Building 114 - Floor 1 - Site AnalysisR.pdf

PDF 2 MB Posted

Attached to
Z2DA--590-19-106 Bathroom Upgrades Federal contract opportunity
Solicitation number
36C24621R0018
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document includes a site analysis report and federal contract opportunity notice. The site analysis report provides existing and proposed layouts for 17 bathrooms in Building 114 at the Hampton VA Medical Center, identifying clearance issues in several rooms that would require wall modifications to meet ADA and VA accessibility standards. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs for bathroom upgrade projects at the Hampton VA campus with an estimated value between $2-5 million. As a Total Service-Disabled Veteran-Owned Small Business set-aside, it requires current SAM and VetBiz registrations. The general scope of work involves architectural, interior finishes, MEP, and associated work in accordance with provided drawings and specifications. The point of contact is listed for any questions.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--590-19-106 Bathroom Upgrades, newest first.
File Type Posted
M600 5.pdf PDF
VAMC Site Map Laydown Area.pdf PDF
Renovate Bathrooms Rev 1 Slab Details R.pdf PDF
138A P101.pdf PDF
02 82 00 HVAMC Bathroom Renovation Asbestos Lead Based Paint Survey.pdf PDF
36C24621R0018_2 0005.docx DOCX document
138A-P101.pdf PDF
36C24621R0018_2 0003.docx DOCX document
M600.pdf PDF
VAMC Site Map - Laydown Area.pdf PDF
36C24621R0018_2 0004.docx DOCX document
36C24621R0018_2 0002.docx DOCX document
Building 110A - Site Analysis.pdf PDF
Building 37 - Site Analysis.pdf PDF
Building 36 - Site Analysis.pdf PDF
Building 116 - Site Analysis.pdf PDF
Hampton VAMC Bathroom Renovation Asbestos _ Lead Based Paint Survey - (F).pdf PDF
Building 43.pdf PDF
Building 138A - Site Analysis.pdf PDF
Building 114 - Floor 2 - Site AnalysisR.pdf PDF
Building 146 Area B - Site Analysis.pdf PDF
Building 33 - Site Analysis.pdf PDF
Building 135 - Site Analysis.pdf PDF
Building 110B - Site Analysis.pdf PDF
Building 110 - Site Analysis.pdf PDF
Building 137 - Site Analysis.pdf PDF
Building 52 - Site Analysis.pdf PDF
Drawing 1-50.pdf PDF
36C24621R0018_2 0001.docx DOCX document
Drawing 151 - 307.pdf PDF
Drawing 51-100.pdf PDF
Drawing 101 - 150.pdf PDF
Bathroom Upgrade Spec Book.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment A - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet
Safety Handbook.pdf PDF
36C24621R0018_2.docx DOCX document
Attachment B - Corp Experience Form.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC - HAMPTON

BATHROOM UPGRADES

Project No. ADG18003.00

BUILDING 114 - First Floor

OVERALL FIRST FLOOR

ROOM AG02

ROOM AG07A

ROOM BG05A

ROOM BG06A

ROOM BG07A

ROOM BG08A

ROOM BG09A

ROOM BG013A

ROOM BG014A

ROOM BG015A

ROOM BG016A

ROOM BG017A

SUMMARY BUILDING 114

December 12, 2018

AD

G

3.

BATHROOM UPGRADES| HAMPTON, VIRGINIA

12.07.18

BUILDING 114

3.

EXISTING

3.

PROPOSED

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR

CLEARANCE

OF SINK

3.

3.

3.

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR

3.

3.

3.

3.

3.

3.

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR

3.

3.

3.

3.

3.

3.

3.

3.

3.

3.

3.

3.

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR

3.

3.

3.

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR

3.

3.

3.

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR

3.

3.

3.

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR

3.

3.

3.

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

REQUIREMENT

FOR SHOWER

WIDTH

WALL NEEDS

TO BE

WIDENED

TO MEET 30”

CLEARANCE

REQUIREMENT

FOR SINK

3.

3.

BUILDING 114 - FIRST FLOOR - SUMMARY

ROOM AG02

The clearances meet minimum ADA requirements (2010 ADA Standards). Does not meet requirements based on the VA Barrier Free Design Standards.

ROOM AG07A

The clearances meet minimum ADA requirements (2010 ADA Standards). Does not meet requirements based on the VA Barrier Free Design Standards.

ROOM BG05A, BG07A, BG08A, BG09A

The clearances meet minimum ADA requirements (2010 ADA Standards). Does not meet requirements based on the VA Barrier Free Design Standards.

ROOM BG06A, BG13A, BG14A, BG15A, BG16A

The clearances around the sink do not meet ADA requirements (2010 ADA Standards) The walls surrounding the sink would need to be widened.

ROOM BG17A

The clearances around the sink do not meet ADA requirements (2010 ADA Standards) The walls surrounding the sink would need to be widened. The width of the shower does need meet ADA requirements and needs to be widened.

AS DIRECTED BY THE VA, BATHROOMS THAT CANNOT MEET

ACCESSIBILITY REQUIREMENTS WILL ONLY RECEIVE NEW

FINISHES AND FIXTURES.

File details come from the government source that posted it. Updated .