36C25519R0017-010.pdf
PDF 843 KB Posted
- Attached to
- Correct workplace & Life Safety Issues, abate asbestos and improve wayfinding Project NO : 657-18-110
- Solicitation number
- 36C25519R0017
About this file
36C25519R0017 VOL 1_JB dwg Fire - Plumbing.pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 11 1 1 1 1
1S 1S1S 1S 1S 1S 1S
2 22 2 2 2 2
FIRE PROTECTION SYMBOL LIST
SYMBOL: DESCRIPTION:
FIRE PROTECTIONFP
FIRE PROTECTION - DRY SYSTEMFPD
SERVICE WATER - POTABLEW
AIR PRESSURE MAINTENANCE DEVICE
AIR SUPERVISORY SWITCH
ANGLE VALVE
BUTTERFLY VALVE WITH MONITOR SWITCH
OS&Y GATE VALVE
OS&Y GATE VALVE WITH MONITOR SWITCH
PRESSURE SWITCH
P
NO HATCH
LIGHT HAZARD COVERAGE AREA: 0.10 GPM/sq.ft. OVER A REMOTE
OPERATING AREA OF 1500 SQUARE FEET COMBINED HOSE
ALLOWANCE OF 100 GPM.
ORDINARY HAZARD GROUP l COVERAGE AREA: 0.15 GPM/sq.ft
OVER A REMOTE OPERATING AREA OF 1500 SQUARE FEET AND
COMBINED HOSE ALLOWANCE OF 250 GPM.
ORDINARY HAZARD GROUP ll COVERAGE AREA: 0.20 GPM/sq.ft
OVER A REMOTE OPERATING AREA OF 1500 SQUARE FEET AND
COMBINED HOSE ALLOWANCE OF 250 GPM.
SPRINKLER - WALL MOUNTED - EXISTING
SPRINKLER - EXISTING
SPRINKLER - CONCEALED - EXISTING
SPRINKLER - EXISTING
SPRINKLER - EXISTING
SPRINKLER - EXISTING
SPRINKLER - EXISTING
A
SPRINKLER - EXISTING
A
INSPECTOR TEST AND DRAIN VALVE
MONITOR SWITCH
COMPRESSED AIR - FIRE PROTECTIONCAF
PIPE CAP
PIPE DOWN
NEW CONNECTION
PIPE UP OR UP/DOWN
SHUTOFF VALVE NORMALLY OPEN
DRAINDFP
NOT ALL SYMBOLS MAY APPLY.
AUTOMATIC DRAIN VALVE
UNION/FLANGE
DIRECTION OF FLOW IN PIPE
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
CHECK VALVE
FLOW SWITCH
F
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
FIRE PROTECTION ABBREVIATION KEY
AD ACCESS DOOR
BFP BACKFLOW PREVENTER
N.C. NORMALLY CLOSED
ABOVE FINISHED FLOORAFF
NC NEW CONNECTION
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS NOTED OTHERWISEUNO
I.E. INVERT ELEVATION
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
T101
SIM
DETAIL REFERRED TO BY ELEVATION
SHEET DETAIL IS LOCATED ON
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
SIM
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
NEW WORK BY THIS CONTRACTOR
(DARK SOLID LINE)
NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR
(DARK LONG DASHED LINE)
NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN
(LIGHT SOLID LINE)
LINE TYPE KEY:
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
CEILINGS, AND FLOORS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, ACCESSORIES, ETC. COORDINATE PANEL TYPE AND COLOR
WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.
10. SEAL ALL WALL, AND FLOOR PENETRATIONS AIRTIGHT WHERE, PIPING, PENETRATE.
PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH
WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.
11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION, AND
FLOOR ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE
ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.
PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH COMPONENTS
RATED FOR SUCH USE.
12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY BETWEEN DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
13. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.
14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
15. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
16. COORDINATE EQUIPMENT TAGS WITH FACILITIES FOR TYPE AND NAMING PRIOR TO
SUBMITTING SHOP DRAWINGS AND ORDERING FINAL LABELS.
17. PRIOR TO THE START OF DEMOLITION ALL EXISTING SYSTEMS AFFECTED BY THIS PROJECT
SHALL BE TESTED FOR EXISTING SYSTEM FLOWS. TESTING SHALL INCLUDE FLOWS
SERVING SPACES OUTSIDE OF THE AREA OF WORK WHICH SHALL BE USED FOR
COMPARISON AND ADJUSTMENT AT PROJECT COMPLETION. SUBMIT DOCUMENTATION AS
NOTED IN SPECIFICATION SECTION 23 05 93.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT
NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.
3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS WITH
2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.
4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK RESPONSE
SPRINKLERS IN UNPARTITIONED SPACES.
5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.
FIRE PROTECTION GENERAL NOTES:
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 11/02/2017.
FIRE / SMOKE BARRIER DESIGNATIONS
1-HOUR SMOKE BARRIER WALL
NON-RATED SMOKE PARTITION (CORRIDORS)
1-HOUR FIRE REATED BARRIER
2-HOUR FIRE RATED BARRIER
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
/1
/2
:1 :1
P
M
FP-001
FIRE PROTECTION COVER SHEET
#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO
SCOPRZ
28 49
BUILDING 1
GORPAT/
MATKAH
NOTES:
1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.
2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.
3. ALL SPRINKLERS SHALL BE UL AND FM LISTED.
4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13
REQUIREMENTS.
5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS.
CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.
6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.
7. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE
SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.
FIRE SPRINKLER USAGE SCHEDULE
AREA TYPE
(NOTE 1 & 6)
AREA
HAZARD
SPRINKLER
TEMPERATURE
RATING
MANUFACTURER
& MODEL NOTES
TAG NAME
(NOTE 4 & 5)
SPRINKLER
TYPE
RESPONSE
CATEGORY FINISH
WITH CEILING SEE PLANS SPR-1 RECESSED
PENDENT
QUICK CHROME 155 VIKING VK,
RELIABLE F1FR,
TYCO TY-FRB,
VICTAULIC V2708
NOTE 2, 3, 7
FIRE PROTECTION MATERIAL LIST
TAG NAME DESCRIPTION MANF. & MODEL
VC-1 VALVE CABINET, ACCOMMODATES A 1-1/2” F.D. VALVE WITH CAP AND CHAIN,
AND PORTABLE FIRE EXTINGUISHER, RECESSED MOUNTED, 20 GAUGE
WHITE BAKED ENAMEL STEEL BOX, 2 GAUGE TUBULAR STEEL DOOR WITH 18
GAUGE FRAME WITH A CONTINUOUS STEEL HINGE (BRASS PIN), STEEL
CORNER SEAMS WELDED AND GROUND SMOOTH, DOOR AND FRAME
FINISHED WITH A WHITE POLYESTER PRIME COAT. HOSE THREADS TO
MATCH LOCAL FIRE DEPARTMENT.
POTTER-ROEMER 1880 SERIES, CROKER 2750 SERIES,
LARSENS VC 2430 SERIES
Q
10.2
10.8
P.1
P.1
Q.1 R
R
R.1 S.1 S.2
S.2
18 18
17 17
16 16
15 15
14 14
13 13
12 12
9 9
8 8
7 7
6 6
6.8
S.4
S.4S.3
S.3
9.5
10.1
REMOVE PIPING AND SPRINKLER
HEADS FOR EXISTING UPPER
PLASTER CEILING (ORIGINAL) AND
LOWER ACT CEILING, DUCTWORK,
AND PIPE REMOVAL.
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
"F
P
1"FP
1"FP
1"FP
"F
P
1"FP
SPR-E
SPR-E
SPR-E
REMOVE EXISTING FIRE
HOSE AND CABINET.
PREPARE PIPING FOR
NEW CONNECTION.
SPR-E
SPR-E
1 1/2" FP UP
"F
P
2" FP DN
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
1"FP
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
REMOVE EXISTING
AUXILIARY DRAIN
VALVE AND PIPING
EXISTING 1" FIRE
PROTECTION DRAIN
SPR-E
SPR-E
1/2"FP
SPR-E
SPR-E
REMOVE FP PIPING BACK TO AS
INDICATED AND PREPARE FOR
NEW CONNECTION.
PROVIDE TEMPORARY PIPING BETWEEN
FP MAIN, NORTH FP BRANCH, AND
ELEVATOR CORRIDOR AS NECESSARY TO
MAINTAIN SYSTEM OPERATION.
COORDINATE WITH OWNER FOR SYSTEM
ISOLATION AND SHUT DOWN.
REMOVE FP PIPING BACK AS
INDICATED AND PREPARE FOR
NEW CONNECTION.
SPR-E
PROVIDE TEMPORARY
SPRINKLER COVERAGE FOR
STAIR LANDING DURING
CONSTRUCTION.
SPR-E
SPR-E
REMOVE FP PIPING BACK TO
RISER INCLUDING ELBOW AND
PREPARE FOR NEW CONNECTION.
PROVIDE TEMPORARY PIPING
BETWEEN RISERS AS NECESSARY
TO MAINTAIN SYSTEM OPERATION.
COORDINATE WITH OWNER FOR
SYSTEM ISOLATION AND SHUT
DOWN.
1 1/4"FP
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
TO NORTH PORTION OF EAST WING
FIRE PROTECTION.
2"FP
EXISTING 3" FIRE
PROTECTION RISER
EXISTING ZONE VALVE
AND FLOW SWITCH
SPR-E
TO ELEVATOR
CORRIDOR
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
/1
/2
:1 :1
P
M
1-2-FD-101E
FIRE PROTECTION DEMOLITION PLAN
#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO
SCOPRZ
29 49
BUILDING 1
GORPAT/
MATKAH
N
O R HT
1/8" = 1'-0"1
SECOND FLOOR - FIRE PROTECTION DEMOLITION PLAN
10.2
10.8
P.1
P.1
Q.1 R
R
R.1 S.1 S.2
S.2
18 18
17 17
16 16
15 15
14 14
13 13
12 12
9 9
8 8
7 7
6 6
6.8
S.4
S.4S.3
S.3
9.5
10.1
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
1 1/2" FP UP
SPR-E
SPR-E
SPR-E
SPR-E
VC-1
PROVIDE NEW PIPING AND SPRINKLER HEADS
FOR REVISED FLOOR PLAN. COORDINATE
ROUTING AND ELEVATION WITH NEW MEP AND
CEILING HEIGHT/LAYOUT. EXISTING SPRINKLER
HEADS AND PIPE ROUTING SHOWN FOR
COMPARISON OF EXISTING LAYOUT TO NEW
FLOOR PLAN FOR REFERENCE.
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
EXISTING 1" FIRE
PROTECTION DRAIN
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
SPR-E
"F
P
TO ELEVATOR
CORRIDOR
TO NORTH PORTION OF EAST
WING FIRE PROTECTION
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
/1
/2
:1 :1
P
M
1-2-FP-101E
FIRE PROTECTION RENOVATION PLAN
#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO
SCOPRZ
30 49
BUILDING 1
GORPAT/
MATKAH
N
O R HT
SECOND FLOOR - FIRE PROTECTION RENOVATION PLAN
1 11 1 1 1 1
1S 1S1S 1S 1S 1S 1S
2 22 2 2 2 2
PLUMBING SYMBOL LIST
SYMBOL: DESCRIPTION:
PIPE SERVING FIXTURE ON FLOOR ABOVE
(EXAMPLE: FD = FLOOR DRAIN)FD
PITCH PIPE IN DIRECTION
RD-1
6"(1000)
ROOF DRAIN PROPERTIES SYMBOL
SIZE (ROOF SQ. FT.)
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
GPM
CHECK VALVE
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
METERM
ALIGNMENT GUIDE
PIPE ANCHOR
EXPANSION JOINT
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
NEW CONNECTION
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
COLD WATER - POTABLECW
DT DRAIN TILE
HOT WATER - POTABLEHW
HOT WATER CIRCULATING - POTABLEHWC
HOT WATER - POTABLE NUMBER INDICATES TEMPHW140
HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140
NON-POTABLE COLD WATERNCW
NON-POTABLE HOT WATERNHW
SANITARY DRAINAGESAN
STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)
STS STORM DRAINAGE (SECONDARY)
VENTV
DRAIND
G NATURAL GAS
NOT ALL SYMBOLS MAY APPLY.
PRESSURE REDUCING VALVE (LIQUID/GAS)
SOLENOID VALVE
SAFETY/RELIEF VALVE
VACUUM BREAKER
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
PUMP
GRV GAS REGULATOR VENT
SERVICE WATER - POTABLEW
PIPE CONTINUATION
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
COLD WATER CIRCULATING - POTABLECWC
PLUMBING ABBREVIATION KEY
CO CLEANOUT
CLINICAL SINKCS
FLOOR CLEANOUTFCO
FLOOR DRAINFD
FLOOR SINKFS
GARBAGE DISPOSERGD
HOSE BIBBHB
I.E. INVERT ELEVATION (FOR REFERENCE ONLY)
LAVATORYLAV
MOP BASINMB
MIXING VALVEMV
ROOF DRAINRD
SHOWERSH
SINKSK
SERVICE SINKSS
TRENCH DRAINTD
TRAP PRIMERTP
WATER CLOSETWC
WALL CLEANOUTWCO
WATER HEATERWH
WASHING MACHINE FIXTUREWMF
YARD CLEANOUTYCO
ELECTRIC WATER COOLEREWC
VENT THROUGH ROOFVTR
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
BFP BACKFLOW PREVENTER
NC NEW CONNECTION
NOT IN CONTRACTNIC
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS NOTED OTHERWISEUNO
EXISTINGE
FLOW METERFM
WATER METERWM
CAST IRONCI
DUCTILE IRONDI
UTILITY BOXUB
OVERFLOW DRAINOFD
VALVE IN VERTICALVIV
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
T101
SIM
DETAIL REFERRED TO BY ELEVATION
SHEET DETAIL IS LOCATED ON
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
SIM
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
NEW WORK BY THIS CONTRACTOR
(DARK SOLID LINE)
NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR
(DARK LONG DASHED LINE)
NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN
(LIGHT SOLID LINE)
LINE TYPE KEY:
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 11/02/2017.
FIRE / SMOKE BARRIER DESIGNATIONS
1-HOUR SMOKE BARRIER WALL
NON-RATED SMOKE PARTITION (CORRIDORS)
1-HOUR FIRE REATED BARRIER
2-HOUR FIRE RATED BARRIER
TEMPERATURE CONTROLS CONTRACTORT.C.C.
SECURITY CONTRACTORS.C.
AUDIO/VISUAL CONTRACTORA.V.C.
NURSE CALL CONTRACTORN.C.C.
CIVIL CONTRACTORC.C.
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
CEILINGS, AND FLOORS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, ACCESSORIES, ETC. COORDINATE PANEL TYPE AND COLOR
WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.
10. SEAL ALL WALL, AND FLOOR PENETRATIONS AIRTIGHT WHERE, PIPING, PENETRATE.
PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH
WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.
11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION, AND
FLOOR ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE
ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.
PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH COMPONENTS
RATED FOR SUCH USE.
12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY BETWEEN DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
13. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.
14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
15. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
16. COORDINATE EQUIPMENT TAGS WITH FACILITIES FOR TYPE AND NAMING PRIOR TO
SUBMITTING SHOP DRAWINGS AND ORDERING FINAL LABELS.
17. PRIOR TO THE START OF DEMOLITION ALL EXISTING SYSTEMS AFFECTED BY THIS PROJECT
SHALL BE TESTED FOR EXISTING SYSTEM FLOWS. TESTING SHALL INCLUDE FLOWS
SERVING SPACES OUTSIDE OF THE AREA OF WORK WHICH SHALL BE USED FOR
COMPARISON AND ADJUSTMENT AT PROJECT COMPLETION. SUBMIT DOCUMENTATION AS
NOTED IN SPECIFICATION SECTION 23 05 93.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
3. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
4. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
BEGINNING ANY WORK.
5. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
PLUMBING FIXTURES.
6. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
BE CONSIDERED SHUTOFF VALVES.
PLUMBING GENERAL NOTES:
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
/1
/2
:2 :1
P
M
P-001
PLUMBING COVER SHEET
#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO
SCOPRZ
31 49
BUILDING 1
GORPAT/
MATKAH
6.8
9.5
10.1
Q
P.1
P.1
T.2
T.2
R
R
Q.1 R.1 S.1
T T.1
10.2
FDFD
4" SAN DN
4" SAN UP
2" V UP
2" V UP
4" SAN DN
FDFD
4" SAN UP
2" V UP
SK
2" V UP
CO
4"SAN
CO
4"SAN
FD
FD
WC
LAV
2" V
UP
LAV
"S
A N
3"SAN
4"SAN
4" SAN UP & DN
2" V UP
4" SAN UP & DN
4"SAN
4"SAN
4" SAN UP
2" V UP
2" SAN UP
FD
FD
FD 2" V UP
4" SAN UP
2" SAN UP 3
"S
A N
3"SAN
CO
3"SAN
4" SAN UP & DN
4"SAN
2"SAN
SK
FD
LAV
CO
UP TO BED PAN
STERILIZER
1 1/4" CW UP
1" HW UP
3/4" HWC UP
4" V UP &
4" SAN DN
2" V UP &
4" SAN DN
FD
2" SAN
CS
SK
1 1/4" CW DN
1" HW DN
3/4" HWC DN
1 1/4" CW UP & DN
1" HW UP & DN
3/4" HWC UP & DN
3/4" HWC DN
1 1/4" CW DN
3/4" HW DN
FD
FD
2"V
2"V
2" SAN UP
2" V UP
4" SAN UP
4" SAN DN 3"SAN
4"SAN
FD
FD
FD
2" V UP
2"SAN
3"SAN
"S
A N
3" SAN UP
1 1/4" HW UP
3/4" HWC UP
1 1/2" CW
UP
1 1/4" HW DN
3/4" HWC DN
1 1/2" CW DN
MB
WC
LAV
3" SAN UP
4" SAN UP CO
2" SAN UP
4"SAN
LAV-E
LAV-E
2" SAN UP
2" SAN UP
4"SAN
FD
WC
SK
4" SAN UP
2" SAN UP
1 1/2" CW UP
1 1/4" HW UP
3/4" HWC UP
2" SAN UP
4" SAN DN
REMOVE PIPE BACK
TO MAIN AND CAP
REMOVE PIPE BACK TO
MAIN AND CAP
4" SAN DN
1 1/4" CW DN
1" HW DN
3/4" HWC DN
REMOVE PIPING BACK
TO MAIN AND CAP
PIPES CAPED
CO
4" SAN UP
2" CW UP
1 1/4" HW UP
3/4" HWC UP
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
/1
/2
:2 :0
P
M
1-1-PD-101E
PLUMBING DEMOLITION PLAN
#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO
SCOPRZ
32 49
BUILDING 1
GORPAT/
MATKAH
N O R
HT
FIRST FLOOR - PLUMBING DEMOLITION PLAN
10.2
10.8
P.1
P.1
Q.1 R
R
R.1 S.1 S.2
S.2
18 18
17 17
16 16
15 15
14 14
13 13
12 12
9 9
8 8
7 7
6 6
6.8
S.4
S.4S.3
S.3
9.5
10.1
FD-E
FD-E
SK-E
SK-E
WC-E
4" SAN DN
WC-E
FD-E
FD-E
SK-E
4" SAN DN,
4" V UP
2" V DN
2" V DN
2" SAN DN
4" V UP
FD-E
WC-E
LAV-E
FD-E
2" V DN
1 1/4"CW
3/4"HW
LAV-E
4" V UP
2"V
2" V DN 4"V
CS-E
SK-E
FD-E
SK-E
2" SAN DN &
2" V UP
2" V UP
4" V UP
3/4" CW TO LAV
ON THIRD FLOOR
2" V DN
4" SAN DN
2" V DN
1 1/4" CW UP & DN
1" HW UP & DN
3/4" HWC UP & DN
1 1/4" CW DN
1" HW DN
3/4" HWC DN
BED PAN
STERILIZER
2" V UP
1" CW DN
2" CW UP & DN
1 1/4" HW UP & DN
3/4" HWC UP & DN
2"CW
1 1/4"HW
3/4"HWC
3/4" CW
3/4" HW
2" CW UP
2" HW UP
LAV-E
3/4" HW 2"CW
1 1/4"HW
3/4"HWC
1 1/4" CW UP & DN
1" HW UP & DN
3/4" HWC UP & DN
3/4"HWC
1"HW
1 1/2"CW
FD-E
1"CW
3/4"CW
3/4"HW
WC-E
LAV-E
3/4"HW
3/4"CW
1 1/4"CW
1"HW
FD-E
FD-E
3/4"HWC
3/4"HW
3/4"CW
FD-E
FD-E
SK-E
4" V UP
2" SAN DN
4" V UP
2" V DN
4" SAN DN
WC-E
FD-E
FD-E
"V
1 1/4"HW
1 1/2"CW
3/4"HWC
1 1/4" HW DN
3/4" HWC DN
1 1/2" CW
DN
2" V UP
LAV-E
SK-E
2" V UP, 3" SAN DN
SK-E
2" V UP
2" SAN DN
1 1/4"CW
3/4"HW
1 1/2"CW
1"HW
3/4" HWC UP
1 1/4" HW UP
2" CW UP
4" V UP
FD-E
2"V
LAV-E
4" V DN
2" V DN
2"SAN DN
4" V UP
FD-E
REMOVE ALL PLUMBING FIXTURES WITH ALL
BRACKETS, HANGERS, ACCESSORIES, ETC. REMOVE
DOMESTIC WATER PIPING BACK TO RISERS. REMOVE
SANITARY AND VENT PIPING BACK TO MAINS.
EXISTING RISERS TO REMAIN. PIPING SERVING
FIXTURES ON FLOOR ABOVE SHALL BE REMOVED
AND RECONNECTED WITH NEW PIPING INSTALLED
AS HIGH AS POSSIBLE. COORDINATE WORK
AFFECTING OTHER FLOORS WITH OWNER. INSTALL
TEMPORARY PIPING AS NECESSARY TO MAINTAIN
AVAILABILITY OF FIXTURES ON FLOOR ABOVE.
MB-E
LAV-E
2" SAN DN
4" SAN DN
2" SAN DN
2" SAN DN
2" SAN DN
2" V UP
4" SAN DN &
2" V UP
2" SAN DN &
2" V UP
FD-E
LAV-E
WC-E
2" V UP
SK-E
3/4"HWC
3/4"HW
1 1/2"CW
1 1/2" CW DN
1 1/4" HW DN
3/4" HWC DN
1"O
1"MV
3/4"O
3/4"O
3/4"MV
1/2"O
3/4"MV
1/2"O
1/2"MV
1/2"O
1/2"MV
1/2"O
1/2"MV
1/2"O
1/2"MV
1/2"O
1/2"MV
3/4"MV
1/2"O
1"MV
1/2"MV
1/2"O
1"MV
1/2"O
1/2"MV
1/2"O
1/2"MV
3/4"O 3/4"O
1"MV
1/2"O
1/2"MV
1/2"O
1"MV
1/2"O
1/2"MV
1/2"O
3/4"MV
1/2"MV
1/2"O
1/2"MV
1/2"MV
1/2"O
1/2"MV
1/2"O
1/2"MV
1/2"O
VB-E
"O
1 1/4"MV
1"O
1"O UP
/4
"O
VB-E
EXISTING VALVE BOX TO
REMAIN IN PLACE AND
BE RECONNECTED.
EXISTING 1"
OXYGEN TO 2W
REMOVE PIPING FROM
RISERS TO POINT AS
INDICATED AND PREPARE
FOR NEW CONNECTION.
REMOVE PIPING BACK TO
MAIN AND CAP
4"V UP
REMOVE PIPING BACK
TO MAIN AND CAP
REMOVE WATER CLOSET
PIPING BACK TO WALL AND
CAP. SANITARY AND VENT
STACK SHALL REMAIN.
4" SAN UP & DN
3" SAN DN
4" SAN DN
1"O
REMOVE EXISTING MEDICAL GASES WHICH
SERVE THE THIRD FLOOR SOUTH AREA BACK
TO RISER AND CAP. THIRD FLOOR LAB NO
LONGER EXISTS. PIPING WHICH ROUTES TO
SECOND FLOOR NORTH OR SECOND FLOOR
WEST SHALL BE EXTENDED AND RECONNECT
TO EXISTING MAINS.
3/4" G UP
1" LA UP
1" MV UP
3/4"CW
1/2"HW
1 1/2"
CW UP
1/2" HW UP
3/4" CW UP
3/4" CW UP
1/2" CW UP
1" MV UP
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
/1
/2
:2 :1
P
M
1-2-PD-101E
PLUMBING DEMOLITION PLAN
#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO
SCOPRZ
33 49
BUILDING 1
GORPAT/
MATKAH
N
O R HT
SECOND FLOOR - PLUMBING DEMOLITION PLAN
6.8
9.5
10.1
Q
P.1
P.1
T.2
T.2
R
R
Q.1 R.1 S.1
T T.1
10.2
4" SAN DN
4" SAN DN,
4" V UP
4" V UP
4" V UP
2"V
2" V DN
2" SAN DN &
2" V UP
2" V UP
4" V UP
3/4" CW TO LAV
ON THIRD FLOOR
1 1/4" CW UP & DN
1" HW UP & DN
3/4" HWC UP & DN
2" CW UP & DN
1 1/4" HW UP & DN
3/4" HWC UP & DN
2"CW
1 1/4"HW
3/4"HWC
2"CW
1 1/4"HW
3/4"HWC
1 1/4" CW UP & DN
1" HW UP & DN
3/4" HWC UP & DN
4" V UP
2" V UP
4" SAN DN
2" V UP
2" V UP
2" V UP
3/4" HWC UP
1 1/4" HW UP
2" CW UP
4" V UP
4" V DN
2"SAN DN
4" V UP
2" SAN DN
2" V UP
1 1/2" CW DN
1 1/4" HW DN
3/4" HWC DN
1"O
1"O UP
4" SAN DN
4" SAN DN
4" SAN DN
2" CW UP
2" HW UP
LAV-E
2" SAN DN &
2" V UP
2" V UP
4" SAN DN &
2" V UP
4" SAN DN
CONNECT TO
EXISTING VALVE BOX
/4
"O
4" SAN DN
NC
CONNECT TO EXISTING
RISERS. (TYP.)
1 1/2"CW
3/4"HW
3/4"HWC
3/4" G UP
1" LA UP
1" MV UP
1 1/2"
CW UP
1/2" HW UP
3/4" CW UP
3/4" CW UP
1/2" CW UP
1" MV UP
NC IN VERTICAL
NC
LAV-E
CAP (TYPICAL)
NC
3/4"CW
1/2"HW
"C
W
/4
"H W
/4
"H W
C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS
FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
/1
/2
:2 :1
P
M
1-2-PL-101E
PLUMBING RENOVATION PLAN
#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO
SCOPRZ
34 49
BUILDING 1
GORPAT/
MATKAH
N
O R HT
SECOND FLOOR - PLUMBING RENOVATION PLAN
File details come from the government source that posted it.