36C25519R0017-007.pdf
PDF 5 MB Posted
- Attached to
- Correct workplace & Life Safety Issues, abate asbestos and improve wayfinding Project NO : 657-18-110
- Solicitation number
- 36C25519R0017
About this file
36C25519R0017 VOL 1_JB dwg Architectural.pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE ABOVE
FIRESTOP
5/8" GYP. BD.
5/8" CORE BD.
ACOUSTIC BATTS
PAF (.145) @ (32" O.C.)
TRACK - T&B
DEMOLITION PLAN LEGEND
FULL HEIGHT ONE-HOUR FIRE RATED TEMPORARY
PARTITION
ELEMENT TO BE REMOVED, TYPICAL
INDICATES EXISTING CONSTRUCTION TO REMAIN UNO.
INDICATES AREA TO BE REMOVED, TYPICAL
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :2
P
M
AD-001
ARCHITECTURAL DEMOLITION PLAN GENERAL NOTES & KEYNOTE
LEGEND
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
DEMOLITION PLAN KEYNOTES
59 REMOVE EXISTING COUNTERTOPS, CASEWORK, MED GAS FIXTURES, PIPING,
SINK, FAUCET & ASSOCIATED PIPING. SEE HAZARDOUS MATERIAL DRAWINGS
FOR ABATEMENT INFORMATION. CAP GAS AND PLUMBING LINES.
60 REMOVE EXISTING TRANSITE PANELS. SEE HAZARDOUS MATERIAL DRAWINGS
FOR ABATEMENT INFORMATION.
61 EXIST DUCT THRU FLOOR/CLG.
62 NO WORK IN THIS AREA.
63 EXISTING SIGNS TO BE RELOCATED.
64 SOFFIT TO REMAIN – PROTECT FROM DAMAGE.
65 PROTECT DRYWALL BULKHEAD FROM DAMAGE DURING DEMOLITION.
66 REMOVE THERMOSTAT AND/OR SENSOR. PATCH, REPAIR, PREP, PRIME AND
FINISH TO MATCH ADJACENT SURFACES.
67 REMOVE CEILING GRID AND PADS AS REQUIRED FOR INSTALLATION OF NEW
FCU.
68 REMOVE DRYWALL/PLASTER AS REQUIRED FOR INSTALLING NEW FCU.
69 PATCH AND REPAIR WALLS WHERE THERMOSTATS ARE REMOVED. PREPARE
FOR NEW FINISH.
70 EXISTING UNIT TO REMAIN. SEE MECH.
71 REMOVE EXISTING DOOR AND FRAME.
72 REMOVE ENTIRE INTERIOR WALL TO LIMITS SHOWN ON PLAN DEMO PLANS.
73 REMOVE VCT FLOORING AND WALL BASE.
74 REMOVE DRYWALL/ACT CEILING SYSTEM.
75 REMOVE PLASTER AND LATH CEILING.
76 REMOVE INTERIOR WALL AS REQUIRED FOR ROUGH OPENING FOR NEW
DOOR.
77 REMOVE WALL FROM FLOOR TO 1” BELOW SUSPENDED CEILING SYSTEM @
CORRIDOR.
78 REMOVE CASEWORK & SINK. CAP ALL PLUMBING LINES BEHIND WALL.
79 REMOVE EXISTING FLOORING TO CONCRETE SUBSTRATE. REPAIR
SUBSTRATE.
80 REPAIR FLOOR SUBSTRATE WITH SELF-LEVELING FILLER.
81 CUT FIRST FLOOR PLASTER CEILINGS 2’X2’ TO CREATE ACCESS POINT FOR
ABOVE CEILING PIPING REMOVAL.
82 REMOVE EXISTING SHOWER STALLS, CERAMIC TILE, AND FLOOR DRAINS.
83 CAP FLOOR DRAINS BELOW FLOOR LINE IF HARD CEILINGS PRESENT ON FIRST
FLOOR.
84 OPEN CHASES AND CLEAN OUT DEBRIS ACCUMULATION.
85 REMOVE EXISTING METAL BENCH.
86 REMOVE EXISTING METAL SHELVING AND RETURN TO OWNER.
87 REMOVE EXISTING METAL WINDOW BLINDS AND STORE FOR REINSTALLATION.
88 EXISTING ALUM. BLDG. EXP. JT. COVER TO REMAIN.
89 REMOVE EXISTING PAPER TOWEL DISPENSER AND RETURN TO OWNER.
90 EXISTING TUB STEEL (TS) WALL BRACE TO REMAIN.
91 EXISTING WALL BRACE STL. PL. / NUTS / BOLTS TO REMAIN. REWORK AS
REQUIRED WHERE PEGBOARD REMOVED TO SECURE AGAINST EXISTING
WALL.
92 REMOVE EXISTING MTL. ACCOUSTICAL CLG. TILE / FURRING / GWB / FRAMING
AND PREP FOR NEW SUSP. ACCOUSTICAL CLG.
93 EXISTING FIN TUBE / CONVECTOR & COVER PANEL - REMOVE ASBESTOS
LINING. SEE HAZARDOUS MATERIAL DRAWINGS FOR ABATEMENT
INFORMATION. PREP FOR NEW FIN TUBE / CONVECTOR ASSY.
94 REMOVE EXISTING VAT / MASTIC - SEE HAZARDOUS MATERIAL DRAWINGS
FOR ABATEMENT. PREP FOR NEW VCT FLOORING.
95 SCRAPE AND REMOVE EXISTING PAINT AND PREP FOR NEW PAINT. SEE
HAZARDOUS MATERIAL DRAWINGS FOR LEAD PAINT ABATEMENT.
96 REMOVE EXISTING WD BOOKCASES AND RETURN TO OWNER.
97 EXISTING TERRAZO CURB TO REMAIN.
98 REMOVE EXISTING BLACKOUT WINDOW FILM FROM EXISTING WINDOWS IN
THIS AREA. PROTECT WINDOW DURING REMOVAL.
DEMOLITION PLAN KEYNOTES
31 REMOVE PORTION OF WINDOW FOR TRASH CHUTE; PROVIDE ENCLOSED
CHUTE TO COVERED DUMPSTER AT GROUND LEVEL; COORDINATE LOCATION
W/ COR; PROVIDE & INSTALL FIRE-RATED ASS'Y TO CLOSE OPENING &
MAINTAIN FIRE RATING DURING CONSTRUCTION. REINSTALL GLAZING AND
RESTORE TO PRE-CONSTRUCTION CONDITION AFTER TRASH CHUTE IS
REMOVED
32 VERIFY WITH COR IF CEILING IS PRESENT OR OPEN TO STRUCTURE.
REMOVE/REPLACE CEILING BACK TO STRUCTURE IF PRESENT
33 WORK AT THIS LOCATION REQUIRES REMOVAL OF EXISTING WALL CONDITION,
FIELD VERIFY. MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR,
BASE, WALL COVERING, WALL-MOUNTED EQUIPMENT AND ACCESSORIES,
ETC.). TYP. WALL CONSTRUCTION: GWB, PAINTED, WITH VINYL BASE. SEE MEP
DRAWINGS FOR FULL EXTENT OF WORK. REMOVE, REPLACE, PATCH AND
REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE WORK AND MEET
THE STANDARDS FOR VA CONSTRUCTION. COORDINATE REMOVAL AND
REINSTALLATION OF WALL MOUNTED EQUIPMENT, CASEWORK, ETC. FIELD
VERIFY. AREA SHOWN IS AN APPROXIMATE AREA TO BE REMOVED. MAINTAIN
EXISTING FIRE RATINGS. VERIFY EXISTING CONDITIONS DURING
PRE-CONSTRUCTION WALK-THROUGH WITH COR. ADDITIONAL COSTS WILL
NOT BE ALLOWED
34 REMOVE PORTION OF EXISTING CHASE WALL AT BASE OF CHASE TO ALLOW
ACCESS FOR DEBRIS REMOVAL; REMOVE DEBRIS INSIDE CHASE; SEAL ALL
PENETRATIONS THROUGH FLOOR AS REQ’D TO MAINTAIN FLOOR/CEILING
ASSEMBLY RATING; CLOSE/PATCH OPENING TO RESTORE INTEGRIGY OF
CHASE FIRE RATING
35 SALVAGE AND RETURN TO OWNER EQUIPMENT IN ROOM IDENTIFIED BY THE
COR.
36 EXIST CORRIDOR DOOR & HARDWARE TO REMAIN DURING CONSTRUCTION;
COORDINATE INSTALLATION/USE OF CONSTRUCTION CORE WITH COR
37 EXIST ELECTRICAL PANELS; SEE ELECT DRAWINGS.
38 REMOVE EXIST ELECTRICAL PANELS; SEE ELECT DRAWINGS.
39 EXIST DOOR AT STAIRS TO REMAIN ACCESSIBLE DURING DURATION OF
CONSTRUCTION FOR EMERGENCY EGRESS.
40 EXIST FURNITURE/OFFICE EQPT TO BE REMOVED BY OWNER PRIOR TO
DEMOLITION (TYP).
41 EXIST FURNITURE/OFFICE EQPT AND OTHER ITEMS STORED IN ROOM TO BE
REMOVED BY OWNER PRIOR TO DEMOLITION (TYP)
42 WORK IN CORRIDORS TO BE CONDUCTED AFTER NORMAL OPERATING HOURS
UNLESS OTHERWISE APPROVED BY THE COR (TYP)
43 SEE ELECT FOR WORK ASSOCIATED W/ DATA CLOSET; SCHEDULE &
COORDINATE WORK IN CLOSET W/ COR.
44 CONTRACTOR ACCESS TO BLDG; COORDINATE W/ COR FOR USE OF OTHER
ACCESS POINTS.
45 EXISTING WINDOW-MOUNTED AIR CONDITIONER TO REMOVE; SALVAGE &
RETURN TO VA - SEE MECH/ELECT.
46 LINE OF EXIST STRUCTURE ABOVE (TYP).
47 EXIST SUSPENDED LIGHT FIXTURE TO REMAIN (TYP) - SEE ELECT.
48 EXIST SUSPENDED LIGHT FIXTURE TO REMOVE (TYP) - SEE ELECT.
49 EXIST FIRE SPRINKLERS IN ROOM TO REMAIN (TYP).
50 REMOVE EXISTING FIRE SPRINKLER SYSTEM IN ROOM. SEE FIRE PROTECTION
DRAWINGS.
51 EXISTING GUARDRAIL WITH LEAD-BASED PAINT TO REMAIN. PROTECT RAILING
FROM DAMAGE DURING CONSTRUCTION.
52 EXISTING DOOR JAMB WITH LEAD-BASED PAINT TO REMAIN. PROTECT FRAME
FROM DAMAGE DURING CONSTRUCTION.
53 LOCATIONS OF EXISTING PIPING. REFER TO G-001 "HAZARDOUS MATERIAL
GENERAL NOTES," GENERAL CONDITIONS AND SPECIFICATION SECTION
"GLOVE BAG ASBESTOS ABATEMENT" FOR ABATEMENT OF
ASBESTOS-CONTAINING MATERIAL (ACM) AT EXISTING PIPING WHERE
PRESENT AND/OR DISCOVERED
54 EXTENTS OF WORK/LAYDOWN AREAS FOR THIS PROJECT.
55 MATERIAL LAYDOWN AREA.
56 AREA OF LARGE-DIAMETER STEAM, WATER AND SANITARY LINES SUSPENDED
FROM STRUCTURE ABOVE. CONTRACTOR TO INVESTIGATE CONDITIONS
PRIOR TO BEGINNING WORK
57 AREA OF SMALL-DIAMETER STEAM, WATER AND SANITARY LINES SUSPENDED
FROM STRUCTURE ABOVE. CONTRACTOR TO INVESTIGATE CONDITIONS
PRIOR TO BEGINNING WORK
58 REMOVE EXISTING PEGBOARD AND FURRING. SEE HAZARDOUS MATERIAL
DRAWINGS FOR ABATEMENT INFORMATION
DEMOLITION PLAN KEYNOTES
1 REMOVE PORTION OF EXIST PLASTER CEILING IN HATCHED AREAS FOR MPTE
WORK AS REQ’D; SEE REFLECTED CEILING DEMOLITION PLAN
2 SEE REFLECTED CEILING PLANS FOR EXTENTS OF HARD CEILING TO BE
REMOVED AND REPLACED FOR MPET WORK.
3 REMOVE PORTIONS OF EXIST ACOUSTICAL CEILING IN HATCHED AREAS FOR
MEPT WORK AS REQ'D; SEE REFLECTED CEILING DEMOLITION PLAN
4 SEE REFLECTED CEILING PLANS FOR EXTENTS OF SUSPENDED ACOUSTICAL
TILE CEILING REMOVAL & REPLACEMENT.
5 SEE MEP DRAWINGS FOR FAN COIL UNIT REMOVAL.
6 EXISTING WALL MOUNTED STEAM CONVECTOR, INCLUDING CONVECTOR BOX,
FIN TUBES AND METAL PLATE COVERS, TO BE REMOVED. OPENING TO BE
INFILLED WITH METAL STUDS AND FIBERGLASS BATT INSULATION W/ VAPOR
BARRIER (R-19 MIN.), 5/8" TYPE "X" GYPSUM WALLBOARD. PATCH/FILL
OPENINGS IN FLOOR AND FIRE SEAL. SEE DETAILS ON SHEET AE-500. SEE MEP
DRAWINGS FOR FIN TUBE REMOVAL AND PREP FOR NEW FIN
TUBE/CONVECTOR.
7 TEMPORARY 1-HR RATED CONSTRUCTION DUST PARTITION – EXTEND FROM
FLOOR TO STRUCTURE ABOVE: W/ 3’-0” X 7’-0” 1 HR RATED DOOR AND HM
FRAME
8 TEMPORARY CONSTRUCTION DUST PARTITION/ANTE ROOM – 1 HR RATED
CONSTRUCTION – EXTEND PARTITIONS FROM FLOOR TO BOTTOM OF
STRUCTURE ABOVE
9 PROTECT EXISTING STAIRWAY WALLS TO REMAIN.
10 EXISTING LINEN CHUTE TO REMAIN.
11 EXISTING ASBESTOS-CORE WOOD STAIRWELL DOORS TO REMOVE AND
REPLACE W/60 MIN-RATED HOLLOW METAL DOORS IN EXISTING FRAMES – SEE
HAZARDOUS MATERIAL DRAWINGS FOR ADDITIONAL INFORMATION
12 EXISTING CHASE/WALLS TO REMAIN.
13 EXISTING WALLS AT ELEVATOR SHAFT TO REMAIN.
14 REMOVE ALL FINISHES FROM STRUCTURAL COLUMNS.
15 REMOVE ALL ITEMS FROM INTERIOR SIDE OF EXTERIOR WALLS TO FACE OF
PLASTER.
16 REMOVE ALL PLUMBING FIXTURES THIS ROOM. SEE MEP
17 REMOVE ALL CASEWORK THIS ROOM. REVIEW W/ COR FOR SALVAGE AND
RETURN TO OWNER OR DISPOSAL BY CONTRACTOR.
18 EXISTING TOILET ROOMS – REMOVE ALL PLUMBING FIXTURES; REMOVE
CERAMIC TILE FLOORING TO CONCRETE SUBSTRATE. SALVAGE AND RETURN
EXISTING PLUMBING FIXTURES AND TOILET ACCESSORIES TO OWNER;
REVIEW W/ COR FOR DISPOSAL OF ITEMS NOT TO BE SALVAGED FOR REUSE
BY OWNER. SEE MEP DEMO DRAWINGS FOR CAPPING OF EXISTING PLUMBING
LINES
19 STICKY WALK-OFF MAT AT CONSTRUCTION ENTRANCES.
20 EXISTING WALL TO REMAIN.
21 EXISTING ELEVATOR SHAFT WALLS TO REMAIN.
22 REMOVE EXIST VCT (TYP); PATCH FLOOR AS REQ'D FOR NEW FLOOR
COVERING; SEE ARCHITECTURAL FINISH PLAN.
23 REFER TO HAZARDOUS MATERIAL ABATEMENT DRAWINGS FOR ADDITIONAL
INFORMATION RELATED TO EXISTING FLOORING AND/OR CEILING REMOVAL
THIS ROOM.
24 REMOVE FURRED WALL FULL-HEIGHT; PATCH TO MATCH WALL BEHIND;
PREPARE FOR NEW FURRED WALL; PATCH FLOOR IN PREPARATION FOR NEW
FLOOR FINISH
25 EXISTING CLOSET – REMOVE ALL PLUMBING FIXTURES; SALVAGE AND
RETURN EXISTING PLUMBING FIXTURES AND TOILET ACCESSORIES TO
OWNER; REVIEW W/ COR FOR DISPOSAL OF ITEMS NOT TO BE SALVAGED FOR
REUSE BY OWNER. SEE MEP DEMO DRAWINGS FOR CAPPING OF EXISTING
PLUMBING LINES AND FLOOR DRAIN
26 REMOVE EXIST GWB/METAL STUD WALL FROM FLOOR TO STRUCTURE ABOVE.
27 PATCH FLOOR AND WALLS WHERE FIN TUBES AND CONVECTORS REMOVED
PRIOR TO INSTALLATION OF NEW FINISHES.
28 CONTRACTOR AND MATERIAL INGRESS/EGRESS PATH. MAINTAIN PATH FOR
EGRESS DURING CONSTRUCTION.
29 ANTE CHAMBER W/ STICKY WALK-OFF MAT – SEE DEMOLITION & NEW FLOOR
PLAN GENERAL NOTES.
30 ERECT NON-COMBUSTIBLE TEMPORARY CONSTRUCTION BARRIER. PROVIDE
1-HOUR-RATED DUST PARTITION DURING DEMOLITION & CONSTRUCTION
(TYP.)
DEMOLITION GENERAL NOTES
1 DASHED LINES INDICATE DEMOLITION ELEMENTS. SOLID GREY LINES
INDICATE EXISTING ELEMENTS TO REMAIN. U.N.O.
2 EXISTING WINDOWS AND FRAMES TO REMAIN. PROTECT FRAMES AND
GLAZING FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION.
3 SALVAGE AND RETURN TO VA ITEMS IDENTIFIED BY THE COR FOR
FUTURE USE NOT OTHERWISE DESIGNATED BY THESE DRAWINGS.
4 VA TO REMOVE EXISTING FURNISHINGS AND EQUIPMENT PRIOR TO
START OF WORK BY GENERAL CONTRACTOR.
5 REMOVE EXISTING FINISHES TO PLASTER, CONCRETE, CLAY TILE OR
MASONRY SUBSTRATE UNLESS NOTED OTHERWISE.
6 REFER TO HAZARDOUS MATERIAL ABATEMENT DRAWINGS FOR
ADDITIONAL INFORMATION RELATED TO ABATEMENT OF EXISTING
FLOORING AND/OR CEILING REMOVAL.
7 REFER TO MECHANICAL DWGS FOR RELATED MECHANICAL
DEMOLITION & NEW CONSTRUCTION NOT SHOWN.
8 REFER TO ELECTRICAL AND TECHNOLOGY DWGS FOR RELATED
ELECTRICAL & TECHNOLOGY DEMOLITION & NEW CONSTRUCTION NOT
SHOWN.
9 EXISTING FIRE PROTECTION SYSTEM TO REMAIN OPERATIONAL
DURING CONSTRUCTION UNLESS OTHERWISE ARRANGED WITH THE
COR.
10 REFER TO CODE REVIEW & LIFE SAFETY PLANS FOR FIRE & SMOKE
PARTITION LEGEND.
11 DEMOLITION WASTE TO BE REMOVED TO DUMPSTER.
12 DISRUPTIVE ACTIVITIES IN OCCUPIED SPACES TO BE LIMITED AS
DIRECTED BY COR. COORDINATE WELL IN ADVANCE WITH COR PRIOR
TO BEGINNING WORK.
13 WORK IN CORRIDORS REQUIRE REMOVAL OF SOME ACOUSTICAL
CEILING TILES AND GRID SYSTEM. SEE MPET DRAWINGS FOR FULL
SCOPE OF WORK. CONTRACTOR TO COORDINATE REMOVAL AND
REINSTALLATION OF CEILING EQUIPMENT (EXAMPLE: LIGHTING AND
DIFFUSERS). REMOVE, SALVAGE AND PROTECT TILE AND GRID FOR
REINSTALLATION. CONTRACTOR IS RESPONSIBLE FOR REPLACING
ACOUSTICAL CEILING TILE AND GRID TO MATCH EXISTING FIELD
CONDITIONS FOR TILE OR GRID OR SURROUNDING TILE OR GRID THAT
ARE DAMAGED DURING WORK. PROVIDE GRID AND TILE TO MATCH
NEW FOR EXISTING GRID OR TILE THAT CAN NOT BE MATCHED. FIELD
VERIFY LAYOUT OF GRID. AREA SHOWN IS AN APPROXIMATE AREA TO
BE REMOVED. VERIFY EXISTING CONDITIONS WITH COR DURING
PRE-CONSTRUCTION WALK THRU, ADDITIONAL COSTS WILL NOT BE
ALLOWED.
14 WORK IN PORTIONS OF SEVERAL BUILDINGS REQUIRES REMOVAL OF
PORTIONS OF EXISTING GYPSUM/ PLASTER CEILINGS, FIELD VERIFY
AND SEE MEPT DRAWINGS FOR FULL EXTENT OF WORK. REMOVE,
REPLACE, PATCH AND REPAIR CEILING TO THE EXTENT NECESSARY TO
COMPLETE WORK. CUT CEILING NEXT TO SUPPORTING MEMBER,
TOOTH IN NEW PLASTER, MATCH NEW FINISH TO EXISTING FINISH.
WHERE ENTIRE CEILING SYSTEM IS TO BE REMOVED TO WALLS OR
SOFFITS REMOVE TO EXTENTS SHOWN. COORDINATE REMOVAL AND
REINSTALLATION OF CEILING EQUIPMENT (EXAMPLE: LIGHTING AND
DIFFUSERS). WHERE ONLY PORTIONS OF CEILING ARE BEING
REMOVED, CONTRACTOR DETERMINES REQUIRED REMOVAL AREA;
CONTRACTOR IS RESPONSIBLE TO COORDINATE REMOVAL AND
REINSTALLATION OF OTHER EQUIPMENT (EXAMPLE: LIGHTING AND
DIFFUSERS) THAT MIGHT BE DISPLACED IN THE PROCESS OF CEILING
SYSTEM REMOVAL. ADDITIONAL CEILING SUPPORT MAY BE REQUIRED,
MATCH EXISTING SYSTEM AS REQUIRED. AREA SHOWN IS AN
APPROXIMATE AREA TO BE REMOVED. VERIFY EXISTING CONDITIONS
WITH COR DURING PRE-CONSTRUCTION WALK THRU.
15 IN AREAS THAT ARE TO BE OCCUPIED AND/OR OPERATIONAL DURING
THE CONSTRUCTION PERIOD AND DESIGNATED FOR AFTER-HOURS
AND/OR WEEKEND WORK, THE CONTRACTOR SHALL RETURN AREA TO
SERVICEABLE CONDITION PRIOR TO THE END OF THE CONTRACTOR’S
WORK PERIOD INCLUDING CLEANING OF AREA AND REINSTALLATION
OF ACOUSTICAL TILE CEILINGS.
X X X
3" = 1'-0"1
TEMPORARY PARTITION DETAIL
A1 C1
STRUCTURE ABOVE
FIRE RATED SEALANT,
EA. SIDE, T&B
HEAD SLIP
CONNECTOR
FINISHED CEILING
ACOUSTIC BATTS
3 5/8" METAL STUDS
@ (16" O.C.)
1 LAYER 5/8" GWB
EA. SIDE
PAF (.145) @ (32" O.C.)
TRACK - T&B
STRUCTURE ABOVE
FIRE RATED SEALANT,
EA. SIDE, T&B
HEAD SLIP
CONNECTOR
FINISHED CEILING
3" MINERAL FIBER
2 5/8" C-H METAL
STUDS @ (16" O.C.)
1 LAYER 3/4" TYPE X
GWB
PAF (.145) @ (32" O.C.)
TRACK - T&B
B1
STRUCTURE ABOVE
FIRE RATED SEALANT,
EA. SIDE, T&B
HEAD SLIP
CONNECTOR
FINISHED CEILING
ACOUSTIC BATTS
3 5/8" METAL STUDS
@ (16" O.C.)
1 LAYER 5/8" GWB
PAF (.145) @ (32" O.C.)
TRACK - T&B
1" TYPE X GWB
1 HOUR FIRE BARRIER
UL 263 DESIGN U419
2 HOUR FIRE BARRIER
UL R1319 DESIGN U415
A
STRUCTURE ABOVE
HEAD SLIP
CONNECTOR
FINISHED CEILING
ACOUSTIC BATTS
3 5/8" METAL STUDS
@ (16" O.C.)
1 LAYER 5/8" GWB
EA. SIDE
PAF (.145) @ (32" O.C.)
TRACK - T&B
A2
STRUCTURE ABOVE
FIRE RATED SEALANT,
EA. SIDE, T&B
HEAD SLIP
CONNECTOR
FINISHED CEILING
ACOUSTIC BATTS
3 5/8" METAL STUDS
@ (16" O.C.)
1 LAYER 5/8" TYPE X
GWB EA. SIDE
PAF (.145) @ (32" O.C.)
TRACK - T&B
1 HOUR FIRE BARRIER
UL R1319 DESIGN 0419
EXTEND GWB TO
6" (MIN) ABOVE CLG.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :1
P
M
AE-001
ARCHITECTURAL RENOVATION PLAN GENERAL NOTES & KEYNOTE
LEGEND
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
RENOVATION GENERAL NOTES
1 REFER TO GENERAL ARCHITECTURAL NOTES ON SHEET G-002 FOR ADDITIONAL ITEMS NOT
COVERED BY THESE NOTES.
2 REFER TO HA – DRAWINGS AND REPORTS ON FILE WITH VA STLHCS – ENGINEERING FOR KNOWN
EXTENTS OF HAZARDOUS MATERIALS IN PROJECT AREA.
3 REFER TO ARCHITECTURAL DEMO PLANS FOR EXTENTS OF DEMOLITION WORK IN PROJECT AREA.
4 REFER TO ROOM FINISH SCHEDULE FOR FINISHES.
5 REFER TO MECHANICAL DWGS FOR RELATED MECHANICAL REMODELING.
6 REFER TO ELECTRICAL DWGS FOR RELATED ELECTRICAL REMODELING.
7 REFER TO FIRE PROTECTION DWGS FOR RELATED FIRE PROTECTION REMODELING.
8 FILL ALL LOCATIONS WHERE MASONRY WALLS HAVE BEEN REMOVED.
9 PATCH TO MATCH EXISTING WHERE DAMAGED BY DEMOLITION.
10 REINSTALL SIGNAGE IN ORIGINAL LOCATION OR WHERE DIRECTED BY COR.
11 REINSTALL PICTURES/ARTWORK IN ORIGINAL LOCATION OR WHERE DIRECTED BY COR.
12 REINSTALL HANDRAILS AND CORNER GUARDS. PATCH TO MATCH EXISTING WHERE REQUIRED DUE
TO REMODELING.
13 DEMOLITION WASTE TO BE REMOVED TO DUMPSTER.
14 DISRUPTIVE ACTIVITIES IN OCCUPIED SPACES TO BE LIMITED AS DIRECTED BY COR. COORDINATE
WELL IN ADVANCE WITH COR PRIOR TO BEGINNING WORK.
15 REFER TO AI-100-SERIES DRAWINGS FOR FURNITURE AND EQUIPMENT.
16 REFER TO AE-100-SERIES DRAWINGS FOR DIMENSIONS AND NOTES FOR NEW CONSTRUCTION.
17 EXISTING EXTERIOR WALL SURFACES VARY IN DEPTH: CONTR TO LAY OUT AND INSTALL NEW EXTERIOR WALLS TO PROVIDE FINISH FACE OF WALL WITHOUT ENCROACHING ON FINISH CLEAR
ROOM DIMENSIONS SHOWN ON ENLARGED FLOOR PLAN.
18 NO WOOD BLOCKING ALLOWED.
19 ALL WALLS AND CHASES TO BE INSULATED - SEE WALL TYPES AND ARCHITECTURAL GENERAL
NOTES.
20 CONTRACTOR TO VERIFY LOCATION OF EXISTING PIPING AND RELATED ITEMS PRIOR TO START OF WORK. COORDINATE ALL EXISTING AND NEW MECHANICAL AND ELECTRICAL WORK TO FIT WITHIN
WALLS AND CHASES SHOWN; WHERE EXISTING OR NEW MECHANICAL AND ELECTRICAL WORK
FALLS OUTSIDE OF THE PROVIDED WALLS AND CHASES, THE CONTRACTOR SHALL NOTIFY THE COR FOR REVISIONS TO THE LAYOUT OF WALLS OR CHASE AT NO ADDITIONAL COST TO THE OWNER.
21 DEMO WORK AND NEW WORK INDICATE APPROXIMATE AREA TO BE REMOVED. CONTRACTOR TO
FIELD VERIFY ACTUAL AREA TO BE REMOVED - REMOVAL EXTENTS MAY DEPEND ON LOCATION OF
AND DIRECTION OF SUSPENDED ACOUSTICAL CEILING GRID MAIN-TEE. CONTRACTOR TO
COORDINATE WORK AREA WITH MEP DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR IS
RESPONSIBLE FOR WORK AS NECESSARY, FIELD VERIFY.
22 MAINTAIN ALL EXISTING FIRE RATINGS. FIELD VERIFY.
23 WORK AREA SHOWN DOES NOT DISTINGUISH BETWEEN PHASES BUT ONLY SHOWS AREA TO BE
REMOVED AND REINSTALLED. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING PHASING OF WORK;
SOME PORTIONS OF WORK SHOWN MIGHT OCCUR IN MULTIPLE PHASES. SEE PHASING
REQUIREMENTS ON SHEET GI-002 AND GC-100.
24 REMOVE AND REINSTALL ALL ITEMS LOCATED IN CEILING (LIGHTS, DIFFUSERS, SPRINKLER HEADS, EXIT SIGNS, SIGNS, FANS, AHU, ALARMS, ANTENNAS, OCCUPANCY SENSORS, SPEAKERS, NURSE CALL, CODE LIGHTS, EMERGENCY SHOWER, CAMERA, CURTAIN TRACK, PATIENT LIFT OR ACCESS HATCHES, ETC.) AS REQUIRED. ALL ITEMS MAY NOT BE INDICATED ON DRAWINGS. FIELD VERIFY
FOR FULL SCOPE OF WORK.
25 ANY CONTRACTOR DISTURBED FINISHES MUST BE RESTORED TO MATCH THE EXISTING FINISH.
COORDINATE WITH VA TO MATCH EXISTING FINISHES.
26 COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO THAT THE FUNCTION AND
APPEARANCE IS NOT AFFECTED BY CONSTRUCTION, THE CONTRACTOR, THEIR EQUIPMENT,
MATERIALS, OR ANY INVOLVED ACTIONS.
27 A 1 HR MINIMUM FIRE-RATED SEPARATION IS REQUIRED BETWEEN ALL OCCUPIED SPACE AND
CONSTRUCTION AREAS. THIS PROTECTION INCLUDES ANY EXISTING PENETRATIONS AND
OPENINGS.
28 PATCH FLOOR SLABS AT PENETRATIONS AND OPENINGS RESULTING FROM REMOVAL OF PIPING AS
NECESSARY TO MAINTAIN EXISTING FIRE SEPARATION AND FINISH.
29 AT PIPING AND EQUIPMENT REMOVAL LOCATIONS PATCH TO MATCH ADJACENT EXISTING FLOOR.
30 PATCH PARTITION WALLS AND FILL/PATCH OPENINGS RESULTING FROM REMOVAL OF PIPING.
MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR, WALL MOUNTED EQUIPMENT AND
ACCESSORIES, ETC.) TYP. WALL CONDITION: GWB OR PLASTER. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE, REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO
COMPLETE WORK AND MEET THE REQUIRED STANDARDS FOR VA CONSTRUCTION. COORDINATE
REMOVAL AND REINSTALLATION OF WALL MOUNTED EQUIPMENT, ETC. FIELD VERIFY. MAINTAIN EXISTING FIRE RATINGS. VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION
WALK THRU, ADDITIONAL COSTS WILL NOT BE ALLOWED.
31 PATCH PARTITION WALLS AT NEW PENETRATIONS RESULTING FROM INSTALLATION OF NEW PIPING.
SEAL AGAINST NEW PIPING TO MATCH EXISTING WALL CONDITION. MATCH EXISTING WALL
CONDITION (FINISH, PAINT COLOR, WALL MOUNTED EQUIPMENT AND ACCESSORIES, ETC.) TYP.
WALL CONDITION: GWB OR PLASTER. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE, REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE WORK AND MEET
THE REQUIRED STANDARDS FOR VA CONSTRUCTION. COORDINATE REMOVAL AND
REINSTALLATION OF WALL MOUNTED EQUIPMENT, ETC. FIELD VERIFY. MAINTAIN EXISTING FIRE
RATINGS. VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU,
ADDITIONAL COSTS WILL NOT BE ALLOWED.
RENOVATION PLAN KEYNOTES
41 LIMITS OF FUTURE OCCUPANCY SHELL SPACE.
42 FURR INTERIOR WALLS W/ 3 5/8" MTL STUDS W/ 5/8" GWB TO 6" ABOVE FINISH CEILING; ALINE F.O. GWB W/ F.O. TERRAZZO CURB WHERE PRESENT; APPLY MTL CASING BEAD TERRAZZO BASES; SEE DETAIL
3/52-0-AE-101
43 FURR WALLS & COLUMNS W/ 7/8" DWC & 5/8" GWB TO 6" ABOVE FINISH CEILING; APPLY MTL CASING BEAD @
GWB/TERRAZO BASE JOINT AND @ OPENINGS.
44 FURR WALLS W/ 3 5/8" MTL STUDS FROM T.O. TERRAZZO CURB TO B.O. STRUCT; INSULATE W/ R-19 6" THICK. FIBERGLASS BATT INSULATION W/ 6 MIL POLY VAPOR BARRIER; 5/8" GWB FULL HEIGHT. APPLY MTL
CASING BEAD AT GWB/TERRAZZO BASE JOINT & AT OPENINGS.
RENOVATION PLAN KEYNOTES
1 SEE ROOM FINISH SCHEDULE ON AF-100-SERIES SHEETS FOR FINISHES.
2 PATCH EXISTING WALL W/ FINISHES TO MATCH EXISTING.
3 EXISTING STAIRWELL WALLS TO REMAIN. SEE ROOM FINISH SCHEDULE FOR NEW FINISHES ON
CONSTRUCTION SIDE OF WORK AREA.
4 EXISTING LINEN CHUTE/WALLS TO REMAIN.
5 NEW NON-RATED RATED PIPE CHASE FROM FLOOR TO STRUCT. ABOVE; W/ NON-RATED ACCESS PANEL;
COORDINATE W/ MECH FOR ACCESS PANEL LOCATION; COORDINATE LOCATIONS W/MEP DRAWINGS. FIRE SEAL PENETRATIONS AT FLOOR AND STRUCTURE ABOVE TO MAINTAIN FIRE RATED ASSEMBLY RATING
6 NEW 2-HR-RATED SHAFT WALL FROM FLOOR TO STRUCT. ABOVE; W/ 90-MIN. RATED ACCESS PANEL;
COORDINATE W/ MECH FOR ACCESS PANEL LOCATION. COORDINATE EXTENTS OF SHAFT ENCLOSURE
W/MEP DRAWINGS.
7 EXISTING CHASE WALL TO REMAIN.
8 PATCH FLOOR AND WALLS WHERE FIN TUBES AND CONVECTORS REMOVED PRIOR TO INSTALLATION OF
NEW FINISHES.
9 EXISTING WALLS AT ELEVATOR SHAFT TO REMAIN.
10 THRU-FLOOR PENETRATION W/ 2-HOUR RATED FIRE DAMPER; COORDINATE SIZE/LOCATION W/ MECH;
PROVIDE & INSTALL FIRE-RATED ASS'Y TO CLOSE OPENING & MAINTAIN FIRE RATING DURING
CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.
11 INFILL EXISTING OPENING W/ 5/8” TYPE “X” GWB AND LT. GA. METAL STUDS FOR 1-HR SEPARATION.
12 1-HOUR RATED WALL - SEE WALL TYPES (TYP).
13 FURR/INSULATE EXTERIOR WALL W/ 3-5/8” LT. GA. METAL STUDS, R-11 BATT INSULATION AND 5/8” GWB
FROM FLOOR TO B.O. STRUCTURE ABOVE.
14 PIPE CHASE - 1-HOUR RATED WALL U.N.O. - SEE WALL TYPES (TYP); W/ 1 HR-RATED ACCESS PANEL;
COORDINATE W/ MECH FOR ACCESS PANEL LOCATION.
15 PAINT EXISTING WALLS: PATCH, SAND, SMOOTH AND PREPARE SURFACE OF EXIST WALL FOR NEW FINISH.
16 INSTALL CORNER GUARDS; SEE ARCHITECTURAL FINISH PLAN AF-100-SERIES SHEETS FOR DETAILS.
17 PATCH TO MATCH EXISTING FINISH AS REQ'D. DUE TO REMODELING.
18 TEMPORARY CONSTRUCTION PARTITION - REMOVE AFTER COMPLETION OF REFINISHING; PATCH TO
MATCH ANY DAMAGE TO EXISTING/NEW FINISHES.
19 MAINTAIN PATH FOR EGRESS DURING CONSTRUCTION.
20 AREA FOR NEW OWNER-PROVIDED/OWNER-INSTALLED CABINET/EQUIPMENT; SEE FINISH PLAN &
EQUIPMENT SCHEDULE.
21 NEW FIRE EXTINGUISHER CABINET (FEC); SEE SHEET AE-500 FOR DETAILS.
22 EXISTING FEC.
23 NEW HM DOOR/FRAME; SEE DOOR SCHEDULE.
24 NEW SOLID-SURFACE WINDOW SILL; SEE SHEET AE-500 FOR DETAILS.
25 EXISTING WALL MOUNTED STEAM CONVECTOR TO BE REMOVED (SEE MECH.). OPENING TO BE INFILLED WITH METAL STUDS AND FIBERGLASS BATT INSULATION W/ VAPOR BARRIER (R-19 MIN.), 5/8" TYPE "X" MR GYPSUM WALLBOARD. PATCH/FILL OPENINGS IN FLOOR AND FIRE SEAL. FINISH TO MATCH EXISTING
CONDITION. SEE DETAILS ON SHEET AE-500.
26 FULLY-RECESSED FIN TUBE CONVECTOR BOX; SEE SHEET AE-500 FOR DETAILS; COORDINATE W/ MECH;
SEE MECH FOR ADDITIONAL INFO.
27 WINDOW POCKET - SEE WALL SECTIONS & REFLECTED CEILING PLAN.
28 SEE AF-100-SERIES SHEETS FOR FLOOR FINISHES.
29 WALL-MOUNTED HOSE BIBB - SEE MECH.
30 FLOOR SINK - SEE MECH.
31 CONTRACTOR AND MATERIAL INGRESS/EGRESS PATH.
32 ANTE CHAMBER W/ STICKY WALK-OFF MAT – SEE DEMOLITION & NEW FLOOR PLAN GENERAL NOTES.
33 TEMPORARY CONSTRUCTION BARRIER - SEE DEMOLITION & NEW FLOOR PLAN GENERAL NOTES.
34 THRU-WALL PENETRATION W/ 2-HOUR RATED FIRE DAMPER; COORDINATE SIZE/LOCATION W/ MECH;
PROVIDE & INSTALL FIRE-RATED ASS'Y TO CLOSE OPENING & MAINTAIN FIRE RATING DURING
CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.
35 REFER TO ASBESTOS ABATEMENT DRAWINGS FOR ADDITIONAL INFORMATION RELATED TO EXISTING
FLOORING AND/OR CEILING REMOVAL THIS ROOM.
36 METAL ZEE FURRING WITH RIGID 2" XPS INSULATION AND 5/8" TYPE “X” GYP BD. EXTEND FULL HEIGHT TO
B.O. STRUCTURE.
37 REMOVE & REPLACE ACCESS HATCH-SEE SHEET AE-500 FOR DETAILS.
38 WRAP COLUMN WITH 1 1/2" MTL STUDS AND 1 LAYER GWB TO 6” ABOVE FINISH CEILING. SEE DETAIL AE-500.
39 ACCESS TO ROOM RESTRICTED TO AFTER HOURS/WEEKENDS. COORDINATE ACTIVITY IN ROOM WITH COR.
40 FURR OUT EXTERIOR WALLS WITH EXTRUDED INSULATION BEHIND METAL STUDS WITH BATT INSULATION, VAPOR BARRIER, AND DRYWALL SHEATHING.
X
1 1/2" = 1'-0"1
WALL TYPES
X
T
T
T
T
T
T
T
T
T
N
N
N
N
F
E
BE
B
E B
NE
N E
NE
N
FT
V
NE
NE
F
N
NE
NE
T V
N
D H
D H
T V
N
NE
NE
T V
N
D
HN2
TV
NE
NE
NENE
N N
D H
T V
N2
N
D H
NE
NE
T
T
T
F
19 2017
27 27
6 27
6.8
9.5
10.1
QP.1 T.2R
Q.1 R.1 S.1
T T.1
10.2
DEMOLITION PLAN LEGEND
FULL HEIGHT ONE-HOUR FIRE RATED TEMPORARY
PARTITION
ELEMENT TO BE REMOVED, TYPICAL
INDICATES EXISTING CONSTRUCTION TO REMAIN UNO.
INDICATES AREA TO BE REMOVED, TYPICAL
OFFICE
2C05
HAC
2C06
D.W.
E3
ELEVATOR NO. 2
E2
TOILET, STAFF
2E31
CORRIDOR
H210
OFFICE
2E07
OFFICE
2E07A
TOILET
2E07CTOILET
2E07B
TOILET
2E06A CHASE
CH-E-6
OFFICE
2E08
OFFICE
2E06
FAX RM.
2E05B
CORRIDOR
H201 OFFICE
2E09
TOILET
2E10
OFFICE
2E05
TOILET
2E05A
TELERETINAL
IMAGING
2E11
ELEC. RM.
2E04
TOILET
2E12A
CHASE
CH-E-9
STORAGE
2E02
OFFICE
2E12
HAC
2E01
STORAGE
2E03
TREAT. RM.
2E13
CHASE
CH-E-3
CHASE
CH-E-8
STAIRWELL NO. 1
S201
SOILED LINEN
CHUTE
2E15A
LACTATION RM.
2E15
STORAGE
2E16A
EXAM
2E16
KITCHENETTE
2E17
RECEPTION
2E18
CHASE
CH-E-7
VITAL SIGN RM.
2E19
CHASE
CH-E-1
EXAM
2E20
EXAM
2E29
CHASE
CH-E-4
8 8
26 24
5 2426
5 24
24 26
24 26
24 26
24 26
24 26
5 5
6.8
9.5
10.1
QP.1 T.2R
Q.1 R.1 S.1
T T.1
10.2
1' -9
12'-10 1/2"
5'-7 1/2"
2' -0
/2
12'-10 1/2"
2' -0
/2
13'-10 1/2"
12'-10 1/2"1'-11"
6'-2"
1' -8
/2
7'-9 1/2"
2'-4 1/2"
6' -1
1' -2
2' -4
5'
-9
4'-2 1/2" 9'-9"
3'-0"
2' -1
1'
-0
1' -6
/2
3'
-7
/2
3' -0
1"
6' -4
4'-11" 7'-4"
4'-11"
4' -0
/2
6'
-7
/2
1' -4
/2
2'-11"
1'-2"
5' -6
/2
6'
-7
/2
3'-1"8 1/2"
6' -5
1'
-2
2'-4 1/2"
3' -1
0"
'-2
/2 "1'-1"
3'-0 1/2"
1' -8
6'-9"
1'-5 1/2"
2E01
2E01A
2E01B
2E01E
2E01C
2E01D
1-AE-301
1-AE-501
1-AE-301
B1
C1
C1
C1
C1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
1-2-AF-101E 3
1-2-AF-101E4
1-2-AF-101E 6
1-2-AF-101E
B1
3'-7 1/2"
CHASE
CH-E-7
2'-4 1/2"
1-AE-301
3'-3"
3' -0
2'-2 1/2"
2' -2
/2
B1
ASBESTOS AND LEAD BASED PAINT
1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING MATERIALS (ACM) PRIOR TO ANY
DEMOLITION.
2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF ASBESTOS AND LEAD BASED PAINT REPORTS. REFER TO DIVISION 2 IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD BASED
PAINT ENCAPSULATION OR REMOVAL SPECIFICATIONS.
3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS OBTAINED FROM THE COR FOR DETAILED INFORMATION AND LOCATIONS. IF THE CONTRACTOR ENCOUNTERS
MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS CONTAINING (ACMs) ARE TO
BE PROVIDE WITH APPROPRIATE OSHA ASBESTOS TRAINING PRIOR TO START OF WORK.
4. REFER TO PHASING PLAN SHEETS IN THESE DRAWINGS. ABATEMENT AND LBP REMOVAL ACTIVITIES
SHALL BE CONDUCTED IN GENERAL ACCORDANCE WITH THE PROJECTS PHASING STRATEGY.
HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA OF FACILITY IN QUESTION TO ABATEMENT SPECIFICATIONS FOR HANDLING OF MATERIALS THAT WERE NOT DIRECTLY OBSERVED, BUT SHOULD BE EXPECTED BY THE
ABATEMENT CONTRACTOR
OFFICE
2C05
HAC
2C06
D.W.
E3
ELEVATOR NO. 2
E2
CORRIDOR
H210
CHASE
CH-E-6
CHASE
CH-E-9
CHASE
CH-E-3
CHASE
CH-E-8
STAIRWELL NO. 1
S201 SOILED LINEN
CHUTE
2E15A
EXAM
2E20
EXAM
2E29
CORRIDOR
H203
CHASE
CH-E-4
DEMOLITION PLAN GENERAL NOTES
1. REFER TO SHEET AD-001.
RENOVATION PLAN GENERAL NOTES
1. REFER TO SHEET AE-001.
DEMOLITION PLAN KEYNOTES
1. REFER TO SHEET AD-001.
RENOVATION PLAN KEYNOTES
1. REFER TO SHEET AE-001.
TEMPORARY PARTITION DETAIL
1. REFER TO SHEET AD-001.
FOR WORK ON FIRST FLOOR
1. REFER TO SHEET 1-1-AC-101E.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :4
P
M
1-2-AE-101E
ARCHITECTURAL DEMOLITION & RENOVATION PLANS - LEVEL 2 - AREA
E
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
1/8" = 1'-0"1
LEVEL 2 - ARCHITECTURAL DEMOLITION PLAN - SOUTH WING
TRUE
PROJECT EXTENTS
PROJECT EXTENTS
SUB PHASE A
SUB PHASE B
W
KEY PLAN
C E
1/8" = 1'-0"2
LEVEL 2 - ARCHITECTURAL RENOVATION PLAN - SOUTH WING
X X
LEVEL 1
524'-0"
LEVEL 2
536'-1 9/32"
LEVEL 3
548'-0 1/16"
LEVEL PH
560'-0 1/16"
7 8 9 10 11 12 13 14 15 16 17 186.8 9.5 10.1 10.2
1-AE-301
1-AE-501
FLAT-PLATE CONVECTOR
(TYP.) - REF. MECH.
1-AE-501
TYP.
1-AE-301
1-2-AC-101E
LEVEL 1
524'-0"
LEVEL 2
536'-1 9/32"
LEVEL 3
548'-0 1/16"
LEVEL PH
560'-0 1/16"
Q P.1T.2 R Q.1R.1S.1T
1-AE-301
1-AE-501
TYP.
T.2 TT.1
5/8" GWB
3 5/8" MTL STUD
@ 16" O.C.
BATT INSULATION
ACOUSTICAL CEILING
TILE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :1
P
M
1-AE-301
BLDG. SECTIONS + PARTIAL WALL SECTIONS - LEVEL 2
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
1/8" = 1'-0"1
LONGITUDINAL BUILDING SECTION - LEVEL 2
1/8" = 1'-0"2
BUILDING CROSS SECTION - LEVEL 2
1" = 1'-0"3
TYPICAL WALL SECTION FOR FURRING
LEVEL 2
536'-1 9/32"
LEVEL 3
548'-0 1/16"
T.2 T
1'-0" 1'-11 1/2"
4"
16 GA. 3 5/8" MTL
STUD @ 16" O.C.
RECESSED HEAT
CONVECTOR - REFER
TO MECH.
5/8" GWB
8' -0
1'
-1
1/ 2"
11 1/2"
F.O. EXIST WALL
FIELD VERIFY
EXISTING WINDOW
ASSEMBLY
1-2-AC-101E
16 GA. 3 5/8" METAL
STUD @ 16" O.C.
W/ 5/8" GWB
S-2 - SILL &
APRON
RB-1
8'-0"
AFF
A D
A M
A X
4' -0
ELEVATION SECTION
PLAN
FIRE ALARM STROBE -
REFER TO ELEC.
PULL
4" M
A X
5/8" TYPE X GWB
FIRE EXTINGUISHER
CABINET
J-RUNNER
FIRE
EXTINGUISHER
B O
T T
O M
O F
S
IG
N 7'
-0
9"
9"
REFER TO VOLUME 3
SHEET AW201 FOR
FIRE EQUIPMENT
SIGN DETAILS
LAMINATE 5/8" GWB TO F.O.
CABINET TO PROVIDE
1 HR RATING
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :1
P
M
1-AE-501
ARCHITECTURAL DETAILS
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJFAHT
1 1/2" = 1'-0"1
TYP. WINDOW POCKET/ WALL CONVECTOR DETAIL
1 1/2" = 1'-0"2
FIRE EXT. CABINET DETAIL
LAMINATE GWB TO F.O. CABINET
NOTES:
1. REFER TO SHEET 1-2-AF-101E (BLDG 1) AND SHEET 52-0-AF-101 (BLDG 52)
FOR ARCHITECTURAL FINISH PLAN AND ROOM FINISH SCHEDULE.
COLOR SCHEDULE GENERAL NOTES:
A. B.O. SOFFITS PAINT TO MATCH VERT. FACE OF SOFFIT.
B. SEE INTERIOR ELEVATIONS FOR ADDITIONAL NOTES ON TYPES, FINISHES, HEIGHTS AND LOCATIONS.
C. PROVIDE NEW S-1 WINDOW SILLS AND APRONS AT EXISTING WINDOWS WITHIN PROJECT AREA UNLESS OTHERWISE DIRECTED BY VASTLHCS' FES-INTERIORS/COR.
D. ALL MANUFACTURES AND PRODUCTS LISTED AS BASIS OF DESIGN; "OR EQUAL" MANUFACTURERS AND PRODUCTS ARE SUBJECT TO REVIEW BY OWNER UNLESS OTHERWISE NOTED.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :1
P
M
1-AE-601
SCHEDULES & DIAGRAMS
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
COLOR SCHEDULE
CODE PRODUCT MANUFACTURER (NOTED) PATTERN/COLOR MISC. REMARKS
AT-1 ACOUSTICAL CEILING TILE AND GRID ARMSTRONG (OR EQ) TILE - FINE FISSURED #1728 W/ HUMIGURAD PLUS, 2'x2', WHITE
GRID - ARMSTRONG - PRELUDE
XL FIRE GUARD 15/16", WHITE
SQUARE EDGE - TYPE 1 - 2'x2' - FOR NEW
CEILINGS JB BLDG. 1-2 EAST; JB BLDG. 52 RMS
GN30/GN31; JC BLDG. 7 RM 18B
AT-2 ACOUSTICAL CEILING TILE AND GRID ARMSTRONG (OR EQ) CLEAN ROOM VL #868 W/
HUMIGUARD PLUS + FIREGUARD,
2'x2', WHITE
GRID - ARMSTRONG - CLEAN
ROOM SYSTEMS
CO-EXTRUDED ALUMINUM,
15/16", WHITE
SPECIAL - CLEAN ROOMS (VINYL FACE AT(SP))
- TYPE 1 - 2'x2' - FOR NEW CEILINGS JC BLDG.
1 - RMS A608-A613B
AT-3 ACOUSTICAL CEILING TILE AND GRID ARMSTRONG (OR EQ) TILE - FINE FISSURED #1729 W/ HUMIGURAD PLUS, 2'x4', WHITE
GRID - ARMSTRONG - PRELUDE
XL FIRE GUARD 15/16", WHITE
SQUARE EDGE - TYPE 2 - 2'x4' - FOR REPLACEMENT/PATCHING OF EXISTING 2'x4'
CEILING TILES/GRID
CG-1 CORNER GUARD, VINYL INPRO (OR EQ) HIGH IMPACT 130 (3"-W)/160 (2"-W)
CORNER GUARD, RIGID VINYL -
SHARKSKIN 0350 ) (SEE REMARKS)
3" LEG-SGL CORNER; 2" LEG -
WALL ENDS (PR); NEW
APPLICATIONS - JB BLDG. 1-2
EAST, JB BLDG. 52 RMS
GN30/GN31; EXISTING RMS -
SEE REMARKS
LOCATED AT OUTSIDE CORNERS & WALL
ENDS, 48" HIGH UNLESS OTHER SHOWN ON
INTERIOR ELEV; FOR EXISTING ROOMS W/
NEW GUARDS, REVIEW W/ VASTLHCS
FES-INTERIORS FOR COLOR SELECTION
WHERE EXIST CORNER GUARD COLOR
DIFFERS
CT-1 CERAMIC TILE DAL-TILE (OR EQ) (SEE REMARKS) MATCH EXISTING SQUARE
WALL TILE - FIELD
MATCH EXISTING PROFILE & COLOR - JC
BLDG. 1-RM A218C - WALLS
CT-2 CERAMIC TILE DAL-TILE (OR EQ) (SEE REMARKS) MATCH EXISTING WALL TILE -
BULLNOSE
MATCH EXISTING PROFILE & COLOR - JC
BLDG. 1-RM A218C - WALL BULLNOSE
CT-3 CERAMIC TILE DAL-TILE (OR EQ) (SEE REMARKS) MATCH EXISTING 2x2 FLOOR
TILE
MATCH EXISTING PROFILE & COLOR - JC
BLDG. 1-RM A218C - FLOOR
DR-1 WOOD DOORS ALGOMA (OR EQ.) WHITE BIRCH, (BOOKMATCH) DOORS - MATCH VASTLHCS MAT'L/COLOR
STANDARD
GT-1 GROUT BOSTIK (OR EQ.) (SEE REMARKS) BOSTIK TRU-COLOR - WITH
CT-1, 2
PREMIXED URETHANE - WALLS; MATCH
EXISTING COLOR
GT-2 GROUT BOSTIK (OR EQ.) (SEE REMARKS) BOSTIK TRU-COLOR - WITH
CT-3
PREMIXED URETHANE - FLOOR; MATCH
EXISTING COLOR
HR-1 HANDRAIL INPRO (OR EQ) (SEE REMARKS) MATCH EXISTING HANDRAILS - MATCH EXISTING PROFILE &
COLOR
KP-1 KICK PLATE INPRO (OR EQ) RIGID VINYL - SHARKSKIN 0350 MATCH EXISTING USED IN
BLDG.
SEE HW SCHEDULE FOR SIZE; MATCH
FACILITY STD.; USE W/ WOOD DOORS
KP-2 KICK PLATE INPRO (OR EQ) (SEE REMARKS) MATCH EXISTING USED IN
BLDG.
SEE HW SCHEDULE FOR SIZE; MATCH
FACILITY STD.; USE W/ HM DOORS
P-1 PAINT SHERWIN-WILLIAMS (OR
EQ)
PEARLY WHITE SW 7009 OFF-WHITE STANDARD WALL - MATCH EXIST - VASTLHCS
STD. JB & JC
P-2 PAINT SHERWIN-WILLIAMS (OR
EQ)
AGREEABLE GRAY SW 7029 SG OFF-WHITE/GRAY HIM DOOR FRAMES & DOORS - MATCH EXIST -
VASTLHCS STD. JB & JC
P-3 PAINT SHERWIN-WILLIAMS (OR
EQ)
(SEE REMARKS) (CEILING WHITE) CEILINGS - MATCH EXIST - VASTLHCS STD. JB
& JC
P-4 PAINT SHERWIN-WILLIAMS (OR
EQ)
URBANE BRONZE SW 7405 DARK BRONZE EXTERIOR TRIM & RAILINGS -VASTLHCS STD.
JC
RB-1 WALL BASE, VINYL JOHNSONITE (OR EQ) TRADITIONAL, GRAY HAZE #24
(SEE REMARKS FOR MATCHING
EXISTING)
4" - HIGH W/ COVE - USE AT
VCT/CONC FLOORS; NEW
APPLICATIONS - JB BLDG. 1 -
2ND FLOOR; JC BLDG.
1-CHASES, JC BLDG. 7-HALL
18B (SEE REMARKS)
AT EXISTING ROOMS W/6" - HIGH BASE,
REVIEW W/ VASTLHCS FES-INTERIORS FOR
COLOR SELECTION WHERE ADJACENT EXIST
BASE COLOR DIFFERS
RB-2 WALL BASE, VINYL JOHNSONITE (OR EQ) TRADITIONAL (COLOR NAME) (#) 4"-HIGH STRAIGHT/TOELESS -
USE AT CARRET
COLOR - MATCH VASTLHCS PROFILE & COLOR
STANDARDS
RES-2 RESINOUS FLOOR/WALLS/INTEGRAL
BASE
DESCO COATINGS (OR EQ) QUARTZ CREMONA DB (SEE
REMARKS)
W/ 36"H WAINSCOT; W/ COVE
BASE DETAIL; JC BLDG. 7
RESTROOMS 18-18A
IN RESTROOMS, USE OVER ABUSE
RESISTANT DRYWALL; COLOR TO BE
SELECTED BY OWNER FROM MFGR'S FULL
RANGE
S-1 SOLID SURFACE CORIAN (OR EQ) LINEN (SEE REMARKS) WINDOW SILLS - 20MM SILLS +
APRONS; NEW APPLICATIONS -
JB BLDG. 1 -2ND FLOOR, JB
BLDG. 52 - ROOMS GN30/GN31;
EXISTING ROOMS - SEE
REMARKS
AT EXISTING ROOMS WHERE SOLID SURFACE
TO BE USED FOR SILLS/APRONS, REVIEW W/
VASTLHCS FES-INTERIORS FOR COLOR
SELECTION WHERE EXIST WINDOW SILL
MATERIAL/COLOR DIFFERS
STN-1 WOOD STAIN/ POLYURETHANE VARNISH SHERWIN WILLIAMS (OR
EQ)
CLEAR FINISH WHITE BIRCH DOORS - CLEAR FINISH - MATCH
VASTLHCS COLOR STANDARD
VCT-1 VINYL COMPOSITION TILE ARMSTRONG (OR EQ) EXCELON STD. IMPERIAL TEXTURE
POLAR WHITE 51941
NEW APPLICATION - JB BLDG. 1
-2ND FLOOR, JB BLDG. 52 -
ROOMS GN30/GN31
AT EXISTING ROOMS WHERE TILE TO BE
USED FOR PATCHING, REVIEW W/ VASTLHCS
FES-INTERIORS FOR COLOR SELECTION
WHERE EXIST VCT COLOR DIFFERS
WSF-1 WELDED SEAM SHEET FLOORING MANNINGTON (OR EQ) (SEE REMARKS) MATCH EXISTING IN ADJACENT
CORRIDOR C101
HEAT WELD - JC BLDG. 7 HALL 18B - MATCH
EXIST CORRIDOR SHT VINYL; REVIEW W/
VASTLHCS FES-INTERIORS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JEFFERSON BARRACKS DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:4 :2
P
M
AC-001
REFLECTED CEILING DEMOLITION & RENOVATION PLAN GENERAL
NOTES & KEYNOTE LEGEND
JEFFERSON BARRACKS VA MEDICAL CENTER, ST. LOUIS, MO
TJF/JJGAHT
REFLECTED CEILING PLANS GENERAL NOTES
1 ALL LOCATIONS INDICATED ARE APPROXIMATE AND MUST BE FIELD VERIFIED. ANY
DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT BEFORE CONTINUATION OF
WORK.
2 ALL NEW FCU PIPING AND DUCTWORK PENETRATIONS TO BE COORDINATED WITH
MEP SUBCONTRACTORS.
3 CONTRACTOR SHALL REMOVE ALL ACT AS NECESSARY FOR ACCESS TO FCU’S TO
NEAREST MAIN “T” AND CROSS “T” OUTSIDE ACCESS AREA. STORE ALL MATERIALS
FOR REUSE. REMOVE DAMAGED MATERIALS FROM SITE AND INSTALL NEW
REPLACEMENT MATERIALS AS REQUIRED TO MATCH ADJACENT MATERIALS IN
COLOR, TEXTURE, PATTERN AND SIZE.
4 ALL GWB/PLASTER PATCHES SHALL BE FLUSH AND SMOOTH WITH ADJACENT
SURFACES OF GWB/PLASTER. NO SHOULDERS, ROUGH EDGES AND/OR OFFSETS
SHALL BE ALLOWED. FEATHER ALL NEW EDGES INTO EXISTING GWB/PLASTER FACES
FOR A SMOOTH TRANSITIION. PREP, PRIME AND PAINT ENTIRE WALL OR CEILING
BEING PATCHED TO MATCH EXISTING ORIGINAL WALL COLOR. PAINT ENTIRE
WALL/CEILING FROM CORNER TO CORNER.
5 GRID AND DEVICE LOCATIONS SHOWN IN CORRIDORS ARE APPROXIMATE AND SHALL
BE FIELD VERIFIED BY THE GENERAL CONTRACTOR IN THE FIELD. ADJUST NEW
LAYOUT AS SHOWN TO MEET FIELD CONDITIONS.
6 CONTRACTOR SHALL PROVIDE ALL NECESSARY TEMPORARY SUPPORTS AS
REQUIRED FOR CEILING MOUNTED EQUIPMENT DURING DEMOLITION AND REBUILD
OPERATIONS.
7 REFER TO MECHANICAL DWGS FOR RELATED MECHANICAL DEMOLITION & NEW
CONSTRUCTION NOT SHOWN.
8 REFER TO ELECTRICAL AND TECHNOLOGY DWGS FOR RELATED ELECTRICAL &
TECHNOLOGY DEMOLITION & NEW CONSTRUCTION NOT SHOWN.
9 EXISTING FIRE PROTECTION SYSTEM TO REMAIN OPERATIONAL DURING
CONSTRUCTION UNLESS OTHERWISE ARRANGED WITH THE COR.
10 REFER TO CODE REVIEW & LIFE SAFTEY SHEETS FOR FIRE & SMOKE PARTITION
LEGEND.
11 DEMOLITION WASTE TO BE REMOVED TO DUMPSTER.
12 DISRUPTIVE ACTIVITIES IN OCCUPIED SPACES TO BE LIMITED AS DIRECTED BY COR.
COORDINATE WELL IN ADVANCE WITH COR PRIOR TO BEGINNING WORK.
13 WORK IN CORRIDORS REQUIRE REMOVAL OF SOME ACOUSTICAL CEILING TILES AND
GRID SYSTEM. SEE MEPT DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR TO
COORDINATE REMOVAL AND REINSTALLATION OF CEILING EQUIPMENT (EXAMPLE:
LIGHTING AND DIFFUSERS). REMOVE, SALVAGE AND PROTECT TILE AND GRID FOR
REINSTALLATION. CONTRACTOR IS RESPONSIBLE FOR REPLACING ACOUSTICAL
CEILING TILE AND GRID TO MATCH EXISTING FIELD CONDITIONS FOR TILE OR GRID OR
SURROUNDING TILE OR GRID THAT ARE DAMAGED DURING WORK. PROVIDE GRID
AND TILE TO MATCH NEW FOR EXISTING GRID OR TILE THAT CAN NOT BE MATCHED.
FIELD VERIFY LAYOUT OF GRID. AREA SHOWN IS AN APPROXIMATE AREA TO BE
REMOVED. VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION
WALK THRU, ADDITIONAL COSTS WILL NOT BE ALLOWED.
14 WORK IN SOME AREAS OF THE PROJECT REQUIRING DEMOLITION AND REMOVAL OF
PLUMBING BELOW THE FLOOR REQUIRES REMOVAL PORTION OF EXISTING GWB/
PLASTER CEILING AND REMOVAL/REPLACEMENT OF SUSPENDED ACOUSTICAL
CEILING TILE, FIELD VERIFY AND SEE MPET DRAWINGS FOR FULL EXTENT OF WORK.
REMOVE, REPLACE, PATCH AND REPAIR CEILING TO THE EXTENT NECESSARY TO
COMPLETE WORK. WHERE PLASTER CEILING IS THE FINISH CEILING, CUT CEILING
NEXT TO SUPPORTING MEMBER, TOOTH IN NEW PLASTER, MATCH NEW FINISH TO
EXISTING FINISH. WHERE ENTIRE CEILING SYSTEM IS TO BE REMOVED TO WALLS OR
SOFFITS REMOVE TO EXTENTS SHOWN. COORDINATE REMOVAL AND
REINSTALLATION OF CEILING EQUIPMENT (EXAMPLE: LIGHTING AND DIFFUSERS).
WHERE ONLY PORTIONS OF CEILING ARE BEING REMOVED, CONTRACTOR
DETERMINES REQUIRED REMOVAL AREA; CONTRACTOR IS RESPONSIBLE TO
COORDINATE REMOVAL AND REINSTALLATION OF OTHER EQUIPMENT (EXAMPLE:
LIGHTING AND DIFFUSERS) THAT MIGHT BE DISPLACED IN THE PROCESS OF CEILING
SYSTEM REMOVAL. ADDITIONAL CEILING SUPPORT MAY BE REQUIRED, MATCH
EXISTING SYSTEM AS REQUIRED. AREA SHOWN IS AN APPROXIMATE AREA TO BE
REMOVED. VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION
WALK THRU.
15 IN CORRIDORS AND ROOMS THAT ARE OCCUPIED AND/OR IN USE WHERE
AFTER-HOURS AND/OR WEEKEND WORK IS PERFORMED AND SPACE IS TO BE
RETURNED TO USE DURING NORMAL OPERATING HOURS, CEILING TILES AND
DEVICES THAT ARE MOVED FOR AFTER-HOURS AND/OR WEEKEND WORK SHALL BE
RETURNED TO THEIR ORIGINAL PLACEMENT PRIOR TO THE END OF THE
CONTRACTOR’S WORK SHIFT. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN-UP
OF AREA PRIOR TO TURNING AREA OVER AT THE END OF THE WORK SHIFT.
16 INSTALL CEILING TO COMPLY WITH SEISMIC REQUIREMENTS.
REFLECTED CEILING RENOVATION PLAN KEYNOTES
16 SURGERY AREA SUBJECT TO SPECIAL REQUIREMENTS FOR WORK IN STERILE AREAS. REFER TO VA
GUIDELINES. SEE ASBESTOS AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
17 EXISTING GWB BOARD/PLASTER CEILING BULKHEAD. REMOVE, REPLACE, PATCH AND REPAIR
BULKHEAD TO THE EXTENT NECESSARY TO COMPLETE WORK. COORDINATE REMOVAL AND
REINSTALLATION OF WALL-MOUNTED EQUIPMENT (EXAMPLE: LIGHTING AND DOOR OPERATOR
SENSORS). VERIFY EXISTING CONDITION DURING PRE-CONSTRUCTION WALK-THROUGH WITH COR.
ADDITIONAL COSTS WILL NOT BE ALLOWED.
18 REPLACE REMOVED CEILING ACCESS HATCH-SEE SHEET AE-500 FOR DETAILS. REPLACE REMOVED
WALL ACCESS HATCH. SEE SHEET AE-500 FOR DETAILS.
REPLACE REMOVED WALL ACCESS HATCH. SEE SHEET AE-500 FOR DETAILS.
19 NEW WORK IN THIS AREA REQUIRES REMOVAL OF ENTIRE EXISTING 12”X12” PERFORATED METAL ACOUSTICAL CEILING, FIBERGLASS INSULATION AND GWB/PLASTER, FIELD VERIFY. REMOVE CEILING
IN ROOM. REMOVE AS SHOWN AND COORDINATE WITH HAZARDOUS MATERIALS REMOVAL. NEW
CEILING TO BE 2’X’2’ ACT WITH NEW LIGHT FIXTURES – COORDINATE W/ ELECTRICAL. VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU, ADDITIONAL COSTS WILL
NOT BE ALLOWED.
20 WINDOW POCKET – SEE DETAIL AE-500.
21 TEMP CONST PARTITION TO BE INSTALLED TO STRUCT. ABOVE WORK ON CEILING ADJACENT TO
WALL TO BE COMPLETED AFTER WALL REMOVAL.
22 GWB CEILING - 2 LAYERS 5/8” OVER MTL CLG. JOISTS.
23 2x2 ACT-MATCH NEW CORRIDOR CEILING HEIGHT.
24 GWB BULKHEAD. SEE DETAIL AE-500.
25 REINSTALL 2’X2’ ACOUSTICAL GRID CEILING WITH PADS. RECONSRUCT ACT SOFFIT AS NEEDED TO
ACCOMMODATE NEW UNIT.
26 REBUILD GWB SOFFIT AFTER INSTALLATION. PREP, PRIME & PAINT SOFFIT, CEILING AND ADJACENT
WALL AT BOTTOM OF SOFFIT.
27 NEW FCU UNIT AND RELATED PIPING SEMI-RECESSED IN EXISTING 2’X2’ ACT SYSTEM. COORDINATE
FINAL LOCATION, SIZE, AND MOUNTING REQUIREMENTS WITH OTHER TRADES.
28 PROVIDE AND INSTALL SEISMIC REINFORCING FOR THE CEILING GRID AND APPURTENANCES IN THE
CEILING GRID. PROVIDE A SEISMIC SLIP JOINT AT THE PERIMETER WALL ANGLE.
29 REINSTALL CEILING AFTER PIPING AND ABANDONED FCU ARE REMOVED. REMOVE ALL CONTROLS
AND PATCH WALLS AS REQUIRED. PAINT ENTIRE WALL WHERE PATCHED.
30 NEW FCU UNIT AND RELATED PIPING FULLY RECESSED ABOVE EXISTING 2’X2’ ACT SYSTEM.
COORDINATE FINAL LOCATION, SIZE AND MOUNTING REQUIREMENTS WITH OTHER TRADES. SEE
DETAIL.
31 NO WORK IN THIS AREA.
32 SCRAPE & REMOVE LOOSE PAINT FROM CEILING IN PREPARATION FOR NEW FINISHES. REFER TO
HAZARDOUS MATERIAL DRAWINGS FOR LEAD-BASED PAINT ABATEMENT INFORMATION.
33 EXISTING TECHNUM SOUND-ABSORBING PANELS ON BOTTOM OF STRUCTURE-DO NOT DISTURB OR
PAINT.
34 PAINT EXPOSED STRUCTURE & CEILING THIS ROOM. SEE ROOM FINISH SCHDULE FOR ADDITIONAL
INFORMATION.
REFLECTED CEILING RENOVATION PLAN KEYNOTES
1 SEE ROOM FINISH SCHEDULE FOR NEW FINISHES OVER PLASTER AND/OR CONCRETE CEILINGS IN
ABATED AREAS.
2 NEW 2’X2’ ACT – SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
3 REMOVE AND REPLACE EXISTING ACT AS REQUIRED FOR MEP WORK.
4 NEW ACT W/CLEAN-ROOM TILE/GRID – SEE ROOM FINISH SCHEDULE.
5 PATCH AND REPAIR EXISTING SOFFITS FOR NEW HVAC WORK.
6 EXISTING CEILING THIS ROOM WAS REMOVED AS PART OF PREVIOUS DEMOLITION WORK.
7 NEW ACT CEILING – INSTALL SALVAGED 2’X4’ TROFFER LIGHT FIXTURES.
8 NEW WORK IN THIS AREA REQUIRES REMOVAL OF SOME ACOUSTICAL CEILING TILES AND GRID SYSTEM. SEE MEP DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF CEILING EQUIPMENT (EXAMPLE: LIGHTING AND DIFFUSERS). REMOVE, SALVAGE AND PROTECT TILE AND GRID FOR REINSTALLATION. CONTRACTOR IS RESPONSIBLE FOR REPLACING ACOUSTICAL CEILING TILE AND GRID TO MATCH EXISTING FIELD CONDITIONS FOR TILE OR GRID OR SURROUNDING TILE OR GRID THAT ARE DAMAGED DURING WORK. PROVIDE GRID AND TILE TO MATCH NEW FOR EXISTING GRID OR TILE THAT CAN NOT BE MATCHED. FIELD VERIFY LAYOUT OF GRID. AREA SHOWN IS AN APPROXIMATE AREA TO BE REMOVED. VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU, ADDITIONAL COSTS WILL NOT BE ALLOWED.
9 IN CONJUNCTION WITH KEYNOTE 8 ABOVE, THE EXISTING CEILING IN THIS AREA IS SEALED AND
SHALL BE RESEALED AFTER WORK IN THE DESIGNATED SPACE HAS BEEN PERFORMED.
10 NEW WORK IN THIS AREA REQUIRES REMOVAL OF EXISTING GWB/ PLASTER CEILING, FIELD VERIFY
AND SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE, REPLACE, PATCH AND REPAIR
CEILING TO THE EXTENT NECESSARY TO COMPLETE WORK. CUT CEILING NEXT TO SUPPORTING
MEMBER, TAPE AND SEAM JOINT, MATCH NEW FINISH TO EXISTING FINISH. WHERE ENTIRE CEILING
SYSTEM IS TO BE REMOVED TO WALLS OR SOFFITS REMOVE TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.