BID DOCUMENTS
September 12, 2018
JEFFERSON BARRACKS & JOHN COCHRAN DIVISIONS
CORRECT WORKPLACE & LIFE
SAFETY ISSUES, ABATE ASBESTOS,
AND IMPROVE WAYFINDING
VA ST. LOUIS HEALTH CARE SYSTEM
915 N. GRAND BLVD.
ST. LOUIS, MISSOURI 63106
VA Project #657-18-110
CLH Project #2018-01
Project Manual
Volume 2
Divisions 21-48
Calvin L. Hinz A R C H I T E C T S, P.C.
3705 North 200th Street Elkhorn, NE 68022
Tel: (402) 291-6941 Fax: (402) 291-9193
CLH
Correct Workplace & Life Safety Issues, Abate Asbestos, & Improve Wayfinding
VA PROJECT NO. 657-18-110 09-12-18
PROJECT TITLE PAGE 00 00 02-1
SECTION 00 00 02
PROJECT TITLE PAGE
PART 1 - GENERAL
1.1 PROJECT TITLE PAGE
Project Name: Correct Workplace & Life Safety Issues, Abate Asbestos, & Improve Wayfinding
VA St. Louis Health Care System, John Cochran Division & Jefferson Barracks Divisions
Project Address: VA St. Louis Health Care System–John Cochran Division
915 N. Grand Blvd.
St. Louis, MO 63106
Owner: Department of Veterans Affairs
VA Heartland Network 15
Kevin Knight
Contracting Officer / Contracting Specialist
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway
Leavenworth, KS 66048-5055
913-946-1143
Kevin.Knight2@va.gov
Owner Contact(COR): Chad Markus
Contracting Officer Representative / Project Manager, Engineering Services
VA St. Louis Health Care System–John Cochran Division
915 N. Grand Blvd.
St. Louis, MO 63106
(314) 652-4100, #5-8724
Chad.Markus@va.gov
CLH Project Number: 2018-01
Architect: Calvin L. Hinz Architects, P.C. (CLH Architects)
Calvin L. Hinz
Project Principal
3705 North 200th Street
Elkhorn, NE 68022
(402) 291-6941 chinz@clharchitects.com
Calvin L. Hinz Architects, P.C. (CLH Architects)
Alan H. Tast, AIA, LEED AP
Project Manager / Project Architect
3705 North 200th Street
Elkhorn, NE 68022
(402) 291-6941 atast@clharchitects.com mailto:Kevin.Knight2@va.gov mailto:Chad.Markus@va.gov mailto:chinz@clharchitects.com mailto:atast@clharchitects.com
VA PROJECT NO. 657-18-110 09-12-18
PROJECT TITLE PAGE 00 00 02-2
Environmental: AMI Environmental
Mike Taylor
8802 South 135th Street, Suite 100
Omaha, NE 68138-6511
(402)397-5001 mtaylor@amienvironmental.com
Mechanical/Fire Prot.: IMEG Engineering
Scott R. Przybysz, PE
Mechanical Engineer
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
(314) 951-2535
Scott.R.Przybysz@imegcorp.com
Electrical: IMEG Engineering
Steven J. Wiegers
Electrical Engineer
15 Sunnen Drive, Suite 104
St. Louis, MO 63143
(314) 951-2513
Steven.J.Wiegers@imegcorp.com
Wayfinding: Baysinger Design Group,Inc.
Sheila Baysinger Hensley, JD, AIA, LEED AP BD+C
4501 West DeYoung St., Suite 100B
Marion, IL 62959
(618) 998-8015
Sheila@baysingerdesigngroup.com
Cost Estimator: VCI (Vali Cooper International)
Colby Payne
Estimating Project Manager
(504)252-3036 colby@valiint.com mailto:mtaylor@amienvironmental.com mailto:Scott.R.Przybysz@imegcorp.com mailto:colby@valiint.com
VA PROJECT NO. 657-18-110 08-06-18
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-17
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 08-18
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 02-17
01 42 19 Reference Standards 05-16
01 45 29 Testing Laboratory Services 08-17
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 09-15
02 82 13.13 Glovebag Asbestos Abatement 09-15
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15
02 82 13.31 Asbestos Transite Abatement 09-15
02 83 33.13 Lead-Based Paint Removal and Disposal 08-16
Appendix A-1 Hazardous Building Materials Inspection Report –
Jefferson Barracks Division Buildings 1 & 52
05-18
Appendix A-2 Hazardous Building Materials Inspection Report – John
Cochran Division Buildings 1 & 7
05-18
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY
n/a
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 08-16
00 01 10-2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 10-17
07 22 00 Roof and Deck Insulation 02-16
07 51 00 Built-Up Bituminous Roofing 08-18
07 60 00 Flashing and Sheet Metal 09-18
07 72 00 Roof Accessories 10-15
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 31 13 Access Doors and Frames 02-16
08 71 00 Door Hardware 01-16
08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 06 00 Schedule for Finishes 04-15
09 22 16 Non-Structural Metal Framing 06-18
09 23 00 Gypsum Plastering 10-15
09 29 00 Gypsum Board 09-18
09 30 13 Ceramic/Porcelain Tiling 10-15
09 51 00 Acoustical Ceilings 12-16
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 09-18
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 13 00 Electronic Directories 05-15
10 14 00 Signage 10-15
10 21 13 Toilet Compartments 12-15
10 26 00 Wall and Door Protection 10-15
10 28 00 Toilet Accessories 02-16
10 44 13 Fire Extinguisher Cabinets 04-18
10 56 26 Storage Shelving
DIVISION 11 – EQUIPMENT
11 73 00 Modification of Ceiling Mounted Patient Lift System 01-17
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
00 01 10-3
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-14
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
22 05 19 Meters and Gages for Plumbing Piping 09-15
22 05 23 General-Duty Valves for Plumbing Piping 09-15
22 07 11 Plumbing Insulation 09-15
22 11 00 Facility Water Distribution 09-15
22 13 00 Facility Sanitary and Vent Piping 09-15
22 40 00 Plumbing Fixtures 09-15
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 08-17
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
08-17
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15
23 07 11 HVAC and Boiler Plant Insulation 02-15
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 08-17
23 22 13 Steam and Condensate Heating Piping 08-17
23 25 00 HVAC Water Treatment 02-15
23 31 00 HVAC Ducts and Casings 03-13
23 34 00 HVAC Fans 02-15
23 36 00 Air Terminal Units 02-15
23 37 00 Air Outlets and Inlets 02-15
23 40 00 HVAC Air Cleaning Devices 02-12
23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11
23 82 00 Convection Heating and Cooling Units 04-11
23 82 16 Air Coils 04-11
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
00 01 10-4
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 09 23 Lighting Controls 01-18
26 24 16 Panelboards 01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 41 00 Facility Lightning Protection 01-17
26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS (NOT USED)
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
VA Project No. 657-18-110 07-15
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
VOLUME 1 - JEFFERSON BARRACKS DIVISION
1 G-001 Cover Sheet & Sheet Index - CORRECT WORKPLACE -
LIFE SAFETY ISSUES, ASBESTOS ABATEMENT - JEFFERSON
BARRACKS DIVISION
2 G-002 Abbreviations, Symbols & General Notes
3 GI-001 Code Review & Life Safety Plan, Legend & Code
Information
4 1-1-GI-101E Code Review & Life Safety Plan-Bldg 1-1st Floor
5 1-2-GI-101E Code Review & Life Safety Plan-Bldg 1-2nd Floor
6 52-0-GI-101N Code Review & Life Safety Plan-Bldg 52-Ground Floor
7 1-1-GC-101E Phasing Plan-Bldg 1-1 East - South Wing + Center
8 1-2-GC-101E Phasing Plan-Bldg 1-2 East - South Wing + Center
9 52-0-GC-101N Phasing Plan-Bldg 52-Ground Floor
10 HA-001 General Asbestos Abatement Notes - Jefferson
Barracks Division Bldgs. 1 & 52
11 1-1-HA-101E Hazardous Material Plan-Bldg 1-1st Floor
12 1-2-HA-101E Hazardous Material Plan-Bldg 1-2nd Floor Class II
Abatement
13 1-2-HA-102E Hazardous Material Plan-Bldg 1-2nd Floor TSI
Abatement
14 52-0-HA-101N Hazardous Material Plan-Bldg 52-Ground Floor-Rooms
GN30 & GN31
15 AD-001 Architectural Demolition Plan General Notes &
Keynote Legend
16 AE-001 Architectural Renovation Plan General Notes and
Keynote Legend
17 1-2-AE-101E Architectural Demolition & Renovation Plans &
Details-Bldg 1-2 East - South Wing + Center
18 1-AE-301 Bldg. Sections + Partial Wall Sections-Bldg 1-2
East - South Wing + Center
19 1-AE-501 Architectural Details-Bldg 1-Multiple
20 1-AE-601 Schedules & Diagrams-Bldg 1-Multiple
21 AC-001 Reflected Ceiling Demolition & Renovation Plan
General Notes and Keynote Legend
22 1-1-AC-101E Reflected Ceiling Demolition & Renovation Plan-Bldg
1-1 East - South Wing + Center
23 1-2-AC-101E Reflected Ceiling Demolition & Renovation Plan-Bldg
1-2 East - South Wing + Center
24 1-2-AF-101E Architectural Finish Plan, Schedule & Details-Bldg
1-2 East - South Wing + Center
25 52-0-AE-101N Architectural Demolition & Renovation Plans-Bldg
52-Ground Floor-North Wing
26 52-0-AC-101N Reflected Ceiling Plan Demolition & Renovation
Plans & Details-Bldg 52-Ground Floor-North Wing
27 52-0-AF-101N Architectural Finish Plan & Schedule-Bldg 52-Ground
Floor-North Wing
00 01 15 - 2
28 FP-001 Fire Protection Cover Sheet
29 1-2-FD-101E Second Floor - Fire Protection Demolition Plan
30 1-2-FP-101E Second Floor - Fire Protection Renovation Plan
31 P-001 Plumbing Cover Sheet
32 1-1-PD-101E First Floor - Plumbing Demolition Plan
33 1-2-PD-101E Second Floor - Plumbing Demolition Plan
34 1-2-PL-101E Second Floor – Plumbing Renovation Plan
35 M-001 Mechanical Cover Sheet
36 1-2-MD-101E Second Floor - Mechanical Demolition Plan
37 1-2-MH-101E Second Floor - HVAC Renovation Plan
38 MH-300 Mechanical HVAC Details
39 MH-400 Control Diagrams
40 MH-500 Mechanical HVAC Schedules
41 E-001 Electrical Cover Sheet
42 1-2-ED-101E Electrical Demolition Plan
43 1-2-EL-101E Electrical Lighting Renovation Plan
44 1-2-EP-101E Electrical Power Renovation Plan
45 1-2-RA-101E Existing Conditions Plan – Bldg. 1 – 2nd Floor
46 1-2-RA-102E Existing Conditions Plan Photos – Bldg. 1 – 2nd
Floor – Rooms A201 - A219 & A230 - A231
47 1-2-RA-103E Existing Conditions Plan Photos – Bldg. 1 – 2nd
Floor – Rooms A201 - A219 & A230 - A231
48 52-0-RA-101N Existing Conditions Plan, Schedules, Elevations &
Notes – Bldg. 52 – Ground Floor - Rooms GN30 & GN31
49 52-0-RA-102N Existing Conditions Plan Photos – Bldg. 52 – Ground
Floor - Rooms GN30 & GN31
VOLUME #2 - JOHN COCHRAN DIVISION
1 G-001 Cover Sheet & Sheet Index - CORRECT WORKPLACE -
LIFE SAFETY ISSUES, ASBESTOS ABATEMENT - JOHN
COCHRAN DIVISION
2 G-002 Abbreviations, Symbols & General Notes
3 GI-001 Code Review & Life Safety Plan-Code Review, Code
List & Legend
4 1-2-GI-101A Code Review & Life Safety Plan-Bldg 1-2nd & 6th
Floors - Partial
5 1-9-GI-101 Code Review & Life Safety Plan-Bldg 1-9th Floor -
Partial
6 7-1-GI-101 Code Review & Life Safety Plan-Bldg 7-1st Floor -
Overall
7 1-6-GC-101A Phasing Plan, Notes & Legend-Bldg 1-6th Floor -
Section 'A' - South Wing - East "Bubble" - GI Lab -
Endoscopy Procedure & Decontamination
8 HA-001 General Asbestos Abatement Notes - John Cochran
Division-Bldgs 1 & 7
9 1-6-HA-101A Hazardous Material Plan - Bldg 1-6th Floor -
Section 'A' - South Wing - East "Bubble" - GI Lab -
Endoscopy Procedure & Decontamination
10 7-1-HA-101 Hazardous Material Plan - Bldg 7-1st Floor -
Overall
11 AD-001 Architectural Demolition General Notes, Keynotes &
Legend
00 01 15 - 3
12 AE-001 Architectural Renovation Plan General Notes and
Keynote Legends
13 1-2-AE-101A Architectural Demolition & Renovation Plans &
Details-Bldg 1-2nd Floor - Section 'A' - South Wing
– Room A218C
14 1-6-AE-101A Architectural Demolition & Renovation Plans-Bldg 1-
6th Floor - Section 'A' - South Wing - East
"Bubble" - GI Lab - Endoscopy Procedure &
Decontamination; 7th & 8th Floors - East "Bubble"
15 1-R-AE-101A Architectural Renovation Plans-Bldg. 1 – Roof
Detail
16 1-AE-301 Bldg. Sections + Partial Wall Sections-Bldg 1-
Section A - South East Tower
17 1-AE-302 Bldg. Section Details – Bldg. 1
18 1-AE-501 Architectural Details-Bldg 1
19 1-AE-601 Schedules & Diagrams-Bldg 1
20 AC-001 Reflected Ceiling Demolition & Renovation General
Notes, Keynotes & Legend
21 1-2-AC-101A Reflected Ceiling Demolition & Renovation Plan &
Details-Bldg 1 2nd Floor - Section 'A' - South
Wing
22 1-6-AC-101A Reflected Ceiling Demolition & Renovation Plan &
Details-Bldg 1 "6th Floor - Section 'A' - South
Wing - East "Bubble" - GI Lab - Endoscopy Procedure
& Decontamination
23 1-2-AF-101A Architectural Finish Plan, Schedule & Details-Bldg
1-2nd Floor - Section 'A' - South Wing
24 1-6-AF-101A Architectural Finish Plan & Schedule-Bldg 1-6th
Floor - Section 'A' - South Wing - East "Bubble" -
GI Lab - Endoscopy Procedure & Decontamination
25 7-1-AD-101 Architectural Demolition Plan & Notes - Bldg 7 -
1st Floor - Overall
26 7-1-AE-101 Architectural Renovation Plan, Details & Notes -
Bldg 7-1st Floor
27 7-1-AE-901 Interior Elevations, Details & Sections-Bldg 7-1st
Floor
28 7-R-AE-101 Architectural Roof Plan - Bldg 7-Roof
29 7-1-AC-101 Reflected Ceiling Renovation Plan, Detail & Legend
- Bldg 7-1st Floor
30 7-1-AF-101 Architectural Finish Plan & Schedules-Bldg 7-1st
Floor
31 FP-001 Fire Protection Cover Sheet
32 1-2-FD-101A Second Floor - Fire Protection Demolition Plan
33 1-6-FD-101A Sixth Floor - Fire Protection Demolition Plan
34 1-2-FP-101A Second Floor - Fire Protection Renovation Plan
35 1-6-FP-101A Sixth Floor - Fire Protection Renovation Plan
36 P-001 Plumbing Cover Sheet
37 1-2-PD-101A Second Floor - Plumbing Demolition Plan
38 1-6-PD-101A Sixth Floor - Plumbing Demolition Plan
39 7-B-PD-101A Basement - Plumbing Demolition Plan
40 7-1-PD-101A First Floor - Plumbing Demolition Plan
41 1-6-PL-101A Sixth Floor - Plumbing Renovation Plan
42 7-B-PL-101 Basement - Plumbing Renovation Plan
43 7-1-PL-101 First Floor - Plumbing Renovation Plan
00 01 15 - 4
44 M-001 Mechanical Cover Sheet
45 1-2-MD-101A Second Floor - Mechanical Demolition Plan
46 1-6-MD-101A Sixth Floor - Mechanical Demolition Plan
47 1-7-MD-101A Seventh Floor - Mechanical Demolition Plan
48 1-8-MD-101A Eighth Floor - Mechanical Demolition Plan
49 7-1-MD-101 First Floor - Mechanical Demolition Plan
50 7-R-MD-101 Roof - Mechanical Demolition Plan
51 1-2-MH-101A Second Floor - HVAC Renovation Plan
52 1-6-MH-101A Sixth Floor - HVAC Renovation Plan
53 1-7-MH-101A Seventh Floor - HVAC Renovation Plan
54 1-8-MH-101A Eighth Floor - HVAC Renovation Plan
55 1-9-MH-101A Ninth Floor - HVAC Renovation Plan
56 1-10-MH-101A Tenth Floor - HVAC Renovation Plan
57 7-1-MH-101 First Floor - HVAC Renovation Plan
58 7-R-MH-101 Roof - HVAC Renovation Plan
59 MH-300 Ventilation Details
60 MH-400 Control Diagrams
61 MH-500 Ventilation Schedules
62 E-001 Electrical Cover Sheet
63 1-2-ED-101A Second Floor - Electrical Demolition Plan
64 1-6-ED-101A Sixth Floor - Electrical Demolition Plan
65 1-2-EL-101A Second Floor - Electrical Lighting Renovation Plan
66 1-2-EP-101A Second Floor - Electrical Renovation Plan
67 1-6-EL-101A Sixth Floor - Electrical Lighting Renovation Plan
68 1-6-EP-101A Sixth Floor - Electrical Renovation Plan
69 1-9-EP-101A Ninth Floor - Electrical Renovation Plan
70 1-10-EP-101A Tenth Floor - Electrical Renovation Plan
71 7-1-ED-101 First Floor - Electrical Demolition Plan
72 7-1-EL-101 First Floor - Electrical Lighting Renovation Plan
73 7-1-EP-101 First Floor - Electrical Renovation Plan
74 1-2-RA-101A Existing Conditions Plan & Photos – Bldg. 1 – 2nd
Floor – Room A218C
75 1-6-RA-101A Existing Conditions Plan – Bldg. 1 – 6th Floor –
Rooms A608-A613B, Corr. H601
76 1-6-RA-102A Existing Conditions Plan Photos - Bldg. 1 – 6th
Floor – Rooms A608 – A613B
77 1-7-RA-101A Existing Conditions Plan Photos – Bldg. 1 – 7th
Floor – Rooms A710 – A711
78 1-8-RA-101A Existing Conditions Plan & Photos – Bldg. 1 – Rooms
A810A – A811, Corr. H803
79 7-1-RA-101 Existing Conditions Plan, Schedule & Photos – Bldg.
7 – Rooms 18-18A
VOLUME 3 - WAYFINDING
1 GI001 Cover Sheet - Wayfinding
2 JC1-AW-100 Overall Wayfinding Plan-Bldg. 1-Level 00
3 JC1-AW-101 Overall Wayfinding Plan-Bldg. 1-Level 01
4 JC1-AW-102 Overall Wayfinding Plan-Bldg. 1-Level 02
5 JC1-AW-103 Overall Wayfinding Plan-Bldg. 1-Level 03
6 JC1-AW-104 Overall Wayfinding Plan-Bldg. 1-Level 04
7 JC1-AW-105 Elevator Plans Bldg. 1
8 JB1-AW-106 Overall Wayfinding Plan-Bldg. 1-Level 00
9 JB1-AW-107 Overall Wayfinding Plan-Bldg. 1-Level 01
10 JB1-AW-108 Overall Wayfinding Plan-Bldg. 1-Level 02
00 01 15 - 5
11 JB1-AW-109 Overall Wayfinding Plan-Bldg. 1-Level 03
12 JBT-AW-110 Tunnel Plan - Section A - Connecting Bldgs. 51, 52, 53, 61, 63
13 JBT-AW-111 Tunnel Plan - Section B - Connecting Bldgs. 4, 23, 51, 51T, 55
14 JBT-AW-112 Tunnel Plan - Section C - Connecting Bldgs. 1, 4, 23, 24
15 AW-200 Signage Details
16 AW-201 Signage Details
- - - END - - -
00 01 15 - 6
This page intentionally left blank.
VA Project No. 657-18-110 06-01-15
21 13 13 - 1
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Design, installation and testing shall be in accordance with
NFPA 13.
B. Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifications.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 07 84 00, FIRESTOPPING.
C. Section 09 91 00, PAINTING.
D. Section 28 31 00, FIRE DETECTION AND ALARM.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13.
1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.
2. Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13. The hazard classification examples of uses and conditions identified in the Annex of NFPA 13 shall be mandatory for areas not listed below. Request clarification from the
Government for any hazard classification not identified. To determining spacing and sizing, apply the following coverage classifications:
a. Light Hazard Occupancies: Patient care, treatment, and customary access areas.
b. Ordinary Hazard Group 1 Occupancies: Laboratories, Mechanical
Equipment Rooms, Transformer Rooms, Electrical Switchgear Rooms, Electric Closets, and Repair Shops.
c. Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, pharmacy and associated storage, laundry, kitchens, kitchen storage areas, retail stores, retail store storage rooms, storage areas, building management storage, 21 13 13 - 2 boiler plants, energy centers, warehouse spaces, file storage areas for the entire area of the space up to 140 square meters
(1500 square feet) and Supply Processing and Distribution (SPD).
6. Provide seismic protection in accordance with NFPA 13. Contractor shall submit load calculations for sizing of sway bracing for systems that are required to be protected against damage from earthquakes.
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in
Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a
Registered Professional Engineer licensed in the field of Fire
Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA
13. Drawings shall include graphical scales that allow the user to
21 13 13 - 3 determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Calculation Sheets:
a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and
Calculations chapter of NFPA 13.
b. Submit calculations of loads for sizing of sway bracing in accordance with NFPA 13.
5. Valve Charts: Provide a valve chart that identifies the location of each new control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID
No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location.
6. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the new system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) printed copy.
2) One complete set in electronic pdf format.
3) One complete set in AutoCAD format or a format as directed by the COR.
b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA
21 13 13 - 4
13. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.
d. One paper copy of the Material and Testing Certificates and the
Operations and Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.
e. Provide one additional copy of the Operations and Maintenance
Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of
Missouri fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-13 ..................Installation of Sprinkler Systems
21 13 13 - 5
25-14 ..................Inspection, Testing, and Maintenance of Water-
Based Fire Protection Systems
101-15 .................Life Safety Code
170-15 .................Fire Safety Symbols
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS
A. Piping and fittings for sprinkler systems shall be in accordance with
NFPA 13.
1. Plain-end pipe fittings with locking lugs or shear bolts are not permitted.
2. Piping sizes 50 mm (2 inches) and smaller shall be black steel
Schedule 40 with threaded end connections.
3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel
Schedule 10 with grooved connections. Grooves in Schedule 10 piping shall be rolled grooved only.
4. Use nonferrous piping in MRI Scanning Rooms.
5. Plastic piping shall not be permitted except for drain piping.
6. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.
2.2 VALVES
A. General:
1. Valves shall be in accordance with NFPA 13.
2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.
B. Control Valve: The control valves shall be a listed indicating type.
Control valves shall be UL Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.
C. Check Valve: Shall be of the swing type with a flanged cast iron body and flanged inspection plate.
D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.
21 13 13 - 6
2.3 SPRINKLERS
A. All sprinklers shall be FM approved quick response except
“institutional” type sprinklers shall be permitted to be UL Listed quick response. Provide FM approved quick response sprinklers in all areas, except that standard response sprinklers shall be provided in freezers, refrigerators, elevator hoistways, elevator machine rooms, and generator rooms.
B. Temperature Ratings: In accordance with NFPA 13 except that sprinklers in elevator shafts and elevator machine rooms shall be no less than intermediate temperature rated and sprinklers in generator rooms shall be no less than high temperature rated.
C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL listed or FM approved for use with the corresponding sprinkler.
2.4 SPRINKLER CABINET
A. Provide sprinkler cabinet with the required number of sprinkler heads of all ratings and types installed, and a sprinkler wrench for each type of sprinkler in accordance with NFPA 13. Locate adjacent to the riser.
B. Provide a list of sprinklers installed in the property in the cabinet.
The list shall include the following:
1. Manufacturer, model, orifice, deflector type, thermal sensitivity, and pressure for each type of sprinkler in the cabinet.
2. General description of where each sprinkler is used.
3. Quantity of each type present in the cabinet.
4. Issue or revision date of list.
2.5 SPRINKLER SYSTEM SIGNAGE
A. Rigid plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Sprinkler system signage shall be attached to the valve or piping with chain.
2.6 SWITCHES:
A. Water flow Alarm Switches: Mechanical, non-coded, non-accumulative retard and adjustable from 0 to 60 seconds minimum. Set flow switches at an initial setting between 20 and 30 seconds.
B. Valve Supervisory Switches for Ball and Butterfly Valves: May be integral with the valve.
21 13 13 - 7
2.7 GAUGES
A. Provide gauges as required by NFPA 13. Provide gauges where the normal pressure of the system is at the midrange of the gauge.
2.8 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING
A. Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.
2.9 WALL, FLOOR AND CEILING PLATES
A. Provide chrome plated steel escutcheon plates.
2.10 VALVE TAGS
A. Engraved black filled numbers and letters, not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (1-1/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings. Where ceiling mounted equipment exists, such as in operating and radiology rooms, install sprinklers so as not to obstruct the movement or operation of the equipment. Sidewall heads may need to be utilized. In stairways, locate piping as near to the ceiling as possible to prevent tampering by unauthorized personnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clearances required by
NFPA 101. Pipe hangers, supports, and restraint of system piping, and seismic bracing shall be installed accordance with NFPA 13.
C. Welding: Conform to the requirements and recommendations of NFPA 13.
D. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer
21 13 13 - 8 system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.
E. Supervisory Switches: Provide supervisory switches for sprinkler control valves.
F. Waterflow Alarm Switches: Install waterflow alarm switches and valves in stairwells or other easily accessible locations.
G. Inspector's Test Connection: Install and supply in accordance with NFPA
13, locate in a secured area, and discharge to the exterior of the building.
H. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the respective waterflow switch or pipe connection near to the pipe from where they were cut.
I. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.
J. Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm
(1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger.
K. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with
Section 07 84 00, FIRESTOPPING.
L. Provide pressure gauges at each water flow alarm switch location and at each main drain connection.
M. Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.
N. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting
21 13 13 - 9 sprinklers. Painting of sprinkler systems above suspended ceilings and in crawl spaces is not required. Painting shall comply with Section 09
91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.
O. Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA 13 and NFPA 25. Sprinkler system signage shall include, but not limited to, the following:
1. Identification Signs:
a. Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector’s test.
b. Provide valve tags for each new operable valve. Coordinate nomenclature and identification of operable valves with COR.
Where existing nomenclature does not exist, the Tag
Identification shall include no less than the following: (FP-B-
F/SZ-#) Fire Protection, Building Number, Floor Number/Smoke Zone
(if applicable), and Valve Number. (E.g., FP-500-1E-001) Fire
Protection, Building 500, First Floor East, Number 001.)
2. Instruction/Information Signs:
a. Provide signage for each control valve to indicate valve function and to indicate what system is being controlled.
b. Provide signage indicating the number and location of low point drains.
P. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.
Q. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption.
3.2 INSPECTION AND TEST
A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed. Hydrostatically test system as specified in NFPA 13, in the presence of the Contracting
Officers Representative (COR) or his designated representative.
21 13 13 - 10
B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test.
Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test
3.3 INSTRUCTIONS
A. Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.
- - - E N D - - -
VA Project No. 657-18-110 07-01-16
22 05 11 - 1
SECTION 22 05 11
COMMON WORK RESULTS FOR PLUMBING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section shall apply to all sections of
Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
C. Abbreviations/Acronyms:
1. ABS: Acrylonitrile Butadiene Styrene
2. AC: Alternating Current
3. ACR: Air Conditioning and Refrigeration
4. AI: Analog Input
5. AISI: American Iron and Steel Institute
6. AO: Analog Output
7. AWG: American Wire Gauge
8. BACnet: Building Automation and Control Network
9. BAg: Silver-Copper-Zinc Brazing Alloy
10. BAS: Building Automation System
11. BCuP: Silver-Copper-Phosphorus Brazing Alloy
12. BSG: Borosilicate Glass Pipe
13. CDA: Copper Development Association
14. C: Celsius
15. CLR: Color
16. CO: Carbon Monoxide
17. COR: Contracting Officer’s Representative
18. CPVC: Chlorinated Polyvinyl Chloride
19. CR: Chloroprene
20. CRS: Corrosion Resistant Steel
21. CWP: Cold Working Pressure
22. CxA: Commissioning Agent
23. db(A): Decibels (A weighted)
24. DDC: Direct Digital Control
25. DI: Digital Input
26. DISS: Diameter Index Safety System
27. DO: Digital Output
28. DVD: Digital Video Disc
29. DN: Diameter Nominal
22 05 11 - 2
30. DWV: Drainage, Waste and Vent
31. ECC: Engineering Control Center
32. EPDM: Ethylene Propylene Diene Monomer
33. EPT: Ethylene Propylene Terpolymer
34. ETO: Ethylene Oxide
35. F: Fahrenheit
36. FAR: Federal Acquisition Regulations
37. FD: Floor Drain
38. FED: Federal
39. FG: Fiberglass
40. FNPT: Female National Pipe Thread
41. FPM: Fluoroelastomer Polymer
42. GPM: Gallons Per Minute
43. HDPE: High Density Polyethylene
44. Hg: Mercury
45. HOA: Hands-Off-Automatic
46. HP: Horsepower
47. HVE: High Volume Evacuation
48. ID: Inside Diameter
49. IPS: Iron Pipe Size
50. Kg: Kilogram
51. kPa: Kilopascal
52. lb: Pound
53. L/s: Liters Per Second
54. L/min: Liters Per Minute
55. MAWP: Maximum Allowable Working Pressure
56. MAX: Maximum
57. MED: Medical
58. m: Meter
59. MFG: Manufacturer
60. mg: Milligram
61. mg/L: Milligrams per Liter
62. ml: Milliliter
63. mm: Millimeter
64. MIN: Minimum
65. NF: Oil Free Dry (Nitrogen)
66. NPTF: National Pipe Thread Female
67. NPS: Nominal Pipe Size
22 05 11 - 3
68. NPT: Nominal Pipe Thread
69. OD: Outside Diameter
70. OSD: Open Sight Drain
71. OS&Y: Outside Stem and Yoke
72. OXY: Oxygen
73. PBPU: Prefabricated Bedside Patient Units
74. PH: Power of Hydrogen
75. PLC: Programmable Logic Controllers
76. PP: Polypropylene
77. PPM: Parts per Million
78. PSIG: Pounds per Square Inch
79. PTFE: Polytetrafluoroethylene
80. PVC: Polyvinyl Chloride
81. PVDF: Polyvinylidene Fluoride
82. RAD: Radians
83. RO: Reverse Osmosis
84. RPM: Revolutions Per Minute
85. RTRP: Reinforced Thermosetting Resin Pipe
86. SCFM: Standard Cubic Feet Per Minute
87. SDI: Silt Density Index
88. SPEC: Specification
89. SPS: Sterile Processing Services
90. STD: Standard
91. SUS: Saybolt Universal Second
92. SWP: Steam Working Pressure
93. TEFC: Totally Enclosed Fan-Cooled
94. TFE: Tetrafluoroethylene
95. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire
96. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire
97. T/P: Temperature and Pressure
98. USDA: U.S. Department of Agriculture
99. V: Volt
100. VAC: Vacuum
101. VA: Veterans Administration
102. VAMC: Veterans Administration Medical Center
103. VAC: Voltage in Alternating Current
104. WAGD: Waste Anesthesia Gas Disposal
105. WOG: Water, Oil, Gas
22 05 11 - 4
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.
D. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
E. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
F. Section 05 50 00, METAL FABRICATIONS.
G. Section 07 60 00, FLASHING AND SHEET METAL: Flashing for Wall and Roof
Penetrations.
H. Section 07 84 00, FIRESTOPPING.
I. Section 07 92 00, JOINT SEALANTS.
J. Section 09 91 00, PAINTING.
K. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
L. Section 22 07 11, PLUMBING INSULATION.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society for Testing and Materials (ASTM):
A36/A36M-2012 ..........Standard Specification for Carbon Structural
Steel
A575-96(R2013)e1 .......Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades
E84-2013a ..............Standard Test Method for Surface Burning
Characteristics of Building Materials
E119-2012a .............Standard Test Methods for Fire Tests of
Building Construction and Materials
F1760-01(R2011) ........Standard Specification for Coextruded
Poly(Vinyl Chloride) (PVC) Non-Pressure Plastic
Pipe Having Reprocessed-Recycled Content
C. International Code Council, (ICC):
IBC-2015 ...............International Building Code
IPC-2015 ...............International Plumbing Code
D. Manufacturers Standardization Society (MSS) of the Valve and Fittings
Industry, Inc:
22 05 11 - 5
SP-58-2009 .............Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and
Installation
SP-69-2003 .............Pipe Hangers and Supports - Selection and
Application
E. Military Specifications (MIL):
P-21035B ...............Paint High Zinc Dust Content, Galvanizing
Repair (Metric)
F. National Fire Protection Association (NFPA):
51B-2014 ...............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
G. NSF International (NSF):
61-2012 ................Drinking Water System Components – Health
Effects
372-2011 ...............Drinking Water System Components – Lead Content
H. Department of Veterans Affairs (VA):
PG-18-10 ...............Plumbing Design Manual
PG-18-13-2011 ..........Barrier Free Design Guide
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and
SAMPLES.
B. Information and material submitted under this section shall be marked
"SUBMITTED UNDER SECTION 22 05 11, COMMON WORK RESULTS FOR PLUMBING",
with applicable paragraph identification.
C. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements and will fit the space available.
D. If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems.
Approval will be given only if all features of the equipment and associated systems, including accessibility, are equivalent to that required by the contract.
E. Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.
22 05 11 - 6
F. Installing Contractor shall provide lists of previous installations for selected items of equipment. Contact persons who will serve as references, with telephone numbers and e-mail addresses shall be submitted with the references.
G. Manufacturer's Literature and Data: Manufacturer’s literature shall be submitted under the pertinent section rather than under this section.
1. Equipment and materials identification.
2. Firestopping materials.
3. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
4. Wall, floor, and ceiling plates.
H. Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together and complete in a group. Coordinate and properly integrate materials and equipment in each group to provide a completely compatible and efficient installation. Final review and approvals will be made only by groups.
I. Coordination Drawings: Complete consolidated and coordinated layout drawings shall be submitted for all new systems, and for existing systems that are in the same areas. The drawings shall include plan views, elevations and sections of all systems and shall be on a scale of not less than 1:32 (3/8 inch equal to one foot). Clearly identify and dimension the proposed locations of the principal items of equipment. The drawings shall clearly show the proposed location and adequate clearance for all equipment, controls, piping, pumps, valves and other items. All valves, trap primer valves, water hammer arrestors, strainers, and equipment requiring service shall be provided with an access door sized for the complete removal of plumbing device, component, or equipment. Detailed layout drawings shall be provided for all piping systems. In addition, details of the following shall be provided.
1. Mechanical equipment rooms.
2. Interstitial space.
3. Hangers, inserts, supports, and bracing.
4. Pipe sleeves.
5. Equipment penetrations of floors, walls, ceilings, or roofs.
22 05 11 - 7
J. Maintenance Data and Operating Instructions:
1. Maintenance and operating manuals in accordance with Section 01 00
00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment. Include complete list indicating all components of the systems with diagrams of the internal wiring for each item of equipment.
2. Include listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment shall be provided.
1.5 QUALITY ASSURANCE
A. Products Criteria:
1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture, supply and servicing of the specified products for at least 5 years.
However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the current generation of technology and basic design that has a proven satisfactory service record of at least 5 years.
2. Equipment Service: There shall be permanent service organizations, authorized and trained by manufacturers of the equipment supplied, located within 160 km (100 miles) of the project. These organizations shall come to the site and provide acceptable service to restore operations within four hours of receipt of notification by phone, e-mail or fax in event of an emergency, such as the shut-down of equipment; or within 24 hours in a non-emergency. Names, mail and e-mail addresses and phone numbers of service organizations providing service under these conditions for (as applicable to the project): pumps, compressors, water heaters, critical instrumentation, computer workstation and programming shall be submitted for project record and inserted into the operations and maintenance manual.
3. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.
4. The products and execution of work specified in Division 22 shall conform to the referenced codes and standards as required by the specifications. Local codes and amendments enforced by the local code official shall be enforced, if required by local authorities
22 05 11 - 8 such as the natural gas supplier. If the local codes are more stringent, then the local code shall apply. Any conflicts shall be brought to the attention of the Contracting Officers Representative
(COR).
5. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer.
6. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.
7. Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment.
8. Asbestos products or equipment or materials containing asbestos shall not be used.
9. Bio-Based Materials: For products designated by the USDA’s Bio-
Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-
Preferred Program, visit http://www.biopreferred.gov.
B. Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the COR prior to installation.