Hampton VAMC Bathroom Renovation Asbestos _ Lead Based Paint Survey - (F).pdf
PDF 22 MB Posted
- Attached to
- Z2DA--590-19-106 Bathroom Upgrades
- Solicitation number
- 36C24621R0018
About this file
This document outlines a federal contract opportunity for bathroom renovation work at the Hampton VAMC facility. The Department of Veterans Affairs is seeking a contractor to provide all labor, tools, and materials for bathroom upgrades throughout the facility, including architectural and interior finishes work as well as mechanical, electrical, and plumbing tasks. The estimated value of the construction work is between $2 million and $5 million. This opportunity is set aside exclusively for bids from service-disabled veteran-owned small businesses. Interested vendors must register on the website to receive any amendments and must have active SAM and VetBiz registrations to be eligible for award. All questions about the solicitation must be emailed to the point of contact by the specified deadline.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Froehling & Robertson, Inc. 833 Professional Place West Chesapeake, Virginia 23320 T 757.436.1111 www.fandr.com
A Minority-Owned Business
January 2019 Update
Restroom Pre-Renovation Asbestos and Lead Based Paint Survey Report p
Hampton Veterans Administration Medical Center
100 Emancipation Drive Hampton, Virginia 23667
Prepared For:
Avetech Design Group 123 Bruton Court, suite 100 Chesapeake, Virginia 23322
Phone: (757) 389-5518 Attention: James Collins, P.E., President
Email: jcollins@avetechdg.com
Issue Date: July 19, 2019
F&R Project Number: 61X-0126
Conducted By:
Jason Cobb Industrial Hygienist
Conducted/Prepared By:
James A. Wallace Industrial Hygienist
Reviewed By:
E. Glenn Hargrove, CIH Director of Industrial Hygiene
Hampton VAMC Restroom Renovation F&R Project Number 61X-0126 i July 19, 2019
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1. PURPOSE
1.2. SITE DESCRIPTION
1.3. BACKGROUND
2.0 SCOPE OF SERVICES
3.0 LIMITED ASBESTOS-CONTAINING MATERIALS SURVEY
3.1. ASBESTOS-CONTAINING MATERIALS (ACM) METHODOLOGY
3.2. ASBESTOS-CONTAINING MATERIALS FINDINGS
3.3. ASBESTOS-CONTAINING MATERIALS INVENTORY
3.3.1. Wallboard System Discussion
3.3.2. Presumed Asbestos-Containing Materials
3.4. ASBESTOS-CONTAINING MATERIALS RECOMMENDATIONS
3.5. APPLICABLE REGULATIONS
3.5.1. EPA/NESHAP Regulations for Asbestos-Containing Materials
3.5.2. Virginia Asbestos Regulations
3.5.3. OSHA Asbestos Regulations
4.0 LIMITED LEAD-BASED PAINT SURVEY
4.1. LEAD-BASED PAINT SURVEY METHODOLOGY
4.1.1. XRF Testing
4.2. LEAD-BASED PAINT SURVEY FINDINGS
4.2.1. XRF Survey Results
4.2.1.1. Locations of Detected Lead-Based Paint
4.2.1.2. Inaccessible or Presumed Lead-Based Paint
4.3. LEAD-BASED PAINT CONCLUSIONS & RECOMMENDATIONS
4.4. APPLICABLE REGULATIONS
4.4.1. OSHA Regulations for Lead
4.4.2. EPA Regulations for Lead
5.0 LIMITATIONS
F&R Project Number 61X-0126 ii July 19, 2019
APPENDICES
Appendix A
F&R Personnel and Laboratory Accreditations
Appendix B
Asbestos Sample Diagrams
Appendix C
Historical Documentation
Appendix D
Asbestos Containing Material Summary Results Table Laboratory Certificates of Analysis
Bulk Sample Chain of Custody Forms
Appendix E
Photographic Documentation
Section 1 Asbestos-Containing Materials
Section 2 Lead-Based Paint
Appendix F
Explanation of XRF Data Table
XRF Data Table XRF Performance Characteristic Sheet
F&R Project Number 61X-0126 1 July 19, 2019
1.0 INTRODUCTION
Froehling & Robertson, Inc. (F&R) conducted a pre-renovation Asbestos and Lead Based Paint (LBP), Survey on July 1, 2, 3, and 11, 2019 of 132 interior restrooms of the Hampton Veterans Administration Medical Center located in Hampton, Virginia. It is F&R’s understanding that the restrooms are the subject of planned renovations which may impact building materials. The following sections document the survey procedures and results. Refer to Appendix A for Personnel Accreditation documentation of F&R personnel associated with this survey.
1.1. Purpose
The purpose of the Asbestos and LBP Survey is to identify Asbestos-Containing Materials (ACMs) and LBP coatings that may require appropriate removal, handling, and disposal procedures prior to scheduled renovation activities at the subject property. This survey is to aid in the determination of health and safety requirements during the conduct of work which may impact identified materials, as well as the preliminary classification of select regulated building materials for possible recycling activities.
1.2. Site Description
The Hampton Veterans Administration Medical Center facility consists of numerous medical and administrative buildings distributed throughout a 100.9-acre parcel of land in Hampton, Virginia.
F&R performed sampling for the identification of ACM and LBP within 132 interior restrooms of Buildings 33 (3 restrooms), 35 (1 restroom), 36 (3 restrooms), 37 (3 restrooms), 43 (6 restrooms), 52 (2 restrooms), 110 (47 restrooms), 110A (9 restrooms), 110B (35 restrooms), 116 (4 restrooms), 135 (7 restrooms), 137 (4 restrooms), 138 (3 restrooms), and 146 (5 restrooms).
Refer to Appendix B for site sketches of the facility, including asbestos sample locations.
Note that F&R utilizes Housing and Urban Development methodology for location identification modifiers: Side A is always the address side or the main entry side of the building. Then, proceeding in a clockwise direction the adjacent sides are labeled B, C and D; for example, the wall on the left side as one enters the building would be denoted as side B. Rooms with similar use patterns are numbered sequentially, generally with the first being the one that is encountered as one moves clockwise through the building from the main entry; unless room numbers are clearly identified on-site or on provided architectural/mechanical drawings which are expected to persist throughout the project. Note that F&R utilized Hallway and Room numbers as they were labeled on-site; such designations are expected to persist throughout the project. Architectural/Mechanical drawings were provided. Refer to Appendix B for facility sketches based upon site conditions observed at the time this survey was conducted.
It should be noted that material and color descriptions are subjective and that, due to the nature of the environment, identical materials and colors may have been labeled as different depending on the lighting, other colors in the area, and other factors.
F&R Project Number 61X-0126 2 July 19, 2019
1.3. Background
F&R was provided with previous asbestos and survey reports. A report prepared by Castle Hill Associates, LLC titled Asbestos Reinspection Report and dated September 2018 (Project Number VA- 17-902700). An additional summary report prepared by an unknown party titled Asbestos Sample Results by Building Number and dated October 10, 2011 was also provided to F&R. Historic survey data has not been tabulated within this report; however, the aforementioned previous survey reports are included for reference as Appendix C – Historical Documentation.
2.0 SCOPE OF SERVICES
As outlined in F&R proposal number 1961-00432, the survey included the following services with respect to the proposed renovation activities:
Identification and sampling, as necessary, of suspect ACMs.
Testing, as necessary, of surface coatings for the presence and concentration of lead.
Based on information provided by the client, it is F&R’s understanding that the restrooms are planned for renovation.
3.0 LIMITED ASBESTOS-CONTAINING MATERIALS SURVEY
F&R’s Virginia Licensed Asbestos Building Inspector, Jason Cobb (Virginia Asbestos License #3303004305), conducted the Asbestos Survey of the targeted property structure areas of concern (restrooms) located at Hampton VA Medical Center complex on July 1, 2, and 3, 2019.
The noted Inspector was assisted by F&R industrial hygienists Sam Bedinger and James Wallace.
Federal Regulations (40 CFR Part 61, Subpart M – National Emission Standard for Asbestos (NESHAP)), as well as Virginia Department of Labor and Industry regulations require a thorough asbestos inspection of the structure to be conducted prior to the commencement of renovation and/or demolition activities. An ACM is defined by the Occupational Safety & Health Administration (OSHA) and the Environmental Protection Agency (EPA) as material containing greater than one percent (1%) asbestos.
F&R Project Number 61X-0126 3 July 19, 2019
3.1. Asbestos-Containing Materials (ACM) Methodology
This survey was conducted in general accordance with the Federal NESHAP and applicable State regulations for the presence of ACMs. The survey was characterized by a visual inspection and sampling of suspect building components within the areas of concern at the subject property to be impacted by the proposed demolition activities.
Guidelines utilized in the asbestos survey were established by the EPA, ASTM International (ASTM), and The Environmental Information Association, Inc. (EIA). Utilized guidelines included:
the Asbestos Hazard Emergency Response Act (40 CFR Part 763, Subpart E – Asbestos-Containing Materials in Schools (cited as AHERA)), ASTM Standard E2356-14 Standard Practice for Comprehensive Building Asbestos Surveys, and the EIA publication Managing Asbestos in Buildings: A Guide for Owners and Managers – A Revision to the United States Environmental Protection Agency’s 1985 document Guidance for Controlling Asbestos-Containing Materials in Buildings (EPA 560/5-85-024) Known as the Purple Book.
F&R’s aforementioned industrial hygienist(s) collected and submitted suspect asbestos-containing bulk samples to the laboratory, of which, a total of six hundred sixty-seven (667) suspect asbestos-containing bulk samples with discernable layers were submitted for analysis on July 5, 2019. Due to multiple layers, a total of eleven hundred eighty-eight (1,188) samples were analyzed.
Samples of suspect ACMs were organized as per the AHERA concept of Homogeneous Area (HA), collected, and transported to the Environmental Hazards Services, L.L.C. (EHS) testing laboratory.
EHS is a National Institute for Standards and Technology (NIST) National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory (NVLAP Lab Code: 101882-0) and Virginia licensed asbestos laboratory, in Richmond, Virginia, for analysis by Polarized Light Microscopy (PLM) following EPA Method 600/R-93/116. Refer to Appendix A for Laboratory Certificates of Accreditations. Refer to Appendix D for Laboratory Certificates of Analysis and Bulk Sample Chain of Custody Forms for further description of sampled materials/analytical results.
3.2. Asbestos-Containing Materials Findings
The following material types were identified, sampled, and accordingly assigned to homogeneous areas based upon similar construction discovered during bulk sampling:
Dry Wall and Joint Compound Floor Materials
Block /Mortar Caulking – Various Applications
Concrete – Various Applications Mastics – Various Applications
Ceramic Tile Mortar Base/Grout Thermal System Insulation
The summary of survey results from sampling events performed on July 1, 2, and 3, 2019 are located in Appendix C. Refer to Appendix B for illustration of the locations of collected bulk
F&R Project Number 61X-0126 4 July 19, 2019 samples. Positive asbestos samples (samples containing >1% asbestos) are in BOLD type.
Identified or presumed ACMs are detailed in the next section.
3.3. Asbestos-Containing Materials Inventory
F&R conducted a survey of the reasonably and safely accessible portions of the restrooms located within each targeted building.
The following table presents identified materials containing greater than 1% asbestos, as well as materials for which asbestos was detected, but in a concentration less than 1%, and presumed materials with regard to F&R survey activities. Further, comprehensive delineation was not performed; therefore, the table below may not completely represent locations of identified ACMs. It is the responsibility of the client or contractor to verify material locations. Photographic documentation of ACMs for reference is provided as Appendix E.
TABLE 1. ASBESTOS-CONTAINING MATERIALS INVENTORY
Sample Number
Material Description Sample Location(s) Result
(Percent ACM)
NESHAP
Category
Estimated Quantities
36-7A/B
Joint compound associated with 4” Gray
Cove Base and Associated Mastic
Building 36 – Room 7 2% Chrysotile Friable
350 SF
36-9A Drywall and Joint Compound (JC)
Building 36 – Room 7
JC = 2% Chrysotile;
0.25% Chrysotile via Composite 400-Point
Count Method
Friable
36-10A/B 1’X1’ Concealed Grid
Ceiling Tile Building 36 – Room 7 4% Chrysotile
Category II Non-Friable
150 SF
43-3F Drywall and Joint
Compound Building 43 – Room 203
JC = 2% Chrysotile;
0.25% Chrysotile via Composite 400-Point
Count Method
Friable 400 SF
43-17A/B/C 12”X12” Tan and Green
VFT and Associated Black Mastic
Building 43 – Rooms 202 and
VFT = 3% Chrysotile Category I
Non-Friable
350 SF
Mastic = 3 – 6%
Chrysotile Category II Non-Friable
43-20B 12”X12” Tan/Yellow VFT
Patch and Associated Black/Brown Mastic
Building 43 – Room 203 Mastic = 4% Chrysotile
Category II Non-Friable
52-11A/B Metal HVAC Black Duct
Mastic Building 52 – Rooms 111 and
4% Chrysotile
Category II Non-Friable
20 SF
(1 inch wide mastic seam
X 96” = ~1
SF)
F&R Project Number 61X-0126 5 July 19, 2019
Sample
Material Description Sample Location(s) Result
(Percent ACM)
NESHAP
Category
Estimated Quantities
110-2-14A/B Maroon Floor Tile and
Associated Mastic Building 110 – Room D203A
VFT = 3% Chrysotile Category I
Non-Friable
25 SF
Mastic = <1%
Chrysotile
NA
110-2-15A/B Black Floor Tile Building 110 – D203A 4% chrysotile Category I
Non-Friable
110-2-16A/B 12”X12” Green VFT and
Associated mastic Building 110 – D207
VFT =-3% Chrysotile Category I
Non-Friable
25 SF
Mastic = 6% Chrysotile
Category II Non-Friable
110A-4C/D Mortar for White 2”X4”
Ceramic tile Building 110A – Rooms C110, C112 and C120 2% Chrysotile
Category II Non-Friable
400 SF
110A-8A/B/C Drywall and Joint
Compound Building 110A – Rooms C231 and C240
JC = 2% Chrysotile;
0.50% Chrysotile via Composite 400-Point
Count Method
Friable 550 SF
110A-10B White Exterior Door
Frame Caulk Building 110A – Room C240 3% Chrysotile
Category II Non-Friable
9 SF
(1 inch wide caulk seam X 1,224” =
~9 SF)
110A-12A/B 12”X12” Multicolored
VFT
Building 110A – C240 VFT = 2% Chrysotile
Category I Non-Friable
120 SF
146-16A/B Off-White HVAC
Insulation Seam Mastic Building 146 – Room 9 and
Room 10 2% Chrysotile
Category II Non-Friable
20 SF
F&R presumes that, where materials have been documented to be ACMs and where those materials are similar to other materials which have not been found to be positive, those similar materials will be considered to be ACMs (i.e. where one material was analyzed and found to be positive, it is prudent to consider other similar materials positive, despite potential analytical data to the contrary).
3.3.1. Wallboard System Discussion
EPA NESHAP regulations indicate that “wallboard systems” where joint compound is used only at the joints and nail holes may be represented by a composite sample (walls which include other layers such as skim coat are not exempted from a requirement to conduct discrete sampling of each layer). Conversely, for wallboard systems with surfacing, NESHAP regulations require individual samples of the drywall and surfacing and prohibit compositing of the wall system.
For this survey, F&R collected individual samples of both the drywall and joint compound; this individual sampling approach was performed in response to OSHA guidelines for worker exposure. Analysis of the three drywall and joint compound samples (36-9A, 43-3F, and 110A-
F&R Project Number 61X-0126 6 July 19, 2019
8A/B/C) found that the drywall tested negative for asbestos and that the joint compound contained asbestos at a concentration of 2%.
The laboratory was requested to analyze one sample where asbestos was identified (36-9A, 43- 3F, and 110A-8A/B/C) as a composite comprising both joint compound and drywall. The PLM results of the composite sample indicated that the sample composite was <1% Chrysotile. The composite sample was then subjected to a more stringent and lower detection limit point count analytical method and found to be 0.25% Chrysotile for samples 36-9A and 43-3F, and 0.50% Chrysotile for sample 110A-8A/B/C. Note that sample layers which were subjected to composite sampling were not collected utilizing the NESHAP methodology specific to composite sampling;
however, they were sampled in the field and consequently represent an approximately one to one ratio. This sampling method may not represent the current joint compound to wallboard ratio; however, samples collected with a representative ratio would be further diluted by the non-asbestos-containing wallboard and therefore the overall concentration of asbestos would be further reduced.
Because OSHA requirements still consider each wallboard system component separately, work which impacts the wallboard system would still be considered Class II Work and subject to those regulations. Based on the composite result indicating that the overall concentration of asbestos in the wallboard system is less than 1%, the material may be able to be disposed of as non-asbestos containing. However, best practices dictate that the wallboard system be treated as ACM during impact and disposal.
3.3.2. Presumed Asbestos-Containing Materials
During the conduct of this survey, sampling was limited to those materials which were within the areas designated by the client, which were safely accessible, and which were able to be sampled without damaging systems or structures. As such, some materials should be presumed to be positive, unless sampling is conducted and shown to be negative. Such presumed asbestos containing materials (PACM) include, but are not limited to:
Fire door interiors, Gaskets and packing materials in plumbing or hydraulic systems, where present, Electrical panel backing/arc deflectors/spark arresters, Wiring insulation or other live electrical system components, Chimneys and flues or other cementitious pipes or panels, Note that asbestos was used in over 3,000 known products and was used extensively in construction materials including in insulation and finish materials such as drywall-based systems, acoustical tiles, caulks and mastics, vinyl-based materials, and specialty products. Asbestos also continues to be used in new construction because, as stated by the EPA, "the manufacture, importation, processing, and distribution in commerce of [various] products […] are not banned.”
F&R Project Number 61X-0126 7 July 19, 2019
3.4. Asbestos-Containing Materials Recommendations
Except for those building materials listed in Table 1, laboratory analysis of the collected, submitted, and analyzed samples indicated an analytical result of “No Asbestos Detected” with regard to asbestos content. Photographic Documentation of site conditions and sampled materials is provided as Appendix E.
Should additional suspect ACMs be discovered during renovation activities that have not been sampled and will be disturbed, F&R recommends work be temporarily halted. Samples of suspect materials should be collected, analyzed, and handled accordingly prior to the resumption of renovation activities.
F&R further recommends that an Asbestos Abatement Contractor, utilizing appropriately accredited personnel, be engaged to properly remove newly discovered ACMs prior to renovation activities that would impact the ACM. If asbestos abatement activities are performed within the building, the work should be performed by an appropriately licensed asbestos abatement contractor.
The Client should note that F&R has encountered instances in which materials were analyzed by Polarized Light Microscopy (PLM) (following EPA Method 600/R-93/116) for the presence of asbestos with a result of “None Detected”, but when analyzed by Transmission Electron Microscopy (TEM) for Non-friable Organically Bound (NOB) bulk material, analytical results have indicated that asbestos is present in quantities greater than 1%. The client should be aware that F&R has samples analyzed by the PLM method for a number of reasons (including financial and time considerations) and that this method is considered acceptable in this state; however, some firms employ the more stringent TEM method which is required in some states. Therefore, it is possible that some materials identified as containing no asbestos within this report may, if subjected to a more stringent analytical method, reveal the presence of asbestos at concentrations of 1% or greater.
In addition, it should be noted that through NESHAP Applicability Determinations, asbestos bulk samples analyzed via PLM which indicate a result of asbestos content to be less than ten (10) percent, including trace amounts (<1%), the material in question shall either be assumed to be an ACM or further analyzed via PLM Point Count or TEM to verify asbestos content. Results obtained via PLM Point Count or TEM analysis shall supersede previous results obtained by standard PLM analysis. Samples with analytical results via PLM which indicate that no asbestos was detected are not required to be further analyzed via PLM Point Count or TEM.
As detailed above, several materials were identified as asbestos-containing, utilized in various instances through the structure. Prior to renovation activities, F&R recommends that the identified ACMs be appropriately removed, handled, and disposed of by an appropriately licensed/accredited Abatement Contractor utilizing appropriately licensed/accredited personnel.
F&R Project Number 61X-0126 8 July 19, 2019
F&R further recommends that a third party Asbestos Professional be retained to provide on-site surveillance and guidance of the Asbestos Abatement Contractor to confirm complete and proper removal/disposal of ACMs in accordance with applicable federal, state, and local regulations. This recommendation is made as a best practice to reduce potential exposure to workers and limit liability.
3.5. Applicable Regulations
3.5.1. EPA/NESHAP Regulations for Asbestos-Containing Materials
The U.S. Environmental Protection Agency promulgated the National Emission Standards for Hazardous Air Pollutants (NESHAP) [40 CFR Part 61], which addresses the application, removal, and disposal of asbestos-containing materials (ACM). Under NESHAP the following categories are defined for asbestos-containing materials:
Friable - When dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Non-friable - When dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Category I Non-friable ACM - Packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than 1% asbestos.
Category II Non-friable ACM – Material, excluding Category I Non-friable ACM, which contains more than 1% asbestos.
Regulated Asbestos Containing Material (RACM) – One of the following:
1. Friable ACM
2. Category I Non-friable ACM that has become friable.
3. Category I Non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading.
4. Category II Non-friable ACM that has a high probability of becoming, or has become, friable by the forces expected to act on the material in the course of demolition or renovation operations.
Under NESHAP, the following actions are required:
1. Prior to the commencement of demolition or renovation activities, the building owner must inspect the affected facility or part of the facility where the demolition or renovation activities will occur for the presence of asbestos.
F&R Project Number 61X-0126 9 July 19, 2019
2. Remove RACM from the facility before activities begin that would break up, dislodge, or similarly disturb the material or preclude access for subsequent removal.
3. RACM need not be removed if:
a) It is Category I non-friable ACM that is not in poor condition.
b) It is on a facility component that is encased in concrete or other similar material and is adequately wet whenever exposed.
c) It was not accessible for testing and was therefore not discovered until after demolition began and because of the demolition the material cannot be safely removed.
d) It is Category II non-friable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition.
3.5.2. Virginia Asbestos Regulations
The Virginia Department of Labor and Industry (DOLI) regulates asbestos through enforcement of the Virginia Occupational Safety and Health (VOSH) regulations, enforcement of the Environmental Protection Agency's National Emission Standards for Hazardous Air Pollutants (NESHAP), and enforcement of the Asbestos Notification regulations found in the Labor Laws of Virginia (§40.1-51.20). Agency locations and regulations can be found on the agency Web site http://www.doli.virginia.gov.
The Virginia Department of Professional and Occupational Regulation (DPOR) is responsible for company and individual licensure in Virginia. Licensure and regulatory information can be found on DPOR's Web site http://www.dpor.virginia.gov/
The Virginia Department of Environmental Quality (DEQ) is responsible for the regulation of landfills in Virginia. Information on the disposal of asbestos in Virginia landfills can be obtained from the DEQ Web site http://www.deq.state.va.us/.
3.5.3. OSHA Asbestos Regulations
The Occupational Safety and Health Administration (OSHA) regulates employee exposure to asbestos under 29 CFR 1926.1101 and 29 CFR 1910.1001. Work associated with known or suspect ACMs must be conducted according to these regulations in addition to the noted EPA regulations.
http://www.doli.virginia.gov/ http://www.dpor.virginia.gov/ http://www.deq.state.va.us/
F&R Project Number 61X-0126 10 July 19, 2019
4.0 LIMITED LEAD-BASED PAINT SURVEY
F&R’s Industrial Hygienist, Jason Cobb, performed the testing of surface coatings for lead on July 3 and 11, 2019. Refer to Appendix A for F&R Personnel Accreditation Documentation.
For definitions of terms used in this document with regard to Lead-Based Paint, please reference the Glossary of the U.S. Department of Housing and Urban Development (HUD) Guidelines for the Evaluation and Control of Lead-Based paint Hazards in Housing (Second Edition, July 2012).
Based on the nature of this survey, when one component tests positive for the presence of lead similar painted/coated components shall be assumed to be lead-containing, unless additional testing is performed.
4.1. Lead-Based Paint Survey Methodology
The survey was conducted in general accordance with EPA’s work practice standards for conducting LBP activities (40 CFR 745.227), and the HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (Second Edition, July 2012); however, this was not a comprehensive surface-by-surface investigation for LBP, but rather a screening survey of major coated surfaces where the presence of LBP is suspected.
Several components, particularly high ceilings, were not safely accessible for testing or required invasive sampling techniques during the survey. Therefore, F&R has employed professional judgment in making determinations about the homogeneity of components determined to be “positive.”
4.1.1. XRF Testing
Sampling of surface coatings was conducted utilizing a Niton XL2-980 X-Ray Fluorescence (XRF) Lead Paint Analyzer (Serial Number 82040) and Niton XL2-980 GOLDD XRF Lead Paint Analyzer (Serial Number 92183). Only accessible painted, coated, and/or varnished surfaces were tested using the XRF.
The XRF contains a small radioisotopic source and operates on the principle of x-ray fluorescence, whereby lead atoms in a surface coating are stimulated to emit characteristic x-rays, which are then detected by the instrument. Levels of lead are reported in units of milligrams per square centimeter (mg/cm2). The XRF can measure surface or non-surface concentrations of lead with 95% accuracy at the HUD action level of 1.0 mg/cm2. The XRF is able to accurately detect a concentration as low as 0.1 mg/cm2 of lead. The XRF classifies coated surfaces as “positive”, “negative”, or “null” for lead content based on the action level (1.0 mg/cm2) and the performance characteristics of the XRF. The XRF was checked for calibration before and after the survey. The calibration was checked against a standard reference material (1.04 mg/cm2 NIST Standard) supplied by the XRF manufacturer. A copy of the XRF Performance Characteristic sheet is https://portal.hud.gov/hudportal/documents/huddoc?id=second_edition_2012.pdf https://portal.hud.gov/hudportal/documents/huddoc?id=second_edition_2012.pdf
F&R Project Number 61X-0126 11 July 19, 2019 included as an attachment to this report.
Positive: Lead is present at or above the action level of 1.0 mg/cm2 on one or more of the components tested.
Negative: Lead is not present at or above the action level of 1.0 mg/cm2 on any of the components tested.
Null: Insufficient data was collected by the XRF during the sample time to determine if the surface is positive or negative (i.e. – premature removal or instrument slippage, terminating the test).
4.2. Lead-Based Paint Survey Findings
4.2.1. XRF Survey Results
A total of seven hundred-fifty (730) XRF readings, excluding calibration readings, were collected from the interior and exterior of the building. Twenty-one (21) of the readings collected at the Project site were positive for LBP when compared to the action level of 1.0 milligrams per square centimeter (mg/cm²). However, those materials that tested positive for LBP were not painted surfaces. Refer to Appendix F, XRF Data Table for a listing of the readings and respective information as well as an explanation of the data table and the Performance Characteristic Sheet.
The following table presents the positive readings collected.
Reading
Component Substrate Building Room Floor Condition Color
July 3 & 11, 2019 Readings
19 Door Wood 35 8 1 Intact Gray
21 Door Wood 35 8 1 Intact Gray
25 Ceiling Wood 35 8 1 Intact White
47 Wall Ceramic
Tile 37 109 1 Intact Green
50 Wall Ceramic
Tile 37 109 1 Intact Green
Window Casing
Wood 37 109 1 Intact White
8 Window Wood 37 205 2 Intact White
11 Window Wood 37 205 2 Intact White
12 Window Wood 37 205 2 Intact White
13 Window Wood 37 205 2 Intact White
14 Trim Wood 37 205 2 Intact White
24 Window Wood 37 206 2 Intact White
25 Window Wood 37 206 2 Intact White
575 Door Frame Metal 110 B423A 4 Intact Gray
576 Door Frame Metal 110 B423A 4 Intact Gray
580 Door Frame Metal 110 B423A 4 Intact Gray
F&R Project Number 61X-0126 12 July 19, 2019
Reading Number
Component Substrate Building Room Floor Condition Color
July 3 & 11, 2019 Readings
583 Door Frame Metal 110 B423A 4 Intact Gray
586 Door Frame Metal 110 B433 4 Intact Gray
587 Door Frame Metal 110 B433 4 Intact Gray
594 Door Frame Metal 110 B412 4 Intact Gray
596 Door Frame Metal 110 B411 4 Intact Gray
4.2.1.1. Locations of Detected Lead-Based Paint
Based on the detection of positive LBP readings on specific component types and our observation of an apparent homogenous painting history, the following building components should be considered as regulated materials with regards to lead content:
LEAD-BASED PAINT MATERIALS INVENTORY
Material
Description Color Substrate
Material Location(s)
Photo #
Interior
Door Gray Wood Building 35
1st floor Restroom Lead 01
Ceiling White Wood Building 35
1st Floor Restroom Lead 02
Wall Green Ceramic Tile Building 37
1s floor restroom Lead 03
Window Casing White Wood Building 37
1st Floor Restroom Lead 04
Window White Wood Building 37 Room 205
Lead 05
Trim White Wood Building 37 Room 205
Lead 06
Window White Wood Building 37 Room 206
Lead 07
Door Frame Gray Metal Building 110 Room B423A
Lead 08
Door Frame Gray Metal Building 110 Room B433
Lead 09
Door Frame Gray Metal Building 110 Room B412
Lead 10
Door Frame Gray Metal Building 110 Room B411
Lead 11
The above table details only those building materials with surfaces with a reported lead concentration greater than or equal to 1.0 mg/cm2. However, readings of the majority of painted or coated surfaces indicated a lead content between 0.1 mg/cm2 and 0.9 mg/cm2.
F&R Project Number 61X-0126 13 July 19, 2019
4.2.1.2. Inaccessible or Presumed Lead-Based Paint
During the conduct of this survey, testing was limited to those materials which were safely accessible and readily visible. As the proposed scope of renovations is limited to the interior of the one hundred and thirty two restrooms specified by the client, no exterior building components were included in the lead-based paint scope of work. Some painted materials should be presumed to be positive, unless sampling is conducted and shown to be negative. Such presumed LBP coated components include, but are not limited to:
Decorative ceilings in Room 202 and Room 203 of Building 43 were inaccessible due to the height.
It should be noted that the renovation plans provided to F&R indicate that the ceilings in Room 202 and Room 203 of Building 43 are to remain in place. Should the scope of renovations alter to include the anticipated removal of the ceiling, F&R recommends that the ceiling be screened for lead-based paint.
4.3. Lead-Based Paint Conclusions & Recommendations
This survey concludes that certain building components located in the interior of the targeted structures of the Hampton VA Medical Center complex contain lead in a quantity that could cause them to become a regulated waste. Photographic documentation of select lead-containing building materials is presented in Appendix E: Section 2.
F&R recommends that activities which may disturb such materials be conducted following appropriate Federal and State regulations. Federal regulations with regard to worker safety and disposal requirements are summarized in the following Section – Applicable Regulations; this is not an exhaustive list.
4.4. Applicable Regulations
4.4.1. OSHA Regulations for Lead
While the majority of materials tested at the site were negative for lead based paint and/or surface coatings, other painted and/or coated surfaces or materials containing lead may contain sufficient concentrations of lead, which when disturbed, may generate lead dust greater than the “Action Level” concentration of 30 micrograms per cubic meter (µg/m3) or greater than the “Permissible Exposure Limit” of 50 µg/m3 established by the OSHA “Lead Exposure in Construction Rule” (29 CFR 1926.62). The OSHA standard does not define acceptable levels of lead in paint at which no exposure to airborne lead (above the action level) would be expected;
however, guidance is available for work practices which present the highest risk for lead exposure to workers. Rather, OSHA defines airborne concentrations and references specific types of work
F&R Project Number 61X-0126 14 July 19, 2019 practices and operations from which a lead hazard may be generated (reference 29 CFR 1926.62, section d). Environmental and personnel monitoring should be conducted during removal or demolition processes (as applicable) to determine actual personal exposure. This monitoring information can be used to determine the levels of personnel protection and environmental controls required for work involving specific removal/demolition processes on specific structures.
Under OSHA requirements, the Contractor performing the work will be required to conduct this monitoring. It is important to note that environmental controls will vary dependent upon the content of lead in paint, the process used to remove it, duration of the work, and the amount of paint to be removed.
F&R recommends that workers disturbing painted (or coated) surfaces as part of this project receive OSHA Lead in Construction Awareness training and that engineering controls and hygiene practices described in 29 CFR 1926.62 be followed during the disturbance of painted (or coated) surfaces.
4.4.2. EPA Regulations for Lead
For disposal of construction/demolition debris that contains lead, testing may be required as specified by the Environmental Protection Agency (EPA) for lead content to determine proper disposal. EPA regulations require that a generator of waste determine if that waste is hazardous by performing testing in accordance with the requirements of 40 CFR 261.11 or for wastes that may be RCRA hazardous (such as items with high lead content), the generator may assume that the waste is hazardous and comply with the hazardous waste regulation. The need for determination of disposal may be additionally subject to the disposal and/or recycling facility utilized.
5.0 LIMITATIONS
This report has been prepared for the exclusive use of Avetech Design Group and/or their agents.
This service was performed in accordance with generally accepted environmental practices. No other warranty, expressed or implied, is made. Conclusions and recommendations are based, in part, upon information provided to us by others and site observations. We have not verified the completeness or accuracy of the information provided by others, unless otherwise noted.
Observations and recommendations are based upon conditions readily visible at the site at the time of the site visit, and upon current industry standards.
During this study, suspect asbestos samples were submitted for analysis at a NVLAP-accredited laboratory via polarized light microscopy and suspect LBP was field characterized using industry standard methods and practices. Inaccessible areas, such as behind solid ceilings or behind solid walls were not surveyed; therefore, some target materials may not have been identified. As with similar surveys of this nature, actual conditions exist only at the precise locations from which samples were collected or tested. Areas inspected were limited to those designated by the scope of services by the Client. Certain inferences are based on the results of this sampling and related
F&R Project Number 61X-0126 15 July 19, 2019 testing to form a professional opinion of conditions in areas beyond those from which the samples were collected. Unless otherwise noted, F&R does not claim to have performed exhaustive delineation and/or quantification of identified materials; it is the responsibility of the client or abatement contractor to verify locations and quantities of regulated materials. Visual evaluation of other materials of concern conducted comprised a cursory visual review of the building materials and, to a limited extent, contents of the facility. It is also understood that this is a non-invasive survey so that it is possible that concealed materials may be present that were not accessible during the original survey. No other warranty, expressed or implied, is made.
Reasonable effort was made by inspection personnel to locate and sample suspect materials within the structure with regard to the scope of services. However, for a facility, the existence of unique or concealed ACMs or LBP and debris is a possibility. F&R does not warrant, guarantee or profess to have the ability to locate or identify all ACMs, LBP, or other chemicals of concern in a facility.
Under this scope of services, F&R assumes no responsibility regarding response actions (e.g.
O&M Plans, Encapsulation, Abatement, Removal, Tenant Notification, etc.) initiated as a result of these findings. F&R assumes no liability for the duties and responsibilities of the Client with respect to compliance with appropriate regulations. Compliance with regulations and response actions are the sole responsibility of the Client and should be conducted in accordance with local, state, and/or federal requirements and should be performed by appropriately qualified and licensed/accredited personnel, as warranted.
Froehling & Robertson, Inc. by virtue of providing the services described in this report, does not assume the responsibility of the person(s) in charge of the site, or otherwise undertake responsibility for reporting to local, state, or federal public agencies conditions at the site that may present a potential danger to public health, safety, or the environment. The Client agrees to notify the appropriate local, state, or federal public agencies as required by law, or otherwise to disclose, in a timely manner, information that may be necessary to prevent danger to public health, safety, or the environment. The contents of the report should not be construed in any way as a recommendation to purchase, sell, or develop the project site. F&R retains the right to revise this report if new information is later discovered or made available. The report must be presented in its entirety.
Appendix A
F&R Personnel and Laboratory Accreditations
Appendix B
Asbestos Sample Diagrams
Project No.: 61X-0126 Scale: NTS
Date: 19-Jul-19 Drawn: SMH
Drawing No.: 1 Checked: JAC
5B
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 33 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
2B
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
5A
2A/3A1A/6A
4A
1B/3B
7A/B
6B
4B
9B 9A
Drawing No.: 1 Checked: JAC
5B/3B
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 35 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
4B
1B/2B1A/2A
4A 3A
5A
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 36 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
5B
9A
10B
6A 7A
8A 6B 8B
10A
7B 9B 3A
1A/2A
4A 4B 5A
3B
1B/2B
5A
Date: 19-Jul-19 Drawn: SMH
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 37 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
12B
13A
11A 12A
1B
9A
9B
5B
8B 8A4C
10B
10A 7A/B
11B 4D
13B
2A/B 1A4B
6B
4A 3A
5A6A
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 43 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
12A
15A
14A
1B/2B/3B
9A9B 5C
5A
5B
3A
13B
10A 11B
11A
1A/2A 4A
7A
13A 12B
10B
111F
3C
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 43 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
1B16B 16A
3D
20B
4B
6B9C
14B
18B
17A
18A
17B 15B
19B
3E/19A 3F
17C
20A
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 52 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
11B
9B
10A
11A
8A
1B/2B
8B
10B
3B
9A
4A
3A
4B
1A/2A
5A/B
6A/B
7A/B
111114
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110A - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
C231C112C110
C120
1B
8A
9A
5D
2A
15A
15B
5E
10B
3B
2B
8B
6A/7A
4C
4A
8C
9B 14A
14B 5C
3C 4B
5B
3A
1A 5A
4D10D
12B
11B
12A
13 A/B
11A
C216D C216F
C240
16A/B
10C
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110B - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
GA-155GB-111
11A
1B
13A
6A 8A
10A
1A
3B/5B
19A
19B
4A
7A
9B
2A
12A
18A
13A 14A
15A/
19C
13I
4B/6B
13H
5A
9A
18B15B/16B
7B
13C
13F
13D
13E
13B 14B
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
GC-103 & GC-103A
GA-137
GA-154
GB-113GB-120GB-122CGB-121J
GC-102 & GC-102A
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110B - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
4D
5C
4E
19D
23A/B
4C
22E
21A/B 22A/B
19E
21C
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
GA-127
GD-109GD-114 & GD-114A GD-113 & GD-113A
13G
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110B - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
2D-1462C-102A
16M
25B
16K
39A/B19C 18A
40A/B
16L
22A 21A
16J
2A 3A
9A
1A
4A
16I
20A
41A
19A
16N
7A 5A
8A
6A 10B
7B 5B2B
6B
23A
16O
10A
9B 3B 4B
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
2A-119A
2A-160 2A-143A 2A-145A 2A-144A
2A-120
2D-111A 2A-111
16A/17A25A
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110B - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
2D-109A 2C
29B
8B
34C
2D
16H
31B
16F 26, 27, 28 B
16E 24C
33A/B
30B 34A/B
37, 38 A/B
12, 13, 14, 15 A
24A
35, 36 A/B
29A 19B
30A
32A/B
16B
16G
1B
7C
9C
18B
6C
11A
16C
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
2C-101
2D-100H2D-106A
2D-107A
2C-100
2D-102
2D-104A
26, 27, 28 A
2D-100G
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110- Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
DG01C
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
1F
DG05J.1
DG05EDG20ADG50D.1DG05C.1
DG29
BG16BBG16N1 DG05H.1BG19
6B
16A 15A/B
1D 30A/B 1K
1A
2A 3A 11A
4A
8A
10A
7A
17A
22A
19A 21A
3C
20A
18A 1H
25A
9B
8B
9A
5A 6A 12A
1G
1E
18B
25B
1I
17B 10C
26A 25C
23A/B
24A/B
11B
4B
2B 1B
5B7B 12B
1C
27A/B
26B
22C
21C
28A/B 1J29A/B
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110, Floor 2 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
N
D203A
D203A
B219 B201
B216 D207 D220A
14A/B
1B
2B
5B 12A
9A
10A
6B 8A
2-3A
5A 6A
2-4A 4B 7A/B
3B
15A/B
11A
8B 2-1A2-2A
9B
1C
16A/B
8C
10B
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110, Floor 4 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
D429A
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
N
1N
1T
1Q
14B
23A 13A/B
23B
15B
1F
2B
1H 1S
22A
13C
18B
D402A
B433
B412D403A
B423A D417A1
D419A1
C401B
D412A1
19A/20A
19B20BIR
21A/B
1B
14A
1P14A
15A
17A/B
16A/BC401A
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110, Floor 4- Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
N
10A/B
4, 5, 6 A/B
D404A
D420A
1D
D411A
D428AD415A1 D416A
D414A
B417B1
1T
1C
1K
7,8,9 A/B
3A/B
11B
1G
IL
1A
12B
1M
22B
11A 2A
1J 12A
D415B1
D430A
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110, Floor 5 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
4B
3B
4A 1A
3A
2 A/B
6A
5A
7A
7B
5B
6B1B
Drawing No.: 1 Checked: JAC
2A
7A 4A
1A
2B1B
3A
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 110, Floor 6 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
Sample Key:
● = No Asbestos Identified In Sample
● = Trace (<1%) Asbestos Identified In Sample
● = >1% Asbestos Identrified In Sample (Material is ACM)
4B
C602
6A
6B
7B5A5B
Drawing No.: 1 Checked: JAC
Froehling & Robertson, Inc.
Engineering • Environmental • Geotechnical 833 Professional Place Chesapeake, Virginia 23320 I USA
T 757.436.1111 I F 757.436.1674
Building 116 - Asbestos Sample Diagram Hampton Veteran Administration Medical Center
100 Emancipation Drive Hampton, Virginia
N
8B
3C
7A/B
4B
5B/6B
3A
4, 5, 6 A
9A
12A
13B
1A/2A
1B/2B 5C
3B
11A 8A
10A13A
12B 11B
10B
Sample Key:
● = No Asbestos…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .