Building 146 Area B - Site Analysis.pdf

PDF 3 MB Posted

Attached to
Z2DA--590-19-106 Bathroom Upgrades Federal contract opportunity
Solicitation number
36C24621R0018
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document includes floor plans and analysis for proposed bathroom upgrades at Building 146 of the Hampton VA Medical Center in Hampton, Virginia. The plans detail existing conditions and proposed modifications to 28 bathrooms on the first floor to bring them into compliance with ADA accessibility requirements. Most bathrooms require reconfiguration of fixtures and addition of grab bars to meet necessary clearances and turning radii. Some bathrooms would need structural modifications like raising sink counters or removing bump-outs. Door widths, shower enclosures and toilet placements are among the specific issues addressed. The project is identified as ADG18003.00 and plans were created by the Hampton VAMC on January 4, 2019.

The related federal contract opportunity is a solicitation for bathroom upgrade construction services with an estimated value between $2-5 million. The solicitation number is 36C24621R0018 and opportunity name is Z2DA-590-19-106 Bathroom Upgrades. The work location is the Hampton VA Medical Center and general scope involves providing all labor, materials and MEP work to upgrade bathrooms per drawings and specifications. The solicitation is a total SDVOSB set-aside issued by the VA's VISN 6. Offerors must register on the website and have active SAM and VetBiz registrations to be eligible for award. Questions may only be submitted by email to the point of contact by the date specified.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--590-19-106 Bathroom Upgrades, newest first.
File Type Posted
Renovate Bathrooms Rev 1 Slab Details R.pdf PDF
138A P101.pdf PDF
02 82 00 HVAMC Bathroom Renovation Asbestos Lead Based Paint Survey.pdf PDF
36C24621R0018_2 0005.docx DOCX document
M600 5.pdf PDF
VAMC Site Map Laydown Area.pdf PDF
138A-P101.pdf PDF
36C24621R0018_2 0003.docx DOCX document
M600.pdf PDF
VAMC Site Map - Laydown Area.pdf PDF
36C24621R0018_2 0004.docx DOCX document
36C24621R0018_2 0002.docx DOCX document
Building 33 - Site Analysis.pdf PDF
Building 135 - Site Analysis.pdf PDF
Hampton VAMC Bathroom Renovation Asbestos _ Lead Based Paint Survey - (F).pdf PDF
Building 43.pdf PDF
Building 138A - Site Analysis.pdf PDF
Building 114 - Floor 1 - Site AnalysisR.pdf PDF
Building 114 - Floor 2 - Site AnalysisR.pdf PDF
Building 110B - Site Analysis.pdf PDF
Building 110 - Site Analysis.pdf PDF
Building 137 - Site Analysis.pdf PDF
Building 52 - Site Analysis.pdf PDF
Building 110A - Site Analysis.pdf PDF
Building 37 - Site Analysis.pdf PDF
Building 36 - Site Analysis.pdf PDF
Building 116 - Site Analysis.pdf PDF
Drawing 51-100.pdf PDF
Drawing 151 - 307.pdf PDF
Drawing 101 - 150.pdf PDF
Drawing 1-50.pdf PDF
36C24621R0018_2 0001.docx DOCX document
Safety Handbook.pdf PDF
36C24621R0018_2.docx DOCX document
Attachment B - Corp Experience Form.docx DOCX document
Attachment A - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet
Bathroom Upgrade Spec Book.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC - HAMPTON

BATHROOM UPGRADES

Project No. ADG18003.00

BUILDING 146: FIRST FLOOR AREA B

OVERALL

ROOM 116 ROOM 150 ROOM 183

ROOM 117 ROOM 151 ROOM 184

ROOM 119 ROOM 154 ROOM 185

ROOM 122 ROOM 155 ROOM 186

ROOM 123 ROOM 158

ROOM 126 ROOM 159

ROOM 127 ROOM 162

ROOM 130 ROOM 163

ROOM 131 ROOM 166

ROOM 134 ROOM 167

ROOM 138 ROOM 170

ROOM 142 ROOM 171

ROOM 143 ROOM 174

ROOM 147 ROOM 176

January 4, 2019

AD

G

3.

BATHROOM UPGRADES| HAMPTON, VIRGINIA

12.14.18

BUILDING 146 - FLOOR PLAN AREA B

3.

EXISTING

3.

PROPOSED

4’-0” DOOR

--MEETS VA

BARRIER FREE

DESIGN STANDARD

3.

3.

3.

4’-0” DOOR

--MEETS VA

BARRIER FREE

3.

3.

3.

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

3.

3.

3.

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

TOILET

CLEARANCE

IS NOT ADA

COMPLIANT.

OVERLAPS THE

SINK

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

SHOWER CLEARANCE DOES NOT MEET

ADA REQUIREMENTS. THE BUMP OUT

WOULD NEED TO BE REMOVED TO

ALLOW FOR CLEAR FLOOR SPACE

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

CLEAR FLOOR

AREA DOES

NOT MEET ADA

REQUIREMENTS

- OVERLAPS THE

TOILET

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

3.

3.

3.

THE CLEARANCES DO NOT

MEET ADA REQUIREMENTS.

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

3.

4’-0” DOOR MEETS

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

3.

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

3.

4’-0” DOOR MEETS

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

3.

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT

WOULD NEED

TO BE REMOVED

TO MAKE CLEAR

FLOOR SPACE FOR

SINK

3.

3.

3.

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

4’-0” DOOR MEETS

3.

3.

3.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

3.

3.

3.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

3’-0” DOOR

MEETS ADA

REQUIREMENTS.

4’-0” DOOR

DOES NOT FIT

-- THEREFORE,

WOULD NOT MEET

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

3.

3.

3.

4’-0” DOOR MEETS

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD NEED TO BE RAISED TO

MAKE WALL SPACE FOR GRAB BAR -- IN ORDER

FOR THE SHOWER CLEAR FLOOR SPACE TO BE

ADA COMPLIANT, THE BUMP OUT WOULD NEED

TO BE REMOVED ALL TOGETHER.

3.

3.

3.

THIS BATHROOM IS IN A CONGREGATE BATH

ROOM. WOULD NEED DIRECTION IF ENTIRE

ROOM WILL HAVE NEW FINISHES / FIXTURES.

3.

3.

3.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

NOT MEET ADA

REQUIREMENTS

4’-0” DOOR MEETS

3.

3.

3.

4’-0” DOOR MEETS

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

SHOWER DOES

NOT MEET ADA

REQUIREMENTS -

WOULD NEED TO

SHIFT WALL BACK

TO MAKE IT ADA

COMPLIANT.

3.

3.

3.

4’-0” DOOR MEETS

VA BARRIER FREE

DESIGN STANDARD

BUMP OUT WOULD

NEED TO BE

RAISED TO MAKE

WALL SPACE FOR

GRAB BAR

SHOWER DOES

NOT MEET ADA

REQUIREMENTS -

WOULD NEED TO

SHIFT WALL BACK

TO MAKE IT ADA

COMPLIANT.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

3.

TOILET

CLEARANCE

OVERLAPS THE

SINK - DOES

3.

3.

BUILDING 146 SUMMARY

ROOM 116, 117, 162, 176** 184,

The clearances do meet ADA Requirements.

ROOM 119, 122, 123, 126, 127, 130, 131, 134, 138, 142, 143, 147, 150, 151,

154, 155, 158, 159, 163, 166, 167, 170, 171, 174, 183, 185, 186, The clearances do not meet ADA Requirements

**ROOM 176

This bathroom is part of a Congregate Bath Room. Would need direction from VA if entire room will have new finishes / fixtures.

File details come from the government source that posted it. Updated .