About this file

36C25519R0017 VOL 1_JB dwg General.pdf

View the file

Other files

File Type Posted
36C25519R0017-0003000.docx DOCX document
36C25519R0017-0002005.pdf PDF
36C25519R0017-0002004.pdf PDF
36C25519R0017-0002000.docx DOCX document
36C25519R0017-0002003.pdf PDF
36C25519R0017-0002002.pdf PDF
36C25519R0017-0002001.jpg JPG image
36C25519R0017-0001000.docx DOCX document
36C25519R0017-0001001.pdf PDF
36C25519R0017-018.pdf PDF
36C25519R0017-000.docx DOCX document
36C25519R0017-007.pdf PDF
36C25519R0017-022.pdf PDF
36C25519R0017-005.pdf PDF
36C25519R0017-023.pdf PDF
36C25519R0017-010.pdf PDF
36C25519R0017-015.pdf PDF
36C25519R0017-024.pdf PDF
36C25519R0017-011.pdf PDF
36C25519R0017-012.pdf PDF
36C25519R0017-027.pdf PDF
36C25519R0017-028.pdf PDF
36C25519R0017-017.pdf PDF
36C25519R0017-026.pdf PDF
36C25519R0017-003.pdf PDF
36C25519R0017-001.pdf PDF
36C25519R0017-013.pdf PDF
36C25519R0017-025.pdf PDF
36C25519R0017-016.pdf PDF
36C25519R0017-004.pdf PDF
36C25519R0017-020.pdf PDF
36C25519R0017-008.pdf PDF
36C25519R0017-002.pdf PDF
36C25519R0017-014.pdf PDF
36C25519R0017-019.pdf PDF
36C25519R0017-009.pdf PDF
36C25519R0017-021.pdf PDF
36C25519R0017_3.docx DOCX document
36C25519R0017_2.docx DOCX document
36C25519R0017_1.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

1. FOR MOST-CURRENT CAMPUS PLAN CONTACT COR.

DRAWING INDEX

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

VETERANS AFFAIRS MEDICAL CENTER

VA PROJECT NUMBER: 657-18-110

JOHN COCHRAN (JC) & JEFFERSON BARRACKS (JB) DIVISION

SAINT LOUIS, MISSOURI

CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, &

IMPROVE WAYFINDING

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:2

:5

A

M

G-001

COVER SHEET & SHEET INDEX

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

JJG/TJFAHT

1 & 52

OVERALL JB CAMPUS SITE PLAN

AD-001 ARCHITECTURAL DEMOLITION PLAN GENERAL NOTES & KEYNOTE LEGEND

AE-001 ARCHITECTURAL RENOVATION PLAN GENERAL NOTES & KEYNOTE LEGEND

1-2-AE-101E ARCHITECTURAL DEMOLITION & RENOVATION PLANS

1-AE-301 BUILDING SECTIONS + PARTIAL WALL SECTIONS

1-AE-501 ARCHITECTURAL DETAILS

1-AE-601 SCHEDULES & DIAGRAMS

AC-001 REFLECTED CEILING DEMOLITION & RENOVATION PLAN GENERAL NOTES AND

KEYNOTES LEGEND

1-1-AC-101E REFLECTED CEILING DEMOLITION & RENOVATION PLAN

1-2-AC-101E REFLECTED CEILING DEMOLITION & RENOVATION PLAN

1-2-AF-101E ARCHITECTURAL FINISH PLAN, SCHEDULE & DETAILS

52-0-AE-101N ARCHITECTURAL DEMOLITION & RENOVATION PLANS

52-0-AC-101N REFLECTED CEILING DEMOLITION & RENOVATION PLANS & DETAILS

52-0-AF-101N ARCHITECTURAL FINISH PLAN & SCHEDULE

FP-001 FIRE PROTECTION COVER SHEET

1-2-FD-101E FIRE PROTECTION DEMOLITION PLAN

1-2-FP-101E FIRE PROTECTION RENOVATION PLAN

P-001 PLUMBING COVER SHEET

1-1-PD-101 PLUMBING DEMOLITION PLAN

1-2-PD-101E PLUMBING DEMOLITION PLAN

1-2-PL-101E PLUMBING RENOVATION PLAN

M-001 MECHANICAL COVER SHEET

1-2-MD-101E MECHANICAL DEMOLITION PLAN

1-2-MH-101E HVAC RENOVATION PLAN

MH-300 MECHANICAL HVAC DETAILS

MH-400 CONTROL DIAGRAMS

MH-500 MECHANICAL HVAC SCHEDULES

E-001 ELECTRICAL COVER SHEET

1-2-ED-101E ELECTRICAL DEMOLITION PLAN

1-2-EL-101E ELECTRICAL LIGHTING RENOVATION PLAN

1-2-EP-101E ELECTRICAL POWER RENOVATION PLAN

1-2-RA-101E EXISTING CONDITION PLAN, SCHEDULES, NOTES & KEYNOTES

1-2-RA-102E EXISTING CONDITION PLAN PHOTOS

1-2-RA-103E EXISTING CONDITION PLAN PHOTOS

52-0-RA-101N EXISTING CONDITION PLAN, SCHEDULES, NOTES & PHOTOS

52-0-RA-102N EXISTING CONDITION PLAN PHOTOS

HA-001 GENERAL ASBESTOS ABATEMENT NOTES

1-1-HA-101E HAZARDOOUS MATERIAL PLAN - 1st FLOOR

1-2-HA-101E HAZARDOOUS MATERIAL PLAN - 2nd FLOOR CLASS II ABATEMENT

1-2-HA-102E HAZARDOOUS MATERIAL PLAN - 2nd FLOOR TSI ABATEMENT

52-0-HA-101N HAZARDOOUS MATERIAL PLAN

G-001 COVER SHEET & SHEET INDEX - CORRECT WORKPLACE - LIFE SAFETY ISSUES,

ASBESTOS ABATEMENT - JEFFERSON BARRACK DIVISION

G-002 ABBREVIATIONS, SYMBOLS & GENERAL NOTES

GI-001 CODE REVIEW & LIFE SAFETY PLAN - LEGEND & CODE INFORMATION

1-1-GI-101E CODE REVIEW & LIFE SAFETY PLAN

1-2-GI-101E CODE REVIEW & LIFE SAFETY PLAN

52-0-GI-101N CODE REVIEW & LIFE SAFETY PLAN

1-1-GC-101E PHASING PLAN

1-2-GC-101E PHASING PLAN

52-0-GC-101N PHASING PLAN

(NOT TO SCALE)

BLDG 1

BLDG. 52

VOLUME 1 - JEFFERSON BARRACKS DIVISION CAMPUS

INDEX OF VOLUMES

VOLUME 1 - JEFFERSON BARRACKS CAMPUS

VOLUME 2 - JOHN COCHRAN CAMPUS

VOLUME 3 - WAYFINDING - JEFFERSON BARRACKS &

JOHN COCHRAN CAMPUS

A

ACOUST. ACOUSTICAL

ACT ACOUSTIC TILE

ADP ART DISPLAY PANEL

ADT ART DISPLAY TRACK

ADJ ADJACENT, ADJUSTABLE

AFC ABOVE FINISH CEILLING

AFF ABOVE FINISH FLOOR

AFP ACCORDION FOLDING PARTITION

AFS ACCESS FLOOR SYSTEM

AHU AIR HANDLING UNIT

ALUM ALUMINUM

AFS ACCESS FLOOR SYSTEM

APPROX APPROXIMATE

ARCH ARCHITECTURE, ARCHITECT

ABBREVIATIONS - SEE ADDITIONAL FINISH MATERIAL ABBREVIATIONS IN THE ROOM FINISH SCHEDULE MATERIAL LEGEND

B

B BENCH

BM BEAM

BD BOARD, BLAST DOOR

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BP BULLET PROOF

C

CAB CABINET

CID COMPREHENSIVE INTERIOR DESIGN

CMU CONCRETE MASONRY UNIT

CJ CONTROL JOINT,

CONSTRUCTION JOINT

C CENTER LINE

CLG CEILING

COL COLUMN

CONC CONCRETE

CONSTR CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACT, CONTRACTOR

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CPT CARPET

CR CHAIR RAIL

CT CARPET TILE

CUP CENTRAL UTILITY PLANT

D

DBL DOUBLE

DC DISPLAY CASE

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DML DEMOLITION

DN DOWN

DR DOOR

DS DOWNSPOUT

DWG DRAWING

E

EA EACH

EEWS EMERGENCY EYEWASH & SHOWER

EF EXHAUST FAN

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

EQUIP EQUIPMENT

EQ. EQUAL

ETC AND SO FORTH (ETCETERA)

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

F

FD FLOOR DRAIN

FDN FOUNDATION

FEB FIRE EXTINGUISHER

& WALL BRACKET

FEC FIRE EXTINGUISHER CABINET

FFL FINISH FLOOR LEVEL

FHC FIRE HOSE CABINET

(WITH EXTINGUISHER & BRACKET)

FHR FIRE HOSE REEL

(WITH EXTINGUISHER & BRACKET)

FIN FINISHED, FINISH

FFEL FINISHED FLOOR ELEVATION

FLR FLOOR

FV FIELD VERIFY

G

GA GAUGE

GALV GALVANIZED

GEJ GUTTER EXPANSION JOINT

GL GRADE LINE, GLASS

GRTG GRATING

GYP GYPSUM

GYP BD GYPSUM BOARD

H

HD HAND

HDWR HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HIGH POINT

HT. HEIGHT

HVAC HEATING, VENTILATION & AIR

CONDITIONING

I

I.D. INSIDE DIAMETER

INSUL INSULATION

INT INTERIOR

J

JC JANITOR'S CLOSET

JT JOINT

L

LAM LAMINATE

LAV LAVATORY

LBL LABEL

LVR LOUVER

LVR LP LOUVER LOW POINT

LP LOW POINT

M

MACH MACHINE

MAINT MAINTENANCE

MANUF MANUFACTURE

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

M.R. MIRRORED

MTD MOUNTED

MTL METAL

N

NIC NOT IN CONTRACT

NGVD NATIONAL GEODETIC

VERTICAL DATUM

NO NUMBER

NTS NOT TO SCALE

O

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

OFF OFFICE

OPP OPPOSITE

OPP. HD. OPPOSITE HAND

OPNG OPENING

OTS OPEN TO STRUCTURE

P

P PAINT (e.g. P-1)

PTD PAINTED

PRTN PARTITION

PLAM PLASTIC LAMINATE

P. PLATE

PNL PANEL

PR PAIR

PLYWD PLYWOOD

R

R OR RAD RADIUS

RA RETURN AIR

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

RECP RECEPTACLE

REG REGULAR

REINF REINFORCED

REQ'D REQUIRED

RGH ROUGH

S

SAPF SPECIAL ACCESS PROGRAM FACILITY

SCHED. SCHEDULE

SECT SECTION

SHT SHEET

SID STRUCTURAL INTERIOR DESIGN

SIM SIMILAR

SPEC SPECIFICATION

SPS SYNTHETIC PANEL SYSTEM

SS STAINLESS STEEL

SSMA STEEL STUD MANUFACTURERS

ASSOCIATION WWW.SSMA.COM

STC SOUND TRANSMISSION

COEFFICIENT

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUPP. SUPPORT

SUSP SUSPENDED

T

TECH TECHNICAL

THK THICK

THRU THROUGH

TLT TOILET

T & B TOP & BOTTOM

T.O.P. TOP OF PARAPET

T.O.S. TOP OF STEEL

TYP TYPICAL

U

U.N.O. UNLESS NOTED OTHERWISE

UL UNDERWRITERS LABORATORY

V

VENT VENTILATE, VENTILATOR

VERT VERTICAL

VOL VOLUME

W

W WIDTH

W/ WITH

WD WOOD

WT WEIGHT

FOR MEDICAL

FACILITIES ONLY

CS CENTRAL STERILE

CT COMPUTED TOMOGRAPHY

ER EMERGENCY ROOM

ICU INTENSIVE CARE UNIT

LDRP LABOR-DELIVERY-RECOVERY-POST

PARTUM

LTC LONG TERM CARE

MRI MAGNETIC RESONANCE IMAGING

MICU MEDICAL INTENSIVE CARE UNIT

OR OPERATING ROOM

OT OCCUPATIONAL THERAPY

PACU POST ANESTHETIC CARE UNIT

PT PHYSICAL THERAPY

RT RESPIRATORY THERAPY

SICU SURGICAL INTENSIVE CARE UNIT

MATERIAL SYMBOLS

CAST-IN-PLACE CONCRETE

EARTH

EXISTING CONSTRUCTION

BRICK

GYPSUM

RIGID INSULATION

STEEL

GENERAL NOTES

1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS IN ORDER TO BE FAMILIAR W/ COORDINATION OF WORK REQUIRED IN THIS DOCUMENT PACKAGE AND EXISTING

CONDITIONS.

2. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.

3. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE

WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.

4. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE OWNER. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH MINIMUM INTERRUPTION. SCHEDULE ALL

ELECTRICAL/MECHANICAL OUTAGES 15 DAYS IN ADVANCE WITH THE OWNER.

5. PROTECT ALL WORK, MATERIALS AND EQUIPMENT. CAP OR PLUG TEMPORARY OPENINGS. DELIVER ALL WORK TO THE

OWNER CLEAN AND IN GOOD CONDITION.

6. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS SHALL BE KEPT CLEAR OF DEBRIS. CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED BY NEW WORK SHALL BE INCLUDED AS WORK

PROVIDED UNDER THIS CONTRACT.

7. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING EQUIPMENT, CONNECTIONS, CONTROLS, ETC.

DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY CONTRACTOR AT

NO COST TO THE OWNER.

8. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.

9. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED.

10. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.

11. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND

SATISFACTORY INSTALLATION.

12. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND WALLS SHALL BE PATCHED WITH LIKE

MATERIALS TO MATCH THE SURROUNDING SURFACES.

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK

UNDER THIS CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION.

14. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT RATED CONSTRUCTION.

14.A. FIRE STOP ALL PENETRATIONS WHERE NEW DEVICES/LINES RELOCATING EXISTING DEVICES/LINES

PENETRATING FLOORS, CEILINGS AND OTHER RATED BARRIERS.

14.B. FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE EXISTING DEVICES/LINES PENETRATE

FLOOR, CEILINGS AND OTHER RATED BARRIERS.

15. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.

16. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD OR AS INDICATED ON DRAWINGS.

17. PROVIDE 16 GA. METAL BACKING PLATES, UNLESS OTHERWISE SHOWN, IN ALL WALLS TO RECEIVE EQUIPMENT, SHELVING AND ACCESSORIES, DOOR STOPS AND OTHER ITEMS REQUIRING REINFORCEMENT. NO WOOD BLOCKING IS

TO BE USED PER VASTLHCS.

18. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES, CONVENIENCE OUTLETS, DOOR STOPS AND OTHER FINISH HARDWARE, ETC., SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF EXISTING WALLS

INDICATED TO REMAIN.

19. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE OWNER. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:

19.A. OWNER'S EQUIPMENT REQUIREMENTS.

19.B. CEILING SUPPORT SYSTEM.

19.C. MECHANICAL DUCTWORK SYSTEM

19.D. LIGHTING FIXTURES, ELECTRICAL WIRING AND CONDUIT SYSTEMS

19.E. PLUMBING AND PIPING SYSTEMS.

19.F. COMMUNICATIONS SYSTEMS.

20. OPTAIN PERMIT FOR AND CONSTRUCT FIRE-RESISTANT ANTE CHAMBER WITH DOOR AND APPOVED HARDWARE TO SEAL OFF CONSTRUCTION AREA FROM CORRIDOR. SEAL ANTE CHAMBER TO EXISTING CONSTRUCTION. PROVIDE WALK-OFF MATS OUTSIDE CORRIDOR AND ROOM SIDES OF CHAMBER. ANTE CHAMBER TO COMPLY WITH REQ'TS.

FOR ICRA LEVEL 4 PROTECTION - REVIEW & COORDINATE PERMIT & CONTSTRUCTION REQ'TS W/ COR AND STATION'S

INFECTION CONTROL OFFICER.

21 AT THE COMPLETION OF DEMOLITION THE CONTRACTOR SHALL HAVE A SITE MEETING WITH THE VA TO REVIEW AS-

BUILT CONDITIONS OF THE EXISTING STRUCTURE.

22. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN QUESTION CONTRACTOR SHALL NOTIFY

THE VA IMMEDIATELY.

23. THE OWNER SHALL BE RESPONSIBLE FOR REMOVING, STORING AND REINSTALLATION OF ALL OF THE OWNER'S EQUIPMENT AND FURNITURE, TO INCLUDE BOTH WALL MOUNTED ITEMS AND MOVABLE ITEMS. THIS COORDINATION OF

OWNER'S ITEMS IS REQUIRED FOR ALL PHASES OF CONSTRUCTION.

24. CONTRACTOR TO USE CONNECTING CORRIDOR EXTERIOR ENTRANCE FOR REMOVAL AND NEW MATERIAL DELIVERY.

CONTRACTOR TO PROVIDE NECESSARY EQUIPMENT TO PROTECT EXISTING FINISHES.

25. WORK THAT REQUIRES ACCESS TO SPACES OUTSIDE DESIGNATED AREA OF WORK SHALL BE COORDINATED WITH THE VA. WORK IN THOSE AREAS SHALL TAKE PLACE OUTSIDE REGULAR BUSINESS HOURS AND THE AREAS SHALL BE

CLEANED AND RETURNED TO SERVICE AT THE END OF EACH SHIFT.

26. UPON COMPLETION OF THE PROJECT. ALL AREAS AVAILABLE FOR CONSTRUCTION MATERIALS, VEHICLES, AND TRASH

RECEPTICLES MUST BE RETURNED TO THEIR ORIGINAL CONDITION.

FIRE PROOFING / FIRE STOPPING GENERAL NOTES:

1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL PENETRATIONS. CONSTRUCTION TO CONFORM TO

MANUFACTURER'S FIRE RATED/TEST ASSEMBLIES.

2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS/PARTITIONS AND FLOORS. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL WITH U.L. DESIGN NUMBER AND

ASTM. FIRE RATED WALLS SHOWN ON PLAN.

3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION.

4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-LABEL EXISTING WALL IF NECESSARY.

5. MAINTAIN 2-HR FIRE RATED FLOOR AT PENETRATIONS, EXISTING FLOOR SLAB, AND 2-HR DECK WITH

FIREPROOFING. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY.

ASBESTOS AND LEAD BASED PAINT

1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING MATERIALS (ACM) PRIOR TO ANY

DEMOLITION.

2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF ASBESTOS AND LEAD BASED PAINT

REPORTS. REFER TO DIVISION 2 IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD BASED

PAINT ENCAPSULATION OR REMOVAL SPECIFICATIONS.

3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS OBTAINED FROM THE COR FOR DETAILED INFORMATION AND LOCATIONS. IF THE CONTRACTOR ENCOUNTERS

MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE

CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS CONTAINING (ACMs) ARE TO

BE PROVIDE WITH APPROPRIATE OSHA ASBESTOS TRAINING PRIOR TO START OF WORK.

4. REFER TO PHASING PLAN SHEETS IN THESE DRAWINGS. ABATEMENT AND LBP REMOVAL ACTIVITIES

SHALL BE CONDUCTED IN GENERAL ACCORDANCE WITH THE PROJECTS PHASING STRATEGY.

HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA OF FACILITY IN QUESTION TO ABATEMENT SPECIFICATIONS FOR HANDLING OF MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT SHOULD BE EXPECTED BY THE

ABATEMENT CONTRACTOR

ARCHITECTURAL SYMBOLS

A101

DETAIL NUMBER

0 COLUMN NUMBER/GRID LINE

SHEET NUMBER

ARCHITECTURAL SECTION

WINDOW TYPE

1 Ref

R e f

1 Ref

R e f

ARCHITECTURAL ELEVATION

A888

DETAIL NUMBER

SHEET NUMBER

CENTER LINE

DIMENSION LINE

DOOR NUMBER SYMBOL

1"

EXISTING TO REMAIN

NEW CONSTRUCTION

EXISTING TO BE REMOVED

EXISTING TO REMAIN

1i

KEYNOTE - FLOOR PLAN

KEYNOTE - DEMOLITION PLAN

X

X

PHASING LIST

PHASE 1 - ABATEMENT - JC & JB CAMPUS

PHASE 2 - JC B1 - 2A18C

PHASE 3 - JC B1 - 6 FL ENDO

PHASE 4 - (DEDUCT ALT) JC-B7

PHASE 5 - JB-B1 - 2 EAST-SOUTH/CTR RENOVATION

- REFER TO PROJECT MANUAL & PHASING PLANS FOR DETAILED INFO.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:5 :2

P

M

G-002

ABBREVIATIONS, SYMBOLS & GENERAL NOTES

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

JJG/TJFAHT

1 & 52

APPLICABLE CODES & DESIGN STANDARDS:

CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):

A. Building Classification – JB Buildings. 1 & 52; JC Building 1

1. Occupancy Classification – JB Bldg. 1 & 52; JC Bldg. 1:

a. Existing Building: I-2 Institutional, Hospital (IBC), Health Care (New & Existing) (NFPA)

b. Occupancy separation:

1) Healthcare requires a 1-hour smoke barrier every 22,500sf, 200ft travel, 30sf net on each side.

2) If entire building healthcare, then:

i. Corridor wall can be smoke partition.

c. Common Path Limit: 100ft.

d. Dead End Limit: 30ft.

e. Travel Distance Limit: 200ft.

f. Fire door and glazing in 1-hour wall: 45 min.

g. 8ft corridors for gurney traffic. 44” clear for remainder.

h. Doors required to be 3’0” wide minimum, with openings to be sized appropriate to accommodate room functions.

i. Intervening rooms not permitted, unless they are accessory to the space served.

j. 1-hour hazardous areas: storage over 100sf, 1-hour rated fire-smoke barrier.

k. Suite walls shall be smoke partitions, no fire rating.

2. Construction Type:

a. Construction Type (IBC/NFPA)

1) JB Building 1: Type I-A/Type I (332) (Assumed based on 1922 construction).

2) JB Building 52: Type I-A/Type I (332) (Assumed based on 1940s construction).

3) JC Building 1: Type I-A/Type I (332) (Assumed based on 1950 construction).

3. Seismic Design:

a. VA H-18-8 / July 2008 / Design Category = Table 1: Critical Facility (Hospital)

1) Spectral Response Accelerations:

i. SS (VA H-18-8) – Table 3 0.596

ii. SI (VA H-18-8) – Table 3 0.171

b. IBC Seismic (Chpt. 1613):

1) Hospital with Emergency Room - Seismic Risk Category IV (Table T1604.5)

2) Seismic Design Category – Short Period (0.2-second) Response Acceleration based on IBC SDS @

0.183g = C (1613.3.4,Table T1613.3.5(1))

3) Seismic Design Category- 1-Second Period Response Acceleration based on IBC SD01 @ 0.596g = D

(1613.3.4, Table T1613.3.5(2))

c. Renovation project will require seismic design considerations for installation of new suspended acoustical ceilings and

MPFE items. Campuses are located in Zone 1. Need to review with VASTLHCS Engineering for current methods used in renovations.

4. Fire Resistive Requirements:

a. International Building Code – Table 601 – Type I-B

1) Structural Frame (Columns, Girders, Trusses)

i. Supporting Floor 2 Hr

ii. Supporting Roof only 1-1/2 Hr

2) Bearing Walls

i. Exterior (not less than Fire Separation) 3 Hr

ii. Interior 3 Hr

iii. Interior (Support Roof only) 2 Hr

3) Nonbearing Walls and Partitions (Table 602 – Group 1)

i. Exterior (Fire Separation: X < 5 Ft) 1 Hr

ii. Exterior (Fire Separation: 5 < X < 10 Ft) 1 Hr

iii. Exterior (Fire Separation: 10 < X < 30 Ft) 1 Hr

iv. Exterior (Fire Separation: 30 < X Ft) 1 Hr

4) Nonbearing Walls and Partitions

i. Interior (Except as noted below) 0 Hr

ii. Fire Walls (Table 705.4) 3 Hr

iii. Fire Barriers (Table 703.7) 2 Hr

iv. Shaft Enclosure (Figure 707.4)

Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr

v. Fire Partitions (708.3) 1 Hr

vi. Smoke Barriers (708.3) 1 Hr

vii. Smoke Partitions (403.3 & 710.3) 0 Hr

viii. Corridors (with Fire Sprinklers Table 1016.1) 0 Hr

ix. Vertical Exit Enclosures (Section 1019.1)

Connecting 4 or more stories 2 Hr Connecting 3 or less stories 1 Hr

x. Exit Passageways (Section 1020.3) Walls/Floor/Ceiling (Separately) 1 Hr Walls/Floor/Ceiling Connecting (Exit Encl.) 2 Hr

xi. Horizontal Exits (Figure 1021.1) 2 Hr

5) Floor Construct (Incl. Support Beams & Joists) 2 Hr

6) Roof Construct (Incl. Support Beams & Joists) 2 Hr

b. NFPA 101/Life Safety Code – Table A.8.2.1.2 – Type I (3.3.2)

1) Exterior Bearing Walls

i. Supporting More Than One Floor 3 Hr

ii. Supporting One Floor Only 3 Hr

iii. Supporting Roof Only 3 Hr

2) Interior Bearing Walls

i. Supporting More Than One Floor 3 Hr

ii. Supporting One Floor Only 2 Hr

iii. Supporting Roof Only 2 Hr

3) Columns

i. Supporting More Than One Floor 3 Hr

ii. Supporting One Floor Only 2 Hr

iii. Supporting Roof Only 2 Hr

4) Beams, Girders, Trusses and Arches

i. Supporting More Than One Floor 3 Hr

ii. Supporting One Floor Only 2 Hr

iii. Supporting Roof Only 2 Hr

5) Floor Construct (Incl. Support Beams & Joists) 2 Hr

6) Roof Construct (Incl. Support Beams & Joists) 1-1/2 Hr

7) Exterior Non-Bearing Walls 0 Hr

5. Fire Protection: Fully Sprinkled

6. Building Project Data:

Approximate Project Area JB – Bldg. 1 (Abatement + Renovation) 6,802sf JB – Bldg. 52 (Abatement Only) 1,644sf JC – Bldg. 1 (Abatement + Renovation) 2,958sf

CODES / REGULATIONS (LATEST EDITION UNLESS NOTED OTHERWISE):

7. Building Envelope/ Opaque Thermal Requirements:

a. ASHRAE 90.1-2010, Zone 4:

1) Roof: Attic R-20ci.

2) Exterior Walls: Mass R-9.5ci.

3) Wall below grade: Not required.

4) Unheated Slabs: Not required.

5) Opaque Doors: Swinging U-0.700, Non-swinging U-0.500.

6) Fenestration/ Vertical Glazing, 0% - 40% of wall:

i. Curtainwall/ Storefront: U-0.50

ii. Entrance Door: U-0.85

iii. SHGC-0.40

b. IECC 2012: Zone 4

1) Roof: Attic R-30ci.

2) Exterior Walls: Mass R-9.5ci.

3) Wall below grade: R-7.5ci.

4) Unheated Slabs: R-10 for 24” below.

5) Opaque Doors: Swinging U-0.77, Non-swinging R-4.75

6) Fenestration/ Vertical Glazing, 0% - 30% of wall:

i. Fixed: U-0.38

ii. Operable: U-0.45

iii. Entrance Doors: U-0.77

CODE INFORMATION

4. NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900

5. Occupational, Safety and Health Administratio (OSHA) Standards.

6. Joint Commission on Accreditation of Healthcare Organizations (JCAHO) Requirements.

7. National Electrical Code (NEC)

8. International Plumbing Code (IPC)

9. ASME Boiler and Pressure Vessel Code

10. ASME Code for Pressure Piping

11. American with Disabilities Act (ADA), Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)

12. State of Missouri Department of Health and Senior Services

13. The Provisions for Construction and Safety Signs.

Stated in the General Requirements Section 01010 of the VA Master Construction Specification.

14. Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1- 2004.

15. Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.

16. American Society of Heating, Refrigeration and Air- Conditioning Engineers (ASHRAE) Standard 90.1 2010, except where 90.1-2004 or 90.1-2007 are referenced or adopted by specific Veterans Affairs Design and Construction Procedures.

17. Energy Policy Act of 2005 (EPAct) and American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) Standard 90.1-2004 Appendix G.

18. Extended Industry- Standard Architecture (EISA) 2007 for new facility fossil fuel generated energy consumption reduction.

B. Authorities Having Jurisdiction:

1. VA must function as the Authority Having Jurisdiction

(AHJ). VA is not subject to local imposition of code enforcement procedures.

2. Joint Commission on the Accreditation of Healthcare Organizations (JCAHO)

3. US Department of Health & Human Services (H&HS)

A. Building Codes and Regulations (Latest Editions)

1. Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).

a. Master Construction Specifications, Program Guide, PG‐18‐1

b. Design and Construction Procedures, PG‐18‐3

c. Standard Details, PG‐18‐4

d. Equipment Guide List, PG‐18‐5

e. Equipment Reference Manual, PG‐18‐6

f. Design Manuals for applicable disciplines, PG-18-10

g. Design Guides for graphics, PG-18-12

h. Barrier Free Design Guide, PG-18-13 (See item

A.11 below)

i. Environmental Compliance Manual, PG-18-17

j. VA Sustainable Design Guide

k. VA Directives, Design Manuals and Design Guides

1) VHA Directive 1116(2) – Sterile Processing Services (SPS)

2) VHA Directive 1761(1) – Supply Chain Management (SCM)

l. VA Design Alerts

m. VA Quality Alerts

n. VA National CAD Standard Application Guide and

BIM Guide

o. VA Drawing Title Box Layout

p. VA AE Design Submission Requirements

q. VA Design Review Checklists

r. Minimum Requirements for A/E Submissions for

Minor and Minor Miscellaneous projects, Handbook H‐18‐15 Volume C

s. Office of Construction & Facilities Management Design Manual, Architectural Design Manual

t. VA Medical Center Memorandums (MCM) (request from COR)

u. Manual for Preparation and Issuance of Construction Solicitation and Contract Documents

v. Technical Summaries

w. National Codes and Standards (NFPA, NEC, Natl.

Plumbing Code, EPA, OSHA, etc.)

x. Uniform Accessibility Standards

y. Asbestos Abatement Design Manual

z. Electrical Design Manual for Hospital Project

aa. Fire Protection Design Manual

bb. Estimating Manual

cc. Seismic Requirements

dd. VA Form 10-6238 Estimate

Worksheet.

2. NFPA and VA Fire Projection Manual for fire protection.

3. NFPA 101 Life Safety Code: addresses life safety and fire protection features.

a. International Building Code (IBC): Items not addressed in NFPA 101, including structural strength, seismic stability, sanitation, adequate light and ventilation, and energy conservation.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:4 :2

P

M

GI-001

CODE REVIEW & LIFE SAFETY PLAN - LEGEND & CODE INFORMATION

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

TJF/JJGAHT

6.8

9.5

10.1

QP.1 T.2R

Q.1 R.1 S.1

T T.1

10.2

1-AE-301

2E01E

E

E

CODES & DESIGN STANDARDS INFORMATION

1. REFER TO SHEET G-001 FOR APPLICABLE CODES & DESIGN STANDARDS

AND CODE INFORMATION.

OFFICE

1E19

WAITING RM.

1E01

BREAK RM.

1E02

EXAM

1E04

MECH. RM.

1E05

OFFICE

1E07

OFFICE

1E08

OFFICE

1E09

CONFERENCE

RM.

1E11

WAITING RM.

1E11A

OFFICE

1E12

OFFICE

1E14

CORRIDOR

1E15K

OFFICE

1E15C

OFFICE

1E15B

OFFICE

1E15A

OFFICE

1E15F

OFFICE

1E15E

ELEC. CLOSET

1E15H

ELEC. CLOSET

1E15J

TOILET, STAFF

1E16

LOBBY

C124

CORRIDOR

H106

CORRIDOR

H105

LAB.

1E40

BREAK RM.

1E40A

STORAGE

1E24

HAC

1E23

STORAGE

1E22

OFFICE

1E125

CORRIDOR

H104

STAIRWELL NO. 1

S101

CORRIDOR

H102

CORRIDOR

H103A

OFFICE

1E17A

MENTAL HEALTH

CHECK-IN

1E18

CORRIDOR

H101

INJECTIONS

1E17

STORAGE

CLOSET

1E134

STORAGE

CLOSET

1E135

CLEAN LINEN

RM.

1E136

LAB.

1E39

ELEVATOR NO. 2

E2

CHASE

CH-E1-1

D.W.

E3

CHASE

CH-E-2

CHASE

CH-E-1

OFFICE

1E15F

OFFICE

1E15E

CONFERENCE

RM.

1E16D

OFFICE

1E15G

OFFICE

1E15F

OFFICE

1E15E

MEANS OF EGRESS TO

EXTERIOR OF BUILDINGS

FIRE EXTINGUISHER LOCATION

EXIT

FIRE BARRIER

SMOKE BARRIER

PATIENT NON-SLEEPING UNIT

HAZARDOUS AREAS

EQUIVALENCY AREAS

SYMBOL LEGEND

Eth re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:4 :1

P

M

1-1-GI-101E

CODE REVIEW & LIFE SAFETY PLAN - LEVEL 1 - AREA E

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

TJF/JJGAHT

TRUE

1/8" = 1'-0"1

LEVEL 1 - CODE REVIEW & LIFE SAFETY PLAN

W

KEY PLAN

C E

6.8

9.5

10.1

QP.1 T.2R

Q.1 R.1 S.1

T T.1

10.2

F E

C

2E01

2E01A

2E01B

2E01E

2E01C

2E01D

AREA OF WORK

AREA OF WORK

E

MEANS OF EGRESS TO

EXTERIOR OF BUILDINGS

FIRE EXTINGUISHER LOCATION

EXIT

FIRE BARRIER

SMOKE BARRIER

PATIENT NON-SLEEPING UNIT

HAZARDOUS AREAS

EQUIVALENCY AREAS

SYMBOL LEGEND

E

OFFICE

2C05

HAC

2C06

D.W.

E3

ELEVATOR NO. 2

E2

CORRIDOR

H210

CHASE

CH-E-9

CHASE

CH-E-3

CHASE

CH-E-8

STAIRWELL NO. 1

S201

SOILED LINEN

CHUTE

2E15A

CHASE

CH-E-7

CHASE

CH-E-1

EXAM

2E20

EXAM

2E21

EXAM

2E29

CORRIDOR

H203

CHASE

CH-E-4

CODES & DESIGN STANDARDS INFORMATION

1. REFER TO SHEET G-001 FOR APPLICABLE CODES & DESIGN STANDARDS

AND CODE INFORMATION.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:4 :0

P

M

1-2-GI-101E

CODE REVIEW & LIFE SAFETY PLAN - LEVEL 2 - AREA E

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

TJF/JJGAHT

TRUE

W

KEY PLAN

C E

1/8" = 1'-0"1

LEVEL 2 - CODE REVIEW & LIFE SAFETY PLAN

AREA OF WORK

E

E

E

HAC

GS02

OI&T

GS01A

CHASE

CH-S-2

PIPE CHASE

Z004

OFFICE

GS22C

OFFICE

GS22A

TOILET

GN27

CLOSET

GN27A

HAC

GN28

VENDING RM.

GN29

ELEVATOR

LOBBY

GS24

OFFICE

GS22

OFFICE

GS22E

OFFICE

GS22D

ELEVATOR NO. 3

E2

CHASE

CH-S-5

CORRIDOR

H003

ELEVATOR NO. 1

E1

CHASE

CH-S-4

STORAGE

GN30

STORAGE

GN31

OFFICE

GN32

CHASE

CH-N-2

CORRIDOR

H005

STAIRWELL NO. 2

S002

WHEELCHAIR

CHARGING

GS21

OFFICE

GS22B

MEANS OF EGRESS TO

EXTERIOR OF BUILDINGS

FIRE EXTINGUISHER LOCATION

EXIT

FIRE BARRIER

SMOKE BARRIER

PATIENT NON-SLEEPING UNIT

HAZARDOUS AREAS

EQUIVALENCY AREAS

SYMBOL LEGEND

E

CODES AND DESIGN STANDARDS INFORMATION

1. REFER TO SHEET GI-001 FOR APPLICABLE CODES & DESIGN STANDARDS &

CODE INFORMATION.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:5 :4

P

M

52-0-GI-101N

CODE REVIEW AND LIFE SAFETY PLAN - LEVEL 0 - AREA N

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

TJF/JJG

BUILDING 52

AHT

1/8" = 1'-0"1

LEVEL 0 - CODE REVIEW AND SAFETY PLAN - OVERALL

TRUE

N S

OFFICE

1E19

WAITING RM.

1E01

BREAK RM.

1E02

EXAM

1E04

MECH. RM.

1E05

OFFICE

1E07

OFFICE

1E08

OFFICE

1E09

CONFERENCE

RM.

1E11

WAITING RM.

1E11A

OFFICE

1E12

OFFICE

1E14

CORRIDOR

1E15K

OFFICE

1E15C

OFFICE

1E15B

OFFICE

1E15A

OFFICE

1E15F

OFFICE

1E15E

ELEC. CLOSET

1E15H

ELEC. CLOSET

1E15J

TOILET, STAFF

1E16

LOBBY

C124

CORRIDOR

H106

CORRIDOR

H105

LAB.

1E40

BREAK RM.

1E40A

STORAGE

1E24

HAC

1E23

STORAGE

1E22

OFFICE

1E125

CORRIDOR

H104

STAIRWELL NO. 1

S101

CORRIDOR

H102

CORRIDOR

H103A

OFFICE

1E17A

MENTAL HEALTH

CHECK-IN

1E18

CORRIDOR

H101

INJECTIONS

1E17

STORAGE

CLOSET

1E134

STORAGE

CLOSET

1E135

CLEAN LINEN

RM.

1E136

LAB.

1E39

ELEVATOR NO. 2

E2

CHASE

CH-E1-1

D.W.

E3

CHASE

CH-E-2

CHASE

CH-E-1

OFFICE

1E15F

OFFICE

1E15E

CONFERENCE

RM.

1E16D

OFFICE

1E15G

OFFICE

1E15F

OFFICE

1E15E

PHASING NOTES & LEGEND

GENERAL PHASING NOTE:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION

PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO THE ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.

COPIES OF THE MOST-CURRENT ASBESTOS REPORT AND LEAD-BASED PAINT REPORT ARE TO BE OBTAINED FROM THE COR.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC.) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

PHASE 5A

GENERAL DESCRIPTION #

5. PHASE 5 - DEMOLITION AND LIMITED RENOVATION OF JEFFERSON BARRACKS BUILDING 1-2ND FLOOR EAST –

SOUTH AND CENTER WINGS.

A. DEMOLITION TO BE PHASED TO START AT CENTER PORTION/EXISTING RECEPTION AREA: CENTER TO BE

DEMOLISHED AFTER-HOURS, WITH TEMPORARY 1-HOUR-RATED CONSTRUCTION BARRIERS/CEILINGS

ERECTED TO PROVIDE ACCESS TO THE NORTH WING AND STAIR 1 TOWER.

B. ABATEMENT AND DEMOLITION OF FIRST FLOOR ABOVE-CEILING AREAS IN ARE TO TAKE PLACE

AFTER-HOURS AND CONCURRENTLY WITH DEMOLITION OF AREA ABOVE.

C. DEMOLITION OF CENTER WING WITHIN CONSTRUCTION BARRIERS TO TAKE PLACE CONCURRENTLY

WITH DEMOLITON OF THE SOUTH WING.

D. DEMOLITON & RENOVATION OF SOUTH WING TO START AT NORTH END AND PROGRESS TOWARD SOUTH. TEMPORARY CONTAINMENT BARRIERS MAY BE ERECTED AT STRATEGIC LOCATIONS TO ALLOW FOR COMPLETION OF ABATEMENT AND DEMOLTION SIMULTANEOUSLY WITH RENOVATION OF PORTIONS

TO THE NORTH OF DEMOLITION AREA.

ALL WORK TO FOLLOW PROTOCOLS FOR UNCOVERING OF AND ABATEMENT OF HAZARDOUS MATERIALS AS CEILINGS, WALLS

AND CHASES ARE REMOVED AS WORK PROGRESSES.

PHASE 5B

GENERAL DESCRIPTION #

APPLICABLE NOTES

1. NORTH, CENTER AND SOUTH WINGS TO VACATE. NORTH WING TO BE REOCCUPIED AFTER COMPLETION OF

CENTER PORTION.

2. CENTER PORTION TO BE RENOVATED AND COMPLETED FIRST TO ALLOW ACCESS TO NORTH WING UPON

OCCUPANCY.

PHASE 5C

GENERAL DESCRIPTION #

PHASE 5D

GENERAL DESCRIPTION #

6.8

9.5

10.1

QP.1 T.2R

Q.1 R.1 S.1

T T.1

10.2

PHASE 5A

PHASE 5D

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:4 :1

P

M

1-1-GC-101E

PHASING PLAN - LEVEL 1 - AREA E

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

TJF/JJGAHT

TRUE

W

KEY PLAN

C E

1/8" = 1'-0"1

LEVEL 1 - REFLECTED CEILING PHASING PLAN - SOUTH WING

N

N

N

N

F

NE

N E

NE

N

F

NE

NE

F

N

NE

NE

N

D H

D H

N

NE

NE

N

D

HN2

NE

NE

NENE

N N

D H

N2

N

D H

NE

NE

6.8

9.5

10.1

QP.1 T.2R

Q.1 R.1 S.1

T T.1

10.2

PHASE 1

PHASE 2

PHASE 5A

PHASE 5B

OFFICE

2C05

HAC

2C06

D.W.

E3

ELEVATOR NO. 2

E2

TOILET, STAFF

2E31

CORRIDOR

H210

OFFICE

2E07

OFFICE

2E07A

TOILET

2E07C

TOILET

2E07B

TOILET

2E06A

CHASE

CH-E-6

OFFICE

2E08

OFFICE

2E06

FAX RM.

2E05B

CORRIDOR

H201 OFFICE

2E09

TOILET

2E10OFFICE

2E05

TOILET

2E05A

TELERETINAL

IMAGING

2E11

ELEC. RM.

2E04

TOILET

2E12A

CHASE

CH-E-9

STORAGE

2E02

OFFICE

2E12

HAC

2E01

STORAGE

2E03

TREAT. RM.

2E13

CHASE

CH-E-3

CHASE

CH-E-8

STAIRWELL NO. 1

S201 SOILED LINEN

CHUTE

2E15A

LACTATION RM.

2E15

STORAGE

2E16A

EXAM

2E16

KITCHENETTE

2E17

RECEPTION

2E18

CHASE

CH-E-7

VITAL SIGN RM.

2E19

CHASE

CH-E-1

OXYGEN

STORAGE

2E30

EXAM

2E20

EXAM

2E29

CHASE

CH-E-4

PHASING NOTES & LEGEND

GENERAL PHASING NOTE:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION

PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO THE ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.

COPIES OF THE MOST-CURRENT ASBESTOS REPORT AND LEAD-BASED PAINT REPORT ARE TO BE OBTAINED FROM THE COR.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC.) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

PHASE 5A

GENERAL DESCRIPTION #

5. PHASE 5 - DEMOLITION AND LIMITED RENOVATION OF JEFFERSON BARRACKS BUILDING 1-2ND FLOOR EAST –

SOUTH AND CENTER WINGS.

A. DEMOLITION TO BE PHASED TO START AT CENTER PORTION/EXISTING RECEPTION AREA: CENTER TO BE

DEMOLISHED AFTER-HOURS, WITH TEMPORARY 1-HOUR-RATED CONSTRUCTION BARRIERS/CEILINGS

ERECTED TO PROVIDE ACCESS TO THE NORTH WING AND STAIR 1 TOWER.

B. ABATEMENT AND DEMOLITION OF FIRST FLOOR ABOVE-CEILING AREAS IN ARE TO TAKE PLACE

AFTER-HOURS AND CONCURRENTLY WITH DEMOLITION OF AREA ABOVE.

C. DEMOLITION OF CENTER WING WITHIN CONSTRUCTION BARRIERS TO TAKE PLACE CONCURRENTLY

WITH DEMOLITON OF THE SOUTH WING.

D. DEMOLITON & RENOVATION OF SOUTH WING TO START AT NORTH END AND PROGRESS TOWARD SOUTH. TEMPORARY CONTAINMENT BARRIERS MAY BE ERECTED AT STRATEGIC LOCATIONS TO ALLOW FOR COMPLETION OF ABATEMENT AND DEMOLTION SIMULTANEOUSLY WITH RENOVATION OF PORTIONS

TO THE NORTH OF DEMOLITION AREA.

ALL WORK TO FOLLOW PROTOCOLS FOR UNCOVERING OF AND ABATEMENT OF HAZARDOUS MATERIALS AS CEILINGS, WALLS

AND CHASES ARE REMOVED AS WORK PROGRESSES.

PHASE 5B

GENERAL DESCRIPTION #

APPLICABLE NOTES

1. NORTH, CENTER AND SOUTH WINGS TO VACATE. NORTH WING TO BE REOCCUPIED AFTER COMPLETION OF

CENTER PORTION.

2. CENTER PORTION TO BE RENOVATED AND COMPLETED FIRST TO ALLOW ACCESS TO NORTH WING UPON

OCCUPANCY.

PHASE 5C

GENERAL DESCRIPTION #

PHASE 5D

GENERAL DESCRIPTION #

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:4 :3

P

M

1-2-GC-101E

PHASING PLAN - LEVEL 2 - AREA E

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

TJF/JJGAHT

1/8" = 1'-0"1

LEVEL 2 - PHASING PLAN - SOUTH WING

TRUE

W

C E

MLK L.1 L.2

J

VENDING RM.

GN29

CORRIDOR

H003

STORAGE

GN30

STORAGE

GN31

OFFICE

GN32

CHASE

CH-N-2

CORRIDOR

H005

PHASING NOTES & LEGEND

GENERAL PHASING NOTE:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION

PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO THE ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.

COPIES OF THE MOST-CURRENT ASBESTOS REPORT AND LEAD-BASED PAINT REPORT ARE TO BE OBTAINED FROM THE COR.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC.) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

PHASE 1: ABATEMENT

GENERAL DESCRIPTION #

1. PHASE 1 - ABATEMENT AND/OR ENCAPSULATION OF HAZARDOUS MATERIALS IN SELECTED ROOMS AT JEFFERSON

BARRACKS (JB) BUILDING 52.

A. JB BUILDING 52-GROUND LEVEL ROOMS GN30, GN31:

a. GN30 AND GN31 TO BE ABATED AT SAME TIME, WITH SEQUENCE TO BE COORDINATED BETWEEN THE COR AND GENERAL CONTRACTOR. PROVIDE TEMPORARY ANTE-ROOM INSIDE DOOR TO ROOM TO ISOLATE FROM REST OF FLOOR. WORK TO CONTINUE IN ROOM FROM BEGINNING OF ABATEMENT TO COMPLETION OF FINISHES.

APPLICABLE NOTES

1. Abatement of areas outside of Phase 1 is to be conducted prior to or in conjunction with demolition associated with each Phase. JB

Building 1 – 2 East/South-Center wing to be abated last as part of Phase 5.

ALL WORK TO FOLLOW PROTOCOLS FOR UNCOVERING OF AND ABATEMENT OF HAZARDOUS MATERIALS AS CEILINGS, WALLS AND

CHASES ARE REMOVED AS WORK PROGRESSES.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

Stamp

/1

/2

:5 :3

P

M

52-0-GC-101N

PHASING PLAN - LEVEL 0 - AREA N

JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO

TJF/JJG

BUILDING 52

AHT

1/2" = 1'-0"1

LEVEL 0 - PHASING PLAN - AREA N - ROOMS GN30 & GN31

TRUE

N S

File details come from the government source that posted it.