NOTES:
1. FOR MOST-CURRENT CAMPUS PLAN CONTACT COR.
DRAWING INDEX
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
VETERANS AFFAIRS MEDICAL CENTER
VA PROJECT NUMBER: 657-18-110
JOHN COCHRAN (JC) & JEFFERSON BARRACKS (JB) DIVISION
SAINT LOUIS, MISSOURI
CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, &
IMPROVE WAYFINDING
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:2
:5
A
M
G-001
COVER SHEET & SHEET INDEX
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJFAHT
1 & 52
OVERALL JB CAMPUS SITE PLAN
AD-001 ARCHITECTURAL DEMOLITION PLAN GENERAL NOTES & KEYNOTE LEGEND
AE-001 ARCHITECTURAL RENOVATION PLAN GENERAL NOTES & KEYNOTE LEGEND
1-2-AE-101E ARCHITECTURAL DEMOLITION & RENOVATION PLANS
1-AE-301 BUILDING SECTIONS + PARTIAL WALL SECTIONS
1-AE-501 ARCHITECTURAL DETAILS
1-AE-601 SCHEDULES & DIAGRAMS
AC-001 REFLECTED CEILING DEMOLITION & RENOVATION PLAN GENERAL NOTES AND
KEYNOTES LEGEND
1-1-AC-101E REFLECTED CEILING DEMOLITION & RENOVATION PLAN
1-2-AC-101E REFLECTED CEILING DEMOLITION & RENOVATION PLAN
1-2-AF-101E ARCHITECTURAL FINISH PLAN, SCHEDULE & DETAILS
52-0-AE-101N ARCHITECTURAL DEMOLITION & RENOVATION PLANS
52-0-AC-101N REFLECTED CEILING DEMOLITION & RENOVATION PLANS & DETAILS
52-0-AF-101N ARCHITECTURAL FINISH PLAN & SCHEDULE
FP-001 FIRE PROTECTION COVER SHEET
1-2-FD-101E FIRE PROTECTION DEMOLITION PLAN
1-2-FP-101E FIRE PROTECTION RENOVATION PLAN
P-001 PLUMBING COVER SHEET
1-1-PD-101 PLUMBING DEMOLITION PLAN
1-2-PD-101E PLUMBING DEMOLITION PLAN
1-2-PL-101E PLUMBING RENOVATION PLAN
M-001 MECHANICAL COVER SHEET
1-2-MD-101E MECHANICAL DEMOLITION PLAN
1-2-MH-101E HVAC RENOVATION PLAN
MH-300 MECHANICAL HVAC DETAILS
MH-400 CONTROL DIAGRAMS
MH-500 MECHANICAL HVAC SCHEDULES
E-001 ELECTRICAL COVER SHEET
1-2-ED-101E ELECTRICAL DEMOLITION PLAN
1-2-EL-101E ELECTRICAL LIGHTING RENOVATION PLAN
1-2-EP-101E ELECTRICAL POWER RENOVATION PLAN
1-2-RA-101E EXISTING CONDITION PLAN, SCHEDULES, NOTES & KEYNOTES
1-2-RA-102E EXISTING CONDITION PLAN PHOTOS
1-2-RA-103E EXISTING CONDITION PLAN PHOTOS
52-0-RA-101N EXISTING CONDITION PLAN, SCHEDULES, NOTES & PHOTOS
52-0-RA-102N EXISTING CONDITION PLAN PHOTOS
HA-001 GENERAL ASBESTOS ABATEMENT NOTES
1-1-HA-101E HAZARDOOUS MATERIAL PLAN - 1st FLOOR
1-2-HA-101E HAZARDOOUS MATERIAL PLAN - 2nd FLOOR CLASS II ABATEMENT
1-2-HA-102E HAZARDOOUS MATERIAL PLAN - 2nd FLOOR TSI ABATEMENT
52-0-HA-101N HAZARDOOUS MATERIAL PLAN
G-001 COVER SHEET & SHEET INDEX - CORRECT WORKPLACE - LIFE SAFETY ISSUES,
ASBESTOS ABATEMENT - JEFFERSON BARRACK DIVISION
G-002 ABBREVIATIONS, SYMBOLS & GENERAL NOTES
GI-001 CODE REVIEW & LIFE SAFETY PLAN - LEGEND & CODE INFORMATION
1-1-GI-101E CODE REVIEW & LIFE SAFETY PLAN
1-2-GI-101E CODE REVIEW & LIFE SAFETY PLAN
52-0-GI-101N CODE REVIEW & LIFE SAFETY PLAN
1-1-GC-101E PHASING PLAN
1-2-GC-101E PHASING PLAN
52-0-GC-101N PHASING PLAN
(NOT TO SCALE)
BLDG 1
BLDG. 52
VOLUME 1 - JEFFERSON BARRACKS DIVISION CAMPUS
INDEX OF VOLUMES
VOLUME 1 - JEFFERSON BARRACKS CAMPUS
VOLUME 2 - JOHN COCHRAN CAMPUS
VOLUME 3 - WAYFINDING - JEFFERSON BARRACKS &
JOHN COCHRAN CAMPUS
A
ACOUST. ACOUSTICAL
ACT ACOUSTIC TILE
ADP ART DISPLAY PANEL
ADT ART DISPLAY TRACK
ADJ ADJACENT, ADJUSTABLE
AFC ABOVE FINISH CEILLING
AFF ABOVE FINISH FLOOR
AFP ACCORDION FOLDING PARTITION
AFS ACCESS FLOOR SYSTEM
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AFS ACCESS FLOOR SYSTEM
APPROX APPROXIMATE
ARCH ARCHITECTURE, ARCHITECT
ABBREVIATIONS - SEE ADDITIONAL FINISH MATERIAL ABBREVIATIONS IN THE ROOM FINISH SCHEDULE MATERIAL LEGEND
B
B BENCH
BM BEAM
BD BOARD, BLAST DOOR
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BP BULLET PROOF
C
CAB CABINET
CID COMPREHENSIVE INTERIOR DESIGN
CMU CONCRETE MASONRY UNIT
CJ CONTROL JOINT,
CONSTRUCTION JOINT
C CENTER LINE
CLG CEILING
COL COLUMN
CONC CONCRETE
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACT, CONTRACTOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPT CARPET
CR CHAIR RAIL
CT CARPET TILE
CUP CENTRAL UTILITY PLANT
D
DBL DOUBLE
DC DISPLAY CASE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DML DEMOLITION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E
EA EACH
EEWS EMERGENCY EYEWASH & SHOWER
EF EXHAUST FAN
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
EQUIP EQUIPMENT
EQ. EQUAL
ETC AND SO FORTH (ETCETERA)
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F
FD FLOOR DRAIN
FDN FOUNDATION
FEB FIRE EXTINGUISHER
& WALL BRACKET
FEC FIRE EXTINGUISHER CABINET
FFL FINISH FLOOR LEVEL
FHC FIRE HOSE CABINET
(WITH EXTINGUISHER & BRACKET)
FHR FIRE HOSE REEL
(WITH EXTINGUISHER & BRACKET)
FIN FINISHED, FINISH
FFEL FINISHED FLOOR ELEVATION
FLR FLOOR
FV FIELD VERIFY
G
GA GAUGE
GALV GALVANIZED
GEJ GUTTER EXPANSION JOINT
GL GRADE LINE, GLASS
GRTG GRATING
GYP GYPSUM
GYP BD GYPSUM BOARD
H
HD HAND
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HT. HEIGHT
HVAC HEATING, VENTILATION & AIR
CONDITIONING
I
I.D. INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
J
JC JANITOR'S CLOSET
JT JOINT
L
LAM LAMINATE
LAV LAVATORY
LBL LABEL
LVR LOUVER
LVR LP LOUVER LOW POINT
LP LOW POINT
M
MACH MACHINE
MAINT MAINTENANCE
MANUF MANUFACTURE
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
M.R. MIRRORED
MTD MOUNTED
MTL METAL
N
NIC NOT IN CONTRACT
NGVD NATIONAL GEODETIC
VERTICAL DATUM
NO NUMBER
NTS NOT TO SCALE
O
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OFF OFFICE
OPP OPPOSITE
OPP. HD. OPPOSITE HAND
OPNG OPENING
OTS OPEN TO STRUCTURE
P
P PAINT (e.g. P-1)
PTD PAINTED
PRTN PARTITION
PLAM PLASTIC LAMINATE
P. PLATE
PNL PANEL
PR PAIR
PLYWD PLYWOOD
R
R OR RAD RADIUS
RA RETURN AIR
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
RECP RECEPTACLE
REG REGULAR
REINF REINFORCED
REQ'D REQUIRED
RGH ROUGH
S
SAPF SPECIAL ACCESS PROGRAM FACILITY
SCHED. SCHEDULE
SECT SECTION
SHT SHEET
SID STRUCTURAL INTERIOR DESIGN
SIM SIMILAR
SPEC SPECIFICATION
SPS SYNTHETIC PANEL SYSTEM
SS STAINLESS STEEL
SSMA STEEL STUD MANUFACTURERS
ASSOCIATION WWW.SSMA.COM
STC SOUND TRANSMISSION
COEFFICIENT
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUPP. SUPPORT
SUSP SUSPENDED
T
TECH TECHNICAL
THK THICK
THRU THROUGH
TLT TOILET
T & B TOP & BOTTOM
T.O.P. TOP OF PARAPET
T.O.S. TOP OF STEEL
TYP TYPICAL
U
U.N.O. UNLESS NOTED OTHERWISE
UL UNDERWRITERS LABORATORY
V
VENT VENTILATE, VENTILATOR
VERT VERTICAL
VOL VOLUME
W
W WIDTH
W/ WITH
WD WOOD
WT WEIGHT
FOR MEDICAL
FACILITIES ONLY
CS CENTRAL STERILE
CT COMPUTED TOMOGRAPHY
ER EMERGENCY ROOM
ICU INTENSIVE CARE UNIT
LDRP LABOR-DELIVERY-RECOVERY-POST
PARTUM
LTC LONG TERM CARE
MRI MAGNETIC RESONANCE IMAGING
MICU MEDICAL INTENSIVE CARE UNIT
OR OPERATING ROOM
OT OCCUPATIONAL THERAPY
PACU POST ANESTHETIC CARE UNIT
PT PHYSICAL THERAPY
RT RESPIRATORY THERAPY
SICU SURGICAL INTENSIVE CARE UNIT
MATERIAL SYMBOLS
CAST-IN-PLACE CONCRETE
EARTH
EXISTING CONSTRUCTION
BRICK
GYPSUM
RIGID INSULATION
STEEL
GENERAL NOTES
1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS IN ORDER TO BE FAMILIAR W/ COORDINATION OF WORK REQUIRED IN THIS DOCUMENT PACKAGE AND EXISTING
CONDITIONS.
2. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
3. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.
4. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE OWNER. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH MINIMUM INTERRUPTION. SCHEDULE ALL
ELECTRICAL/MECHANICAL OUTAGES 15 DAYS IN ADVANCE WITH THE OWNER.
5. PROTECT ALL WORK, MATERIALS AND EQUIPMENT. CAP OR PLUG TEMPORARY OPENINGS. DELIVER ALL WORK TO THE
OWNER CLEAN AND IN GOOD CONDITION.
6. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS SHALL BE KEPT CLEAR OF DEBRIS. CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED BY NEW WORK SHALL BE INCLUDED AS WORK
PROVIDED UNDER THIS CONTRACT.
7. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING EQUIPMENT, CONNECTIONS, CONTROLS, ETC.
DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY CONTRACTOR AT
NO COST TO THE OWNER.
8. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.
9. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED.
10. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.
11. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND
SATISFACTORY INSTALLATION.
12. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND WALLS SHALL BE PATCHED WITH LIKE
MATERIALS TO MATCH THE SURROUNDING SURFACES.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK
UNDER THIS CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION.
14. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT RATED CONSTRUCTION.
14.A. FIRE STOP ALL PENETRATIONS WHERE NEW DEVICES/LINES RELOCATING EXISTING DEVICES/LINES
PENETRATING FLOORS, CEILINGS AND OTHER RATED BARRIERS.
14.B. FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE EXISTING DEVICES/LINES PENETRATE
FLOOR, CEILINGS AND OTHER RATED BARRIERS.
15. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.
16. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD OR AS INDICATED ON DRAWINGS.
17. PROVIDE 16 GA. METAL BACKING PLATES, UNLESS OTHERWISE SHOWN, IN ALL WALLS TO RECEIVE EQUIPMENT, SHELVING AND ACCESSORIES, DOOR STOPS AND OTHER ITEMS REQUIRING REINFORCEMENT. NO WOOD BLOCKING IS
TO BE USED PER VASTLHCS.
18. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES, CONVENIENCE OUTLETS, DOOR STOPS AND OTHER FINISH HARDWARE, ETC., SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF EXISTING WALLS
INDICATED TO REMAIN.
19. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE OWNER. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:
19.A. OWNER'S EQUIPMENT REQUIREMENTS.
19.B. CEILING SUPPORT SYSTEM.
19.C. MECHANICAL DUCTWORK SYSTEM
19.D. LIGHTING FIXTURES, ELECTRICAL WIRING AND CONDUIT SYSTEMS
19.E. PLUMBING AND PIPING SYSTEMS.
19.F. COMMUNICATIONS SYSTEMS.
20. OPTAIN PERMIT FOR AND CONSTRUCT FIRE-RESISTANT ANTE CHAMBER WITH DOOR AND APPOVED HARDWARE TO SEAL OFF CONSTRUCTION AREA FROM CORRIDOR. SEAL ANTE CHAMBER TO EXISTING CONSTRUCTION. PROVIDE WALK-OFF MATS OUTSIDE CORRIDOR AND ROOM SIDES OF CHAMBER. ANTE CHAMBER TO COMPLY WITH REQ'TS.
FOR ICRA LEVEL 4 PROTECTION - REVIEW & COORDINATE PERMIT & CONTSTRUCTION REQ'TS W/ COR AND STATION'S
INFECTION CONTROL OFFICER.
21 AT THE COMPLETION OF DEMOLITION THE CONTRACTOR SHALL HAVE A SITE MEETING WITH THE VA TO REVIEW AS-
BUILT CONDITIONS OF THE EXISTING STRUCTURE.
22. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN QUESTION CONTRACTOR SHALL NOTIFY
THE VA IMMEDIATELY.
23. THE OWNER SHALL BE RESPONSIBLE FOR REMOVING, STORING AND REINSTALLATION OF ALL OF THE OWNER'S EQUIPMENT AND FURNITURE, TO INCLUDE BOTH WALL MOUNTED ITEMS AND MOVABLE ITEMS. THIS COORDINATION OF
OWNER'S ITEMS IS REQUIRED FOR ALL PHASES OF CONSTRUCTION.
24. CONTRACTOR TO USE CONNECTING CORRIDOR EXTERIOR ENTRANCE FOR REMOVAL AND NEW MATERIAL DELIVERY.
CONTRACTOR TO PROVIDE NECESSARY EQUIPMENT TO PROTECT EXISTING FINISHES.
25. WORK THAT REQUIRES ACCESS TO SPACES OUTSIDE DESIGNATED AREA OF WORK SHALL BE COORDINATED WITH THE VA. WORK IN THOSE AREAS SHALL TAKE PLACE OUTSIDE REGULAR BUSINESS HOURS AND THE AREAS SHALL BE
CLEANED AND RETURNED TO SERVICE AT THE END OF EACH SHIFT.
26. UPON COMPLETION OF THE PROJECT. ALL AREAS AVAILABLE FOR CONSTRUCTION MATERIALS, VEHICLES, AND TRASH
RECEPTICLES MUST BE RETURNED TO THEIR ORIGINAL CONDITION.
FIRE PROOFING / FIRE STOPPING GENERAL NOTES:
1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL PENETRATIONS. CONSTRUCTION TO CONFORM TO
MANUFACTURER'S FIRE RATED/TEST ASSEMBLIES.
2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS/PARTITIONS AND FLOORS. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL WITH U.L. DESIGN NUMBER AND
ASTM. FIRE RATED WALLS SHOWN ON PLAN.
3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION.
4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-LABEL EXISTING WALL IF NECESSARY.
5. MAINTAIN 2-HR FIRE RATED FLOOR AT PENETRATIONS, EXISTING FLOOR SLAB, AND 2-HR DECK WITH
FIREPROOFING. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY.
ASBESTOS AND LEAD BASED PAINT
1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING MATERIALS (ACM) PRIOR TO ANY
DEMOLITION.
2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF ASBESTOS AND LEAD BASED PAINT
REPORTS. REFER TO DIVISION 2 IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD BASED
PAINT ENCAPSULATION OR REMOVAL SPECIFICATIONS.
3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS OBTAINED FROM THE COR FOR DETAILED INFORMATION AND LOCATIONS. IF THE CONTRACTOR ENCOUNTERS
MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS CONTAINING (ACMs) ARE TO
BE PROVIDE WITH APPROPRIATE OSHA ASBESTOS TRAINING PRIOR TO START OF WORK.
4. REFER TO PHASING PLAN SHEETS IN THESE DRAWINGS. ABATEMENT AND LBP REMOVAL ACTIVITIES
SHALL BE CONDUCTED IN GENERAL ACCORDANCE WITH THE PROJECTS PHASING STRATEGY.
HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA OF FACILITY IN QUESTION TO ABATEMENT SPECIFICATIONS FOR HANDLING OF MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT SHOULD BE EXPECTED BY THE
ABATEMENT CONTRACTOR
ARCHITECTURAL SYMBOLS
A101
DETAIL NUMBER
0 COLUMN NUMBER/GRID LINE
SHEET NUMBER
ARCHITECTURAL SECTION
WINDOW TYPE
1 Ref
R e f
1 Ref
R e f
ARCHITECTURAL ELEVATION
A888
DETAIL NUMBER
SHEET NUMBER
CENTER LINE
DIMENSION LINE
DOOR NUMBER SYMBOL
1"
EXISTING TO REMAIN
NEW CONSTRUCTION
EXISTING TO BE REMOVED
EXISTING TO REMAIN
1i
KEYNOTE - FLOOR PLAN
KEYNOTE - DEMOLITION PLAN
X
X
PHASING LIST
PHASE 1 - ABATEMENT - JC & JB CAMPUS
PHASE 2 - JC B1 - 2A18C
PHASE 3 - JC B1 - 6 FL ENDO
PHASE 4 - (DEDUCT ALT) JC-B7
PHASE 5 - JB-B1 - 2 EAST-SOUTH/CTR RENOVATION
- REFER TO PROJECT MANUAL & PHASING PLANS FOR DETAILED INFO.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:5 :2
P
M
G-002
ABBREVIATIONS, SYMBOLS & GENERAL NOTES
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJFAHT
1 & 52
APPLICABLE CODES & DESIGN STANDARDS:
CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):
A. Building Classification – JB Buildings. 1 & 52; JC Building 1
1. Occupancy Classification – JB Bldg. 1 & 52; JC Bldg. 1:
a. Existing Building: I-2 Institutional, Hospital (IBC), Health Care (New & Existing) (NFPA)
b. Occupancy separation:
1) Healthcare requires a 1-hour smoke barrier every 22,500sf, 200ft travel, 30sf net on each side.
2) If entire building healthcare, then:
i. Corridor wall can be smoke partition.
c. Common Path Limit: 100ft.
d. Dead End Limit: 30ft.
e. Travel Distance Limit: 200ft.
f. Fire door and glazing in 1-hour wall: 45 min.
g. 8ft corridors for gurney traffic. 44” clear for remainder.
h. Doors required to be 3’0” wide minimum, with openings to be sized appropriate to accommodate room functions.
i. Intervening rooms not permitted, unless they are accessory to the space served.
j. 1-hour hazardous areas: storage over 100sf, 1-hour rated fire-smoke barrier.
k. Suite walls shall be smoke partitions, no fire rating.
2. Construction Type:
a. Construction Type (IBC/NFPA)
1) JB Building 1: Type I-A/Type I (332) (Assumed based on 1922 construction).
2) JB Building 52: Type I-A/Type I (332) (Assumed based on 1940s construction).
3) JC Building 1: Type I-A/Type I (332) (Assumed based on 1950 construction).
3. Seismic Design:
a. VA H-18-8 / July 2008 / Design Category = Table 1: Critical Facility (Hospital)
1) Spectral Response Accelerations:
i. SS (VA H-18-8) – Table 3 0.596
ii. SI (VA H-18-8) – Table 3 0.171
b. IBC Seismic (Chpt. 1613):
1) Hospital with Emergency Room - Seismic Risk Category IV (Table T1604.5)
2) Seismic Design Category – Short Period (0.2-second) Response Acceleration based on IBC SDS @
0.183g = C (1613.3.4,Table T1613.3.5(1))
3) Seismic Design Category- 1-Second Period Response Acceleration based on IBC SD01 @ 0.596g = D
(1613.3.4, Table T1613.3.5(2))
c. Renovation project will require seismic design considerations for installation of new suspended acoustical ceilings and
MPFE items. Campuses are located in Zone 1. Need to review with VASTLHCS Engineering for current methods used in renovations.
4. Fire Resistive Requirements:
a. International Building Code – Table 601 – Type I-B
1) Structural Frame (Columns, Girders, Trusses)
i. Supporting Floor 2 Hr
ii. Supporting Roof only 1-1/2 Hr
2) Bearing Walls
i. Exterior (not less than Fire Separation) 3 Hr
ii. Interior 3 Hr
iii. Interior (Support Roof only) 2 Hr
3) Nonbearing Walls and Partitions (Table 602 – Group 1)
i. Exterior (Fire Separation: X < 5 Ft) 1 Hr
ii. Exterior (Fire Separation: 5 < X < 10 Ft) 1 Hr
iii. Exterior (Fire Separation: 10 < X < 30 Ft) 1 Hr
iv. Exterior (Fire Separation: 30 < X Ft) 1 Hr
4) Nonbearing Walls and Partitions
i. Interior (Except as noted below) 0 Hr
ii. Fire Walls (Table 705.4) 3 Hr
iii. Fire Barriers (Table 703.7) 2 Hr
iv. Shaft Enclosure (Figure 707.4)
Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr
v. Fire Partitions (708.3) 1 Hr
vi. Smoke Barriers (708.3) 1 Hr
vii. Smoke Partitions (403.3 & 710.3) 0 Hr
viii. Corridors (with Fire Sprinklers Table 1016.1) 0 Hr
ix. Vertical Exit Enclosures (Section 1019.1)
Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr
x. Exit Passageways (Section 1020.3) Walls/Floor/Ceiling (Separately) 1 Hr Walls/Floor/Ceiling Connecting (Exit Encl.) 2 Hr
xi. Horizontal Exits (Figure 1021.1) 2 Hr
5) Floor Construct (Incl. Support Beams & Joists) 2 Hr
6) Roof Construct (Incl. Support Beams & Joists) 2 Hr
b. NFPA 101/Life Safety Code – Table A.8.2.1.2 – Type I (3.3.2)
1) Exterior Bearing Walls
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 3 Hr
iii. Supporting Roof Only 3 Hr
2) Interior Bearing Walls
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
3) Columns
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
4) Beams, Girders, Trusses and Arches
i. Supporting More Than One Floor 3 Hr
ii. Supporting One Floor Only 2 Hr
iii. Supporting Roof Only 2 Hr
5) Floor Construct (Incl. Support Beams & Joists) 2 Hr
6) Roof Construct (Incl. Support Beams & Joists) 1-1/2 Hr
7) Exterior Non-Bearing Walls 0 Hr
5. Fire Protection: Fully Sprinkled
6. Building Project Data:
Approximate Project Area JB – Bldg. 1 (Abatement + Renovation) 6,802sf JB – Bldg. 52 (Abatement Only) 1,644sf JC – Bldg. 1 (Abatement + Renovation) 2,958sf
CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):
7. Building Envelope/ Opaque Thermal Requirements:
a. ASHRAE 90.1-2010, Zone 4:
1) Roof: Attic R-20ci.
2) Exterior Walls: Mass R-9.5ci.
3) Wall below grade: Not required.
4) Unheated Slabs: Not required.
5) Opaque Doors: Swinging U-0.700, Non-swinging U-0.500.
6) Fenestration/ Vertical Glazing, 0% - 40% of wall:
i. Curtainwall/ Storefront: U-0.50
ii. Entrance Door: U-0.85
iii. SHGC-0.40
b. IECC 2012: Zone 4
1) Roof: Attic R-30ci.
2) Exterior Walls: Mass R-9.5ci.
3) Wall below grade: R-7.5ci.
4) Unheated Slabs: R-10 for 24” below.
5) Opaque Doors: Swinging U-0.77, Non-swinging R-4.75
6) Fenestration/ Vertical Glazing, 0% - 30% of wall:
i. Fixed: U-0.38
ii. Operable: U-0.45
iii. Entrance Doors: U-0.77
CODE INFORMATION
4. NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
5. Occupational, Safety and Health Administratio (OSHA) Standards.
6. Joint Commission on Accreditation of Healthcare Organizations (JCAHO) Requirements.
7. National Electrical Code (NEC)
8. International Plumbing Code (IPC)
9. ASME Boiler and Pressure Vessel Code
10. ASME Code for Pressure Piping
11. American with Disabilities Act (ADA), Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
12. State of Missouri Department of Health and Senior Services
13. The Provisions for Construction and Safety Signs.
Stated in the General Requirements Section 01010 of the VA Master Construction Specification.
14. Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1- 2004.
15. Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.
16. American Society of Heating, Refrigeration and Air- Conditioning Engineers (ASHRAE) Standard 90.1 2010, except where 90.1-2004 or 90.1-2007 are referenced or adopted by specific Veterans Affairs Design and Construction Procedures.
17. Energy Policy Act of 2005 (EPAct) and American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) Standard 90.1-2004 Appendix G.
18. Extended Industry- Standard Architecture (EISA) 2007 for new facility fossil fuel generated energy consumption reduction.
B. Authorities Having Jurisdiction:
1. VA must function as the Authority Having Jurisdiction
(AHJ). VA is not subject to local imposition of code enforcement procedures.
2. Joint Commission on the Accreditation of Healthcare Organizations (JCAHO)
3. US Department of Health & Human Services (H&HS)
A. Building Codes and Regulations (Latest Editions)
1. Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
a. Master Construction Specifications, Program Guide, PG‐18‐1
b. Design and Construction Procedures, PG‐18‐3
c. Standard Details, PG‐18‐4
d. Equipment Guide List, PG‐18‐5
e. Equipment Reference Manual, PG‐18‐6
f. Design Manuals for applicable disciplines, PG-18-10
g. Design Guides for graphics, PG-18-12
h. Barrier Free Design Guide, PG-18-13 (See item
A.11 below)
i. Environmental Compliance Manual, PG-18-17
j. VA Sustainable Design Guide
k. VA Directives, Design Manuals and Design Guides
1) VHA Directive 1116(2) – Sterile Processing Services (SPS)
2) VHA Directive 1761(1) – Supply Chain Management (SCM)
l. VA Design Alerts
m. VA Quality Alerts
n. VA National CAD Standard Application Guide and
BIM Guide
o. VA Drawing Title Box Layout
p. VA AE Design Submission Requirements
q. VA Design Review Checklists
r. Minimum Requirements for A/E Submissions for
Minor and Minor Miscellaneous projects, Handbook H‐18‐15 Volume C
s. Office of Construction & Facilities Management Design Manual, Architectural Design Manual
t. VA Medical Center Memorandums (MCM) (request from COR)
u. Manual for Preparation and Issuance of Construction Solicitation and Contract Documents
v. Technical Summaries
w. National Codes and Standards (NFPA, NEC, Natl.
Plumbing Code, EPA, OSHA, etc.)
x. Uniform Accessibility Standards
y. Asbestos Abatement Design Manual
z. Electrical Design Manual for Hospital Project
aa. Fire Protection Design Manual
bb. Estimating Manual
cc. Seismic Requirements
dd. VA Form 10-6238 Estimate
Worksheet.
2. NFPA and VA Fire Projection Manual for fire protection.
3. NFPA 101 Life Safety Code: addresses life safety and fire protection features.
a. International Building Code (IBC): Items not addressed in NFPA 101, including structural strength, seismic stability, sanitation, adequate light and ventilation, and energy conservation.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :2
P
M
GI-001
CODE REVIEW & LIFE SAFETY PLAN - LEGEND & CODE INFORMATION
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
6.8
9.5
10.1
QP.1 T.2R
Q.1 R.1 S.1
T T.1
10.2
1-AE-301
2E01E
E
E
CODES & DESIGN STANDARDS INFORMATION
1. REFER TO SHEET G-001 FOR APPLICABLE CODES & DESIGN STANDARDS
AND CODE INFORMATION.
OFFICE
1E19
WAITING RM.
1E01
BREAK RM.
1E02
EXAM
1E04
MECH. RM.
1E05
OFFICE
1E07
OFFICE
1E08
OFFICE
1E09
CONFERENCE
RM.
1E11
WAITING RM.
1E11A
OFFICE
1E12
OFFICE
1E14
CORRIDOR
1E15K
OFFICE
1E15C
OFFICE
1E15B
OFFICE
1E15A
OFFICE
1E15F
OFFICE
1E15E
ELEC. CLOSET
1E15H
ELEC. CLOSET
1E15J
TOILET, STAFF
1E16
LOBBY
C124
CORRIDOR
H106
CORRIDOR
H105
LAB.
1E40
BREAK RM.
1E40A
STORAGE
1E24
HAC
1E23
STORAGE
1E22
OFFICE
1E125
CORRIDOR
H104
STAIRWELL NO. 1
S101
CORRIDOR
H102
CORRIDOR
H103A
OFFICE
1E17A
MENTAL HEALTH
CHECK-IN
1E18
CORRIDOR
H101
INJECTIONS
1E17
STORAGE
CLOSET
1E134
STORAGE
CLOSET
1E135
CLEAN LINEN
RM.
1E136
LAB.
1E39
ELEVATOR NO. 2
E2
CHASE
CH-E1-1
D.W.
E3
CHASE
CH-E-2
CHASE
CH-E-1
OFFICE
1E15F
OFFICE
1E15E
CONFERENCE
RM.
1E16D
OFFICE
1E15G
OFFICE
1E15F
OFFICE
1E15E
MEANS OF EGRESS TO
EXTERIOR OF BUILDINGS
FIRE EXTINGUISHER LOCATION
EXIT
FIRE BARRIER
SMOKE BARRIER
PATIENT NON-SLEEPING UNIT
HAZARDOUS AREAS
EQUIVALENCY AREAS
SYMBOL LEGEND
Eth re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :1
P
M
1-1-GI-101E
CODE REVIEW & LIFE SAFETY PLAN - LEVEL 1 - AREA E
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
TRUE
1/8" = 1'-0"1
LEVEL 1 - CODE REVIEW & LIFE SAFETY PLAN
W
KEY PLAN
C E
6.8
9.5
10.1
QP.1 T.2R
Q.1 R.1 S.1
T T.1
10.2
F E
C
2E01
2E01A
2E01B
2E01E
2E01C
2E01D
AREA OF WORK
AREA OF WORK
E
MEANS OF EGRESS TO
EXTERIOR OF BUILDINGS
FIRE EXTINGUISHER LOCATION
EXIT
FIRE BARRIER
SMOKE BARRIER
PATIENT NON-SLEEPING UNIT
HAZARDOUS AREAS
EQUIVALENCY AREAS
SYMBOL LEGEND
E
OFFICE
2C05
HAC
2C06
D.W.
E3
ELEVATOR NO. 2
E2
CORRIDOR
H210
CHASE
CH-E-9
CHASE
CH-E-3
CHASE
CH-E-8
STAIRWELL NO. 1
S201
SOILED LINEN
CHUTE
2E15A
CHASE
CH-E-7
CHASE
CH-E-1
EXAM
2E20
EXAM
2E21
EXAM
2E29
CORRIDOR
H203
CHASE
CH-E-4
CODES & DESIGN STANDARDS INFORMATION
1. REFER TO SHEET G-001 FOR APPLICABLE CODES & DESIGN STANDARDS
AND CODE INFORMATION.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :0
P
M
1-2-GI-101E
CODE REVIEW & LIFE SAFETY PLAN - LEVEL 2 - AREA E
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
TRUE
W
KEY PLAN
C E
1/8" = 1'-0"1
LEVEL 2 - CODE REVIEW & LIFE SAFETY PLAN
AREA OF WORK
E
E
E
HAC
GS02
OI&T
GS01A
CHASE
CH-S-2
PIPE CHASE
Z004
OFFICE
GS22C
OFFICE
GS22A
TOILET
GN27
CLOSET
GN27A
HAC
GN28
VENDING RM.
GN29
ELEVATOR
LOBBY
GS24
OFFICE
GS22
OFFICE
GS22E
OFFICE
GS22D
ELEVATOR NO. 3
E2
CHASE
CH-S-5
CORRIDOR
H003
ELEVATOR NO. 1
E1
CHASE
CH-S-4
STORAGE
GN30
STORAGE
GN31
OFFICE
GN32
CHASE
CH-N-2
CORRIDOR
H005
STAIRWELL NO. 2
S002
WHEELCHAIR
CHARGING
GS21
OFFICE
GS22B
MEANS OF EGRESS TO
EXTERIOR OF BUILDINGS
FIRE EXTINGUISHER LOCATION
EXIT
FIRE BARRIER
SMOKE BARRIER
PATIENT NON-SLEEPING UNIT
HAZARDOUS AREAS
EQUIVALENCY AREAS
SYMBOL LEGEND
E
CODES AND DESIGN STANDARDS INFORMATION
1. REFER TO SHEET GI-001 FOR APPLICABLE CODES & DESIGN STANDARDS &
CODE INFORMATION.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:5 :4
P
M
52-0-GI-101N
CODE REVIEW AND LIFE SAFETY PLAN - LEVEL 0 - AREA N
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJG
BUILDING 52
AHT
1/8" = 1'-0"1
LEVEL 0 - CODE REVIEW AND SAFETY PLAN - OVERALL
TRUE
N S
OFFICE
1E19
WAITING RM.
1E01
BREAK RM.
1E02
EXAM
1E04
MECH. RM.
1E05
OFFICE
1E07
OFFICE
1E08
OFFICE
1E09
CONFERENCE
RM.
1E11
WAITING RM.
1E11A
OFFICE
1E12
OFFICE
1E14
CORRIDOR
1E15K
OFFICE
1E15C
OFFICE
1E15B
OFFICE
1E15A
OFFICE
1E15F
OFFICE
1E15E
ELEC. CLOSET
1E15H
ELEC. CLOSET
1E15J
TOILET, STAFF
1E16
LOBBY
C124
CORRIDOR
H106
CORRIDOR
H105
LAB.
1E40
BREAK RM.
1E40A
STORAGE
1E24
HAC
1E23
STORAGE
1E22
OFFICE
1E125
CORRIDOR
H104
STAIRWELL NO. 1
S101
CORRIDOR
H102
CORRIDOR
H103A
OFFICE
1E17A
MENTAL HEALTH
CHECK-IN
1E18
CORRIDOR
H101
INJECTIONS
1E17
STORAGE
CLOSET
1E134
STORAGE
CLOSET
1E135
CLEAN LINEN
RM.
1E136
LAB.
1E39
ELEVATOR NO. 2
E2
CHASE
CH-E1-1
D.W.
E3
CHASE
CH-E-2
CHASE
CH-E-1
OFFICE
1E15F
OFFICE
1E15E
CONFERENCE
RM.
1E16D
OFFICE
1E15G
OFFICE
1E15F
OFFICE
1E15E
PHASING NOTES & LEGEND
GENERAL PHASING NOTE:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION
PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO THE ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.
COPIES OF THE MOST-CURRENT ASBESTOS REPORT AND LEAD-BASED PAINT REPORT ARE TO BE OBTAINED FROM THE COR.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC.) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.
PHASE 5A
GENERAL DESCRIPTION #
5. PHASE 5 - DEMOLITION AND LIMITED RENOVATION OF JEFFERSON BARRACKS BUILDING 1-2ND FLOOR EAST –
SOUTH AND CENTER WINGS.
A. DEMOLITION TO BE PHASED TO START AT CENTER PORTION/EXISTING RECEPTION AREA: CENTER TO BE
DEMOLISHED AFTER-HOURS, WITH TEMPORARY 1-HOUR-RATED CONSTRUCTION BARRIERS/CEILINGS
ERECTED TO PROVIDE ACCESS TO THE NORTH WING AND STAIR 1 TOWER.
B. ABATEMENT AND DEMOLITION OF FIRST FLOOR ABOVE-CEILING AREAS IN ARE TO TAKE PLACE
AFTER-HOURS AND CONCURRENTLY WITH DEMOLITION OF AREA ABOVE.
C. DEMOLITION OF CENTER WING WITHIN CONSTRUCTION BARRIERS TO TAKE PLACE CONCURRENTLY
WITH DEMOLITON OF THE SOUTH WING.
D. DEMOLITON & RENOVATION OF SOUTH WING TO START AT NORTH END AND PROGRESS TOWARD SOUTH. TEMPORARY CONTAINMENT BARRIERS MAY BE ERECTED AT STRATEGIC LOCATIONS TO ALLOW FOR COMPLETION OF ABATEMENT AND DEMOLTION SIMULTANEOUSLY WITH RENOVATION OF PORTIONS
TO THE NORTH OF DEMOLITION AREA.
ALL WORK TO FOLLOW PROTOCOLS FOR UNCOVERING OF AND ABATEMENT OF HAZARDOUS MATERIALS AS CEILINGS, WALLS
AND CHASES ARE REMOVED AS WORK PROGRESSES.
PHASE 5B
GENERAL DESCRIPTION #
APPLICABLE NOTES
1. NORTH, CENTER AND SOUTH WINGS TO VACATE. NORTH WING TO BE REOCCUPIED AFTER COMPLETION OF
CENTER PORTION.
2. CENTER PORTION TO BE RENOVATED AND COMPLETED FIRST TO ALLOW ACCESS TO NORTH WING UPON
OCCUPANCY.
PHASE 5C
GENERAL DESCRIPTION #
PHASE 5D
GENERAL DESCRIPTION #
6.8
9.5
10.1
QP.1 T.2R
Q.1 R.1 S.1
T T.1
10.2
PHASE 5A
PHASE 5D
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :1
P
M
1-1-GC-101E
PHASING PLAN - LEVEL 1 - AREA E
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
TRUE
W
KEY PLAN
C E
1/8" = 1'-0"1
LEVEL 1 - REFLECTED CEILING PHASING PLAN - SOUTH WING
N
N
N
N
F
NE
N E
NE
N
F
NE
NE
F
N
NE
NE
N
D H
D H
N
NE
NE
N
D
HN2
NE
NE
NENE
N N
D H
N2
N
D H
NE
NE
6.8
9.5
10.1
QP.1 T.2R
Q.1 R.1 S.1
T T.1
10.2
PHASE 1
PHASE 2
PHASE 5A
PHASE 5B
OFFICE
2C05
HAC
2C06
D.W.
E3
ELEVATOR NO. 2
E2
TOILET, STAFF
2E31
CORRIDOR
H210
OFFICE
2E07
OFFICE
2E07A
TOILET
2E07C
TOILET
2E07B
TOILET
2E06A
CHASE
CH-E-6
OFFICE
2E08
OFFICE
2E06
FAX RM.
2E05B
CORRIDOR
H201 OFFICE
2E09
TOILET
2E10OFFICE
2E05
TOILET
2E05A
TELERETINAL
IMAGING
2E11
ELEC. RM.
2E04
TOILET
2E12A
CHASE
CH-E-9
STORAGE
2E02
OFFICE
2E12
HAC
2E01
STORAGE
2E03
TREAT. RM.
2E13
CHASE
CH-E-3
CHASE
CH-E-8
STAIRWELL NO. 1
S201 SOILED LINEN
CHUTE
2E15A
LACTATION RM.
2E15
STORAGE
2E16A
EXAM
2E16
KITCHENETTE
2E17
RECEPTION
2E18
CHASE
CH-E-7
VITAL SIGN RM.
2E19
CHASE
CH-E-1
OXYGEN
STORAGE
2E30
EXAM
2E20
EXAM
2E29
CHASE
CH-E-4
PHASING NOTES & LEGEND
GENERAL PHASING NOTE:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION
PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO THE ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.
COPIES OF THE MOST-CURRENT ASBESTOS REPORT AND LEAD-BASED PAINT REPORT ARE TO BE OBTAINED FROM THE COR.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC.) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.
PHASE 5A
GENERAL DESCRIPTION #
5. PHASE 5 - DEMOLITION AND LIMITED RENOVATION OF JEFFERSON BARRACKS BUILDING 1-2ND FLOOR EAST –
SOUTH AND CENTER WINGS.
A. DEMOLITION TO BE PHASED TO START AT CENTER PORTION/EXISTING RECEPTION AREA: CENTER TO BE
DEMOLISHED AFTER-HOURS, WITH TEMPORARY 1-HOUR-RATED CONSTRUCTION BARRIERS/CEILINGS
ERECTED TO PROVIDE ACCESS TO THE NORTH WING AND STAIR 1 TOWER.
B. ABATEMENT AND DEMOLITION OF FIRST FLOOR ABOVE-CEILING AREAS IN ARE TO TAKE PLACE
AFTER-HOURS AND CONCURRENTLY WITH DEMOLITION OF AREA ABOVE.
C. DEMOLITION OF CENTER WING WITHIN CONSTRUCTION BARRIERS TO TAKE PLACE CONCURRENTLY
WITH DEMOLITON OF THE SOUTH WING.
D. DEMOLITON & RENOVATION OF SOUTH WING TO START AT NORTH END AND PROGRESS TOWARD SOUTH. TEMPORARY CONTAINMENT BARRIERS MAY BE ERECTED AT STRATEGIC LOCATIONS TO ALLOW FOR COMPLETION OF ABATEMENT AND DEMOLTION SIMULTANEOUSLY WITH RENOVATION OF PORTIONS
TO THE NORTH OF DEMOLITION AREA.
ALL WORK TO FOLLOW PROTOCOLS FOR UNCOVERING OF AND ABATEMENT OF HAZARDOUS MATERIALS AS CEILINGS, WALLS
AND CHASES ARE REMOVED AS WORK PROGRESSES.
PHASE 5B
GENERAL DESCRIPTION #
APPLICABLE NOTES
1. NORTH, CENTER AND SOUTH WINGS TO VACATE. NORTH WING TO BE REOCCUPIED AFTER COMPLETION OF
CENTER PORTION.
2. CENTER PORTION TO BE RENOVATED AND COMPLETED FIRST TO ALLOW ACCESS TO NORTH WING UPON
OCCUPANCY.
PHASE 5C
GENERAL DESCRIPTION #
PHASE 5D
GENERAL DESCRIPTION #
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :3
P
M
1-2-GC-101E
PHASING PLAN - LEVEL 2 - AREA E
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
1/8" = 1'-0"1
LEVEL 2 - PHASING PLAN - SOUTH WING
TRUE
W
C E
MLK L.1 L.2
J
VENDING RM.
GN29
CORRIDOR
H003
STORAGE
GN30
STORAGE
GN31
OFFICE
GN32
CHASE
CH-N-2
CORRIDOR
H005
PHASING NOTES & LEGEND
GENERAL PHASING NOTE:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION
PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO THE ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.
COPIES OF THE MOST-CURRENT ASBESTOS REPORT AND LEAD-BASED PAINT REPORT ARE TO BE OBTAINED FROM THE COR.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC.) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.
PHASE 1: ABATEMENT
GENERAL DESCRIPTION #
1. PHASE 1 - ABATEMENT AND/OR ENCAPSULATION OF HAZARDOUS MATERIALS IN SELECTED ROOMS AT JEFFERSON
BARRACKS (JB) BUILDING 52.
A. JB BUILDING 52-GROUND LEVEL ROOMS GN30, GN31:
a. GN30 AND GN31 TO BE ABATED AT SAME TIME, WITH SEQUENCE TO BE COORDINATED BETWEEN THE COR AND GENERAL CONTRACTOR. PROVIDE TEMPORARY ANTE-ROOM INSIDE DOOR TO ROOM TO ISOLATE FROM REST OF FLOOR. WORK TO CONTINUE IN ROOM FROM BEGINNING OF ABATEMENT TO COMPLETION OF FINISHES.
APPLICABLE NOTES
1. Abatement of areas outside of Phase 1 is to be conducted prior to or in conjunction with demolition associated with each Phase. JB
Building 1 – 2 East/South-Center wing to be abated last as part of Phase 5.
ALL WORK TO FOLLOW PROTOCOLS FOR UNCOVERING OF AND ABATEMENT OF HAZARDOUS MATERIALS AS CEILINGS, WALLS AND
CHASES ARE REMOVED AS WORK PROGRESSES.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:5 :3
P
M
52-0-GC-101N
PHASING PLAN - LEVEL 0 - AREA N
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJG
BUILDING 52
AHT
1/2" = 1'-0"1
LEVEL 0 - PHASING PLAN - AREA N - ROOMS GN30 & GN31
TRUE