Building 36 - Site Analysis.pdf
PDF 3 MB Posted
- Attached to
- Z2DA--590-19-106 Bathroom Upgrades Federal contract opportunity
- Solicitation number
- 36C24621R0018
About this file
This document contains a site analysis report and a federal contract opportunity notice. The site analysis report evaluates bathroom upgrades needed at the Hampton VA Medical Center in buildings including rooms 4, 7, 105B, and 105C. Some rooms can be made accessible with minor modifications while others require more substantial changes that may violate building codes. Bathrooms unable to meet accessibility standards will only receive new finishes and fixtures.
The related federal contract opportunity is a solicitation to provide all labor, materials, and services for bathroom upgrades at the Hampton VA campus. Estimated value is $2-5 million. The project scope involves architectural, interior finishes, and mechanical, electrical, and plumbing work. The solicitation is a total service-disabled veteran-owned small business set aside. Interested vendors must register on the website to receive amendments and notices. Current System for Award Management and Vendor Information Pages registration is required to be eligible for award. Questions must be emailed by a specified date.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC - HAMPTON
BATHROOM UPGRADES
Project No. ADG18003.00
BUILDING 36
OVERALL
ROOM 4
ROOM 7
ROOM 105B
ROOM 105C
SUMMARY
January 07, 2019
AD
G
3.
BATHROOM UPGRADES| HAMPTON, VIRGINIA
01.07.19
BUILDING 36
3.
3.
DOOR NEEDS TO
SHIFT TO ALLOW
FOR CLEAR FLOOR
SPACE
3.
3.
3.
3’ - 0” DOOR
MEETS ADA
REQUIREMENTS
MANEUVERING CLEARANCE
AT DOOR DOES NOT MEET
ADA REQUIREMENTS. IF
WALL IS REMOVED TO MAKE
THE CLEARANCE, IT WOULD
BE TAKING SPACE OUT OF
SURROUNDING OFFICES.
WALL TO BE
CLOSED OFF TO
MAKE WALL SPACE
FOR GRAB BAR
NEW LOCATION FOR
WATER HEATER TO
PROVIDE REQUIRED
KNEE SPACE PER ADA
3.
3.
3.
3.
MEETS ADA
REQUIREMENTS
REMOVING THE
URINAL MAKES
THE BATHROOM
ADA COMPLIANT
BUT OFFSETS THE
BUILDING CODE.
3.
3.
MEETS ADA
REQUIREMENTS
REMOVING THE
STALL MAKES
THE BATHROOM
ADA COMPLIANT
BUT OFFSETS THE
BUILDING CODE.
3.
3.
BUILDING 36 SUMMARY
ROOM 04
Existing plan can be made accessible if the door can shift to allow for clear floor space.
ROOM 07
Existing plan can not be made accessible. The proposed fixture layout is compliant but the door approach does not have the required maneuvering clearance.
ROOM 105B + 105C
Existing plan can not be made accessible. The fixture count would need to be decreased in order to bring it closer to being ADA compliant but that would offset the building code.
AS DIRECTED BY THE VA, BATHROOMS THAT CANNOT MEET
ACCESSIBILITY REQUIREMENTS, WILL ONLY RECEIVE NEW
FINISHES AND FIXTURES