This document contains site analysis plans and specifications for bathroom upgrade projects at the Hampton VA Medical Center in Hampton, Virginia. The project involves upgrading bathrooms in Building 114 on the second floor to meet ADA accessibility requirements by reconfiguring layouts and replacing fixtures. Specific rooms are identified where clearances do not comply and modifications are required, such as shifting walls and removing sinks. Where full compliance is not feasible, only new finishes and fixtures will be installed.
The related federal contract opportunity is solicitation number 36C24621R0018 for project 590-19-106 Bathroom Upgrades at the Hampton VAMC. The project scope involves providing all labor, materials, and associated work for bathroom upgrades throughout the facility in accordance with drawings and specifications. The estimated contract value is between $2,000,000 and $5,000,000. The solicitation is set aside as a total SDVOSB and interested vendors must register on the website to receive amendments. The point of contact for any questions is named and email is specified as the only acceptable method of inquiry.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC - HAMPTON
BATHROOM UPGRADES
Project No. ADG18003.00
BUILDING 114 - SECOND FLOOR
OVERALL SECOND FLOOR
ROOM A102A.1
ROOM A102C.1
ROOM A102D.1
ROOM A102E.1
ROOM A102F.1
ROOM A102G.1
ROOM A102H.1
ROOM A102J.1
SUMMARY BUILDING 114 - FLOOR 2
December 12, 2018
AD
G
3.
BATHROOM UPGRADES| HAMPTON, VIRGINIA
12.12.2018
BUILDING 114 - FLOOR 2
3.
EXISTING
3.
PROPOSED
3.
3.
3.
3.
3.
3.
THE TURNING
CLEARANCE
OVERLAPS
THE TOILET.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
3.
TOILET
WALL NEEDS
TO SHIFT
FORWARD SO
THE TOILET
CLEARANCE
IS CLEAR OF
SINK FIXTURE.
3.
3.
3.
3.
3.
BUILDING 114 SUMMARY
ROOM A1012A - A102J
The clearances do not meet ADA Requirements.
ROOM A113
The clearance at the sink counter needs to be widened & the toilet back wall will need to shift up.
ROOM A115
The sink counter needs to be removed so all the clearances can meet the ADA requirement.
AS DIRECTED BY THE VA, BATHROOMS THAT CANNOT MEET
ACCESSIBILITY REQUIREMENTS WILL ONLY RECEIVE NEW
FINISHES AND FIXTURES.