About this file

36C25519R0017 VOL 2_JC dwg Fire - Plumbing.pdf

View the file

Other files

File Type Posted
36C25519R0017-0003000.docx DOCX document
36C25519R0017-0002005.pdf PDF
36C25519R0017-0002004.pdf PDF
36C25519R0017-0002000.docx DOCX document
36C25519R0017-0002003.pdf PDF
36C25519R0017-0002002.pdf PDF
36C25519R0017-0002001.jpg JPG image
36C25519R0017-0001000.docx DOCX document
36C25519R0017-0001001.pdf PDF
36C25519R0017-018.pdf PDF
36C25519R0017-000.docx DOCX document
36C25519R0017-007.pdf PDF
36C25519R0017-022.pdf PDF
36C25519R0017-005.pdf PDF
36C25519R0017-023.pdf PDF
36C25519R0017-010.pdf PDF
36C25519R0017-024.pdf PDF
36C25519R0017-011.pdf PDF
36C25519R0017-012.pdf PDF
36C25519R0017-027.pdf PDF
36C25519R0017-028.pdf PDF
36C25519R0017-017.pdf PDF
36C25519R0017-026.pdf PDF
36C25519R0017-003.pdf PDF
36C25519R0017-001.pdf PDF
36C25519R0017-013.pdf PDF
36C25519R0017-025.pdf PDF
36C25519R0017-016.pdf PDF
36C25519R0017-004.pdf PDF
36C25519R0017-020.pdf PDF
36C25519R0017-008.pdf PDF
36C25519R0017-002.pdf PDF
36C25519R0017-014.pdf PDF
36C25519R0017-019.pdf PDF
36C25519R0017-009.pdf PDF
36C25519R0017-021.pdf PDF
36C25519R0017-006.pdf PDF
36C25519R0017_3.docx DOCX document
36C25519R0017_2.docx DOCX document
36C25519R0017_1.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 11 1 1 1 1

1S 1S1S 1S 1S 1S 1S

2 22 2 2 2 2

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

FIRE PROTECTION - DRY SYSTEMFPD

SERVICE WATER - POTABLEW

AIR PRESSURE MAINTENANCE DEVICE

AIR SUPERVISORY SWITCH

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

OS&Y GATE VALVE

OS&Y GATE VALVE WITH MONITOR SWITCH

PRESSURE SWITCH

P

NO HATCH

LIGHT HAZARD COVERAGE AREA: 0.10 GPM/sq.ft. OVER A

REMOTE OPERATING AREA OF 1500 SQUARE FEET COMBINED

HOSE ALLOWANCE OF 100 GPM.

ORDINARY HAZARD GROUP l COVERAGE AREA: 0.15 GPM/sq.ft

OVER A REMOTE OPERATING AREA OF 1500 SQUARE FEET

AND COMBINED HOSE ALLOWANCE OF 250 GPM.

ORDINARY HAZARD GROUP ll COVERAGE AREA: 0.20 GPM/sq.ft

OVER A REMOTE OPERATING AREA OF 1500 SQUARE FEET AND

COMBINED HOSE ALLOWANCE OF 250 GPM.

SPRINKLER - WALL MOUNTED - EXISTING

SPRINKLER - EXISTING

SPRINKLER - CONCEALED - EXISTING

SPRINKLER - EXISTING

SPRINKLER - EXISTING

SPRINKLER - EXISTING

SPRINKLER - EXISTING

A

SPRINKLER - EXISTING

A

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

COMPRESSED AIR - FIRE PROTECTIONCAF

PIPE CAP

PIPE DOWN

NEW CONNECTION

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

FIRE PROTECTION ABBREVIATION KEY

AD ACCESS DOOR

BFP BACKFLOW PREVENTER

N.C. NORMALLY CLOSED

ABOVE FINISHED FLOORAFF

NC NEW CONNECTION

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

I.E. INVERT ELEVATION

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

LINE TYPE KEY:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

CEILINGS, AND FLOORS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, ACCESSORIES, ETC. COORDINATE PANEL TYPE AND COLOR

WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.

10. SEAL ALL WALL AND FLOOR PENETRATIONS AIRTIGHT WHERE PIPING PENETRATE.

PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH

WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION, AND

FLOOR ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE

ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.

PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH COMPONENTS

RATED FOR SUCH USE.

12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY BETWEEN DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

13. DO NOT EQUIPMENT SERVICE CLEARANCES.

14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

15. DO NOT SUPPORT EQUIPMENT, OR PIPING FROM METAL DECKING OR OTHER NON-

STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

16. COORDINATE EQUIPMENT TAGS WITH OWNER FOR TYPE AND NAMING PRIOR TO

SUBMITTING SHOP DRAWINGS AND ORDERING FINAL LABELS.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS WITH

2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK RESPONSE

SPRINKLERS IN UNPARTITIONED SPACES.

5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.

FIRE PROTECTION GENERAL NOTES:

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 11/02/2017.

FIRE / SMOKE BARRIER DESIGNATIONS

1-HOUR SMOKE BARRIER WALL

NON-RATED SMOKE PARTITION (CORRIDORS)

1-HOUR FIRE REATED BARRIER

2-HOUR FIRE RATED BARRIER

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :1

P

M

FP-001

FIRE PROTECTION COVER SHEET

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

31 79

BUILDING 1

GORPAT/

MATKAH

NOTES:

1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.

3. ALL SPRINKLERS SHALL BE UL AND FM LISTED.

4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING

PLAN AND NFPA 13 REQUIREMENTS.

5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON

THE DRAWINGS. CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.

6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

7. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE

SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 6)

AREA

HAZARD

SPRINKLER

TEMPERATURE

RATING

MANUFACTURER &

MODEL NOTES

TAG NAME

(NOTE 4 & 5)

SPRINKLER

TYPE

RESPONSE

CATEGORY FINISH

2ND FLOOR WITH

CEILINGS, A611,

A613, A613B

SEE PLANS SPR-1 RECESSED

PENDENT

QUICK CHROME 155 VIKING VK, RELIABLE

F1FR, TYCO TY-FRB,

VICTAULIC V2708

NOTE 2, 3, 7

6TH FLOOR WITH

CEILINGS

SEE PLANS SPR-2 CONCEALED

WITH GASKET

STANDARD WHITE 155 VIKING B-2, RELIABLE

G4A, TYCO RF II,

VICTAULIC V3802

NOTES 2, 3, 7

A. DEDUCT ALT #1: ALL WORK IN BASE BID WITH THE FOLLOWING EXCEPTIONS / DEDUCTIONS:

1. WORK JOHN COCHRAN BUILDING 7 DELETE

BID ALTERNATE

CORRIDOR

H202

FILM VIEW

A216

RADIOGRAPHIC

AND

FLUOROSCOPIC

A217

TOILET

A218

RADIOGRAPHIC

A219

X-RAY

A220

CONTROL

A221

RADIOGRAPHIC

AND

FLUOROSCOPIC

A215

TOILET

A216C

CONTROL

A217AEQUIPMENT

STORAGE

A218C

TOILET

A219E

CONTROL

A219D

LASER PRINT

A219B

FILM STORAGE

A219C

DUMB WAITER

LOBBY

A219A

ELEC. CLOSET

A220A

CONTROL

A215A

CHASE

CH-A-7

7 6 5 3489

D D

A

B

C

SPR-E

SPR-E

FP

F P

FP

REVISE SPRINKLER PIPING AND

PROVIDE NEW HEADS AS

NECESSARY FOR FLOOR PLAN

WORK, ROOM DESIGNATION

CHANGES AND CEILING

HEIGHT/LAYOUT ADJUSTMENTS.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :0

P

M

1-2-FD-101A

SECOND FLOOR - FIRE PROTECTION DEMOLITION PLAN

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

32 79

BUILDING 1

GORPAT/

MATKAH

N O R

HT

1/4" = 1'-0"1

SECOND FLOOR - FIRE PROTECTION DEMOLITION PLAN

OFFICE

A602

HAC

A603

NURSE

MANAGER

A604

MED. PREP.

A605

NURSE STATION

A606

NOUR.

A607

GI PROCEDURE

ROOM

A608

PROCEDURE

RM.

A609 PROCEDURE

RM.

A610

SCOPE

A610A

PROCEDURE

RM.

A611

PROCEDURE

RM.

A612

SCOPE

CLEANING

A613B

CLEAN

A614

SOILED

A615

ANTE RM.

A613A

CLEAN UTILITY

A611A

SCOPE

CLEANING

DIRTY SIDE

A613

CORRIDOR

H601

NURSE BREAK

RM.

A616

WORKSTATION

A624

STAIRWELL NO.

S602

TOILET

A626A

OFFICE

A629

TOILET

A627A

TOILET

A628

OFFICE

A631

OFFICE

A632

BED RM.

A626

STAIRWELL NO.

S601

ELEC. CLOSET

A629A

CHASE

CH-A-6

CHASE

CH-A-7

CHASE

CH-A-8

CHASE

CH-A-9

CHASE

CH-A-10

CHASE

CH-A-12

CHASE

CH-A-11

CHASE

CH-A-16

CHASE

CH-A-17

CHASE

CH-A-18

F.E. CLOSET

H602A

7 6 5 2 13

48910

I

H H

G

F

E

REVISE SPRINKLER PIPING AND PROVIDE NEW

HEADS AS NECESSARY FOR NEW DUCTWORK

INSTALLATION AND CEILING ADJUSTMENTS.

COORDINATE LAYOUT WITH MECHANICAL

CONTRACTOR, ELECTRICAL CONTRACTOR, AND

ARCHITECTURAL.

FP

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E SPR-E SPR-E

SPR-E

SPR-E

SPR-E

SPR-E

SPR-E SPR-E

SPR-E

SPR-ESPR-E

SPR-E

SPR-E

SPR-E SPR-E

EXISTING DRAIN RISER

REMOVE EXISTING DRAIN

VALVE AND STORE FOR

REUSE AND ASSOCIATED

PIPING, HANGERS,

ACCESSORIES, ETC. CAP

CONNECTION AT DRAIN.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :0

P

M

1-6-FD-101A

SIXTH FLOOR PLAN - FIRE PROTECTION DEMOLITION PLAN

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

33 79

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SIXTH FLOOR - FIRE PROTECTION DEMOLITION PLAN

FILM VIEW

A216

RADIOGRAPHIC

AND

FLUOROSCOPIC

A217

TOILET

A218

RADIOGRAPHIC

A219

X-RAY

A220

CONTROL

A221

RADIOGRAPHIC

AND

FLUOROSCOPIC

A215

TOILET

A216C

CONTROL

A217AEQUIPMENT

STORAGE

A218C

TOILET

A219E

CONTROL

A219D

LASER PRINT

A219B

FILM STORAGE

A219C

DUMB WAITER

LOBBY

A219A

ELEC. CLOSET

A220A

CONTROL

A215A

CHASE

CH-A-7

7 6 5 3489

D D

A

B

C

REVISE SPRINKLER PIPING AND

PROVIDE NEW HEADS AS

NECESSARY FOR FLOOR PLAN

WORK, ROOM DESIGNATION

CHANGES AND CEILING

HEIGHT/LAYOUT ADJUSTMENTS.SPR-E

SPR-E

FP

F P

FP

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :0

P

M

1-2-FP-101A

SECOND FLOOR - FIRE PROTECTION RENOVATION PLAN

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

34 79

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SECOND FLOOR - FIRE PROTECTION RENOVATION PLAN

F

G

F

E

H H

I

OFFICE

A602

HAC

A603

NURSE

MANAGER

A604

MED. PREP.

A605

NURSE STATION

A606

NOUR.

A607

GI PROCEDURE

ROOM

A608

PROCEDURE

RM.

A609 PROCEDURE

RM.

A610

SCOPE

A610A

PROCEDURE

RM.

A611

PROCEDURE

RM.

A612

SCOPE

CLEANING

A613B

CLEAN

A614

SOILED

A615

ANTE RM.

A613A

CLEAN UTILITY

A611A

SCOPE

CLEANING

DIRTY SIDE

A613

CORRIDOR

H601

NURSE BREAK

RM.

A616

WORKSTATION

A624

STAIRWELL NO.

S602

TOILET

A626A

OFFICE

A629

TOILET

A627A

TOILET

A628

OFFICE

A631

OFFICE

A632

BED RM.

A626

STAIRWELL NO.

S601

ELEC. CLOSET

A629A

CHASE

CH-A-6

CHASE

CH-A-7

CHASE

CH-A-8

CHASE

CH-A-9

CHASE

CH-A-10

CHASE

CH-A-12

CHASE

CH-A-11

CHASE

CH-A-16

CHASE

CH-A-17

CHASE

CH-A-18

F.E. CLOSET

H602A

REVISE SPRINKLER PIPING AND PROVIDE NEW

HEADS AS NECESSARY FOR NEW DUCTWORK

INSTALLATION AND CEILING ADJUSTMENTS.

COORDINATE LAYOUT WITH MECHANICAL

CONTRACTOR, ELECTRICAL CONTRACTOR, AND

ARCHITECTURAL.

SCOPE

FP FPFP

SPR-E SPR-E

SPR-E

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :1

P

M

1-6-FP-101A

SIXTH FLOOR PLAN - FIRE PROTECTION RENOVATION PLAN

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

35 79

BUILDING 1

GORPAT/

MATKAH

N O R

HT

SIXTH FLOOR - FIRE PROTECTION RENOVATION PLAN

1 11 1 1 1 1

1S 1S1S 1S 1S 1S 1S

2 22 2 2 2 2

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

GPM

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

NEW CONNECTION

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

COLD WATER - POTABLECW

DT DRAIN TILE

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

HOT WATER - POTABLE NUMBER INDICATES TEMPHW140

HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140

NON-POTABLE COLD WATERNCW

NON-POTABLE HOT WATERNHW

SANITARY DRAINAGESAN

STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)

STS STORM DRAINAGE (SECONDARY)

VENTV

DRAIND

G NATURAL GAS

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

GRV GAS REGULATOR VENT

SERVICE WATER - POTABLEW

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

COLD WATER CIRCULATING - POTABLECWC

PLUMBING ABBREVIATION KEY

CO CLEANOUT

CLINICAL SINKCS

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

GARBAGE DISPOSERGD

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MIXING VALVEMV

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRENCH DRAINTD

TRAP PRIMERTP

WATER CLOSETWC

WALL CLEANOUTWCO

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

NC NEW CONNECTION

NOT IN CONTRACTNIC

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

EXISTINGE

FLOW METERFM

WATER METERWM

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

OVERFLOW DRAINOFD

VALVE IN VERTICALVIV

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

LINE TYPE KEY:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

CEILINGS, AND FLOORS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, ACCESSORIES, ETC. COORDINATE PANEL TYPE AND COLOR

WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.

10. SEAL ALL WALL AND FLOOR PENETRATIONS AIRTIGHT WHERE PIPING PENETRATE.

PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH

WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION, AND

FLOOR ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE

ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.

PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH COMPONENTS

RATED FOR SUCH USE.

12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY BETWEEN DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

13. DO NOT EQUIPMENT SERVICE CLEARANCES.

14. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

15. DO NOT SUPPORT EQUIPMENT, OR PIPING FROM METAL DECKING OR OTHER NON-

STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

16. COORDINATE EQUIPMENT TAGS WITH OWNER FOR TYPE AND NAMING PRIOR TO

SUBMITTING SHOP DRAWINGS AND ORDERING FINAL LABELS.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

3. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

4. VERIFY PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO BEGINNING ANY WORK.

5. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

6. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

PLUMBING GENERAL NOTES:

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED 11/02/2017.

FIRE / SMOKE BARRIER DESIGNATIONS

1-HOUR SMOKE BARRIER WALL

NON-RATED SMOKE PARTITION (CORRIDORS)

1-HOUR FIRE REATED BARRIER

2-HOUR FIRE RATED BARRIER

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

AUDIO/VISUAL CONTRACTORA.V.C.

NURSE CALL CONTRACTORN.C.C.

CIVIL CONTRACTORC.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

FAUCET SEE

SPECIFICATIONS

LAMINAR FLOW

CONTROL DEVICE

OFFSET

WASTE

TRAP

PARALLEL

TO WALL

LOOSE

KEY STOP

ESCUTCHEON

FINISHED

FLOOR

[8 m m

[102mm]

[2 m m

F O

R F

IX

T

U R

E H

E

IG

H T

S S

E E

A R

C H

IT

E

C T

U R

A L D

R A

W

IN

G S

4"

/4

0' 2"0' 2"

MINIMUM 16 GAGE GALVANIZED

STEEL PLATE 12"x48" [300x1200mm] MIN. SECURED TO

A MIN. 4 STUDS PER LAVATORY

1/4" [6mm]∅ MOLLY BOLT HOLLOW

WALL ANCHOR (1 EA. SIDE OF LAV)

MIN. (3) 1/4"

[6mm] MACHINE

BOLTS W/DOUBLE

LOCK NUTS ON

BACK SIDE

MIN. 5 1/4"

[131mm]∅ GALV.

MACHINE BOLTS

WELDED TO PLATE

1/4" [6mm]

TYP. 1/8"

TYP. [3mm]

A A

PLAN

SECTION-A

NOTES:

1. AT LAVS WITH FOOT PEDAL CONTROLS

PROVIDE AN ADDITIONAL 16 GAGE

GALVANIZED STEEL PLATE 12"x16" [300x600mm] SECURED TO A MINIMUM

OF 2 STUDS PER FOOT PEDAL.

2. PROVIDE 20 GAGE STUDS WHEN HEIGHT

EXCEEDS 12'-0" [3600mm]

STEEL HANGER BY LAV

MFGR

STEEL WALL

PLATE

WALL

ANCHOR

STUDS

FOR FIXTURE

HEIGHT SEE

ARCHITECTURAL

DRAWINGS

V A

R

IE

S

[9 m m

T O

F L O

O R th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :1

P

M

P-001

PLUMBING COVER SHEET

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

36 79

BUILDING 1

GORPAT/

MATKAH

11 & 7

BLDG 7 - NOT FULLY SPRINKLERED

BLDG 1 - FULLY SPRINKLERED

A. DEDUCT ALT #1: ALL WORK IN BASE BID WITH THE FOLLOWING EXCEPTIONS / DEDUCTIONS:

1. WORK JOHN COCHRAN BUILDING 7 DELETE

BID ALTERNATE

P-408 LAVATORY 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 2 2 YES NO

P-202

URINAL WALL

HUNG

2 [ 50 ] 1.5 [ 38 ] .75 [ 19 ] 2 5 N/A NO

P-103

WATER CLOSET,

WALL HUNG

3 [ 75 ] 2 [ 50 ] 1.25 [ 31 ] 6 10 N/A NO

IN [mm] IN [mm] IN [mm] IN [mm]

MARK DESCRIPTION

WASTE PIPE VENT PIPE COLD WATER HOT WATER WASTE

FIXTURE

UNITS

WATER

FIXTURE

UNITS

WRIST

BLADE

HANDLES

ELECTRIC

SENSOR

REMARKS

PLUMBING FIXTURE SCHEDULE

NO SCALE1

TYPICAL WHEELCHAIR LAVATORY DETAIL

NO SCALE2

LAVATORY MOUNTING DETAIL

FILM VIEW

A216

RADIOGRAPHIC

AND

FLUOROSCOPIC

A217

TOILET

A218

RADIOGRAPHIC

A219

X-RAY

A220

CONTROL

A221

RADIOGRAPHIC

AND

FLUOROSCOPIC

A215

TOILET

A216C

CONTROL

A217AEQUIPMENT

STORAGE

A218C

TOILET

A219E

CONTROL

A219D

LASER PRINT

A219B

FILM STORAGE

A219C

DUMB WAITER

LOBBY

A219A

ELEC. CLOSET

A220A

CONTROL

A215A

CHASE

CH-A-7

7 6 5 3489

D D

A

B

C

REMOVE SINK AND ALL BRACKETS, HANGERS,

ACCESSORIES. REMOVE DOMESTIC PIPING

BACK TO MAIN IN CEILING OF FLOOR BELOW.

REMOVE SANITARY PIPING BACK INTO WALL

AND CAP.

2" SAN DN,

2" V TO STACK

4" SAN DN,

2 1/2" V UP

EXISTING OXYGEN AND VACUUM LINES TO

REMAIN. LINES ARE STACKED VERTICALLY

WITH ONE ABOVE THE OTHER.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :5

P

M

1-2-PD-101A

SECOND FLOOR - PLUMBING DEMOLITION PLAN

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

37 79

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SECOND FLOOR - PLUMBING DEMOLITION PLAN

NURSE

MANAGER

A604

MED. PREP.

A605

NURSE STATION

A606

NOUR.

A607

GI PROCEDURE

ROOM

A608

PROCEDURE

RM.

A609 PROCEDURE

RM.

A610

SCOPE

A610A

PROCEDURE

RM.

A611

PROCEDURE

RM.

A612

SCOPE

CLEANING

A613B

CLEAN

A614

SOILED

A615

ANTE RM.

A613A

CLEAN UTILITY

A611A

SCOPE

CLEANING

DIRTY SIDE

A613

CORRIDOR

H601

NURSE BREAK

RM.

A616

WORKSTATION

A624

STAIRWELL NO.

S602

TOILET

A626A

OFFICE

A629

TOILET

A627A

TOILET

A628

BED RM.

A626

STAIRWELL NO.

S601

ELEC. CLOSET

A629A

CHASE

CH-A-6

CHASE

CH-A-7

CHASE

CH-A-8

CHASE

CH-A-9

CHASE

CH-A-10

CHASE

CH-A-12

CHASE

CH-A-11

CHASE

CH-A-17

CHASE

CH-A-18

F.E. CLOSET

H602A

7 6 5 2 13

48910

I

H H

G

F

E

WC-E

SK-E

SK-E

WC-E

LAV-E

SK-E

WC-E

MB-E

WC-E

SK-E

2"HW

3"CW

2 1/2" CW DN

1 1/4" HW DN

2 1/2" CW

1 1/4" CW

3/4"O

1/2"MA

1"MV

MGO-E

1/2"O

1/2"MA

3/4"MV

MGO-E

MGO-E

MGO-E

MGO-E

2 1/2"CW

1/2"O

1/2"MA

3/4"MV

1/2"O

1/2"MA

3/4"MV

MGO-E

MGO-E

SK-E

SK-E

SK-E

SK-E

MB-E

FD-E

SK-E

SK-E

SK-E

SK

4" SAN DN

WC

WC-E

SK FD

FD-E

4" SAN UP & DN

4" SAN UP & DN

4" SAN

UP & DN

FD-E FD-E

SK-E

SK-E

3/4"HW

1 1/2"CW 3/4"HW

1 1/2"CW

1 1/2"CW

3/4"HW

3/4"HW

1 1/2"CW

3" CW DN

2" HW DN

2 1/2" V UP & DN

4" V UP & DN

4" V UP & DN

2"V

"V

3" ST UP & DN

3" ST UP & DN

4" ST UP & DN

2" CW UP

2" CW UP

SK

SK

SH

SK-E

FD-E

WC-E

4"SAN

WC-E

4"SAN

3"SAN

P505

P403

P403

"V

2"V 2"V

P403

P414 P104

P403

P403

P104

P701

2"V

"V

4"SAN

4"SAN

4"SA

N

2"SAN

2"SAN

2"SAN

2"SAN

2"SAN

"S

A N

"S

A N

4"SAN

4"SAN

P403

P104

P414

2"HW

3"CW

2"HW

3"CW

P403

P414

P104

P403

2"V

"V

2"V

"V

2"SAN

3"SAN

2"SAN

4"SAN

3/4"HW

1 1/2"CW

REMOVE PIPING AS INDICATED FOR INSTALLATION

OF NEW DUCT WORK. PREPARE PIPING FOR NEW

CONNECTION. COORDINATE PIPING REMOVAL,

RELOCATION, ELEVATION AND INSTALLATION WITH

MECHANICAL CONTRACTOR. (TYPICAL ALL)

2" V DN

4" SAN UP

3" SAN UP

4"SA

N

4" SAN DN

2" V UP

REMOVE PIPING AS SHOWN

INCLUDING ELBOW UP TO FLOOR

ABOVE AND PREPARE FOR NEW

CONNECTION (TYP.)

/2

"O

/2 "M

A

/4 "M

V

4"SAN

WORK REQUIRED ON 8TH

FLOOR FOR BACKFLOW

PREVENTOR INSTALLATION.

REFER TO SHEET 1-8-

MD-101A. COORDINATE

WORK WITH OWNER AND

MECHANICAL CONTRACTOR.

WORK REQUIRED ON 8TH

FLOOR FOR DUCT CHASE

INSTALLATION. REFER TO

SHEET 1-8-MD-101A.

COORDINATE WORK WITH

OWNER AND MECHANICAL

CONTRACTOR.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :0

P

M

1-6-PD-101A

SIXTH FLOOR PLAN - PLUMBING DEMOLITION

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

38 79

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SIXTH FLOOR - PLUMBING DEMOLITION PLAN

PIPE BASEMENT

B2

SERVICE RM.

B1

B

C

D

E

F

G

A

2 1

1" CW UP

3/4"HW

3/4"CW

1"CW

1"HW

3/4" CW UP

1/2"HWC

1"HW

1 1/4"CW

1/2"HWC

3/4"HW

3/4"CW

HB-E

3/4"HWC

1"HW

1 1/4"CW

3/4"HW

3"CW

1 1/2"CW

1 1/4"HW

1 1/4"CW

2 1/2"CW

1 1/2"HW

1"HWC

3/4" MAKE UP WATER

EXPANSION TANK

2 1/2"CW

2"HW

1"HWC

3/4"HW

3/4"CW

2 1/2"CW

2"HW

1"HWC

WH-E

CS

2" SAN UP

2"V

2"V

1 1/2"V

4"SAN

2"SAN

UP TO L-3E

ABOVE.

UP TO P-92, P-66D,

P-104E ABOVE.

UP TO HI-60E

ABOVE.

UP TO (1) N-3E (1)

C.S. ABOVE

UP TO L-3E &

CS. ABOVE

UP TO VL-114

ABOVE

2"SAN

2"SAN

4"SAN

UP TO A-3E ABOVE

UP TO R-3E, N-3E

& COMPRESSOR

ABOVE

REMOVE PIPING

BACK TO MAIN

AND CAP

EXISTING 120

GALLON ELECTRIC

WATER HEATER

/2 "C

W

BFP-E

BFP-E

ET-E

4" ST UP

CO

2"ST

FD

ST UP TO ROOF

3" ST UP

8"ST 8"ST

"S

T

CO

3/4"CW

4"SAN

1 1/2"VAC

3/4"MA

1 1/4"G

3/4"VAC

1/2"MA

3/4"G

3/4"VAC

1/2"MA

3/4"G

1/2"G

1/2"MA

1/2"VAC

REMOVE PIPING

BACK TO VALVES

AND CAP.

5" ST

S T

S T

3/4" CW

3/4" HW

3/4"HWC

3/4"HW

1 1/2"CW

1 1/2"CW

3/4"HW

3/4"HWC

3/4"VAC

1/2"MA

3/4"G REMOVE EXISTING CAP

AND PREPARE FOR

NEW CONNECTION.

REMOVE PIPING AND

PREPARE FOR NEW

CONNECTION.

REMOVE PIPING IN VERTICAL

RISER AND PREPARE FOR NEW

CONNECTION.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:4 :5

P

M

7-B-PD-101

BASEMENT - PLUMBING DEMOLITION PLAN

ST. LOUIS MO - JOHN COCHRAN

SCOPRZ

39 79

BUILDING 7

GORPAT/

MATKAH

N

O R HT

1/8" = 1'-0"1

BASEMENT - PLUMBING DEMOLITION PLAN

DEDUCT ALTERNATE

B

C

D

E

F

G

A

2 1

REMOVE SINK AND ALL BRACKETS,

HANGERS, ACCESSORIES, ETC.

REMOVE DOMESTIC PIPING BACK

TO MAIN AND CAP. REMOVE

SANITARY AND VENT PIPING BACK

INTO WALL AND CAP.

REMOVE LAB GAS OUTLETS

AND ALL BRACKETS,

HANGERS, ACCESSORIES,

ETC. REMOVE PIPING BACK TO

MAIN IN CRAWL SPACE BELOW

AND CAP.

1 1/2" V DN

3" VTR

2 1/2"V

REMOVE PIPING FROM

COMPRESSORS ABOVE FREEZER

DOWN TO PIPE MAINS IN

CRAWLSPACE AND CAP.

FD-E

ST UP TO ROOF

"V

2"V

2"V th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:4 :5

P

M

7-1-PD-101

FIRST FLOOR - PLUMBING DEMOLITION PLAN

ST. LOUIS MO - JOHN COCHRAN

SCOPRZ

40 79

BUILDING 7

GORPAT/

MATKAH

N O R

HT

1/8" = 1'-0"1

FIRST FLOOR - PLUMBING DEMOLITION PLAN

F

G

F

E

H H

I

OFFICE

A602

HAC

A603

NURSE

MANAGER

A604

MED. PREP.

A605

NURSE STATION

A606

NOUR.

A607

GI PROCEDURE

ROOM

A608

PROCEDURE

RM.

A609 PROCEDURE

RM.

A610

SCOPE

A610A

PROCEDURE

RM.

A611

PROCEDURE

RM.

A612

SCOPE

CLEANING

A613B

CLEAN

A614

SOILED

A615

ANTE RM.

A613A

CLEAN UTILITY

A611A

SCOPE

CLEANING

DIRTY SIDE

A613

CORRIDOR

H601

NURSE BREAK

RM.

A616

WORKSTATION

A624

STAIRWELL NO.

S602

TOILET

A626A

OFFICE

A629

TOILET

A627A

TOILET

A628

OFFICE

A631

OFFICE

A632

BED RM.

A626

STAIRWELL NO.

S601

ELEC. CLOSET

A629A

CHASE

CH-A-6

CHASE

CH-A-7

CHASE

CH-A-8

CHASE

CH-A-9

CHASE

CH-A-10

CHASE

CH-A-12

CHASE

CH-A-11

CHASE

CH-A-16

CHASE

CH-A-17

CHASE

CH-A-18

F.E. CLOSET

H602A

WC-E

SK-E

SK-E

WC-E

LAV-E

SK-E

WC-E

MB-E

WC-E

SK-E

2"HW

3"CW

2 1/2" CW

1 1/4" CW

3/4"O

1/2"MA

1"MV

MGO-E

1/2"O

1/2"MA

3/4"MV

MGO-E

MGO-E

MGO-E

MGO-E

SK-E

SK-E

SK-E

SK-E

MB-E

FD-E

SK

SK

SK-E

SK

WC

WC-E

SK

FD-E

FD-E

4" SAN UP & DN

4" SAN UP & DN

4" SAN UP & DN

FD-E FD-E

SK-E

SK-E

3/4"HW

1 1/2"CW

3" CW DN

2" HW DN

2 1/2" V UP & DN

4" V UP

& DN

4" V UP & DN

2"V

"V

3" ST UP & DN

3" ST UP & DN

4" ST UP & DN

2" CW UP

2" CW UP

SK

SK

SH

SK

FD-E

WC-E

WC-E

P505

P403

P403

"V

2"V

P403

P414 P104

P403

P403

P104

P701

4"SAN

4"SAN

2"SAN

2"SAN

P403

P104

P414

2"HW

3"CW

2"HW

3"CW

P403 P414

P104

P403

2"V

"V

2"V

2"SAN

4"SAN

4"SAN

2"V

4"SAN

2"SAN

2"V

2"V

"V

"V

"S

A N

3"SAN

3"SAN

3/4"HW

1 1/2"CW

INSTALL PIPING AS INDICATED FOR INSTALLATION

OF NEW DUCT WORK. COORDINATE PIPING

RELOCATION, ELEVATION AND INSTALLATION WITH

MECHANICAL CONTRACTOR. (TYPICAL ALL)

MGO-E

3" SAN UP

4" SAN DN

2" V DN

4" SAN DN

2" V UP

2 1/2" CW DN

1 1/4" HW DN

/2

"O

/2 "M

A

/4

"M V

PROVIDE NEW TEE CONNECTION

INTO RISER FOR ELEVATION

CHANGE FOR VENT

PROVIDE NEW TEE CONNECTION

INTO RISER FOR ELEVATION

CHANGE FOR VENT

4" SAN UP

3"SAN

"S

A N

4"SAN

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC NC

NC

NC

NC

NC

NC

2"V

3/4"O

1/2"MA

1"MV

NC IN

VERTICAL

/4

"H W

/2 "C

W

PROVIDE NEW ELBOW INSTALLED AS TIGHT TO

STRUCTURE ABOVE AS POSSIBLE TO RAISE

ELEVATION OF PIPING FOR NEW DUCT

INSTALLATION. (TYP.)

NC IN

VERTICAL

"V

/2 "C

W

/4 "H

W

/4

"C W

/4

"H W

3/4"O

1/2"MA

3/4"MV

1/2"MA

1/2"O

1/2"O

1/2"MA

3/4"MV

2"V

2"V

WORK REQUIRED ON 8TH

FLOOR FOR BACKFLOW

PREVENTOR INSTALLATION.

REFER TO SHEET 1-8-

MD-101A. COORDINATE

WORK WITH OWNER AND

MECHANICAL CONTRACTOR.

WORK REQUIRED ON 8TH

FLOOR FOR DUCT CHASE

INSTALLATION. REFER TO

SHEET 1-8-MD-101A.

COORDINATE WORK WITH

OWNER AND MECHANICAL

CONTRACTOR.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

FULLY SPRINKLERED

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:3 :0

P

M

1-6-PL-101A

SIXTH FLOOR PLAN - PLUMBING RENOVATION

ST. LOUIS, MO - VA JOHN COCHRAN

SCOPRZ

41 79

BUILDING 1

GORPAT/

MATKAH

N

O R HT

SIXTH FLOOR - PLUMBING RENOVATION PLAN

PIPE BASEMENT

B2

SERVICE RM.

B1

B

C

D

E

F

G

A

2 1

1" CW UP

3/4"HW

3/4"CW

1"CW

1"HW

3/4" CW UP

1/2"HWC

1"HW

1 1/4"CW

1/2"HWC

3/4"HW

3/4"CW

HB-E

3/4"HWC

1"HW

1 1/4"CW

3/4"HW

3"CW

1 1/2"CW

1 1/4"HW

1 1/4"CW

2 1/2"CW

1 1/2"HW

1"HWC

3/4" MAKE UP WATER

EXPANSION TANK

2 1/2"CW

2"HW

1"HWC

3/4"HW

3/4"CW

2 1/2"CW

2"HW

1"HWC

WH-E

CS

2" SAN UP

2"V

2"V

1 1/2"V

4"SAN

2"SAN

UP TO L-3E

ABOVE.

UP TO P-92, P-66D,

P-104E ABOVE.

UP TO HI-60E

ABOVE.

UP TO (1) N-3E (1)

C.S. ABOVE

UP TO L-3E &

CS. ABOVE

UP TO VL-114

ABOVE

2"SAN

2"SAN

4"SAN

UP TO A-3E ABOVE

REMOVE PIPING

FROM SINK DOWN TO

MAIN AND CAP

EXISTING 120

GALLON ELECTRIC

WATER HEATER

BFP-E

BFP-E

ET-E

4" ST UP

CO

2"ST

FD

ST UP TO ROOF

3" ST UP

8"ST 8"ST

"S

T

CO

3/4"CW

1 1/2"VAC

3/4"MA

1 1/4"G

3/4"VAC

1/2"MA

3/4"G

3/4"VAC

1/2"MA

3/4"G

1/2"G

1/2"MA

1/2"VAC

1 1/2"CW

CAP

3"SAN

1 1/2" CW UP

3" SAN UP

2" V UP

FD

1 1/2" CW UP

3" SAN UP

3/4" HW UP

2" SAN UP

3/4" CW UP 2" SAN UP

3/4" CW UP FD

1 1/2" V UP

WHA-1

1 1/2" CW UP

3" SAN UP

FCO

3"SAN

0.5

2" SAN UP

WHA-1

5" ST

S T

5" ST

/2 "C

W

NC

3/4"HW

3/4"HWC

TP-1

TP-1

INSTALL SHUT OFF, BALANCE,

CHECK, AND SHUT OFF VALVE

ASSEMBLY IN BASEMENT

MECHANICAL ROOM. DEVICES

SHOWN IN CRAWLSPACE FOR

CLARITY OF DEVICES.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:4 :0

P

M

7-B-PL-101

BASEMENT - PLUMBING RENOVATION PLAN

ST. LOUIS MO - JOHN COCHRAN

SCOPRZ

42 79

BUILDING 7

GORPAT/

MATKAH

N

O R HT

1/8" = 1'-0"1

BASEMENT - PLUMBING RENOVATION PLAN

B

C

D

E

F

G

A

2 1

COORDINATE FLOOR

CLEANOUT LOCATION WITH

WATER CLOSET LOCATION.

2"V DN

2" SAN DN

2" SAN DN

2" V DN

2"V DN

2"V

FD-C

FD-C

TP-2

TP-2

P-408

P-103

P-103

P-408

P-202

P-103

CONNECT TO

EXISTING 3"

VTR VERTICAL

1 1/2" V DN

3" VTR

2"V

3/4" HW DN

1 1/2" CW DN

1 1/2" V DN

3/4" CW DN

3/4" CW DN

1 1/2" CW DN

1 1/2" V DN

1 1/2" CW DN

3/4"H W

2 1/2"V

"V

2"V

2"V

FD-E

ST UP TO ROOF

3/4" CW DN

2" SAN DN

3/4" HW DN

2"V

2"V

FD-CFCO-1

3"SAN

3"SAN

P-103

P-202

P-408

P-103

P-103

FD-C

5" ST

2"V

2"V

1 1/2"V

2"SAN

P-408

2"V 3"V 2"V 2 1/2"V

2"V

1 1/2"V

2"V 1 1/2"V 2"V

2"V

2"V

3"SAN

3"SAN

2"SAN

3"SAN

2"SAN

2"SAN

3"SAN

TP-2

TP-2

3" VTR

P-103

P-202

P-408

P-103

P-103

P-408

WHA-1

3/4"CW

3/4"HW

1 1/2"CW

1 1/2"CW

1 1/2"CW

3/4"HWC

3/4"HW

1 1/2"CW

1 1/2"CW

WHA-1

3/4"CW

3/4"CW

1 1/2"CW

1 1/2"CW

3/4"HW

3/4"HWC

3/4"CW

REFER 7-B-PL-101

FOR CONTINUATION.

REFER 7-B-PL-101

FOR CONTINUATION.

TP-1

1/2"CW

TP-1

1/2"CW

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VA FORM 08-6231

ARCHITECTS Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS

Dwg: Of:

657-18-110CORRECT WORKPLACE & LIFE SAFETY

ISSUES, ABATE ASBESTOS, & IMPROVE

WAYFINDING

SEPTEMBER 12, 2018

Building Name

JOHN COCHRAN DIVISION -

Revisions: Date:

3705 North 200th Street Elkhorn, Nebraska 68022

(402) 291-6941

15 Sunnen Drive Suite 104 St. Louis, MO 64143

(314) 645-1132

8802 South 135th Street, Suite 100 Omaha, NE 68138

(402) 861-4445

BID DOCUMENTS

VETERANS

HEALTH

ADMINISTRATION

/1

/2

:4 :5

P

M

7-1-PL-101

FIRST FLOOR - PLUMBING RENOVATION PLAN

ST. LOUIS MO - JOHN COCHRAN

SCOPRZ

43 79

BUILDING 7

GORPAT/

MATKAH

N

O R HT

1/8" = 1'-0"1

FIRST FLOOR - PLUMBING RENOVATION PLAN

DEDUCT ALTERNATE

NO SCALE2

RISER DIAGRAM FOR SANITARY AND VENT

NO SCALE3

RISER DIAGRAM FOR DOMESTIC

File details come from the government source that posted it.