DEMOLITION PLAN LEGEND
FULL HEIGHT ONE-HOUR FIRE RATED
TEMPORARY PARTITION
ELEMENT TO BE REMOVED, TYPICAL
INDICATES EXISTING CONSTRUCTION
TO REMAIN UNO.
INDICATES AREA TO BE REMOVED,
TYPICAL
STRUCTURE ABOVE
FIRESTOP
5/8" GYP. BD.
5/8" CORE BD.
ACOUSTIC BATTS
PAF (.145) @ (32" O.C.)
TRACK - T&B
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:1 :4
P
M
AD-001
ARCHITECTURAL DEMOLITION GENERAL NOTES, KEYNOTES & LEGEND
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
DEMOLITION GENERAL NOTES
32 WORK IN CORRIDORS REQUIRE REMOVAL OF SOME ACOUSTICAL CEILING TILES AND
GRID SYSTEM. SEE MEPT DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR TO
COORDINATE REMOVAL AND REINSTALLATION OF CEILING EQUIPMENT (EXAMPLE:
LIGHTING AND DIFFUSERS). REMOVE, SALVAGE AND PROTECT TILE AND GRID FOR
REINSTALLATION. CONTRACTOR IS RESPONSIBLE FOR REPLACING ACOUSTICAL
CEILING TILE AND GRID TO MATCH EXISTING FIELD CONDITIONS FOR TILE OR GRID OR
SURROUNDING TILE OR GRID THAT ARE DAMAGED DURING WORK. PROVIDE GRID AND
TILE TO MATCH NEW FOR EXISTING GRID OR TILE THAT CAN NOT BE MATCHED. FIELD
VERIFY LAYOUT OF GRID. AREA SHOWN IS AN APPROXIMATE AREA TO BE REMOVED.
VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU,
ADDITIONAL COSTS WILL NOT BE ALLOWED.
33 WORK IN PORTIONS OF SEVERAL BUILDINGS REQUIRES REMOVAL OF PORTIONS OF
EXISTING GYPSUM/ PLASTER CEILINGS, FIELD VERIFY AND SEE MEPT DRAWINGS FOR
FULL EXTENT OF WORK. REMOVE, REPLACE, PATCH AND REPAIR CEILING TO THE
EXTENT NECESSARY TO COMPLETE WORK. CUT CEILING NEXT TO SUPPORTING
MEMBER, TOOTH IN NEW PLASTER, MATCH NEW FINISH TO EXISTING FINISH. WHERE
ENTIRE CEILING SYSTEM IS TO BE REMOVED TO WALLS OR SOFFITS REMOVE TO
EXTENTS SHOWN. COORDINATE REMOVAL AND REINSTALLATION OF CEILING
EQUIPMENT (EXAMPLE: LIGHTING AND DIFFUSERS). WHERE ONLY PORTIONS OF CEILING
ARE BEING REMOVED, CONTRACTOR DETERMINES REQUIRED REMOVAL AREA;
CONTRACTOR IS RESPONSIBLE TO COORDINATE REMOVAL AND REINSTALLATION OF
OTHER EQUIPMENT (EXAMPLE: LIGHTING AND DIFFUSERS) THAT MIGHT BE DISPLACED
IN THE PROCESS OF CEILING SYSTEM REMOVAL. ADDITIONAL CEILING SUPPORT MAY BE
REQUIRED, MATCH EXISTING SYSTEM AS REQUIRED. AREA SHOWN IS AN APPROXIMATE
AREA TO BE REMOVED. VERIFY EXISTING CONDITIONS WITH COR DURING
PRE-CONSTRUCTION WALK THRU.
34 IN AREAS THAT ARE TO BE OCCUPIED AND/OR OPERATIONAL DURING THE
CONSTRUCTION PERIOD AND DESIGNATED FOR AFTER-HOURS AND/OR WEEKEND
WORK, THE CONTRACTOR SHALL RETURN AREA TO SERVICEABLE CONDITION PRIOR TO
THE END OF THE CONTRACTOR’S WORK PERIOD INCLUDING CLEANING OF AREA AND
REINSTALLATION OF ACOUSTICAL TILE CEILINGS.
35 TEMPORARY CONSTRUCTION BARRIER WALLS & MATS ARE TO BE REMOVED AFTER
COMPLETION OF WORK. PATCH & REPAIR ANY DAMAGE TO EXISTING FINISHES.
DEMOLITION GENERAL NOTES
1 REFER TO PROJECT SPECIFICATIONS FOR OTHER APPLICABLE INFORMATION.
2 REFER TO MEP DRAWINGS FOR MECHANICAL, ELECTRICAL, AND PLUMBING FOR
DEMOLITION WORK.
3 DEMOLITION AND CONSTRUCTION MUST BE SEQUENCED AND COORDINATED TO
INSURE THE HOSPITAL’S OPERATIONS ARE CONTINUALLY MAINTAINED.
4 DEMOLITION PLAN REFLECTS INFORMATION GATHERED FROM EXISTING DRAWINGS
AND FIELD INSPECTIONS. EACH CONTRACTOR SHALL VERIFY ACCURACY OF
INFORMATION AND INCLUDE ALL REQUIRED DEMOLITION IN HIS BID. ALL CONTRACTORS
SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.
5 CONTACT ARCHITECT FOR DISCREPANCIES FOR DIRECTION IF DEMOLISHED WALLS
CONTAIN UNANTICIPATED PIPING, ELECTRICAL, OR STRUCTURAL ELEMENTS.
6 ALL LOCATIONS INDICATED ARE APPROXIMATE AND MUST BE FILED VERIFIED. ANY
DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT BEFORE CONTINUATION OF
THE WORK.
7 EXISTING WALLS TO DEMOLISHED ARE SHOWN DASHED.
8 EXISTING ITEMS AND EQUIPMENT NOT INDICATED ON THE DRAWINGS SHALL REMAIN
UNLESS LOCATED ON OR WITHIN A PARTITION SCHEDULED FOR DEMOLITION.
9 EXISTING CEILING GRID COMPONENTS REMOVED MAY BE REINSTALLED INTO THE
EXISTING CEILING GRID IF THE ARE UNDAMAGED AND IN LIKE NEW CONDITION.
10 CEILING PADS WHICH ARE BROKEN, MARRED, DISCOLORED AND UNUSABLE SHWLL NOT
BE INSTALLED AFTER AND/OR REPLACEMENT OF GRID COMPONENTS.
11 ALL WIREMOLD REMOVED TO GAIN ACCESS FOR THE REMOVAL OF FCU’S AND RELATED
PIPING SHALL BE RE-SECURED TO THE WALLS/CEILING AFTER NEW UNITS ARE
INSTALLED.
12 PROVIDE NEW PENETRATIONS AT OPENINGS AS REQUIRED FOR ALL NEW FCU PIPING
AND OUTSIDE AIR DUCTWORK.
13 ALL CORRIDORS DESIGNATE AS HAVING ACT SYSTEM REMOVED SHALL HAVE A NEW
ACT SYSTEM INSTALLED IN CURRENT CONFIGURATION. KEEP WALL ANGLE AT
PERIMETER (TYPICAL).
14 EXISTING LIGHTS, SMOKE DETECTORS, SPEAKERS AND ALL OTHER CEILING DEVICES
SHALL REMAIN CONNECTED, TEMPORARILY SUPENDED AND USED DURING DEMOLITION
OPERATIONS. CONTRACTOR TO INSURE ALL DEVICES ARE PROPERLY SECURED AND
PROTECTED DURING ALL DEMOLITION AND REBUILD OPERATIONS. COVER ALL SMOKE
DETECTORS DURING PIPE SOLDERING, ETC TO PREVENT FALSE ALARMS.
15 PATCH AND/OR REPAIR ALL WALL SURFACES TO MATCH ADJACENT SURFACE WHERE
THERMOSTATS AND SENSORS ARE REMOVED. PREP, PRIME AND PAINT THE ENTIER
WALL AT THE REPAIR.
16 EXISTING GRILLES FOR RETURN AIR SHALL BE REMOVED, STORED AND RE-INSTALLED
IN EXISTING LOCATIONS. EXISTNG SUPPLY DIFFUSERS SHALL BE TEMPORARILY
SUSPENDED AND RE-INSTALLED IN THE NEW CEILING SYSTEM.
17 PROVIDE PERMANENT SUPPORT FOR LOW VOLTAGE TELEPHONE AND COMPUTER
WIRING THAT IS PRESENTLY LAYING ON TOP OF ACOUSTICAL CEILING TILES AND
RELATED GRID. PROIVIDE BRIDAL RING SUPPORTS (OR APPROVED EQUAL) EVERY 4’-0”
OC MAXIMUM.
18 ALL NOTES REGARDING THE REMOVAL OF MECHANICAL EQUIPMENT AND PIPING ARE
GIVEN FOR REFERENCE AND CLARITY ONLY. FOR SCOPES OF WORK DESCRIBING THE
MECHANICAL SYSTEM COMPONENTS TO BE REMOVED, SEE MECHANICAL DEMOLITION
SHEETS.
19 ALL EXISTING SEISMIC BRACING TO BE DETACHED FROM EXISTING CEILING TO BE
REMOVED AND LEFT IN PLACE UNTIL NEW CEILING IS INSTALLED. USE EXISTING
SEISMIC BRACING TO BRACE NEW CEILINGS.
20 DASHED LINES INDICATE DEMOLITION ELEMENTS. SOLID GREY LINES INDICATE
EXISTING ELEMENTS TO REMAIN. U.N.O.
21 EXISTING WINDOWS AND FRAMES TO REMAIN. PROTECT FRAMES AND GLAZING FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION.
22 SALVAGE AND RETURN TO VA ITEMS IDENTIFIED BY THE COR FOR FUTURE USE NOT
OTHERWISE DESIGNATED BY THESE DRAWINGS.
23 VA TO REMOVE EXISTING FURNISHINGS AND EQUIPMENT PRIOR TO START OF WORK BY
GENERAL CONTRACTOR.
24 REMOVE EXISTING FINISHES TO PLASTER, CONCRETE, CLAY TILE OR MASONRY
SUBSTRATE UNLESS NOTED OTHERWISE.
25 REFER TO HAZARDOUS MATERIAL ABATEMENT DRAWINGS FOR ADDITIONAL
INFORMATION RELATED TO ABATEMENT OF EXISTING FLOORING AND/OR CEILING
REMOVAL.
26 REFER TO MECHANICAL DWGS FOR RELATED MECHANICAL DEMOLITION & NEW
CONSTRUCTION NOT SHOWN.
27 REFER TO ELECTRICAL AND TECHNOLOGY DWGS FOR RELATED ELECTRICAL &
TECHNOLOGY DEMOLITION & NEW CONSTRUCTION NOT SHOWN.
28 EXISTING FIRE PROTECTION SYSTEM TO REMAIN OPERATIONAL DURING
CONSTRUCTION UNLESS OTHERWISE ARRANGED WITH THE COR.
29 REFER TO CODE REVIEW & LIFE SAFETY PLANS FOR FIRE & SMOKE PARTITION LEGEND.
30 DEMOLITION WASTE TO BE REMOVED TO DUMPSTER.
31 DISRUPTIVE ACTIVITIES IN OCCUPIED SPACES TO BE LIMITED AS DIRECTED BY COR.
COORDINATE WELL IN ADVANCE WITH COR PRIOR TO BEGINNING WORK.
DEMOLITION KEYNOTES (NOT ALL NOTES MAY BE USED)
35 EXISTING WINDOW-MOUNTED AIR CONDITIONER TO REMOVE; SALVAGE & RETURN TO VA - SEE
MECH/ELECT.
36 LINE OF EXIST STRUCTURE ABOVE (TYP).
37 EXIST SUSPENDED LIGHT FIXTURE TO REMAIN (TYP) - SEE ELECT.
38 EXIST SUSPENDED LIGHT FIXTURE TO REMOVE (TYP) - SEE ELECT.
39 EXIST FIRE SPRINKLERS IN ROOM TO REMAIN (TYP).
40 REMOVE PORTION OF EXISTING CONC FLOOR SLAB & STRUCTURE FOR NEW THRU-FLOOR
DUCT PENETRATIONS/FIRE DAMPERS. INSTALL TEMPORARY 2-HOUR-RATED FIRE BLOCKING
MATERIAL IN OPENING TO MAINTAIN FIRE RATING OF FLOOR ASSEMBLY UNTIL FIRE DAMPERS
ARE INSTALLED. COORDINATE LOCATION/SIZE W/ MECHANICAL.
41 LOCATIONS OF EXISTING PIPING. REFER TO G-001 "HAZARDOUS MATERIAL GENERAL NOTES,"
GENERAL CONDITIONS AND SPECIFICATION SECTION "GLOVE BAG ASBESTOS ABATEMENT"
FOR ABATEMENT OF ASBESTOS-CONTAINING MATERIAL (ACM) AT EXISTING PIPING WHERE
PRESENT AND/OR DISCOVERED.
42 AREA OF LARGE-DIAMETER STEAM, WATER AND SANITARY LINES SUSPENDED FROM
STRUCTURE ABOVE. CONTRACTOR TO INVESTIGATE CONDITIONS PRIOR TO BEGINNING
WORK.
43 AREA OF SMALL-DIAMETER STEAM, WATER AND SANITARY LINES SUSPENDED FROM
STRUCTURE ABOVE. CONTRACTOR TO INVESTIGATE CONDITIONS PRIOR TO BEGINNING
WORK.
44 EXIST DUCT THRU FLOOR/CLG.
45 NO WORK IN THIS AREA.
46 EXISTING SIGNS TO BE RELOCATED.
47 SOFFIT TO REMAIN – PROTECT FROM DAMAGE.
48 PROTECT GWB BULKHEAD FROM DAMAGE DURING DEMOLITION.
49 REMOVE THERMOSTAT AND/OR SENSOR. PATCH, REPAIR, PREP, PRIME AND FINISH TO
MATCH ADJACENT SURFACES.
50 REMOVE CEILING GRID AND PADS AS REQUIRED FOR INSTALLATION OF NEW FCU.
51 REMOVE DRYWALL/PLASTER AS REQUIRED FOR INSTALLING NEW FCU.
52 PATCH AND REPAIR WALLS WHERE THERMOSTATS ARE REMOVED. PREPARE FOR NEW
FINISH.
53 EXISTING UNIT TO REMAIN. SEE MECH.
54 REMOVE VCT FLOORING AND WALL BASE.
55 REMOVE INTERIOR WALL AS REQUIRED FOR ROUGH OPENING FOR NEW DOOR.
56 REMOVE WALL FROM FLOOR TO 1” BELOW SUSPENDED CEILING SYSTEM @ CORRIDOR.
57 REMOVE CASEWORK & SINK. CAP ALL PLUMBING LINES BEHIND WALL.
58 EXISTING DOOR JAMB WITH LEAD-BASED PAINT TO REMAIN. PROTECT FRAME FROM DAMAGE
DURING CONSTRUCTION.
59 REMOVE BUILT-IN LOCKERS - PREP FOR INFILL
DEMOLITION KEYNOTES (NOT ALL NOTES MAY BE USED)
1 REMOVE EXISTING METAL CASEWORK, SINK, AND PLASTIC LAMINATE BACKSPLASHES.
2 REMOVE PORTION OF EXIST PLASTER CEILING IN HATCHED AREAS FOR MEP WORK AS REQ’D;
SEE REFLECTED CEILING DEMOLITION PLAN.
3 SEE REFLECTED CEILING PLANS FOR EXTENTS OF HARD CEILING TO BE REMOVED AND
REPLACED FOR MEP WORK.
4 REMOVE PORTIONS OF EXIST ACOUSTICAL CEILING IN HATCHED AREAS FOR MEPT WORK AS
REQ'D; SEE REFLECTED CEILING DEMOLITION PLAN.
5 SEE REFLECTED CEILING PLANS FOR EXTENTS OF SUSPENDED ACOUSTICAL TILE CEILING
REMOVAL & REPLACEMENT.
6 SEE MEP DRAWINGS FOR FAN COIL UNIT REMOVAL.
7 TEMPORARY 1-HR RATED CONSTRUCTION DUST PARTITION – EXTEND FROM FLOOR TO
STRUCTURE ABOVE: W/ 3’-0” X 7’-0” 1 HR RATED DOOR AND HM FRAME.
8 EXISTING CHASE/WALLS TO REMAIN.
9 REMOVE EXISTING RADIATORS; PIPING TO REMOVE AND CAP BELOW FLOOR. SEE MEP
DRAWINGS.
10 REMOVE ALL PLUMBING FIXTURES THIS ROOM. SEE MEP.
11 REMOVE ALL CASEWORK THIS ROOM. REVIEW W/ COR FOR SALVAGE AND RETURN TO OWNER
OR DISPOSAL BY CONTRACTOR.
12 STICKY WALK-OFF MAT AT CONSTRUCTION ENTRANCES.
13 EXISTING WALL TO REMAIN.
14 REMOVE EXIST VCT (TYP); PATCH FLOOR AS REQ'D FOR NEW FLOOR COVERING; SEE
ARCHITECTURAL FINISH PLAN.
15 REFER TO HAZARDOUS MATERIAL ABATEMENT DRAWINGS FOR ADDITIONAL INFORMATION
RELATED TO EXISTING FLOORING AND/OR CEILING REMOVAL THIS ROOM.
16 STERILE STORAGE AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER TO VA GUIDELINES.
17 CLEAN ROOM AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER TO VA GUIDELINES.
18 ERECT NON-COMBUSTIBLE TEMPORARY CONSTRUCTION BARRIER. PROVIDE 1-HR RATED
DUST PARTITION FROM FLOOR TO BOTTOM OF EXISTING CEILING DURING DEMOLITION AND
CONSTRUCTION, W/ 3’-0” X 7’-0” 1 HR RATED DOOR AND HM FRAME, WITH FIRE-RETARDANT
POLY CURTAIN ABOVE PARTITION SEALED TO STRUCTURE TO COMPLETE ISOLATION OF
CONSTRUCTION AREA - REMOVE AFTER COMPLETION OF REFINISHING; PATCH TO MATCH ANY
DAMAGE TO EXISTING/NEW FINISHES.
19 CONTRACTOR AND MATERIAL INGRESS/EGRESS PATH. MAINTAIN PATH FOR EGRESS DURING
CONSTRUCTION.
20 ANTECHAMBER W/ STICKY WALK-OFF MAT – SEE DEMOLITION & NEW FLOOR PLAN GENERAL
NOTES.
21 ERECT NON-COMBUSTIBLE TEMPORARY CONSTRUCTION BARRIER. PROVIDE 1-HOUR-RATED
DUST PARTITION DURING DEMOLITION & CONSTRUCTION (TYP.).
22 REMOVE PORTION OF WINDOW AND WALL FOR THRU-WALL PENETRATION; COORDINATE
SIZE/LOCATION W/ MECH; PROVIDE & INSTALL FIRE-RATED ASS'Y TO CLOSE OPENING &
MAINTAIN FIRE RATING DURING CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.
23 WORK IN THIS AREA REQUIRES REMOVAL OF EXISTING INSULATED FREEZER CEILING, WALL
AND FLOOR PANELS, FIELD VERIFY. SEE MEP DRAWINGS FOR RELATED WORK. FOR REMOVAL
OF ENTIRE CEILING, CONTRACTOR IS RESPONSIBLE TO COORDINATE REMOVAL AND
REINSTALLATION OF OTHER EQUIPMENT THAT MAY BE DISPLACED IN THE PROCESS.
ADDITIONAL CEILING SUPPORT MAY BE REQUIRED. AREA SHOWN IS AN APPROXIMATE AREA
TO BE REMOVED. VERIFY EXISTING CONDITION DURING PRE-CONSTRUCTION WALK-THROUGH
WITH COR. ADDITIONAL COSTS WILL NOT BE ALLOWED.
24 AREA SUBJECT TO SPECIAL REQUIREMENTS FOR WORK IN STERILE AREAS. REFER TO VA
GUIDELINES. SEE HAZARDOUS MATERIAL AND MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
25 WORK AT THIS LOCATION REQUIRES REMOVAL OF EXISTING WALL CONDITION, FIELD VERIFY.
MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR, BASE, WALL COVERING,
WALL-MOUNTED EQUIPMENT AND ACCESSORIES, ETC.). TYP. WALL CONSTRUCTION: GWB,
PAINTED, WITH VINYL BASE. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE,
REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE WORK AND
MEET THE STANDARDS FOR VA CONSTRUCTION. COORDINATE REMOVAL AND
REINSTALLATION OF WALL MOUNTED EQUIPMENT, CASEWORK, ETC. FIELD VERIFY. AREA
SHOWN IS AN APPROXIMATE AREA TO BE REMOVED. MAINTAIN EXISTING FIRE RATINGS.
VERIFY EXISTING CONDITIONS DURING PRE-CONSTRUCTION WALK-THROUGH WITH COR.
ADDITIONAL COSTS WILL NOT BE ALLOWED.
26 SALVAGE AND RETURN TO OWNER EQUIPMENT IN ROOM IDENTIFIED BY THE COR.
27 EXISTING LT. GA. METAL STUD WALL; PREP FOR NEW GWB FINISHES.
28 WORK THIS AREA TO REQUIRE REPLACEMENT OF ACOUSTICAL CEILING TILE AND CLEAN-UP
OF AREA PRIOR TO END OF WORK DAY.
29 EXIST RADIATOR TO REMAIN - SEE MECH.
30 EXIST DOOR AT STAIRS TO REMAIN ACCESSIBLE DURING DURATION OF CONSTRUCTION FOR
EMERGENCY EGRESS.
31 EXIST FURNITURE/OFFICE EQPT TO BE REMOVED BY OWNER PRIOR TO DEMOLITION (TYP).
32 WORK IN CORRIDORS TO BE CONDUCTED AFTER NORMAL OPERATING HOURS UNLESS
OTHERWISE APPROVED BY THE COR (TYP).
33 ACCESS TO CRAWL SPACE THRU BASEMENT MECHANICAL ROOM.
34 CONTRACTOR ACCESS TO BLDG; COORDINATE W/ COR FOR USE OF OTHER ACCESS POINTS.
X X
3" = 1'-0"1
TEMPORARY PARTITION DETAIL
A1 D1
STRUCTURE ABOVE
FIRE RATED SEALANT,
EA. SIDE, T&B
HEAD SLIP
CONNECTOR
FINISHED CEILING
ACOUSTIC BATTS
3 5/8" METAL STUDS
@ (16" O.C.)
1 LAYER 5/8" GWB
EA. SIDE
PAF (.145) @ (32" O.C.)
TRACK - T&B
STRUCTURE ABOVE
FIRE RATED SEALANT,
EA. SIDE, T&B
HEAD SLIP
CONNECTOR
FINISHED CEILING
2 1/2" C-H METAL
STUDS @ (16" O.C.)
(2) LAYERS 1/2" TYPE X
GWB
PAF (.145) @ (32" O.C.)
TRACK - T&B
C1
STRUCTURE ABOVE
FIRE RATED SEALANT,
EA. SIDE, T&B
HEAD SLIP
CONNECTOR
FINISHED CEILING
ACOUSTIC BATTS
3 5/8" METAL STUDS
@ (16" O.C.)
1 LAYER 5/8" GWB
PAF (.145) @ (32" O.C.)
TRACK - T&B
1" TYPE X GWB
1 HOUR FIRE BARRIER
UL 263 DESIGN U419
2 HOUR FIRE BARRIER
UL R7094 DESIGN U428
B1
STRUCTURE ABOVE
HEAD SLIP
CONNECTOR
FINISHED CEILING
ACOUSTIC BATTS
3 5/8" METAL STUDS
@ (16" O.C.)
1 LAYER 5/8" GWB
PAF (.145) @ (32" O.C.)
TRACK - T&B
6" ABOVE FINISHED
CEILING
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:1 :0
P
M
AE-001
ARCHITECTURAL RENOVATION PLAN GENERAL NOTES & KEYNOTES
LEGEND
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
RENOVATION GENERAL NOTES
30 PATCH PARTITION WALLS AND FILL/PATCH OPENINGS RESULTING FROM
REMOVAL OF PIPING. MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR,
WALL MOUNTED EQUIPMENT AND ACCESSORIES, ETC.) TYP. WALL CONDITION:
GWB OR PLASTER. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE,
REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE
WORK AND MEET THE REQUIRED STANDARDS FOR VA CONSTRUCTION.
COORDINATE REMOVAL AND REINSTALLATION OF WALL MOUNTED EQUIPMENT,
ETC. FIELD VERIFY. MAINTAIN EXISTING FIRE RATINGS. VERIFY EXISTING
CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU, ADDITIONAL
COSTS WILL NOT BE ALLOWED.
31 PATCH PARTITION WALLS AT NEW PENETRATIONS RESULTING FROM
INSTALLATION OF NEW PIPING. SEAL AGAINST NEW PIPING TO MATCH EXISTING
WALL CONDITION. MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR,
WALL MOUNTED EQUIPMENT AND ACCESSORIES, ETC.) TYP. WALL CONDITION:
GWB OR PLASTER. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE,
REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE
WORK AND MEET THE REQUIRED STANDARDS FOR VA CONSTRUCTION.
COORDINATE REMOVAL AND REINSTALLATION OF WALL MOUNTED EQUIPMENT,
ETC. FIELD VERIFY. MAINTAIN EXISTING FIRE RATINGS. VERIFY EXISTING
CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU, ADDITIONAL
COSTS WILL NOT BE ALLOWED.
RENOVATION GENERAL NOTES
1 REFER TO GENERAL ARCHITECTURAL NOTES ON SHEET G-002 FOR ADDITIONAL
ITEMS NOT COVERED BY THESE NOTES.
2 REFER TO HA – DRAWINGS AND REPORTS ON FILE WITH VA STLHCS –
ENGINEERING FOR KNOWN EXTENTS OF HAZARDOUS MATERIALS IN PROJECT
AREA.
3 REFER TO ARCHITECTURAL DEMO PLANS FOR EXTENTS OF DEMOLITION WORK
IN PROJECT AREA.
4 REFER TO ROOM FINISH SCHEDULE FOR FINISHES.
5 REFER TO MECHANICAL DWGS FOR RELATED MECHANICAL REMODELING.
6 REFER TO ELECTRICAL DWGS FOR RELATED ELECTRICAL REMODELING.
7 REFER TO FIRE PROTECTION DWGS FOR RELATED FIRE PROTECTION
REMODELING.
8 FILL ALL LOCATIONS WHERE MASONRY WALLS HAVE BEEN REMOVED.
9 PATCH TO MATCH EXISTING WHERE DAMAGED BY DEMOLITION.
10 REINSTALL SIGNAGE IN ORIGINAL LOCATION OR WHERE DIRECTED BY COR.
11 REINSTALL PICTURES/ARTWORK IN ORIGINAL LOCATION OR WHERE DIRECTED
BY COR.
12 REINSTALL HANDRAILS AND CORNER GUARDS. PATCH TO MATCH EXISTING
WHERE REQUIRED DUE TO REMODELING
13 DEMOLITION WASTE TO BE REMOVED TO DUMPSTER.
14 DISRUPTIVE ACTIVITIES IN OCCUPIED SPACES TO BE LIMITED AS DIRECTED BY
COR. COORDINATE WELL IN ADVANCE WITH COR PRIOR TO BEGINNING WORK.
15 REFER TO 1-AE-601 DRAWING NUMBER FOR FURNITURE AND EQUIPMENT.
16 REFER TO AE-100-SERIES DRAWINGS FOR DIMENSIONS AND NOTES FOR NEW
CONSTRUCTION.
17 EXISTING EXTERIOR WALL SURFACES VARY IN DEPTH: CONTR TO LAY OUT AND
INSTALL NEW EXTERIOR WALLS TO PROVIDE FINISH FACE OF WALL WITHOUT
ENCROACHING ON FINISH CLEAR ROOM DIMENSIONS SHOWN ON ENLARGED
FLOOR PLAN.
18 NO WOOD BLOCKING ALLOWED.
19 ALL WALLS AND CHASES TO BE INSULATED - SEE WALL TYPES AND
ARCHITECTURAL GENERAL NOTES.
20 CONTRACTOR TO VERIFY LOCATION OF EXISTING PIPING AND RELATED ITEMS
PRIOR TO START OF WORK. COORDINATE ALL EXISTING AND NEW MECHANICAL
AND ELECTRICAL WORK TO FIT WITHIN WALLS AND CHASES SHOWN; WHERE
EXISTING OR NEW MECHANICAL AND ELECTRICAL WORK FALLS OUTSIDE OF THE
PROVIDED WALLS AND CHASES, THE CONTRACTOR SHALL NOTIFY THE COR FOR
REVISIONS TO THE LAYOUT OF WALLS OR CHASE AT NO ADDITIONAL COST TO
THE OWNER.
21 DEMO WORK AND NEW WORK INDICATE APPROXIMATE AREA TO BE REMOVED.
CONTRACTOR TO FIELD VERIFY ACTUAL AREA TO BE REMOVED - REMOVAL
EXTENTS MAY DEPEND ON LOCATION OF AND DIRECTION OF SUSPENDED
ACOUSTICAL CEILING GRID MAIN-TEE. CONTRACTOR TO COORDINATE WORK
AREA WITH MEP DRAWINGS FOR FULL SCOPE OF WORK. CONTRACTOR IS
RESPONSIBLE FOR WORK AS NECESSARY, FIELD VERIFY.
22 MAINTAIN ALL EXISTING FIRE RATINGS. FIELD VERIFY.
23 WORK AREA SHOWN DOES NOT DISTINGUISH BETWEEN PHASES BUT ONLY
SHOWS AREA TO BE REMOVED AND REINSTALLED. CONTRACTOR IS
RESPONSIBLE FOR IDENTIFYING PHASING OF WORK; SOME PORTIONS OF WORK
SHOWN MIGHT OCCUR IN MULTIPLE PHASES. SEE PHASING REQUIREMENTS ON
SHEET G-002 AND GC-100.
24 REMOVE AND REINSTALL ALL ITEMS LOCATED IN CEILING (LIGHTS, DIFFUSERS,
SPRINKLER HEADS, EXIT SIGNS, SIGNS, FANS, AHU, ALARMS, ANTENNAS,
OCCUPANCY SENSORS, SPEAKERS, NURSE CALL, CODE LIGHTS, EMERGENCY
SHOWER, CAMERA, CURTAIN TRACK, PATIENT LIFT OR ACCESS HATCHES, ETC.)
AS REQUIRED. ALL ITEMS MAY NOT BE INDICATED ON DRAWINGS. FIELD VERIFY
FOR FULL SCOPE OF WORK.
25 ANY CONTRACTOR DISTURBED FINISHES MUST BE RESTORED TO MATCH THE
EXISTING FINISH. COORDINATE WITH VA TO MATCH EXISTING FINISHES.
26 COVER AND PROTECT ALL VA EQUIPMENT AND FURNITURE SO THAT THE
FUNCTION AND APPEARANCE IS NOT AFFECTED BY CONSTRUCTION, THE
CONTRACTOR, THEIR EQUIPMENT, MATERIALS, OR ANY INVOLVED ACTIONS.
27 A 1 HR MINIMUM FIRE-RATED SEPARATION IS REQUIRED BETWEEN ALL
OCCUPIED SPACE AND CONSTRUCTION AREAS. THIS PROTECTION INCLUDES
ANY EXISTING PENETRATIONS AND OPENINGS.
28 PATCH FLOOR SLABS AT PENETRATIONS AND OPENINGS RESULTING FROM
REMOVAL OF PIPING AS NECESSARY TO MAINTAIN EXISTING FIRE SEPARATION
AND FINISH.
29 AT PIPING AND EQUIPMENT REMOVAL LOCATIONS PATCH TO MATCH ADJACENT
EXISTING FLOOR.
RENOVATION KEYNOTES
34 LT. GA. METAL STUD PARTITION FRAMING TO BOTTOM OF LT. GA. CEILING
JOISTS W/ ONE LAYER 5/8” TYPE “X” MR GWB EACH SIDE.
35 6” MTL STUD WALL MATCH ADJ. WALL STUD HEIGHT WITH 1 LAYER 5/8”
TYPE “X” MOISTURE-MOLD RESISTANT GWB EA SIDE.
36 CEILING-HUNG METAL TOILET PARTITION.
37 FURR OUT EXTERIOR WALLS WITH EXTRUDED INSULATION BEHIND
METAL STUDS WITH BATT INSULATION, VAPOR BARRIER, AND DRYWALL
SHEATHING.
38 LIMITS OF FUTURE OCCUPANCY SHELL SPACE.
39 EXISTING CHASE WALL TO REMAIN.
40 PATCH FLOOR AND WALLS WHERE RADIATORS AND CONVECTORS WERE
REMOVED.
41 INFILL OPENING W/GWB & MTL STUDS
RENOVATION KEYNOTES
1 STERILE STORAGE AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER
TO VA GUIDELINES.
2 CLEAN ROOM AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER TO VA
GUIDELINES.
3 SEE ROOM FINISH SCHEDULE ON AF-101 SERIES SHEETS FOR FINISHES.
4 PATCH EXISTING WALL W/ FINISHES TO MATCH EXISTING.
5 REPAIR EXISTING CEILING AFTER INSTALLATION OF NEW HVAC
EQUIPMENT, SEE REFLECTED CEILING PLAN.
6 NEW 2-HR RATED SHAFT WALL FROM FLOOR TO STRUCT. ABOVE; W/
90-MIN. RATED ACCESS PANEL; COORDINATE W/ MECH FOR ACCESS
PANEL LOCATION. COORDINATE EXTENTS OF SHAFT ENCLOSURE W/MEP
DRAWINGS.
7 THRU-FLOOR PENETRATION W/ 2-HOUR RATED FIRE DAMPER;
COORDINATE SIZE/LOCATION W/ MECH; PROVIDE & INSTALL FE-RATED
ASS'Y TO CLOSE OPENING & MAINTAIN FIRE RATING DURING
CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.
8 1-HOUR RATED WALL - SEE WALL TYPES (TYP).
9 PAINT EXISTING WALLS: PATCH, SAND, SMOOTH AND PREPARE SURFACE
OF EXIST WALL FOR NEW FINISH.
10 INSTALL CORNER GUARDS; SEE ARCHITECTURAL FINISH PLAN
AF-100-SERIES SHEETS FOR DETAILS.
11 PATCH TO MATCH EXISTING FINISH AS REQ'D. DUE TO REMODELING.
12 TEMPORARY CONSTRUCTION PARTITION - REMOVE AFTER COMPLETION
OF REFINISHING; PATCH TO MATCH ANY DAMAGE TO EXISTING/NEW
FINISHES.
13 MAINTAIN PATH FOR EGRESS DURING CONSTRUCTION.
14 AREA FOR NEW OWNER-PROVIDED/OWNER-INSTALLED
CABINET/EQUIPMENT; SEE FINISH PLAN & EQUIPMENT SCHEDULE.
15 NEW FIRE EXTINGUISHER CABINET (FEC); SEE SHEET AE-500 FOR
DETAILS.
16 EXISTING FEC.
17 NEW WD DOOR/HM FRAME; SEE DOOR SCHEDULE.
18 WINDOW POCKET - SEE WALL SECTIONS & REFLECTED CEILING PLAN.
19 WIRE STORAGE SHELVING; SEE EQUIPMENT SCHEDULE.
20 SEE AF-100-SERIES SHEETS FOR FLOOR FINISHES.
21 CONTRACTOR AND MATERIAL INGRESS/EGRESS PATH.
22 ANTE CHAMBER W/ STICKY WALK-OFF MAT – SEE DEMOLITION & NEW
FLOOR PLAN GENERAL NOTES.
23 TEMPORARY CONSTRUCTION BARRIER - SEE DEMOLITION & NEW FLOOR
PLAN GENERAL NOTES.
24 THRU-WALL PENETRATION W/ 2-HOUR RATED FIRE DAMPER;
COORDINATE SIZE/LOCATION W/ MECH; PROVIDE & INSTALL FIRE-RATED
ASS'Y TO CLOSE OPENING & MAINTAIN FIRE RATING DURING
CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.
25 ALUMINUM-CLAD INSULATED EXTERIOR WALL PANELS AND FRAMING
OVER FACE OF BUILDING. SEE AE-200-SERIES SHEETS FOR ELEVATIONS
AND DETAILS.
26 EXISTING HEAD WALL TO REMAIN. CONSTRUCT NEW CEILING/GRID UP TO
EXISTING HEAD WALL.
27 PROCEDURE AREA SUBJECT TO SPECIAL REQUIREMENTS FOR WORK IN
STERILE AREAS. REFER TO VA GUIDELINES. SEE ASBESTOS AND
MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
28 WORK AT THIS LOCATION REQUIRES REMOVAL OF EXISTING WALL
CONDITION, FIELD VERIFY. MATCH EXISTING WALL CONDITION (FINISH,
PAINT COLOR, BASE, WALL COVERING, WALL-MOUNTED EQUIPMENT AND
ACCESSORIES, ETC.). TYP. WALL CONSTRUCTION: MR GWB, PAINTED,
WITH VINYL BASE. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK.
REMOVE, REPLACE, PATCH AND REPAIR WALL TO THE EXTENT
NECESSARY TO COMPLETE WORK AND MEET THE STANDARDS FOR VA
CONSTRUCTION. COORDINATE REMOVAL AND REINSTALLATION OF WALL
MOUNTED EQUIPMENT, CASEWORK, ETC. FIELD VERIFY. AREA SHOWN IS
AN APPROXIMATE AREA TO BE REMOVED. MAINTAIN EXISTING FIRE
RATINGS. VERIFY EXISTING CONDITIONS DURING PRE-CONSTRUCTION
WALK-THROUGH WITH COR. ADDITIONAL COSTS WILL NOT BE ALLOWED.
29 REFER TO ASBESTOS ABATEMENT DRAWINGS FOR ADDITIONAL
INFORMATION RELATED TO EXISTING FLOORING AND/OR CEILING
REMOVAL THIS ROOM.
30 REMOVE & REPLACE ACCESS HATCH-SEE SHEET AE-500 FOR DETAILS.
31 SEE AF-100-SERIES SHEETS FOR NEW TOILET ACCESSORIES LOCATIONS,
SCHEDULE AND MOUNTING HEIGHTS.
32 NEW 5/8” TYPE “X” MR GWB OVER EXISTING LT. GA. METAL STUD
FRAMING.
33 6” LT. GA. METAL CEILING JOISTS W/ TWO LAYERS 5/8” TYPE “X” MR GWB
CEILING.
X X
1 1/2" = 1'-0"1
WALL TYPES
A
B
C
7 6 5 4
1-2-AF-101A
CORRIDOR
H202
FILM VIEW
A216
RADIOGRAPHIC
AND
FLUOROSCOPIC
A217
TOILET
A218
RADIOGRAPHIC
A219
CONTROL
A217A
EQUIPMENT
STORAGE
A218C
TOILET
A219E
CONTROL
A219D
LASER PRINT
A219B
FILM STORAGE
A219C
DUMB WAITER
LOBBY
A219A
CHASE
CH-A-7
10 11
A
B
C
7 6 5 4
CORRIDOR
H202
FILM VIEW
A216
RADIOGRAPHIC
AND
FLUOROSCOPIC
A217
TOILET
A218
RADIOGRAPHIC
A219
CONTROL
A217A
EQUIPMENT
STORAGE
A218C
TOILET
A219E
CONTROL
A219D
LASER PRINT
A219B
FILM STORAGE
A219C
DUMB WAITER
LOBBY
A219A
CHASE
CH-A-7
DEMOLITION PLAN LEGEND
FULL HEIGHT ONE-HOUR FIRE RATED
TEMPORARY PARTITION
ELEMENT TO BE REMOVED, TYPICAL
INDICATES EXISTING CONSTRUCTION
TO REMAIN UNO.
INDICATES AREA TO BE REMOVED,
TYPICAL
1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING
MATERIALS (ACM) PRIOR TO ANY DEMOLITION.
2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF
ASBESTOS AND LEAD BASED PAINT REPORTS. REFER TO DIVISION 2
IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD
BASED PAINT ENCAPSULATION OR REMOVAL SPECIFICATIONS.
3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD
BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN
GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS
OBTAINED FROM THE COR FOR DETAILED INFORMATION AND
LOCATIONS. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT
COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND
NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)
IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL
INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS
CONTAINING (ACMs) ARE TO BE PROVIDE WITH APPROPRIATE OSHA
ASBESTOS TRAINING PRIOR TO START OF WORK.
4. REFER TO PHASING PLAN SHEETS IN THESE DRAWINGS.
ABATEMENT AND LBP REMOVAL ACTIVITIES SHALL BE CONDUCTED
IN GENERAL ACCORDANCE WITH THE PROJECTS PHASING
STRATEGY.
5. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS
MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA
OF FACILITY IN QUESTION TO ABATEMENT SPECIFICATIONS FOR
HANDLING OF MATERIALS THAT WERE NOT DIRECTLY OBSERVED,
BUT SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR
ASBESTOS AND LEAD BASED PAINT
DEMOLITION PLAN GENERAL NOTES
1. REFER TO SHEET AD-001.
RENOVATION PLAN GENERAL NOTES
1. REFER TO SHEET AE-001.
RENOVATION PLAN KEYNOTES
1. REFER TO SHEET AE-001.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:0 :1
P
M
1-2-AE-101A
ARCHITECTURAL DEMOLITION & RENOVATION PLANS - LEVEL 2 - AREA
A
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
1/4" = 1'-0"2
PARTIAL LEVEL 2 ARCHITECTURAL RENOVATION PLAN - EQUIPMENT STORAGE A218C
A B
C
D
KEY PLAN
1/4" = 1'-0"1
LEVEL 2 - ARCHITECTURAL DEMOLITION PLAN - EQUIPMENT STORAGE A218C
TRUE
DEMOLITION KEYNOTES (NOT ALL NOTES MAY BE USED)
35 EXISTING WINDOW-MOUNTED AIR CONDITIONER TO REMOVE; SALVAGE & RETURN TO VA - SEE
MECH/ELECT.
36 LINE OF EXIST STRUCTURE ABOVE (TYP).
37 EXIST SUSPENDED LIGHT FIXTURE TO REMAIN (TYP) - SEE ELECT.
38 EXIST SUSPENDED LIGHT FIXTURE TO REMOVE (TYP) - SEE ELECT.
39 EXIST FIRE SPRINKLERS IN ROOM TO REMAIN (TYP).
40 REMOVE PORTION OF EXISTING CONC FLOOR SLAB & STRUCTURE FOR NEW THRU-FLOOR
DUCT PENETRATIONS/FIRE DAMPERS. INSTALL TEMPORARY 2-HOUR-RATED FIRE BLOCKING
MATERIAL IN OPENING TO MAINTAIN FIRE RATING OF FLOOR ASSEMBLY UNTIL FIRE DAMPERS
ARE INSTALLED. COORDINATE LOCATION/SIZE W/ MECHANICAL.
41 LOCATIONS OF EXISTING PIPING. REFER TO G-001 "HAZARDOUS MATERIAL GENERAL NOTES,"
GENERAL CONDITIONS AND SPECIFICATION SECTION "GLOVE BAG ASBESTOS ABATEMENT"
FOR ABATEMENT OF ASBESTOS-CONTAINING MATERIAL (ACM) AT EXISTING PIPING WHERE
PRESENT AND/OR DISCOVERED.
42 AREA OF LARGE-DIAMETER STEAM, WATER AND SANITARY LINES SUSPENDED FROM
STRUCTURE ABOVE. CONTRACTOR TO INVESTIGATE CONDITIONS PRIOR TO BEGINNING
WORK.
43 AREA OF SMALL-DIAMETER STEAM, WATER AND SANITARY LINES SUSPENDED FROM
STRUCTURE ABOVE. CONTRACTOR TO INVESTIGATE CONDITIONS PRIOR TO BEGINNING
WORK.
44 EXIST DUCT THRU FLOOR/CLG.
45 NO WORK IN THIS AREA.
46 EXISTING SIGNS TO BE RELOCATED.
47 SOFFIT TO REMAIN – PROTECT FROM DAMAGE.
48 PROTECT GWB BULKHEAD FROM DAMAGE DURING DEMOLITION.
49 REMOVE THERMOSTAT AND/OR SENSOR. PATCH, REPAIR, PREP, PRIME AND FINISH TO
MATCH ADJACENT SURFACES.
50 REMOVE CEILING GRID AND PADS AS REQUIRED FOR INSTALLATION OF NEW FCU.
51 REMOVE DRYWALL/PLASTER AS REQUIRED FOR INSTALLING NEW FCU.
52 PATCH AND REPAIR WALLS WHERE THERMOSTATS ARE REMOVED. PREPARE FOR NEW
FINISH.
53 EXISTING UNIT TO REMAIN. SEE MECH.
54 REMOVE VCT FLOORING AND WALL BASE.
55 REMOVE INTERIOR WALL AS REQUIRED FOR ROUGH OPENING FOR NEW DOOR.
56 REMOVE WALL FROM FLOOR TO 1” BELOW SUSPENDED CEILING SYSTEM @ CORRIDOR.
57 REMOVE CASEWORK & SINK. CAP ALL PLUMBING LINES BEHIND WALL.
58 EXISTING DOOR JAMB WITH LEAD-BASED PAINT TO REMAIN. PROTECT FRAME FROM DAMAGE
DURING CONSTRUCTION.
59 REMOVE BUILT-IN LOCKERS - PREP FOR INFILL
DEMOLITION KEYNOTES (NOT ALL NOTES MAY BE USED)
1 REMOVE EXISTING METAL CASEWORK, SINK, AND PLASTIC LAMINATE BACKSPLASHES.
2 REMOVE PORTION OF EXIST PLASTER CEILING IN HATCHED AREAS FOR MEP WORK AS REQ’D;
SEE REFLECTED CEILING DEMOLITION PLAN.
3 SEE REFLECTED CEILING PLANS FOR EXTENTS OF HARD CEILING TO BE REMOVED AND
REPLACED FOR MEP WORK.
4 REMOVE PORTIONS OF EXIST ACOUSTICAL CEILING IN HATCHED AREAS FOR MEPT WORK AS
REQ'D; SEE REFLECTED CEILING DEMOLITION PLAN.
5 SEE REFLECTED CEILING PLANS FOR EXTENTS OF SUSPENDED ACOUSTICAL TILE CEILING
REMOVAL & REPLACEMENT.
6 SEE MEP DRAWINGS FOR FAN COIL UNIT REMOVAL.
7 TEMPORARY 1-HR RATED CONSTRUCTION DUST PARTITION – EXTEND FROM FLOOR TO
STRUCTURE ABOVE: W/ 3’-0” X 7’-0” 1 HR RATED DOOR AND HM FRAME.
8 EXISTING CHASE/WALLS TO REMAIN.
9 REMOVE EXISTING RADIATORS; PIPING TO REMOVE AND CAP BELOW FLOOR. SEE MEP
DRAWINGS.
10 REMOVE ALL PLUMBING FIXTURES THIS ROOM. SEE MEP.
11 REMOVE ALL CASEWORK THIS ROOM. REVIEW W/ COR FOR SALVAGE AND RETURN TO OWNER
OR DISPOSAL BY CONTRACTOR.
12 STICKY WALK-OFF MAT AT CONSTRUCTION ENTRANCES.
13 EXISTING WALL TO REMAIN.
14 REMOVE EXIST VCT (TYP); PATCH FLOOR AS REQ'D FOR NEW FLOOR COVERING; SEE
ARCHITECTURAL FINISH PLAN.
15 REFER TO HAZARDOUS MATERIAL ABATEMENT DRAWINGS FOR ADDITIONAL INFORMATION
RELATED TO EXISTING FLOORING AND/OR CEILING REMOVAL THIS ROOM.
16 STERILE STORAGE AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER TO VA GUIDELINES.
17 CLEAN ROOM AREA SUBJECT TO SPECIAL REQUIREMENTS. REFER TO VA GUIDELINES.
18 ERECT NON-COMBUSTIBLE TEMPORARY CONSTRUCTION BARRIER. PROVIDE 1-HR RATED
DUST PARTITION FROM FLOOR TO BOTTOM OF EXISTING CEILING DURING DEMOLITION AND
CONSTRUCTION, W/ 3’-0” X 7’-0” 1 HR RATED DOOR AND HM FRAME, WITH FIRE-RETARDANT
POLY CURTAIN ABOVE PARTITION SEALED TO STRUCTURE TO COMPLETE ISOLATION OF
CONSTRUCTION AREA - REMOVE AFTER COMPLETION OF REFINISHING; PATCH TO MATCH ANY
DAMAGE TO EXISTING/NEW FINISHES.
19 CONTRACTOR AND MATERIAL INGRESS/EGRESS PATH. MAINTAIN PATH FOR EGRESS DURING
CONSTRUCTION.
20 ANTECHAMBER W/ STICKY WALK-OFF MAT – SEE DEMOLITION & NEW FLOOR PLAN GENERAL
NOTES.
21 ERECT NON-COMBUSTIBLE TEMPORARY CONSTRUCTION BARRIER. PROVIDE 1-HOUR-RATED
DUST PARTITION DURING DEMOLITION & CONSTRUCTION (TYP.).
22 REMOVE PORTION OF WINDOW AND WALL FOR THRU-WALL PENETRATION; COORDINATE
SIZE/LOCATION W/ MECH; PROVIDE & INSTALL FIRE-RATED ASS'Y TO CLOSE OPENING &
MAINTAIN FIRE RATING DURING CONSTRUCTION PRIOR TO COMPLETION OF FIRE DAMPER.
23 WORK IN THIS AREA REQUIRES REMOVAL OF EXISTING INSULATED FREEZER CEILING, WALL
AND FLOOR PANELS, FIELD VERIFY. SEE MEP DRAWINGS FOR RELATED WORK. FOR REMOVAL
OF ENTIRE CEILING, CONTRACTOR IS RESPONSIBLE TO COORDINATE REMOVAL AND
REINSTALLATION OF OTHER EQUIPMENT THAT MAY BE DISPLACED IN THE PROCESS.
ADDITIONAL CEILING SUPPORT MAY BE REQUIRED. AREA SHOWN IS AN APPROXIMATE AREA
TO BE REMOVED. VERIFY EXISTING CONDITION DURING PRE-CONSTRUCTION WALK-THROUGH
WITH COR. ADDITIONAL COSTS WILL NOT BE ALLOWED.
24 AREA SUBJECT TO SPECIAL REQUIREMENTS FOR WORK IN STERILE AREAS. REFER TO VA
GUIDELINES. SEE HAZARDOUS MATERIAL AND MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
25 WORK AT THIS LOCATION REQUIRES REMOVAL OF EXISTING WALL CONDITION, FIELD VERIFY.
MATCH EXISTING WALL CONDITION (FINISH, PAINT COLOR, BASE, WALL COVERING,
WALL-MOUNTED EQUIPMENT AND ACCESSORIES, ETC.). TYP. WALL CONSTRUCTION: GWB,
PAINTED, WITH VINYL BASE. SEE MEP DRAWINGS FOR FULL EXTENT OF WORK. REMOVE,
REPLACE, PATCH AND REPAIR WALL TO THE EXTENT NECESSARY TO COMPLETE WORK AND
MEET THE STANDARDS FOR VA CONSTRUCTION. COORDINATE REMOVAL AND
REINSTALLATION OF WALL MOUNTED EQUIPMENT, CASEWORK, ETC. FIELD VERIFY. AREA
SHOWN IS AN APPROXIMATE AREA TO BE REMOVED. MAINTAIN EXISTING FIRE RATINGS.
VERIFY EXISTING CONDITIONS DURING PRE-CONSTRUCTION WALK-THROUGH WITH COR.
ADDITIONAL COSTS WILL NOT BE ALLOWED.
26 SALVAGE AND RETURN TO OWNER EQUIPMENT IN ROOM IDENTIFIED BY THE COR.
27 EXISTING LT. GA. METAL STUD WALL; PREP FOR NEW GWB FINISHES.
28 WORK THIS AREA TO REQUIRE REPLACEMENT OF ACOUSTICAL CEILING TILE AND CLEAN-UP
OF AREA PRIOR TO END OF WORK DAY.
29 EXIST RADIATOR TO REMAIN - SEE MECH.
30 EXIST DOOR AT STAIRS TO REMAIN ACCESSIBLE DURING DURATION OF CONSTRUCTION FOR
EMERGENCY EGRESS.
31 EXIST FURNITURE/OFFICE EQPT TO BE REMOVED BY OWNER PRIOR TO DEMOLITION (TYP).
32 WORK IN CORRIDORS TO BE CONDUCTED AFTER NORMAL OPERATING HOURS UNLESS
OTHERWISE APPROVED BY THE COR (TYP).
33 ACCESS TO CRAWL SPACE THRU BASEMENT MECHANICAL ROOM.
34 CONTRACTOR ACCESS TO BLDG; COORDINATE W/ COR FOR USE OF OTHER ACCESS POINTS.
x xx
TRUE
3 5
H
G
F
E
2 134
40 40
3 5
1-AE-302
B1
B1
B1
NURSE STATION
A606
NOUR.
A607
GI PROCEDURE
ROOM
A608
PROCEDURE RM.
A609
PROCEDURE RM.
A610
SCOPE
A610A
PROCEDURE RM.
A611PROCEDURE RM.
A612
SCOPE
CLEANING
A613B
CLEAN
A614
MED RM.
A613A
CLEAN UTILITY
A611A
SCOPE
CLEANING DIRTY
SIDE
A613
CORRIDOR
H601
CHASE
CH-A-8
CHASE
CH-A-10
CHASE
CH-A-7
CHASE
CH-A-11
CHASE
CH-A-6
CHASE
CH-A-9
21 21 21 21
212121
8 8
H
G
F
E
2 134
1-AE-301
NURSE STATION
A606
NOUR.
A607
GI PROCEDURE
ROOM
A608
PROCEDURE RM.
A609
PROCEDURE RM.
A610
SCOPE
A610A
PROCEDURE RM.
A611
PROCEDURE RM.
A612
SCOPE
CLEANING
A613B
CLEAN
A614
MED RM.
A613A
CLEAN UTILITY
A611A
SCOPE
CLEANING DIRTY
SIDE
A613
CORRIDOR
H601
CHASE
CH-A-8
CHASE
CH-A-10
CHASE
CH-A-7
CHASE
CH-A-11
CHASE
CH-A-6
CHASE
CH-A-9
DEMOLITION PLAN KEYNOTES
1. REFER TO SHEET AE-001.
RENOVATION PLAN KEYNOTES
1. REFER TO SHEET AE-001.
DEMOLITION PLAN GENERAL NOTES
1. REFER TO SHEET AD-001.
RENOVATION PLAN GENERAL NOTES
1. REFER TO SHEET AE-001.
DEMOLITION PLAN LEGEND
FULL HEIGHT ONE-HOUR FIRE RATED
TEMPORARY PARTITION
ELEMENT TO BE REMOVED, TYPICAL
INDICATES EXISTING CONSTRUCTION
TO REMAIN UNO.
INDICATES AREA TO BE REMOVED,
TYPICAL
1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING
MATERIALS (ACM) PRIOR TO ANY DEMOLITION.
2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF
ASBESTOS AND LEAD BASED PAINT REPORTS. REFER TO DIVISION 2
IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD
BASED PAINT ENCAPSULATION OR REMOVAL SPECIFICATIONS.
3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD
BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN
GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS
OBTAINED FROM THE COR FOR DETAILED INFORMATION AND
LOCATIONS. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT
COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND
NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)
IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL
INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS
CONTAINING (ACMs) ARE TO BE PROVIDE WITH APPROPRIATE OSHA
ASBESTOS TRAINING PRIOR TO START OF WORK.
4. REFER TO PHASING PLAN SHEETS IN THESE DRAWINGS.
ABATEMENT AND LBP REMOVAL ACTIVITIES SHALL BE CONDUCTED
IN GENERAL ACCORDANCE WITH THE PROJECTS PHASING
STRATEGY.
5. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS
MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA
OF FACILITY IN QUESTION TO ABATEMENT SPECIFICATIONS FOR
HANDLING OF MATERIALS THAT WERE NOT DIRECTLY OBSERVED,
BUT SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR
ASBESTOS AND LEAD BASED PAINT
H
G
F
E
2 1
1-AE-301
AREA TO BE DEMO'D
FOR MECH. CHASE
2'-6"
F.V.
4'-0 1/4"
PORTION OF WALL
TO BE DEMO'D
RELOCATE/ MODIFY OVERHEAD
PATIENT LIFT RAILS/SUPPORTS
AS NEEDED (TYP)
RELOCATE/ MODIFY OVERHEAD
PATIENT LIFT RAILS/SUPPORTS
AS NEEDED (TYP)
TOILET
A709
3 BED PATIENT
RM.
A710
3 BED PATIENT
RM.
A711
TOILET
A711A
CORRIDOR
H701 CHASE
CH-A-5
H
G
F
E
2 1
1-AE-301
AREA TO BE DEMO'D
FOR MECH. CHASE
PORTION OF WALL
TO BE DEMO'D
PROTECT DOOR &
DOOR JAMB DURING
DEMOLITION OF WALL
F.V.
3'-1"
PORTION OF WALL
TO BE DEMO'D
PROTECT DOOR &
DOOR JAMB DURING
DEMOLITION OF WALL
EXAM
A809A
EXAM
A810
EXAM
810A
CORRIDOR
H803
EXAM
A811
EXAM
A811A
EXAM
A812
LEVEL 6 - AREA A ADDITIONAL NOTES
1. REFER TO PHASING PLAN FOR SEQUENCE OF
CONSTRUCTION.
2. AREA TO REMAIN OPERATIONAL DURING CONSTRUCTION
H
G
F
E
1-AE-301
1-AE-302
C1
3'-5 1/2"
/2
/4
1-AE-302 4
H
G
F
E
1-AE-301
1-AE-302
C1
/2
/4
3'-5 1/2"
RE-INSTALL OVERHEAD
PATIENT LIFT RAILS/SUPPORTS
AS NEEDED (TYP)
RE-INSTALL OVERHEAD
PATIENT LIFT RAILS/SUPPORTS
AS NEEDED (TYP)
B1
B1
3 BED PATIENT
RM.
A710
3 BED PATIENT
RM.
A711
CHASE
CH-A-5
EXAM
A810
EXAM
810A
CORRIDOR
H803
EXAM
A811
EXAM
A811A
FLOOR PENETRATIONS AND PLUMBING MODIFICATIONS NECESSARY TO
ACCOMMODATE NEW DUCT(S) MAY DISTURB ASBESTOS-CONTAINING
MATERIAL (ACM). ASSUME ALL THERMAL SYSTEM INSULATION ON PIPES
AND FITTINGS (TSI) AND FLOOR COVERINGS AND MASTICS TO BE ACM
UNTIL SAMPLED AND PROVEN NOT TO CONTAIN ASBESTOS. PERFORM
SPOT ABATEMENT AS NEEDED FOR FLOOR PENETRATIONS AND PLUMBING
RECONFIGURATION. COORDINATE ABATEMENT AND LIMITS OF ABATEMENT
WITH GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR
OWNER’S REPRESENTATIVE, AND THE VPIH. ABATE ACM FLOOR
COVERINGS AND MASTIC IN ACCORDANCE WITH SEC. 02 82 13-19,
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. ABATE ALL TSI IN
ACCORDANCE WITH 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT.
6TH - 8TH FLOOR DUCT INSTALLATION
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:0 :2
P
M
1-6-AE-101A
ARCHITECTURAL DEMOLITION & RENOVATION PLANS - LEVEL 6 - AREA
A - G.I. LAB - ENDOSCOPY PROCEDURE & DECONTAMINATION
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
1/4" = 1'-0"2
PARTIAL LEVEL 6 ARCHITECTURAL RENOVATION PLAN - ENDOSCOPY PROCEDURE &
DECONTAMINATION
TRUE
A
B
C
D
KEY PLAN
1/4" = 1'-0"1
PARTIAL LEVEL 6 ARCHITECTURAL DEMOLITION PLAN - ENDOSCOPY PROCEDURE &
DECONTAMINATION
TRUE
X
X
1/4" = 1'-0"3
PARTIAL LEVEL 7 DEMOLITION PLAN
1/4" = 1'-0"4
PARTIAL LEVEL 8 DEMOLITION PLAN
1/4" = 1'-0"6
PARTIAL LEVEL 8 RENOVATION PLAN
1/4" = 1'-0"5
PARTIAL LEVEL 7 RENOVATION PLAN
H
G
F
E
7 6 5 2 13489
1-AE-301
1-AE-3013
ROOF TOP UNIT -
HRV-1 - REFER TO MECH.
1-AE-302
1-AE-301
1-AE-301
1-AE-301
REFER TO 1-6-GC-101A
FOR CONTRACTOR
ACCESS LOCATION.
193'-3"204'-3"
1-AE-302 4
NOTE
1. REFER PHASING PLAN 1-6-GC-101A FOR ROOF
CONTRACTOR ACCESS LOCATION.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:1 :4
P
M
1-R-AE-101A
ARCHITECTURAL RENOVATION PLAN - ROOF - AREA A - ROOF DETAIL
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG/TJF
BUILDING 1
AHT
1/4" = 1'-0"1
ROOF - ARCHITECTURAL ROOF PLAN & DETAIL
TRUE
A
B
KEY PLAN
ARARE
LEVEL 6
158'-4 1/4"
LEVEL 7
169'-4 1/4"
LEVEL 8
181'-3 1/4"
LEVEL 9
192'-8 3/4"
2 134
7"1'-6"
ROOF TOP UNIT -
HRV-1 - REFER TO MECH.
2 HR FIRE/SMOKE WALL
2 HR FIRE/SMOKE WALL
FLOOR TO BE DEMO'D
FOR MECH CHASE
FLOOR TO BE DEMO'D
FOR MECH CHASE
ROOF TO BE DEMO'D
FOR MECH CHASE
1-AE-302
1-AE-501
1-AE-302
2 HR RATED
FIRE STOPPING
2 HR RATED
FIRE STOPPING
2 HR FIRE/SMOKE DAMPER
- REFER TO MECH
2 HR FIRE/SMOKE DAMPER
- REFER TO MECH
INFILL WINDOW
INFILL WINDOW
3'-1 3/4"
3'-1 3/4"
2 HR SOFFIT
3 3/4"
3 3/4"
1-AE-501
ACCESS PANELS REFER
TO 2/1-6-AC-101A
FOR DETAILS
F.O. RATED SOFFIT
2'-9"
REMOVE, PATCH, & REPAIR EXISTING CEILING
AS NEEDED FOR INSTALLATION OF NEW 2 HR CHASE
(TYP)
REMOVE, PATCH, & REPAIR EXISTING CEILING AS
NEEDED FOR INSTALLATION OF NEW 2 HR CHASE
(TYP)
REFER TO MEP DRAWINGS FOR RE-ROUTING
CONDUITS AND ALL MECH WORK (TYP)
REFER TO MEP DRAWINGS FOR RE-ROUTING
CONDUITS AND ALL MECH WORK (TYP)
EXISTING EXTERIOR
WALL
2 HR FIRE/SMOKE DAMPER
- REFER TO MECH
H
G
F
E
2 134
1-AE-301
ROOF TOP UNIT -
HRV-1 - REFER TO MECH.
1-AE-3013
1-AE-302
1-AE-301GUARDRAIL
GUARDRAIL GUARDRAIL
30"X30" CONC.
PAVER (TYP)
TYP.
1'-0"
EXISTING ROOF TOP UNIT
- REFER TO MECH.
REFER TO MECH.
REFER TO MECH.
1-AE-301
1-AE-302 4
LEVEL 6
158'-4 1/4"
LEVEL 7
169'-4 1/4"
LEVEL 8
181'-3 1/4"
LEVEL 9
192'-8 3/4"
PENTHOUSE
203'-8 3/4"
HG GGF FE
1-AE-301
ROOF TOP UNIT
HRV-1
(REFER TO MECH)
1-AE-501
1-AE-501
LEVEL 9
192'-8 3/4"
HHH
27/64" DIA HOLE WITH
4"x1/2" EXPANSION ANCHOR
3 1/2" EMBED MIN.
3/16" PLATE
3/16" PLATE
P1.5
3/16" PLATE
3/16" GUSSET PLATE
3/16" PLATE
6"
1"
/4
3/16"
3/16"
BOTH
SIDES
3/16"
P1.5
3/16"
3/16"
WELD GAP SHUT
BOTH SIDES
WELD GAP SHUT
BOTH SIDES
LEVEL 9
192'-8 3/4"
6"6'-0" TYP.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:1 :5
P
M
1-AE-301
BUILDING SECTIONS & PARTIAL WALL SECTIONS
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG
BUILDING 1
AHT
A
B
C
D
KEY PLAN
1/4" = 1'-0"2
SECTION - LEVEL 6 - ROOF
1/4" = 1'-0"1
LEVEL 8 - ROOF PLAN
1/4" = 1'-0"3
PARTIAL ELEVATION - LEVEL 6 - ROOF
3/4" = 1'-0"6
ROOF RAILING
1 1/2" = 1'-0"5
MOUNTING PLATE DETAIL
MOUNTING BRACKET
REFER TO 5/1-AE-301
FOR MORE INFO.
P1.5
EXISTING MASONRY
PARAPET
P1.5
1/4" = 1'-0"4
RAILING ELEVATION
PAINT RAIL -
P-4 (TYP)
PAINT RAIL - P-4 (TYP)
- REFER TO COLOR
SCHD. SHT. AE-600
LEVEL 9
192'-8 3/4"
1-AE-302
REFER TO 3/1-AE-501 FOR
HVAC DUCT PENETRATION
DETAIL
1-AE-302
2 HOUR SHAFT WALL
INTERIOR FACE OF
EXISTING WALL
EXISTING CONC. BEAM
3 3/4" 3'-1 3/4"
EXISTING PARAPET
EXTERIOR FACE OF
EXISTING WALL
1-AE-501
REMOVE PORTION OF EXISTING
ROOF FOR NEW DUCT CHASE
LEVEL 6
158'-4 1/4"
LEVEL 7
169'-4 1/4"
LEVEL 8
181'-3 1/4"
LEVEL 9
192'-8 3/4"
H G F E
1-AE-301
1-AE-501
RATED ACCESS
PANEL
HVAC DUCTS - REFER TO MECH.
C1
2 HR SHAFT WALL2 HR SHAFT WALL
2 HR SHAFT WALL2 HR SHAFT WALL
C1
NON-RATED 24"X24"
ACCESS PANEL
NON-RATED 24"X24"
ACCESS PANEL
A
C T
R
E F
E R
T O
R C
P
G
Y P
C L
G
R E
F E
R T
O R
C P
B
.O H
R R
A T
E D
S O
F F
IT
G
Y P
C L
G
R E
F E
R T
O R
C P
A
C T
R
E F
E R
T O
R C
P
2 HR SHAFT WALL ENCLOSURE
9'-11 3/4"
3 3/4"
CHASE OPENING
8'-1" 3 3/4" 11 3/4"
FIRE-SMOKE DAMPER - REFER TO MECH.
SUSP. ACT
GWB MTL SOFFIT - 5/8" GWB W/ 2 5/8"
MTL STUD
SUSP. ACT
GWB MTL SOFFIT - 5/8" GWB W/ 2 5/8"
MTL STUD
EXISTING WALL TO REMAIN.
MODIFY WALL TO TERMINATE
@ B.O. RATED SOFFIT (TYP)
3'-10 1/4" 3'-10 1/4"
90 MIN RATED 24"X24"
ACCESS PANEL -
REFER TO 2/1-AE-501
FOR TYPICAL ACCESS
PANEL DETAIL
4'-0" 4'-0 1/4"
RELOCATE/ MODIFY OVERHEAD
PATIENT LIFT RAILS/SUPPORTS
AS NEEDED (TYP)
RELOCATE/ MODIFY OVERHEAD
PATIENT LIFT RAILS/SUPPORTS
AS NEEDED (TYP)
A811
EXAM
A810A
EXAM
A710
3 BED PATIENT
RM
A711
3 BED PATIENT
RM.
A610
PROCEDURE ROOM
A611
PROCEDURE RM
REFER TO 3/1-AE-302 FOR 2 HR
SHAFT WALL HEAD DETAIL
/4
REMOVE PORTION OF EXISTING ROOF
FLOOR FOR NEW DUCT CHASE
REMOVE PORTION OF EXISTING CONC.
FLOOR FOR NEW DUCT CHASE
REMOVE PORTION OF EXISTING CONC.
FLOOR FOR NEW DUCT CHASE
EXISTING CONC. BEAM
GUARD RAIL - SEE
SHEET 1-AE-301
FOR DETAILS
REFER TO 3/1-AE-501 FOR
ROOF CURB DETIAL
LEVEL 9
192'-8 3/4"
1-AE-302
USG STEEL J RUNNER
1" TYPE X GWB
(2) LAYERS OF 1/2"
TYPE X GWB
FIRESTOP SEALANT
AS NEEDED
USG STEEL C-H STUD
STRUCTURE ABOVE
LEVEL 8
181'-3 1/4"
LEVEL 9
192'-8 3/4"
GG
F
B-A
1-AE-301
RATED ACCESS
PANEL FOR HVAC
DAMPER - REFER TO MECH.
ROOF TOP DUCTS-
REFER TO MECH.
SEE DETAIL 2/1-AE-501
FOR ACCESS PANEL DETAIL
FINISH CLG.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VA FORM 08-6231
ARCHITECTS Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS
Dwg: Of:
657-18-110CORRECT WORKPLACE & LIFE SAFETY
ISSUES, ABATE ASBESTOS, & IMPROVE
WAYFINDING
SEPTEMBER 12, 2018
Building Name
JOHN COCHRAN DIVISION -
Revisions: Date:
3705 North 200th Street Elkhorn, Nebraska 68022
(402) 291-6941
15 Sunnen Drive Suite 104 St. Louis, MO 64143
(314) 645-1132
8802 South 135th Street, Suite 100 Omaha, NE 68138
(402) 861-4445
BID DOCUMENTS FULLY SPRINKLERED
VETERANS
HEALTH
ADMINISTRATION
Stamp
/1
/2
:1 :1
P
M
1-AE-302
BUILDING SECTION DETAILS
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
JJG
BUILDING 1
AHT
1 1/2" = 1'-0"1
ROOF PENETRATION DETAIL
1/2" = 1'-0"5
SECTION - 6TH FLOOR
3" = 1'-0"3
2 HOUR SHAFT WALL HEAD DETAIL
3/8" = 1'-0"4
CORRIDOR H803 - EAST ELEVATION
J RUNNER
FASTENERS PER
MANUF. INSTRUCTIONS
LATCH
(2) LAYERS OF 1/2"
TYPE X GWB
RATED ACCESS
PANEL
1" TYPE X GWB -
SHAFT LINER PANEL
F
CHANNEL MOLDING
ACT TILE
3 5/8" MTL STUD
@ 16" O.C.
5/8" GWB
S E
E R
C P
S E
E R
C P
S E
E R
C P
V A
R
IE
S
WIRE HANGER & CROSS
RUNNER @ 24" O.C.
ATTACHED TO
STRUCTURE ABOVE (TYP
MAIN RUNNER @ 48"
O.C. (TYP)
ACT TILE
ROOF MEMBRANE TO LAP OVER TOP OF CURB
WOOD NAILER
EXISTING ROOF
COVER BOARD
RIGID INSULATION
FLASHING OVER
EXISTING MODIFIED
BITUMEN ROOFING
FLASHING RECEIVER
SEALANT
WOOD BLOCKING
CANT
UPPER DUCT
SECTION
T O
P O
F C
U R
B
M
IN
U P
P E
R D
U C
T E
X T
E N
D S
T O
B E
L O
W T
O P
O F
C U
R B
COUNTERFLASHING
GRAVEL - MATCH EXISTING
MODIFIED BITUMEN
BUILT-UP ROOFING
LEVEL 7
169'-4 1/4"
G F
1-AE-301
(2) LAYERS OF 5/8" TYPE X GWB
S E
E R
C P
EXISTING CONCRETE BEAM
C-H STUD @ 16" O.C. (TYP.)
J RUNNERS
EXISTING PORTION OF WALL TO BE
DEMO'D TO BE FLUSH W/ BOTTOM
OF NEW FIRE RATED SOFFIT -
FIELD VERIFY
METAL TRACK W/ GWB -
MATCH EXISTING
3 5/8" METAL STUD @
16" O.C.
5/8" GWB
1" TYPE X GWB
NEW 2 HOUR SHAFT WALL ABOVE NEW 2 HOUR SHAFT WALL ABOVE
3 3/4" 8'-1" 3 3/4" 11 3/4"
B .O
E
X
IS
T
IN
G B
E A
M
7 3/4"
PORTION OF EXISTING CONC. FLOOR TO BE REMOVED FOR NEW DUCT CHASE (TYP)
7'-6" 1'-6 1/4"
2 HR SHAFT WALL ENCLOSURE
9'-11 3/4"
2 3/4" W x 3/8" H ALUM. MILL FINISH
LOMANCO 105 M (OR EQ.) ALUM.
CONTINOUS COVERED STRIP VENT
- CUT TO WIDTH OF OPENING
1-AE-501
EXISTING WINDOW TO REMAIN
PROTECT DURING CONST. -
PAINT INSIDE FACE OF GLAZING
FLAT BLACK (TYP)
4" 5'-3" 4"
4" 5'-3" 4"
2 3/4" W x 3/8" H ALUM. MILL FINISH
LOMANCO 105 M (OR EQ.) ALUM.
CONTINOUS COVERED STRIP VENT
- CUT TO WIDTH OF OPENING
5/8" TYPE X GWB
EXISTING WINDOW
METAL STUD
2 3/4" W x…