About this file

36C25519R0017 0002 36C25519R0017 0002.docx

View the file

Other files

File Type Posted
36C25519R0017-0003000.docx DOCX document
36C25519R0017-0002005.pdf PDF
36C25519R0017-0002004.pdf PDF
36C25519R0017-0002003.pdf PDF
36C25519R0017-0002002.pdf PDF
36C25519R0017-0002001.jpg JPG image
36C25519R0017-0001000.docx DOCX document
36C25519R0017-0001001.pdf PDF
36C25519R0017-018.pdf PDF
36C25519R0017-000.docx DOCX document
36C25519R0017-007.pdf PDF
36C25519R0017-022.pdf PDF
36C25519R0017-005.pdf PDF
36C25519R0017-023.pdf PDF
36C25519R0017-010.pdf PDF
36C25519R0017-015.pdf PDF
36C25519R0017-024.pdf PDF
36C25519R0017-011.pdf PDF
36C25519R0017-012.pdf PDF
36C25519R0017-027.pdf PDF
36C25519R0017-028.pdf PDF
36C25519R0017-017.pdf PDF
36C25519R0017-026.pdf PDF
36C25519R0017-003.pdf PDF
36C25519R0017-001.pdf PDF
36C25519R0017-013.pdf PDF
36C25519R0017-025.pdf PDF
36C25519R0017-016.pdf PDF
36C25519R0017-004.pdf PDF
36C25519R0017-020.pdf PDF
36C25519R0017-008.pdf PDF
36C25519R0017-002.pdf PDF
36C25519R0017-014.pdf PDF
36C25519R0017-019.pdf PDF
36C25519R0017-009.pdf PDF
36C25519R0017-021.pdf PDF
36C25519R0017-006.pdf PDF
36C25519R0017_3.docx DOCX document
36C25519R0017_2.docx DOCX document
36C25519R0017_1.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-26-2019 657-18-110 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Leavenworth

KS

66048 To all Offerors/Bidders

36C25519R0017 01-16-2019

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

7 MARCH 2019 3:00 pm CST X Request for Proposal for project 657-18-110 Correct Workplace & Life Safety Issues, Abate Asbestos and Improve Wayfinding, at the St. Louis Healthcare System, John Cochran and Jefferson Barracks Divisions, St. Louis, MO.

The above cited solicitation is hereby amended as shown below:

A. The due date for proposals is extended to 7 MARCH 2019 at 3:00 pm CST.

B. Answers to additional questions and revised attachments are provided in this amendment.

C. All other terms and conditions of the solicitation remain unchanged.

David P. Holden Questions and Answers Project 657-18-110 Supplement

1. On sheet AW201 in Volume 3 – Improve Wayfinding, there are two sign types shown that are to be used at Bldg. 7 / JC Campus which are not included in the Sign Location Plans in Volume 3:

O - Fire Extinguisher Signage L - Wall & Hanging Restroom Signage Are Sign Types O and L part of the scope of work? If so, where are the signs located? How many of each type are to be included?

Answer: See Vol. 2 sheet 7-1-AE-901 interior elevations 9 and 10 for locations and usage of Sign Types L-Wall and L-Hanging (sheet 7-1-AE-901 attached for reference).

Sign Type ‘O’-Fire Extinguisher Cabinet in Bldg. 7, I have asked our consultant to investigate further as it shows in the drawing Vol. 3-Sheet AW201 (copy attached for reference). No new fire extinguisher/cabinet is included in the work for Bldg. 7. Drawings 7-1-AE-101 and 7-1-GI-101 (attached for reference) do not indicate a FEC/fire extinguisher in the corridors of Bldg. 7.

If an existing fire extinguisher cabinet (FEC) or wall-mounted fire extinguisher is present in the corridors, and such a sign isn’t currently in place, it would be installed on the center line above the cabinet/extinguisher wall bracket, with the bottom of the sign at +7’-0” Above Finish Floor (AFF). If the ceiling above the cabinet/bracket is less than 7’-9” high, the top of the sign will need to be placed directly below the ceiling as the sign is 9-inches tall.

2. Please clarify the scope of Wayfinding Improvements in the Tunnels at Jefferson Barracks.

a. General Note 9 on Sheets JC1-AW100 through JBT-AW110 in Volume 3 reads: “Provide quantity (15) fifteen inserts for existing tunnel wall hung directories which are remaining ... See symbol “TDX” for locations. Sign Locations Plans do not show symbol “TDX”, but they do show a symbol “K” which is the designation for the Tunnel Map on AW201. Is the “K” symbol used in lieu of “TDX”? What is the total quantity of inserts needed? Do the existing wall hung directories have a clear cover to protect the replacement inserts?

Answer: A2a: BDG - Revise Note 9 to read as follow:

1. PROVIDE QUANTITY (15) FIFTEEN INSERTS FOR EXISTING TUNNEL WALL HUNG DIRECTORIES WHICH ARE REMAINING. INSERT NOMENCLATURE WILL BE PROVIDED AT TIME OF SHOP DRAWING PROCESS IN ORDER TO PROVIDE MOST CURRENT BUILDING NUMBER INFORMATION AT THAT TIME AND COORDINATE NOMENCLATURE. VERIFY LOCATIONS IN FIELD WITH VA COR.

Clarification:

TDX is referencing a wall hung tunnel directory. The tunnel directories are similar to the directory image attached. The total quantity of inserts is (15) as indicated in Note 9. The Signage Types shown on the drawings with symbols, such as ‘K’, are new signs intended to supplement the existing signage.

b. General Note 10 on Sheets JC1-AW100 through JBT-AW110 in Volume 3 reads: “Provide quantity (50) fifty inserts for existing tunnel wall hung directories which are remaining ... See symbol “BDX” for locations. There are no “BDX” symbols in the Tunnels, however, there is one shown on JC1-AW102 (Level 2 of John Cochran), one shown on JB1-AW106 (Level 00 of Jefferson Barracks), two shown on JB1-AW107 (Level 1 of Jefferson Barracks) and two shown on JB1-AW108 (Level 2 of Jefferson Barracks). Please provide a drawing and description of sign type “BDX”, and advise total quantity needed.

Answer: A2b: BDG - Revise Note 10 to read as follow:

1. PROVIDE QUANTITY (50) FIFTY INSERTS FOR EXISTING BUILDING WALL HUNG DIRECTORIES WHICH ARE REMAINING. INSERT NOMENCLATURE WILL BE PROVIDED AT TIME OF SHOP DRAWING PROCESS IN ORDER TO PROVIDE MOST CURRENT BUILDING NUMBER INFORMATION AT THAT TIME. SEE SYMBOL "BDX" FOR LOCATIONS.

Clarification:

Provide (50) inserts as indicated in Note 10. BDX is applicable to Building Directories and is not applicable to the tunnels. The existing building directories are similar to the directory image attached.

3. Which of the firms in the “Interested Vendors List” are likely to bid as a Prime Contractor? Are there firms not on the list that may bid as a Prime Contractor?

Answer: We do not know who will bid as a Prime. Any company that qualifies under the set-aside requirements and is a VIP/CVE certified SDVOSB may bid.

4. Regarding sheet 7-1-AE-901, the woman’s portion of the bathroom, detail #5, shows what appears to be a two toilet roll holder(TA-3). Why was there not a sanitary napkin dispenser also included?

Answer: Equipment for the restrooms is shown and noted on interior elevations on sheet 7-1-AE-901 and scheduled on sheet 1-AE-601. Previous reviews have not called attention to this item. For sanitary napkin dispensers in Women’s Toilets, they can be surface-mounted to walls near the toilet paper dispensers in the two toilet stalls shown on Sheet 7-1-AE-901 elevations 5 and 7. Elevation 7 also needs to add TA-3 toilet paper dispenser.

Modifications needed to the drawings:

1. Sheet 1-AE-601 – Add to Furniture, Equipment & Accessories Schedule: TA-5 – Disposal, Sanitary Napkin, Contractor-Provided, Contractor-Installed, Mounted to wall or toilet partition.

1. Sheet 7-1-AE-101 – Add to Renovation General Notes: 32. Restroom Equipment: Refer to Interior Elevations Sheet 7-1-AE-901 and Furniture, Equipment & Accessories Schedule on Sheet 1-AE-601 for types and locations.

1. Sheet 7-1-AE901 –

2. Elevation 5 – Add Sanitary Napkin Dispenser TA-5 to mount on wall. Location to be coordinated with COR.

2. Elevation 7 – Add Sanitary Napkin Dispenser TA-5 and toilet paper holder TA-3. Locations to be coordinated with COR.

Specification Section 10 28 00 – Toilet Accessories – for whatever reason, sanitary napkin dispensers are not part of the VA standard specification taken from the TiL and need to be added. We will need to add to the specification Disposal, Sanitary Napkin, Stainless Steel, Surface Mounted, as item 2.4.1 – Disposal, Sanitary Napkin, Stainless Steel, Surface Mounted, as follows:

0. 2.4.1 SANITARY NAPKIN DISPENSERS

0. A. Surface mounted type for wall or toilet partition.

0. B. Fabricate of stainless steel.

0. C. Provide flip-up cover, secured to container by a heavy-duty stainless steel piano hinge.

A.1 List of Attachments

See attached document: existing directory signage.

See attached document: 7-1-AE-101-19-02-25.

See attached document: 1-AE-601 Rev 19-02-25.

See attached document: 7-1-AE-901 Rev 19-02-25.

See attached document: 102800 rev 19-02-25.