About this file

36C25519R0017 VOL 1_JB dwg Fire - Plumbing.pdf

View the file

Other files

File Type Posted
36C25519R0017-0003000.docx DOCX document
36C25519R0017-0002005.pdf PDF
36C25519R0017-0002004.pdf PDF
36C25519R0017-0002000.docx DOCX document
36C25519R0017-0002003.pdf PDF
36C25519R0017-0002002.pdf PDF
36C25519R0017-0002001.jpg JPG image
36C25519R0017-0001000.docx DOCX document
36C25519R0017-0001001.pdf PDF
36C25519R0017-018.pdf PDF
36C25519R0017-000.docx DOCX document
36C25519R0017-007.pdf PDF
36C25519R0017-022.pdf PDF
36C25519R0017-005.pdf PDF
36C25519R0017-023.pdf PDF
36C25519R0017-015.pdf PDF
36C25519R0017-024.pdf PDF
36C25519R0017-011.pdf PDF
36C25519R0017-012.pdf PDF
36C25519R0017-027.pdf PDF
36C25519R0017-028.pdf PDF
36C25519R0017-017.pdf PDF
36C25519R0017-026.pdf PDF
36C25519R0017-003.pdf PDF
36C25519R0017-001.pdf PDF
36C25519R0017-013.pdf PDF
36C25519R0017-025.pdf PDF
36C25519R0017-016.pdf PDF
36C25519R0017-004.pdf PDF
36C25519R0017-020.pdf PDF
36C25519R0017-008.pdf PDF
36C25519R0017-002.pdf PDF
36C25519R0017-014.pdf PDF
36C25519R0017-019.pdf PDF
36C25519R0017-009.pdf PDF
36C25519R0017-021.pdf PDF
36C25519R0017-006.pdf PDF
36C25519R0017_3.docx DOCX document
36C25519R0017_2.docx DOCX document
36C25519R0017_1.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 11 1 1 1 1

1S 1S1S 1S 1S 1S 1S

2 22 2 2 2 2

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

FIRE PROTECTION - DRY SYSTEMFPD

SERVICE WATER - POTABLEW

AIR PRESSURE MAINTENANCE DEVICE

AIR SUPERVISORY SWITCH

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

OS&Y GATE VALVE

OS&Y GATE VALVE WITH MONITOR SWITCH

PRESSURE SWITCH

P

NO HATCH

LIGHT HAZARD COVERAGE AREA: 0.10 GPM/sq.ft. OVER A REMOTE

OPERATING AREA OF 1500 SQUARE FEET COMBINED HOSE

ALLOWANCE OF 100 GPM.

ORDINARY HAZARD GROUP l COVERAGE AREA: 0.15 GPM/sq.ft

OVER A REMOTE OPERATING AREA OF 1500 SQUARE FEET AND

COMBINED HOSE ALLOWANCE OF 250 GPM.

ORDINARY HAZARD GROUP ll COVERAGE AREA: 0.20 GPM/sq.ft

OVER A REMOTE OPERATING AREA OF 1500 SQUARE FEET AND

COMBINED HOSE ALLOWANCE OF 250 GPM.

SPRINKLER - WALL MOUNTED - EXISTING

SPRINKLER - EXISTING

SPRINKLER - CONCEALED - EXISTING

SPRINKLER - EXISTING

SPRINKLER - EXISTING

SPRINKLER - EXISTING

SPRINKLER - EXISTING

A

SPRINKLER - EXISTING

A

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

COMPRESSED AIR - FIRE PROTECTIONCAF

PIPE CAP

PIPE DOWN

NEW CONNECTION

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

FIRE PROTECTION ABBREVIATION KEY

AD ACCESS DOOR

BFP BACKFLOW PREVENTER

N.C. NORMALLY CLOSED

ABOVE FINISHED FLOORAFF

NC NEW CONNECTION

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

I.E. INVERT ELEVATION

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

LINE TYPE KEY:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

CEILINGS, AND FLOORS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, ACCESSORIES, ETC. COORDINATE PANEL TYPE AND COLOR

WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.

10. SEAL ALL WALL, AND FLOOR PENETRATIONS AIRTIGHT WHERE, PIPING, PENETRATE.

PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH

WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION, AND

FLOOR ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE

ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.

PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH COMPONENTS

RATED FOR SUCH USE.

12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY BETWEEN DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

13. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.

14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

15. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

16. COORDINATE EQUIPMENT TAGS WITH FACILITIES FOR TYPE AND NAMING PRIOR TO

SUBMITTING SHOP DRAWINGS AND ORDERING FINAL LABELS.

17. PRIOR TO THE START OF DEMOLITION ALL EXISTING SYSTEMS AFFECTED BY THIS PROJECT

SHALL BE TESTED FOR EXISTING SYSTEM FLOWS. TESTING SHALL INCLUDE FLOWS

SERVING SPACES OUTSIDE OF THE AREA OF WORK WHICH SHALL BE USED FOR

COMPARISON AND ADJUSTMENT AT PROJECT COMPLETION. SUBMIT DOCUMENTATION AS

NOTED IN SPECIFICATION SECTION 23 05 93.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS WITH

2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK RESPONSE

SPRINKLERS IN UNPARTITIONED SPACES.

5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.

FIRE PROTECTION GENERAL NOTES:

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 11/02/2017.

FIRE / SMOKE BARRIER DESIGNATIONS

1-HOUR SMOKE BARRIER WALL

NON-RATED SMOKE PARTITION (CORRIDORS)

1-HOUR FIRE REATED BARRIER

2-HOUR FIRE RATED BARRIER

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:1 :1

P

M

FP-001

FIRE PROTECTION COVER SHEET

#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO

SCOPRZ

28 49

BUILDING 1

GORPAT/

MATKAH

NOTES:

1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.

3. ALL SPRINKLERS SHALL BE UL AND FM LISTED.

4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13

REQUIREMENTS.

5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS.

CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.

6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

7. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE

SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 6)

AREA

HAZARD

SPRINKLER

TEMPERATURE

RATING

MANUFACTURER

& MODEL NOTES

TAG NAME

(NOTE 4 & 5)

SPRINKLER

TYPE

RESPONSE

CATEGORY FINISH

WITH CEILING SEE PLANS SPR-1 RECESSED

PENDENT

QUICK CHROME 155 VIKING VK,

RELIABLE F1FR,

TYCO TY-FRB,

VICTAULIC V2708

NOTE 2, 3, 7

FIRE PROTECTION MATERIAL LIST

TAG NAME DESCRIPTION MANF. & MODEL

VC-1 VALVE CABINET, ACCOMMODATES A 1-1/2” F.D. VALVE WITH CAP AND CHAIN,

AND PORTABLE FIRE EXTINGUISHER, RECESSED MOUNTED, 20 GAUGE

WHITE BAKED ENAMEL STEEL BOX, 2 GAUGE TUBULAR STEEL DOOR WITH 18

GAUGE FRAME WITH A CONTINUOUS STEEL HINGE (BRASS PIN), STEEL

CORNER SEAMS WELDED AND GROUND SMOOTH, DOOR AND FRAME

FINISHED WITH A WHITE POLYESTER PRIME COAT. HOSE THREADS TO

MATCH LOCAL FIRE DEPARTMENT.

POTTER-ROEMER 1880 SERIES, CROKER 2750 SERIES,

LARSENS VC 2430 SERIES

Q

10.2

10.8

P.1

P.1

Q.1 R

R

R.1 S.1 S.2

S.2

18 18

17 17

16 16

15 15

14 14

13 13

12 12

9 9

8 8

7 7

6 6

6.8

S.4

S.4S.3

S.3

9.5

10.1

REMOVE PIPING AND SPRINKLER

HEADS FOR EXISTING UPPER

PLASTER CEILING (ORIGINAL) AND

LOWER ACT CEILING, DUCTWORK,

AND PIPE REMOVAL.

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

"F

P

1"FP

1"FP

1"FP

"F

P

1"FP

SPR-E

SPR-E

SPR-E

REMOVE EXISTING FIRE

HOSE AND CABINET.

PREPARE PIPING FOR

NEW CONNECTION.

SPR-E

SPR-E

1 1/2" FP UP

"F

P

2" FP DN

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

1"FP

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

REMOVE EXISTING

AUXILIARY DRAIN

VALVE AND PIPING

EXISTING 1" FIRE

PROTECTION DRAIN

SPR-E

SPR-E

1/2"FP

SPR-E

SPR-E

REMOVE FP PIPING BACK TO AS

INDICATED AND PREPARE FOR

NEW CONNECTION.

PROVIDE TEMPORARY PIPING BETWEEN

FP MAIN, NORTH FP BRANCH, AND

ELEVATOR CORRIDOR AS NECESSARY TO

MAINTAIN SYSTEM OPERATION.

COORDINATE WITH OWNER FOR SYSTEM

ISOLATION AND SHUT DOWN.

REMOVE FP PIPING BACK AS

INDICATED AND PREPARE FOR

NEW CONNECTION.

SPR-E

PROVIDE TEMPORARY

SPRINKLER COVERAGE FOR

STAIR LANDING DURING

CONSTRUCTION.

SPR-E

SPR-E

REMOVE FP PIPING BACK TO

RISER INCLUDING ELBOW AND

PREPARE FOR NEW CONNECTION.

PROVIDE TEMPORARY PIPING

BETWEEN RISERS AS NECESSARY

TO MAINTAIN SYSTEM OPERATION.

COORDINATE WITH OWNER FOR

SYSTEM ISOLATION AND SHUT

DOWN.

1 1/4"FP

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

TO NORTH PORTION OF EAST WING

FIRE PROTECTION.

2"FP

EXISTING 3" FIRE

PROTECTION RISER

EXISTING ZONE VALVE

AND FLOW SWITCH

SPR-E

TO ELEVATOR

CORRIDOR

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:1 :1

P

M

1-2-FD-101E

FIRE PROTECTION DEMOLITION PLAN

#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO

SCOPRZ

29 49

BUILDING 1

GORPAT/

MATKAH

N

O R HT

1/8" = 1'-0"1

SECOND FLOOR - FIRE PROTECTION DEMOLITION PLAN

10.2

10.8

P.1

P.1

Q.1 R

R

R.1 S.1 S.2

S.2

18 18

17 17

16 16

15 15

14 14

13 13

12 12

9 9

8 8

7 7

6 6

6.8

S.4

S.4S.3

S.3

9.5

10.1

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

1 1/2" FP UP

SPR-E

SPR-E

SPR-E

SPR-E

VC-1

PROVIDE NEW PIPING AND SPRINKLER HEADS

FOR REVISED FLOOR PLAN. COORDINATE

ROUTING AND ELEVATION WITH NEW MEP AND

CEILING HEIGHT/LAYOUT. EXISTING SPRINKLER

HEADS AND PIPE ROUTING SHOWN FOR

COMPARISON OF EXISTING LAYOUT TO NEW

FLOOR PLAN FOR REFERENCE.

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

EXISTING 1" FIRE

PROTECTION DRAIN

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

"F

P

TO ELEVATOR

CORRIDOR

TO NORTH PORTION OF EAST

WING FIRE PROTECTION

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:1 :1

P

M

1-2-FP-101E

FIRE PROTECTION RENOVATION PLAN

#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO

SCOPRZ

30 49

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SECOND FLOOR - FIRE PROTECTION RENOVATION PLAN

1 11 1 1 1 1

1S 1S1S 1S 1S 1S 1S

2 22 2 2 2 2

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

GPM

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

NEW CONNECTION

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

COLD WATER - POTABLECW

DT DRAIN TILE

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

HOT WATER - POTABLE NUMBER INDICATES TEMPHW140

HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140

NON-POTABLE COLD WATERNCW

NON-POTABLE HOT WATERNHW

SANITARY DRAINAGESAN

STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)

STS STORM DRAINAGE (SECONDARY)

VENTV

DRAIND

G NATURAL GAS

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

GRV GAS REGULATOR VENT

SERVICE WATER - POTABLEW

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

COLD WATER CIRCULATING - POTABLECWC

PLUMBING ABBREVIATION KEY

CO CLEANOUT

CLINICAL SINKCS

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

GARBAGE DISPOSERGD

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MIXING VALVEMV

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRENCH DRAINTD

TRAP PRIMERTP

WATER CLOSETWC

WALL CLEANOUTWCO

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

NC NEW CONNECTION

NOT IN CONTRACTNIC

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

EXISTINGE

FLOW METERFM

WATER METERWM

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

OVERFLOW DRAINOFD

VALVE IN VERTICALVIV

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

LINE TYPE KEY:

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 11/02/2017.

FIRE / SMOKE BARRIER DESIGNATIONS

1-HOUR SMOKE BARRIER WALL

NON-RATED SMOKE PARTITION (CORRIDORS)

1-HOUR FIRE REATED BARRIER

2-HOUR FIRE RATED BARRIER

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

AUDIO/VISUAL CONTRACTORA.V.C.

NURSE CALL CONTRACTORN.C.C.

CIVIL CONTRACTORC.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

CEILINGS, AND FLOORS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, ACCESSORIES, ETC. COORDINATE PANEL TYPE AND COLOR

WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.

10. SEAL ALL WALL, AND FLOOR PENETRATIONS AIRTIGHT WHERE, PIPING, PENETRATE.

PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH

WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION, AND

FLOOR ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE

ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.

PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH COMPONENTS

RATED FOR SUCH USE.

12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY BETWEEN DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

13. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.

14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

15. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

16. COORDINATE EQUIPMENT TAGS WITH FACILITIES FOR TYPE AND NAMING PRIOR TO

SUBMITTING SHOP DRAWINGS AND ORDERING FINAL LABELS.

17. PRIOR TO THE START OF DEMOLITION ALL EXISTING SYSTEMS AFFECTED BY THIS PROJECT

SHALL BE TESTED FOR EXISTING SYSTEM FLOWS. TESTING SHALL INCLUDE FLOWS

SERVING SPACES OUTSIDE OF THE AREA OF WORK WHICH SHALL BE USED FOR

COMPARISON AND ADJUSTMENT AT PROJECT COMPLETION. SUBMIT DOCUMENTATION AS

NOTED IN SPECIFICATION SECTION 23 05 93.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

3. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

4. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO

BEGINNING ANY WORK.

5. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

6. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

PLUMBING GENERAL NOTES:

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:2 :1

P

M

P-001

PLUMBING COVER SHEET

#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO

SCOPRZ

31 49

BUILDING 1

GORPAT/

MATKAH

6.8

9.5

10.1

Q

P.1

P.1

T.2

T.2

R

R

Q.1 R.1 S.1

T T.1

10.2

FDFD

4" SAN DN

4" SAN UP

2" V UP

2" V UP

4" SAN DN

FDFD

4" SAN UP

2" V UP

SK

2" V UP

CO

4"SAN

CO

4"SAN

FD

FD

WC

LAV

2" V

UP

LAV

"S

A N

3"SAN

4"SAN

4" SAN UP & DN

2" V UP

4" SAN UP & DN

4"SAN

4"SAN

4" SAN UP

2" V UP

2" SAN UP

FD

FD

FD 2" V UP

4" SAN UP

2" SAN UP 3

"S

A N

3"SAN

CO

3"SAN

4" SAN UP & DN

4"SAN

2"SAN

SK

FD

LAV

CO

UP TO BED PAN

STERILIZER

1 1/4" CW UP

1" HW UP

3/4" HWC UP

4" V UP &

4" SAN DN

2" V UP &

4" SAN DN

FD

2" SAN

CS

SK

1 1/4" CW DN

1" HW DN

3/4" HWC DN

1 1/4" CW UP & DN

1" HW UP & DN

3/4" HWC UP & DN

3/4" HWC DN

1 1/4" CW DN

3/4" HW DN

FD

FD

2"V

2"V

2" SAN UP

2" V UP

4" SAN UP

4" SAN DN 3"SAN

4"SAN

FD

FD

FD

2" V UP

2"SAN

3"SAN

"S

A N

3" SAN UP

1 1/4" HW UP

3/4" HWC UP

1 1/2" CW

UP

1 1/4" HW DN

3/4" HWC DN

1 1/2" CW DN

MB

WC

LAV

3" SAN UP

4" SAN UP CO

2" SAN UP

4"SAN

LAV-E

LAV-E

2" SAN UP

2" SAN UP

4"SAN

FD

WC

SK

4" SAN UP

2" SAN UP

1 1/2" CW UP

1 1/4" HW UP

3/4" HWC UP

2" SAN UP

4" SAN DN

REMOVE PIPE BACK

TO MAIN AND CAP

REMOVE PIPE BACK TO

MAIN AND CAP

4" SAN DN

1 1/4" CW DN

1" HW DN

3/4" HWC DN

REMOVE PIPING BACK

TO MAIN AND CAP

PIPES CAPED

CO

4" SAN UP

2" CW UP

1 1/4" HW UP

3/4" HWC UP

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:2 :0

P

M

1-1-PD-101E

PLUMBING DEMOLITION PLAN

#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO

SCOPRZ

32 49

BUILDING 1

GORPAT/

MATKAH

N O R

HT

FIRST FLOOR - PLUMBING DEMOLITION PLAN

10.2

10.8

P.1

P.1

Q.1 R

R

R.1 S.1 S.2

S.2

18 18

17 17

16 16

15 15

14 14

13 13

12 12

9 9

8 8

7 7

6 6

6.8

S.4

S.4S.3

S.3

9.5

10.1

FD-E

FD-E

SK-E

SK-E

WC-E

4" SAN DN

WC-E

FD-E

FD-E

SK-E

4" SAN DN,

4" V UP

2" V DN

2" V DN

2" SAN DN

4" V UP

FD-E

WC-E

LAV-E

FD-E

2" V DN

1 1/4"CW

3/4"HW

LAV-E

4" V UP

2"V

2" V DN 4"V

CS-E

SK-E

FD-E

SK-E

2" SAN DN &

2" V UP

2" V UP

4" V UP

3/4" CW TO LAV

ON THIRD FLOOR

2" V DN

4" SAN DN

2" V DN

1 1/4" CW UP & DN

1" HW UP & DN

3/4" HWC UP & DN

1 1/4" CW DN

1" HW DN

3/4" HWC DN

BED PAN

STERILIZER

2" V UP

1" CW DN

2" CW UP & DN

1 1/4" HW UP & DN

3/4" HWC UP & DN

2"CW

1 1/4"HW

3/4"HWC

3/4" CW

3/4" HW

2" CW UP

2" HW UP

LAV-E

3/4" HW 2"CW

1 1/4"HW

3/4"HWC

1 1/4" CW UP & DN

1" HW UP & DN

3/4" HWC UP & DN

3/4"HWC

1"HW

1 1/2"CW

FD-E

1"CW

3/4"CW

3/4"HW

WC-E

LAV-E

3/4"HW

3/4"CW

1 1/4"CW

1"HW

FD-E

FD-E

3/4"HWC

3/4"HW

3/4"CW

FD-E

FD-E

SK-E

4" V UP

2" SAN DN

4" V UP

2" V DN

4" SAN DN

WC-E

FD-E

FD-E

"V

1 1/4"HW

1 1/2"CW

3/4"HWC

1 1/4" HW DN

3/4" HWC DN

1 1/2" CW

DN

2" V UP

LAV-E

SK-E

2" V UP, 3" SAN DN

SK-E

2" V UP

2" SAN DN

1 1/4"CW

3/4"HW

1 1/2"CW

1"HW

3/4" HWC UP

1 1/4" HW UP

2" CW UP

4" V UP

FD-E

2"V

LAV-E

4" V DN

2" V DN

2"SAN DN

4" V UP

FD-E

REMOVE ALL PLUMBING FIXTURES WITH ALL

BRACKETS, HANGERS, ACCESSORIES, ETC. REMOVE

DOMESTIC WATER PIPING BACK TO RISERS. REMOVE

SANITARY AND VENT PIPING BACK TO MAINS.

EXISTING RISERS TO REMAIN. PIPING SERVING

FIXTURES ON FLOOR ABOVE SHALL BE REMOVED

AND RECONNECTED WITH NEW PIPING INSTALLED

AS HIGH AS POSSIBLE. COORDINATE WORK

AFFECTING OTHER FLOORS WITH OWNER. INSTALL

TEMPORARY PIPING AS NECESSARY TO MAINTAIN

AVAILABILITY OF FIXTURES ON FLOOR ABOVE.

MB-E

LAV-E

2" SAN DN

4" SAN DN

2" SAN DN

2" SAN DN

2" SAN DN

2" V UP

4" SAN DN &

2" V UP

2" SAN DN &

2" V UP

FD-E

LAV-E

WC-E

2" V UP

SK-E

3/4"HWC

3/4"HW

1 1/2"CW

1 1/2" CW DN

1 1/4" HW DN

3/4" HWC DN

1"O

1"MV

3/4"O

3/4"O

3/4"MV

1/2"O

3/4"MV

1/2"O

1/2"MV

1/2"O

1/2"MV

1/2"O

1/2"MV

1/2"O

1/2"MV

1/2"O

1/2"MV

3/4"MV

1/2"O

1"MV

1/2"MV

1/2"O

1"MV

1/2"O

1/2"MV

1/2"O

1/2"MV

3/4"O 3/4"O

1"MV

1/2"O

1/2"MV

1/2"O

1"MV

1/2"O

1/2"MV

1/2"O

3/4"MV

1/2"MV

1/2"O

1/2"MV

1/2"MV

1/2"O

1/2"MV

1/2"O

1/2"MV

1/2"O

VB-E

"O

1 1/4"MV

1"O

1"O UP

/4

"O

VB-E

EXISTING VALVE BOX TO

REMAIN IN PLACE AND

BE RECONNECTED.

EXISTING 1"

OXYGEN TO 2W

REMOVE PIPING FROM

RISERS TO POINT AS

INDICATED AND PREPARE

FOR NEW CONNECTION.

REMOVE PIPING BACK TO

MAIN AND CAP

4"V UP

REMOVE PIPING BACK

TO MAIN AND CAP

REMOVE WATER CLOSET

PIPING BACK TO WALL AND

CAP. SANITARY AND VENT

STACK SHALL REMAIN.

4" SAN UP & DN

3" SAN DN

4" SAN DN

1"O

REMOVE EXISTING MEDICAL GASES WHICH

SERVE THE THIRD FLOOR SOUTH AREA BACK

TO RISER AND CAP. THIRD FLOOR LAB NO

LONGER EXISTS. PIPING WHICH ROUTES TO

SECOND FLOOR NORTH OR SECOND FLOOR

WEST SHALL BE EXTENDED AND RECONNECT

TO EXISTING MAINS.

3/4" G UP

1" LA UP

1" MV UP

3/4"CW

1/2"HW

1 1/2"

CW UP

1/2" HW UP

3/4" CW UP

3/4" CW UP

1/2" CW UP

1" MV UP

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:2 :1

P

M

1-2-PD-101E

PLUMBING DEMOLITION PLAN

#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO

SCOPRZ

33 49

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SECOND FLOOR - PLUMBING DEMOLITION PLAN

6.8

9.5

10.1

Q

P.1

P.1

T.2

T.2

R

R

Q.1 R.1 S.1

T T.1

10.2

4" SAN DN

4" SAN DN,

4" V UP

4" V UP

4" V UP

2"V

2" V DN

2" SAN DN &

2" V UP

2" V UP

4" V UP

3/4" CW TO LAV

ON THIRD FLOOR

1 1/4" CW UP & DN

1" HW UP & DN

3/4" HWC UP & DN

2" CW UP & DN

1 1/4" HW UP & DN

3/4" HWC UP & DN

2"CW

1 1/4"HW

3/4"HWC

2"CW

1 1/4"HW

3/4"HWC

1 1/4" CW UP & DN

1" HW UP & DN

3/4" HWC UP & DN

4" V UP

2" V UP

4" SAN DN

2" V UP

2" V UP

2" V UP

3/4" HWC UP

1 1/4" HW UP

2" CW UP

4" V UP

4" V DN

2"SAN DN

4" V UP

2" SAN DN

2" V UP

1 1/2" CW DN

1 1/4" HW DN

3/4" HWC DN

1"O

1"O UP

4" SAN DN

4" SAN DN

4" SAN DN

2" CW UP

2" HW UP

LAV-E

2" SAN DN &

2" V UP

2" V UP

4" SAN DN &

2" V UP

4" SAN DN

CONNECT TO

EXISTING VALVE BOX

/4

"O

4" SAN DN

NC

CONNECT TO EXISTING

RISERS. (TYP.)

1 1/2"CW

3/4"HW

3/4"HWC

3/4" G UP

1" LA UP

1" MV UP

1 1/2"

CW UP

1/2" HW UP

3/4" CW UP

3/4" CW UP

1/2" CW UP

1" MV UP

NC IN VERTICAL

NC

LAV-E

CAP (TYPICAL)

NC

3/4"CW

1/2"HW

"C

W

/4

"H W

/4

"H W

C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JEFFERSON BARRACKS DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:2 :1

P

M

1-2-PL-101E

PLUMBING RENOVATION PLAN

#1 JEFFERSON BARRACKS DRIVE, ST. LOUIS, MO

SCOPRZ

34 49

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SECOND FLOOR - PLUMBING RENOVATION PLAN

File details come from the government source that posted it.