About this file

36C25519R0017 0001 36C25519R0017 0001.docx

View the file

Other files

File Type Posted
36C25519R0017-0003000.docx DOCX document
36C25519R0017-0002005.pdf PDF
36C25519R0017-0002004.pdf PDF
36C25519R0017-0002000.docx DOCX document
36C25519R0017-0002003.pdf PDF
36C25519R0017-0002002.pdf PDF
36C25519R0017-0002001.jpg JPG image
36C25519R0017-0001001.pdf PDF
36C25519R0017-018.pdf PDF
36C25519R0017-000.docx DOCX document
36C25519R0017-007.pdf PDF
36C25519R0017-022.pdf PDF
36C25519R0017-005.pdf PDF
36C25519R0017-023.pdf PDF
36C25519R0017-010.pdf PDF
36C25519R0017-015.pdf PDF
36C25519R0017-024.pdf PDF
36C25519R0017-011.pdf PDF
36C25519R0017-012.pdf PDF
36C25519R0017-027.pdf PDF
36C25519R0017-028.pdf PDF
36C25519R0017-017.pdf PDF
36C25519R0017-026.pdf PDF
36C25519R0017-003.pdf PDF
36C25519R0017-001.pdf PDF
36C25519R0017-013.pdf PDF
36C25519R0017-025.pdf PDF
36C25519R0017-016.pdf PDF
36C25519R0017-004.pdf PDF
36C25519R0017-020.pdf PDF
36C25519R0017-008.pdf PDF
36C25519R0017-002.pdf PDF
36C25519R0017-014.pdf PDF
36C25519R0017-019.pdf PDF
36C25519R0017-009.pdf PDF
36C25519R0017-021.pdf PDF
36C25519R0017-006.pdf PDF
36C25519R0017_3.docx DOCX document
36C25519R0017_2.docx DOCX document
36C25519R0017_1.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25519R0017 0001

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-22-2019 657-18-110 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Leavenworth KS 66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Leavenworth KS 66048 To all Offerors/Bidders

36C25519R0017 01-16-2019

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 5 MARCH 2019 3:00 pm CST X Request for Proposal for project 657-18-110 Correct Workplace & Life Safety Issues, Abate Asbestos and Improve Wayfinding, at the St. Louis Healthcare System, John Cochran and Jefferson Barracks Divisions, St. Louis, MO.

The above cited solicitation is hereby amended a s shown below:

A. The due date for proposals is extended to 5 MARCH 2019 at 3:00 pm CST.

B. Answers to questions and other information from the site visit are provided in this amendment.

C. All other terms and conditions of the solicitation remain unchanged.

David P. Holden Questions and Answers Project 657-18-110

1. Is this project sales tax exempt?

Yes

2. Where will the designated parking area be for workers accessing the construction site?

Neither JC or JB divisions have contractor specific parking. Parking at JC is on the streets at their cost. At JB all parking is within the campus and no contractor designated parking is made.

3. Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations.

Yes, we will allow submittal software that meets or exceeds VA’s Security compatibility. Though, Submittal Exchange is the software that we are currently using at VA St. Louis and is the preferred software for submittal exchange.

4. During construction in an area where the ceilings or fire suppression system will be disrupted, will NFPA 241 apply? Will the government require additional security measures beyond NFPA code such as fire watch, temporary fire alarms, adjustments to sprinkler heads, etc.

NFPA 241 will apply though a fire watch will not be required to be posted. The Contractor will be required to install a sufficient number, a minimum of two, temporary fire alarm/smoke detectors in those areas where the fire suppression will be disrupted.

5. Due to current potentially significant tariffs being placed on the importation of building materials such as wood or steel by the current Presidential Executive Branch, if a tariff is placed after bid time and before award will the government consider a price escalation on a contract value for products such as steel or wood should the executive branch levee tariffs effecting such materials? Most of these materials would still have been Buy American compliant as the tariffs would increase pricing on all steel or wood materials, regardless of origin.

A price adjustment may be considered if appropriate criteria are met.

6. Can there be multiple phases going at the same time, especially with all the signage to be installed?

The most important phasing that must be kept in mind is that ALL work must be completed at the John Cochran Division, prior to beginning work at the Jefferson Barracks Division. Phasing requirements are described in the Project Manual, Volume 1 and have been determined through extensive planning and will be followed.

7. If GC can mobilize in different floors and buildings, will each team must have GC supervision with them at all times?

A GC supervisor is required on the project at all times while work is being performed. Only one (1) GC Supervisor is required.

8. Will a qualified Superintendent be able to fill the roles of the SSHO on site?

Yes

9. Will an industrial Hygienist be required to be on site with abatement team at all time while abating?

Refer to Specification Project Manual 1 page 02 82 11 – 25 section 2.2.1 GENERAL for definitions and responsibilities of Contractor Industrial Hygiene.

10. Is there a preferred manufacturer for the signage and kiosks?

Basis-Of-Design Kiosks – Specified in project specification section 10 13 00 – Electronic Directories subpart 2.1A Kiosk: Navigo By: Interactive Touchscreen Solutions, Inc.

1655 Crofton Blvd., Suite 103 Crofton, MD 21114

Contact:

Leah Devine, Digital Experience Expert Ph. 410-451-1540 Email: ldevine@itoughinc.com

There was not a basis-of-design for the signage.

The contractor is to match existing sizes, colors, materials, aesthetics, etc.

11. From the areas to be abated, what is the extent of the patching and painting?

All disturbances must be patched and/or painted to VA specifications.

12. There are multiple notes throughout the drawings that state: “VERIFY EXISTING CONDITIONS WITH COR DURING PRE-CONSTRUCTION WALK THRU, ADDITIONAL COSTS WILL NOT BE ALLOWED.” These notes pertain to areas that were not accessible during the pre-construction walk thru; therefore, we would request these statements be removed.

These areas were not available during the walk through because as an active VA hospital we are not going to stop services to our Veterans for a pre-bid walkthrough. The Contractors have the drawings and specifications which should be sufficient to produce a bid and if they need to increase their bid to cover risks that is their decision to make. The request to remove these notes/statements is not approved.

13. Several product/material substitution requests were received as questions.

Product and material substitutions will be addressed by the COR/Facility Engineer and the A/E during the submittal phase of construction. Pre-approval of substitutions is not feasible or appropriate.

A.1 List of Attachments

See attached document: Project 657-18-110 Pre-Bid Attendees_2019-02-06.