALL SECTIONS & REFLECTED CEILING PLAN.

19 WIRE STORAGE SHELVING; SEE EQUIPMENT SCHEDULE.

20 SEE AF-100 SERIES SHEETS FOR FLOOR FINISHES.

21 CONTRACTOR AND MATERIAL INGRESS/EGRESS PATH.

22 ANTE CHAMBER W/ STICKY WALK-OFF MAT – SEE DEMOLITION & NEW

FLOOR PLAN GENERAL NOTES.

23 TEMPORARY CONSTRUCTION BARRIER - SEE DEMOLITION & NEW

FLOOR PLAN GENERAL NOTES.

24 THRU-WALL PENETRATION W/ 2-HOUR RATED FIRE DAMPER;

COORDINATE SIZE/LOCATION W/ MECH; PROVIDE & INSTALL

FIRE-RATED ASS'Y TO CLOSE OPENING & MAINTAIN FIRE RATING

DURING CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.

25 ALUMINUM-CLAD INSULATED EXTERIOR WALL PANELS AND FRAMING

OVER FACE OF BUILDING. SEE AE-200 SERIES SHEETS FOR

ELEVATIONS AND DETAILS.

26 EXISTING HEAD WALL TO REMAIN. CONSTRUCT NEW CEILING/GRID UP

TO EXISTING HEAD WALL.

27 PROCEDURE AREA SUBJECT TO SPECIAL REQUIREMENTS FOR WORK

IN STERILE AREAS. REFER TO VA GUIDELINES. SEE ASBESTOS AND

MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

28 WORK AT THIS LOCATION REQUIRES REMOVAL OF EXISTING WALL

CONDITION, FIELD VERIFY. MATCH EXISTING WALL CONDITION (FINISH,

PAINT COLOR, BASE, WALL COVERING, WALL-MOUNTED EQUIPMENT

AND ACCESSORIES, ETC.). TYP. WALL CONSTRUCTION: MR GWB,

PAINTED, WITH VINYL BASE. SEE MEP DRAWINGS FOR FULL EXTENT OF

WORK. REMOVE, REPLACE, PATCH AND REPAIR WALL TO THE EXTENT

NECESSARY TO COMPLETE WORK AND MEET THE STANDARDS FOR VA

CONSTRUCTION. COORDINATE REMOVAL AND REINSTALLATION OF

WALL MOUNTED EQUIPMENT, CASEWORK, ETC. FIELD VERIFY. AREA

SHOWN IS AN APPROXIMATE AREA TO BE REMOVED. MAINTAIN

EXISTING FIRE RATINGS. VERIFY EXISTING CONDITIONS DURING

PRE-CONSTRUCTION WALK-THROUGH WITH COR. ADDITIONAL COSTS

WILL NOT BE ALLOWED.

RENOVATION KEYNOTES

1 STERILE STORAGE AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER

TO VA GUIDELINES.

2 CLEAN ROOM AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER TO

VA GUIDELINES.

3 SEE ROOM FINISH SCHEDULE ON AF-100 SERIES SHEETS FOR

FINISHES.

4 PATCH EXISTING WALL W/ FINISHES TO MATCH EXISTING.

5 REPAIR EXISTING CEILING AFTER INSTALLATION OF NEW HVAC

EQUIPMENT -SEE REFLECTED CEILING PLAN.

6 NEW 2-HR-RATED SHAFT WALL FROM FLOOR TO STRUCT. ABOVE; W/

90-MIN. RATED ACCESS PANEL; COORDINATE W/ MECH FOR ACCESS

PANEL LOCATION. COORDINATE EXTENTS OF SHAFT ENCLOSURE

W/MEP DRAWINGS.

7 THRU-FLOOR PENETRATION W/ 2-HOUR RATED FIRE DAMPER;

COORDINATE SIZE/LOCATION W/ MECH; PROVIDE & INSTALL

FIRE-RATED ASS'Y TO CLOSE OPENING & MAINTAIN FIRE RATING

DURING CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.

8 1-HOUR RATED WALL - SEE WALL TYPES (TYP).

9 PAINT EXISTING WALLS: PATCH, SAND, SMOOTH AND PREPARE

SURFACE OF EXIST WALL FOR NEW FINISH.

10 INSTALL CORNER GUARDS; SEE ARCHITECTURAL FINISH PLAN

AF-100-SERIES SHEETS FOR DETAILS.

11 PATCH TO MATCH EXISTING FINISH AS REQ'D. DUE TO REMODELING.

12 TEMPORARY CONSTRUCTION PARTITION - REMOVE AFTER

COMPLETION OF REFINISHING; PATCH TO MATCH ANY DAMAGE TO

EXISTING/NEW FINISHES.

13 MAINTAIN PATH FOR EGRESS DURING CONSTRUCTION.

14 AREA FOR NEW OWNER-PROVIDED/OWNER-INSTALLED

CABINET/EQUIPMENT; SEE FINISH PLAN & EQUIPMENT SCHEDULE.

15 NEW FIRE EXTINGUISHER CABINET (FEC); SEE SHEET AE-500 FOR

DETAILS.

16 EXISTING FEC.

17 NEW WD DOOR/HM FRAME; SEE DOOR SCHEDULE.

1 1/2" = 1'-0"3 Wall Types

X X XDOOR SCHEDULE

DOOR NO.

SIZE

FINISH

FRAME

HARDWARE COMMENTSWIDTH HEIGHT

FRAME

MATERIAL FRAME TYPE

18 3'-0" 7'-0" P-8 HOLLOW

METAL

1 HW1 Deduct Alternate #1 - No Work Bldg. 7 - PAINT COLOR TO MATCH EXISTING HOLLOW METAL FRAMES IN ADJACENT

CORRIDOR

18A 3'-0" 7'-0" P-8 HOLLOW

METAL

1 HW1 Deduct Alternate #1 - No Work Bldg. 7 - PAINT COLOR TO MATCH EXISTING HOLLOW METAL FRAMES IN ADJACENT

CORRIDOR

3" = 1'-0"5

DOOR 18 & 18A HEADER DETAIL

atast Text Box Add Sanitary Napkin Dispensers - Womens Tlts 19-02-25 atast Text Box 32 REFER TO SHEETS 7-1-AE-901 FOR TOILET ACCESSORY AND EQUIPMENT LOCATIONS; REFER TO SHEET 1-AE-601 FURNITURE, EQUIPMENT & ACCESSORIES SCHEDULE AND SPECIFICATIONS FOR TOILET ACCESSORIES AND EQUIPMENT atast Text Box atast Polygon atast Text Box atast Polygon atast Rectangle atast Rectangle atast Rectangle atast Rectangle

Sheets
7-1-AE-101 - ARCHITECTURAL RENOVATION PLAN, DETAILS & NOTES- LEVEL 1

File details come from the government source that posted it.