S02_512-23-154 Addendum 1 Change Log.pdf
PDF 156 KB Posted
- Solicitation number
- 36C24526R0014
About this file
This document is an Addendum Bulletin Summary for the Loch Raven Boiler Consolidation project (Project Number: 512-23-154), issued by Above Group, an engineering design consulting firm. The addendum, designated as Bid Addendum 1, details extensive updates to multiple technical drawings and diagrams, including changes to the sheet list, drainage system, control device numbering, gas detection diagrams, system diagrams, and input/output (IO) summaries. Specifically, the changes affect sheets G002, CU201, MH101, MI001-MI611, MI701-MI703, and MP101-MP102, with modifications ranging from relocated unit heaters to updated valving and format revisions.
The bulletin instructs contractors that if the described changes involve time or contract sum adjustments, they must submit a detailed Change of Work Proposal with itemized labor, material, overhead, and profit breakdowns. Contractors are required to provide quotations from subcontractors or suppliers if their prices are included in the prime contractor's proposal. Failure to respond to the bulletin within the specified time will result in the contractor being considered unaffected by the changes and waiving rights to increased compensation or time extensions.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(321) 345-9026 305 East Drive Suite H Melbourne, FL 32904 abovegroup@abovegroupinc.com
Addendum Bulletin Summary
9/25/2025 Project Name: Loch Raven Boiler Consolidation Project Number: 512-23-154 Addendum/Change Bulletin Designation: Bid Addendum 1 Subject: Updates to control diagrams and site drainage
This Bulletin is not a change order. If work described in this Bulletin involves a change in time or contract sum, provide on Change of Work Proposal for each line item, itemizing labor and material, overhead and profit price breakdown in accordance with the Specifications. Also include any time extensions, if required. Lump sum labor and material prices will not be accepted. If sub-contractors’ or suppliers’ prices are included in the prime contractor’s proposal, provide a copy of their quotation. If no response to a Bulletin is received within the time specified above, then the non-responding Contractor will be determined to not be affected by the change and any rights for increased compensation or time extensions shall be waived.
Specification Changes:
No Specification changes
Drawing Changes:
• G002 – Updated sheet list with changes to sheets described herein
• CU201 – Updates to drainage system inside loading dock
• MH101 – Relocated unit heaters as clouded.
• MI001 - Updated control device numbering scheme
• MI111 – Updated gas detection diagram format and added IO summary
• MI601A – New sheet to update format for system diagram, clarified IO points and sequence of operation
• MI601B – New sheet to revise format for sequence of operation
• MI602 – Updated format and added IO summary
• MI603 – Updated format and added IO summary
• MI604 – Updated format and added IO summary
• MI605 – Updated format and added IO summary
• MI606 – Updated format and added IO summary
• MI607– Updated format and added IO summary
• MI608 – Updated format and added IO summary
(321) 345-9026 305 East Drive Suite H Melbourne, FL 32904 abovegroup@abovegroupinc.com
• MI609 – Updated format and added IO summary
• MI610– Updated format and added IO summary
• MI611 – Updated format and added IO summary
• MI701 – Updated format and added IO summary
• MI702 – Updated format and added IO summary
• MI703 – Updated format and added IO summary
• MP101 – Updated valving to match flow diagram, updated location of unit heaters
• MP102– Updated valving to match flow diagram, updated location of unit heaters
File details come from the government source that posted it. Updated .