This solicitation is for bathroom upgrades at various buildings throughout the Hampton VA Medical Center campus. The scope of work includes architectural, interior finishes, and MEP work. Estimated value is between $2-5 million. This opportunity is set aside for total SDVOSB and offers are due no later than February 5, 2021. Any questions must be emailed to the contracting officer by this date. The selected contractor will be responsible for providing all labor, materials, tools and associated work to complete bathroom renovations at multiple buildings in accordance with provided drawings and specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--590-19-106 Bathroom Upgrades, newest first.
File Type Posted
Renovate Bathrooms Rev 1 Slab Details R.pdf PDF
138A P101.pdf PDF
02 82 00 HVAMC Bathroom Renovation Asbestos Lead Based Paint Survey.pdf PDF
36C24621R0018_2 0005.docx DOCX document
M600 5.pdf PDF
VAMC Site Map Laydown Area.pdf PDF
138A-P101.pdf PDF
M600.pdf PDF
VAMC Site Map - Laydown Area.pdf PDF
36C24621R0018_2 0004.docx DOCX document
36C24621R0018_2 0002.docx DOCX document
Hampton VAMC Bathroom Renovation Asbestos _ Lead Based Paint Survey - (F).pdf PDF
Building 43.pdf PDF
Building 138A - Site Analysis.pdf PDF
Building 114 - Floor 1 - Site AnalysisR.pdf PDF
Building 114 - Floor 2 - Site AnalysisR.pdf PDF
Building 110B - Site Analysis.pdf PDF
Building 110 - Site Analysis.pdf PDF
Building 137 - Site Analysis.pdf PDF
Building 52 - Site Analysis.pdf PDF
Building 110A - Site Analysis.pdf PDF
Building 37 - Site Analysis.pdf PDF
Building 36 - Site Analysis.pdf PDF
Building 116 - Site Analysis.pdf PDF
Building 146 Area B - Site Analysis.pdf PDF
Building 33 - Site Analysis.pdf PDF
Building 135 - Site Analysis.pdf PDF
Drawing 151 - 307.pdf PDF
Drawing 101 - 150.pdf PDF
Drawing 1-50.pdf PDF
36C24621R0018_2 0001.docx DOCX document
Drawing 51-100.pdf PDF
Attachment A - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet
Bathroom Upgrade Spec Book.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Safety Handbook.pdf PDF
36C24621R0018_2.docx DOCX document
Attachment B - Corp Experience Form.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-29-2020 590-19-106 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24621R0018_2 12-29-2020

X

This amendment is to add more info to help with your proposals.

Deadline for proposals are no later than Friday, February 5, 2021 at 4:30 EST.

Please see drawings attached

Keith Norman Contracting Officer

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.

(a) GENERAL INSTRUCTIONS:

1. All proposal preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.

2. The price, technical response and past performance of each Offeror will be evaluated independently. Offerors shall separately document each of the three factors. Each of the three offer sections shall therefore be labeled with the Offerors name, business address, and VA Solicitation Number.

3. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including these instructions, the terms and conditions, representations and certifications, and technical and past performance requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

The offer shall consist of three (3) separate parts:

• Part I – TECHNICAL CAPABILITY

• Part II – PAST PERFORMANCE

• Part III – PRICE

(b) SPECIFIC INSTRUCTIONS

1. PART I - TECHNICAL PROPOSAL – Submit electronic PDF document(s) by email.

Management Approach, Corporate Experience, Key Personnel Qualifications, Construction Schedule, Phasing Plan, Infection Control Plan, Quality Control Plan, Safety Plan and the Contractors plan to minimize interference.

Format as follows:

TAB A: General Information

a. Cover page with Solicitation Number and Project Title

b. Table of Contents

c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principle points of contact with addresses, phone numbers and email addresses.

TAB B: TECHNICAL CAPABILITY

a. Management Approach – Subfactor 1

b. Corporate Experience – Subfactor 2

c. Key Personnel Qualifications – Subfactor 3

d. Quality Control Plan – Subfactor 4

2. PART II – PAST PERFORMANCE - Submit Past Performance Questionnaires to references. (Solicitation Attachment C)

a. Past Performance Questionnaires: The contractor shall send out the enclosed past performance questionnaires to each of their references listed under the Experience technical factor or any other references that the Offeror deems necessary. The Government will evaluate the quality and extent of Offeror’s performance deemed relevant and recent to the requirements of this solicitation.

b. The references must return the survey directly to the Government Contracting Officer listed on the survey, via email.

3. PART III - PRICE PROPOSAL - Submit electronic PDF document(s) by email.

TAB A: General Information

a. Cover page with Solicitation Number and Project Title

b. Table of Contents

c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principle points of contact with addresses, phone numbers and email addresses.

TAB B: Offer, Guarantee, and Certifications

a. Complete the SF 1442, Blocks 14, 15, 17, 19, 20A, 20B, 20C and 30. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 30b. One copy of the SF 1442 must bear an original, authorized signature. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP. All sections of the RFP, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract.

b. Complete the PROPOSAL ITEM LIST on Attachment A. As part of their proposal, each Offeror shall be required to complete the attached Base Proposal Item Price Breakdown Form for the Base Proposal Item only. (Solicitation Attachment A)

c. Complete 52.204-8 Annual Representations and Certifications, paragraph (d) applies to this contract. 52.209-5--complete sections (a) (1) and (2), and 52.209-7 paragraph (b). Print out these provisions in their entirety and submit it with the proposal. Offerors shall submit only those pages that require fill-in.

d. Acknowledgement of Amendments

e. Copy of VetBiz Registry printout showing your firm as a verified SDVOSB.

f. Not completing 52.209-7(b), Information Regarding Responsibility Matters (OCT 2018), will render the proposal technically unsatisfactory and will eliminate the proposal from any further consideration for award.

(c) GENERAL INFORMATION

1. Format for proposal Part I & II shall be as follows:

a. A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.

b. Typing shall not be less than font size 12.

2. Offers shall be submitted via email to the Contracting Specialist, Keith Norman, at Keith.Norman2@va.gov prior to the due date and time identified in the solicitation. Multiple emails will likely be required to submit all attachments. Server capacity is 10MB for file attachments, per email.

3. Each response shall address each factor in the sequence listed and clearly identify which factor is being addressed.

4. There shall be no mention of costs in the Technical Proposal.

5. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by the Contracting Office and the Hampton VA Medical Center:

• New Year’s Day – 1 January

• Martin Luther King’s Birthday – Third Monday in January

• Presidents Day – Third Monday in February

• Memorial Day – Last Monday in May

• Independence Day – 4 July

• Labor Day – First Monday in September

• Columbus Day – Second Monday in October

• Veterans Day – 11 November

• Thanksgiving Day – Fourth Thursday in November

• Christmas Eve – 24 December

• Any other Federal Holiday granted by the President of the United States

RFI’S: VA REPSONSES
BATHROOM UPGRADES
Contract #: 36C24621R0018
Project #: 590-19-106
January 25, 2021

1. There is a spec section for casework and countertops, however, there does not appear to be any details or notes in the drawings for cabinets, shelves, vanities, or other typical manufactured woodwork. Can you clarify what scope of work these spec sections are referring to, 12 32 00 and 12 36 00?

This section can be deleted.

2. It appears that demo notes call to remove wall tile but not the backer board. Can you confirm that the backer board is glass mat sheathing, or some other rigid surface capable of withstanding tile demo? Or should we assume an allowance to replace a certain quantity and provide a unit price for any further damaged backer board that needs to be replaced? It is unlikely that walls do not have some sort of existing and unquantifiable damage or will not get damaged during demo.

Substrates vary, an allowance should be assumed to replace damaged substrate to make it ready for new work.

3. There are work notes to install privacy film on bathroom windows. Is there a spec for that or does the finish legend suffice? Does the existing film need to be removed first?

The basis of design product is listed on the finish legend. Existing film should be removed prior to installation of new film.

4. Drawing sheet AE002 shows a detail for “code signage ADA details”. Is this just for reference or will new ADA bathroom signs be part of this contract?

This is for reference.

5. Drawing sheet GI00 Phasing notes say that there must be at least one female and one male restroom available. Is this per building? Per floor? Per area? Per a certain capacity? If it’s per building, does the HVAMC object to shutting down all 47 bathrooms in building 110 except 2 and performing construction on all at once?

VA Response: Contractor may work on multiple bathrooms simultaneously, but there must be one male and one female bathroom available within 100ft of closed bathrooms at all times. Available bathrooms shall be on the same floor of the construction area.

6. Spec Section 01 45 00, Section 1.4: Can you confirm that the CQC System Manger, SSHO, and superintendent cannot be the same person? And if not, confirm that CQC Systems Manager and the SSHO, 2 separate individuals, must BOTH be on site at all times during construction, i.e. 2 managers on site employed by the General Contractor at all times.

VA Response: CQC Systems Manager and SSHO shall be 2 separate individuals that must be onsite at all times during constructions employed by the Prime Contractor. Either one of them can share duties with the superintendent as long as they meet both requirements.

7. Is there space within any of the buildings for a temporary construction office or does the contractor need to rent one? If so, where is there area to hookup and mobile office with power and water?

VA Response: There is no space inside the facility for temporary use. Contractor shall provide their own space. Power can be made available depending on the agreed location with the COR. Water availability will depend on the available space for a temporary office as coordinated and approved by the COR.

8. Will there be a laydown area next to each building for a dumpster and storage area? Or will the laydown area be centralized in one single location for all buildings, and not moved?

VA Response: For bidding purposes, a laydown area at the west end of the property may be provided in area shown in the attached site map. Other arrangements can be submitted for COR approval depending on the mobilization date.

9. Drawing sheet 43.AS103: There is concrete infill for a ramp and new hand railing noted in building 43 but no work notes, details, or specs. Can you provide more info? Type of concrete, reinforcement, doweling, thickness, slope? Railing anchors, profile, materials, galvanized?

A revision will be forth coming with more information on this.

10. There is an electronic safety and security spec, 28 05 00, but no scope of work noted in the drawings. Can you clarify which features of work this applies to? Is this spec section just included for reference?

PACE Response: This section was included for reference only. If contractor damages during construction any of the electronic safety and security devices, this spec section shall be used as a guide for replacement.

11. Can you confirm that bid items 2-4 are not deducts but are asking for the entire scope of work, minus the buildings noted? i.e Bid Item 2 Deduct Alternate 1 is all work in the complete set of plans and specs in their entirety EXCEPT buildings 52, 138, 138A…Bid Item 3 Deduct Alternate 2 is all work in the complete set of plans and specs in their entirety EXCEPT buildings 35 and 36…Bid Item 4 Deduct Alternate 3 is all work in the complete set of plans and specs in their entirety EXCEPT building 33? It appears that bid items 2-4 are intended to be bid options, not deducts to the base bid?

Each deduct alternate removes the referenced buildings from the scope of work. All deduct alternates are compounding, for example, Deduct Alt #3 cannot be taken without first taking Deduct Alt #1 & #2.

12. Is it possible to email proposals instead of hand deliver hard copies? It doesn’t appear this is a sealed bid with a bid opening, so hopefully email delivery will be acceptable?

VA Response: All proposals are to be emailed to Keith.Norman2@va.gov

13. When is construction expected to start for this project? Immediately, or is it anticipated for later in the year?

VA Response: Immediately after award. Award month is expected to be March 2021.

14. Drawing sheet 138A.P101appear to be missing from the Beta SAM files. Can you provide the Bldg 138A Plumbing demo and new work page?

PACE Response: Sheet is included as an attachment.

15. Contractor is very concerned that many bathrooms were not available for a prebid site visit. The risk of unforeseen conditions and subsequent change order requests is very high for these areas. Will additional site visits be scheduled to allow contractors to view all areas to be renovated?

VA Response: There will not be additional site visits.

16. With over 300 pages of drawings and the lack of site visits, the RFI window is too narrow for contractors to develop responsible RFIs. Site analysis documents were issued yesterday and there is not enough time to adequately review them. Will the RFI deadline be extended at least a week to two weeks?

VA Response: Proposals are due on February 5, 2021 as indicated on the latest amendment.

17. In order to install new welded frames, the walls on either side of the frame and above the frame must be demolished for approximately six to eight inches on each side of the location to allow the new frame to be set and new walls built around it. Drawings do not address this demolition or restoration of finishes on corridor side of doors. Please advise if this is the design intent? Please provide wall types and thicknesses to be constructed at each location and construction material – CMU, wood stud, metal stud. If door frames are to be replaced, please provide information on finishes to be restored at hallway/corridor side of frames in all buildings.

All finishes should be replaced in kind New door frames are only required where doors are being widened or relocated as indicate on the demolition plans. Otherwise, existing frames can remain and are to be painted. Corridor finishes are to be replace in kind to match existing.

18. Most bathroom elevations show existing frames to remain and new doors to be installed. Most door schedules call for new hollow metal frames. This applies to buildings 35, 36, 37, 43, 52, 110B, 135, 146. Please confirm existing frames to remain in all locations.

New door frames are only required where doors are being widened or relocated as indicate on the demolition plans. Otherwise, existing frames can remain and are to be painted.

19. Bldg 17, 110 110B, 116, 135, 137, 138, some interior elevations call for new door but are silent on whether frames are to remain. Door schedules call for new frames. Please confirm existing frames are to be left in place and painted.

New door frames are only required where doors are being widened or relocated as indicate on the demolition plans. Otherwise, existing frames can remain and are to be painted

20. Dwg 36.AS101 Room 105C detail D5 shows BCS-1 on east wall. There is currently a recessed stainless-steel paper towel dispenser and trash receptacle similar to PTD-2 in this location not shown on plans. Is this unit to be demolished and the wall infilled to prepare for BCS-1 blocking and installation? What is the current building 36 construction - are steel studs or wood studs to be used if the area is to be infilled?

Yes, this trash can is to be removed and wall to be infilled. Steel studs are acceptable for infill.

21. Dwg 36.AS101 Room 105C detail F5 is not dimensioned. Current center toilet is not centered in stall but is offset toward the window. Detail D5 appears to show toilets centered in larger stalls. Please verify toilets are to be re-centered. If centering is required, it is likely that the ceiling in the area below will need to be accessed in order to offset the sanitary waste pipe. What is the ceiling material below room 105C?

Toilet locations if not dimensioned can remain in existing location.

22. Please provide direction on construction framing to be used in each building whether wood stud or metal Metal.

23. What is “Odorless Epoxy Paint”? See 17 AS101 General New work note 8. What MPIs in paint spec 09 91 00 corresponds to these areas? Paint spec does not appear to address “wet” areas The reference note to can be omitted. Provide Interior Acrylic Latex Semi-Gloss paint in all wet areas.

24. What areas and surfaces are considered “wet” Per General New work note 8?

The reference note to can be omitted. Provide Interior Acrylic Latex Semi-Gloss paint in all wet areas.

25. Where is the designated parking, lay down, and dumpster locations for these jobs?

VA Response: See attached site plan.

26. Is there an area set aside for construction office and meetings?

VA Response: See answer to question #7. Meetings with the VA shall be virtually or in Building 37 as agreed with COR depending on the number of people attending.

27. What are off-peak hours in Bldg 17, see 17 AS100 VA Response: Construction hours for this building shall be coordinated with the COR. If allowed by the Canteen Service, the contractor could work one restroom at a time during normal hours 7:00 AM to 5:00 PM while making temporarily the other available restroom unisex. If Service does not concur, contractor shall perform all work after 5 PM.

28. See AE001, general note 2, How many access doors should we include in our estimate for this job in its entirety?

Contractor to verify quantities based on the drawings.

29. See Note 10 page 17 AS101 says to turn heads up after demolition of ceilings and return them to the down position as new ceilings go in. Should we figure no new heads will be added and therefore no new drawings will be needed?

PACE Response: No new sprinklers will be added under this contract. However, all sprinklers removed for any reason are required to be replaced in accordance with NFPA 25, section 5.4.1.1.

30. Bldg 35 105B and 105C walls appear to have wallpaper above tile. Is wallpaper to be stripped off and walls skimmed to level 5?

Yes, demo note #3 indicates wall finish to be removed and surface to be prepared for new work.

31. Some historical buildings appear to have plaster walls. If they are lathe board and plaster, do the walls that are opened for plumbing rough ins need to be repaired using this method or are metal stud/drywall repairs acceptable?

Metal Stud/drywall is acceptable provided they can match the finish of the existing wall.

32. 36 105B water heater is currently located inside a cabinet below the sink. New fixture P-110 does not have a cabinet. Please confirm water heater is to sit on the floor adjacent to the sink PACE Response: This water heater is a tankless type and should be mounted to the wall below the sink.

33. Bldg 17 was not available on walk through and site analysis was not provided. Will analysis or another site visit opportunity be provided?

VA Response: No.

34. Drawing M600 has an yellow lettering and green box color that makes the drawings nearly illegible. Can this page be corrected asap?

PACE Response: A new PDF has been provided as part of these comment responses.

35. Drawings call for PreTabs. Are post TABs also required?

PACE Response: Post TAB is also required.

36. M-1 Lighted Mirrors are designed for surface mount installation but drawing E501 mounting says ceiling recessed. Product depth is 2”. Opening the walls to recess these units will require reframing to provide a unit support of something roughly 1.5” deep. Typically there is conduit, waste vent stacks, and other obstructions in the walls. Recess mounting against manufacturer’s recommendations may affect internal unit temperatures and service life. Will the VA consider surface mounting these units?

PACE Response: PACE takes no exception to surface mounting these mirrors provided the connections and conduit routing is coordinated with the new installation approach.

37. What size M-1 Mirrors are required for each of the bathrooms?

Mirror sizes are indicated on AE003 Toilet Accessory Schedule.

38. Bldg 36 room 7 electrical calls for extending power to new lighted mirror location. What is the ceiling type in this room? Should conduit be cut into walls/ceiling as needed and patched or can surface mounted conduit be used similar to existing for outlet adjacent to the sink?

PACE Response: Bldg. 36 has drop ceiling and all conduits are to be concealed for aesthetics.

39. page 138 A.AS101 Note 8 says ceiling to remain on demo page. 138A.AS100 finish schedule says new ACT-1 for that room, please clarify.

Ceilings are to be replaced.

40. The drawings call for abatement and notes we need to perform a survey of all areas being demoed to ensure and note any possible abatement issues. Since there is no test completed, can the VA provided all bidders with an Allowance Price to carry for the Abatement work? Or can the VA provide the Hazmat Testing results?

Report is attached for use.

41. Drawing 110.as102, General Door Schedule note # 6. Note # 6 calls for an automatic door opener. There are no specifications for the opener and will not work with the lockset listed.

Automatic door openers are not required for these doors.

42. Are Acrovyn doors required for the construction barriers?

No

43. Are terminated stops required on the door frames?

No

44. 08 1 00 2.19, are ligature resistant door alarms needed? If so what openings?

No

45. Every AS100 sheet for each building indicates on General Note 4 that “Contractor to complete one restroom at a time.” Will the Government allow work in multiple buildings at the same time or is work allowed only in one building at a time? If the building has multiple floors/levels, will the Government allow concurrent work on each floor as long as one unisex bathroom is available per floor?

This note is specific to a situation where only 2 restrooms exist in one area. Phasing Note #1 on G100 indicates Contractor to provide phasing plan for approval to ensure not all restrooms in any given building are without at least one female and one male restroom available.

46. Sheet GI000, Sprinkler Note 1 states to “Modify existing sprinkler system within the limit of construction as indicated on the contract drawings for this project. Provide temporary upright sprinkler heads (during construction).”

a. Will fire protection drawings be provided to show existing heads versus new heads?

PACE Response: No new heads should be required by this project.

b. If no new drawings are available, are there as-built drawings showing the existing layout of sprinkler heads in each bathroom?

PACE Response: It is not anticipated that heads will be required to be relocated as a part of this scope of work.

c. If no new drawings are available, will it be the responsibility of the Contractor and their fire protection subcontractor to design-assist and provide drawings via submittal review?

PACE Response: If it is determined that a new head is required it will be the responsibility of the fire protection subcontractor to design assist and provide drawings.

47. The drawings indicate Hiny Hiders toilet partitions from the manufacturer, Scranton, which are solid plastic material. The Spec Section 10 21 13 indicates phenolic material. Scranton does produce phenolic, only solid plastic. Please advise.

Spec section calls for polyethylene, Hiny Hiders are a High-Density Plastic Polyethylene.

48. There are some drawings that show new tile being installed, but not existing tile demolition. For example in rooms 205 and 206 in Bldg 37 (sheet 37.AS101), the demo plan does not have Demo Note “3” to indicate removal of the existing tile. However, the elevation 37.AE700 and finish schedule on 37.AS101 indicate new tile in these rooms. Please advise that in all buildings in all bathrooms that if new tile is shown that demo note 3 should apply to the demolition work plans.

This is correct. All existing tile is to be removed.

49. The following sheets indicate ACT-1 but do not have any details on the finish schedule: 17.AS100, 43.AS100, 52.AS100, 110.AS100, 110.AS101, 110.AS102, 110.AS103, 110B.AS100, 116.AS100, 135.AS100, 135.AS101, and 138A.AS100. Several architectural sheets show ACT-1 as Armstrong 584WH White 24x24 with some grid as non-tegular and some as 15/16” angled tegular. Please confirm what ACT-1 is required on these listed sheets.

ACT-1 is required on all listed sheets and is to be non-tegular.

50. There is some work and findings shown in the Amendment 2 Site Analysis Reports for each building (dated 2.28.19) that is not shown on the 100% drawings (dated 3.18.20). Please confirm that the 100% drawings supersede the reports and that the reports are to be used for reference only.

VA Response: Drawings supersede the reports. Reports are only for reference and not construction.

51. The following scopes of work were shown on the Amendment 2 Hazardous Materials report, but not on the 100% drawings. Please confirm these items should be disregarded and not in this contract.

a. The Hazardous Materials Report Page 5 shows asbestos in Off-White HVAC insulation seam mastic in Building 146, Rooms 9 and 10. The sheets for Building 146 do not indicate this work.

b. The Hazardous Materials Report Page 12 shows lead based paint in Building 110, Room B411, door frame. The sheets for Building 110 do not indicate this work.

c. The Hazardous Materials Report Page 12 shows lead based paint in Building 37, Rooms 205 and 206, windows and trim. The sheets for Building 37 do not indicate this work.

VA Response: If a bathroom in the contract is included in the report then it should be considered as the report being accurate.

52. The finish schedule for the sink is unclear can you please confirm which sinks will be use at each question with which model Corian Sink (or vanities) are to be used in each area?

Sinks are called out on the Plumbing New Work Plans and basis of design specified on P002.

53. Several areas do have the Corian and Wilsonart finishes called out on their finish schedule and there are even more that do not call them out. However both areas are using the same sink drawings on the interior elevations. There are no call outs for the finishes on any of the new vanities and no details drawings showing intent. On top of that, the plumbing details call for vitreous china wall mounted sinks as well as Corian ones. In order to bid this accordingly we will need the following:

The reference to Corian and Wilsonart finishes should be deleted. All sinks will be wall hung.

a. Confirmation at each location as to which sinks will be used Sinks types are indicated on the Plumbing New Work plans.

b. Finish callouts stating which model Corian sinks(or vanities) will be used in each area.

Refer to plumbing new work plans. Corian vanities are not used.

c. Confirmation if these Corian vanities will need ADA plam aprons underneath. (these are shown in some new work areas, but not all).

Refer to plumbing new work plans for sink types and sheet P002. Corian vanities are not used.

Attachments:

· Plumbing Sheet 138A-P101

· Mechanical Sheet M600

· HVAMC Restroom Pre-Renovation Asbestos and Lead Based Paint Survey Report dated July 19, 2019

See attached document: 138A-P101.

See attached document: M600.

See attached document: VAMC Site Map - Laydown Area.

Contract #: 36C24621R0018 Project #: 590-19-106 Bathroom Upgrades