This document is a comprehensive set of mechanical engineering design drawings for the Loch Raven Consolidated Boiler Spaces project located in Baltimore, Maryland for the U.S. Department of Veterans Affairs. The project involves a complex boiler facility renovation with 195 total engineering sheets covering multiple disciplines including mechanical, electrical, plumbing, fire protection, structural, and civil engineering.

Key technical details include the installation of three new boilers (each with 6,695 MBH output), a variable primary heating hot water system, gas and fuel oil piping infrastructure, gas detection systems, and extensive building control and automation systems. The design incorporates multiple safety features such as emergency shutoff valves, gas monitoring, fire alarm integration, and redundant control systems. The project is fully sprinklered and includes provisions for backup fuel sources including natural gas and liquefied propane gas. The bid documents are dated 07/07/2025, with a bid addendum issued on 09/24/2025, indicating an upcoming construction procurement process.

View the file

Other files

File Type Posted
NAICS Appeal of Venergy Group LLC SBA No. NAICS-6377 2026 ch.pdf PDF
36C24526R0014 0007_1.docx DOCX document
36C24526R0014 0006.docx DOCX document
36C24526R0014 0005.docx DOCX document
512-23-154_M-801 Bid Add 2.pdf PDF
512-23-154 Bid Addendum 2 Change Log.pdf PDF
512-23-154 - Geotech Report.pdf PDF
512-23-154 - Appendix - HAZMAT.pdf PDF
087100.pdf PDF
512-23-154_Civil MDE Stamped - Bid Add 2.pdf PDF
36C24526R0014 0004_1.docx DOCX document
512-23-154_FA101 Bid Add 2.pdf PDF
S04_Site Visit Sign In_36C24526R0014 - Completed.pdf PDF
512-23-154_FX001 Bid Add 2.pdf PDF
Venergy - NAICS - Notice Orderch1.pdf PDF
36C24526R0014 0003.docx DOCX document
36C24526R0014 0002.docx DOCX document
36C24526R0014 0001_1.docx DOCX document
S02_10 512-23-154 PCRA boiler consolidation.pdf PDF
S02_03 512-23-154 Loch Raven Boiler - Drawings.pdf PDF
S02_02 512-23-154 Loch Raven Boilers - Specs.pdf PDF
36C24526R0014_1.docx DOCX document
S02_512-23-154 Addendum 1 Change Log.pdf PDF
S02_01 512-23-154 Loch Raven Boiler - Final Narrative.pdf PDF
36C24526R0014_1.docx DOCX document
36C24526R0014.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /0

V A

M C

L o c h R a v e n

B o ile r C o n s o lid a ti o n /0

V A

L R

B o ile r C o n s o lid a ti o n

R

M

E P

.r v t

/2

/2

:0

:0

A

M

G002

SHEET LIST Loch Raven Construct Consolidated Boiler Spaces

BALTIMORE MD

0123038

07/07/2025 SK AJZ

BID DOCUMENTS

512-23-154

SHEET LIST

SHEET NUMBER SHEET NAME

GENERAL

G001 COVER SHEET

G002 SHEET LIST

G003 GENERAL NOTES

G100 CODE DATA

CIVIL

CN001 GENERAL NOTES

VI101 EXISTING CONDITIONS & SURVEY SHEET 1

VI102 EXISTING CONDITIONS & SURVEY SHEET 2

VI103 EXISTING CONDITIONS & SURVEY SHEET 3

VI104 EXISTING CONDITIONS & SURVEY SHEET 4

VI105 EXISTING CONDITIONS & SURVEY SHEET 5

BL101 SOIL BORING LOGS - 1

BL102 UTILITY TEST HOLE SURVEY

BL103 UTILITY TEST HOLE SURVEY

GC001 EROSION & SEDIMENT CONTROL NOTES

GC101 EROSION & SEDIMENT CONTROL PLAN PHASE I

GC102 EROSION & SEDIMENT CONTROL PLAN PHASE I & II

GC103 EROSION & SEDIMENT CONTROL PLAN PHASE I & II

GC201 EROSION & SEDIMENT CONTROL PLAN PHASE II

GC501 EROSION & SEDIMENT CONTROL DETAILS

GC502 EROSION & SEDIMENT CONTROL DETAILS

GC503 MICRO-BIO PLAN & PROFILE

CD101 SITE DEMOLITION PLAN

CD102 SITE DEMOLITION PLAN

CD103 SITE DEMOLITION PLAN

CS100 OVERALL SITE PLAN

CS101 SITE LAYOUT PLAN

CS102 SITE LAYOUT PLAN

CS103 SITE LAYOUT PLAN

CS501 SITE DETAILS

CS502 SITE DETAILS

CG101 SITE GRADING & DRAINAGE PLAN

CG102 SITE GRADING & DRAINAGE PLAN

CG103 SITE GRADING & DRAINAGE PLAN

CG501 GRADING & DRAINAGE DETAILS

CU101 SITE UTILITY PLAN

CU102 SITE UTILITY PLAN

CU103 SITE UTILITY PLAN

CU201 SANITARY SEWER PLAN & PROFILE

CU202 UTILITY SERVICE PROFILES

CU231 HOT WATER PIPE PLAN & PROFILE

CU241 HOT WATER PIPE PLAN & PROFILE

CU251 HOT WATER PIPE PLAN & PROFILE

CU261 HOT WATER PIPE PLAN & PROFILE

CU301 GAS LINE PLAN & PROFILE

CU302 GAS LINE PLAN & PROFILE

CU501 UTILITY DETAILS

CU502 UTILITY DETAILS

LS101 LANDSCAPE PLAN

LS102 LANDSCAPE PLAN

LS103 LANDSCAPE PLAN

LS501 LANDSCAPE DETAILS

STRUCTURAL

S-001 GENERAL NOTES AND ABBREVIATIONS

S-002 STATEMENT OF SPECIAL INSPECTIONS

SS100 FOUNDATION AND SLAB ON GRADE PLAN

SS101 MEZZANINE FRAMING PLAN

SS102 ROOF FRAMING PLAN

SS103 BOILER STACK SCREEN FRAMING PLAN

SS104 EQUIPMENT ENCLOSURE PLAN

SS105 MANHOLE 1 PLANS AND ELEVATIONS

SS106 MANHOLE 2 PLANS AND ELEVATIONS

SS107 MANHOLE 3 PLANS AND ELEVATIONS

SS108 MANHOLE 4 PLANS AND ELEVATIONS

S-301 CONCRETE DETAILS AND SECTIONS

S-302 CONCRETE DETAILS AND SECTIONS

S-303 CONCRETE DETAILS AND SECTIONS

S-304 MASONRY DETAILS AND SECTIONS

S-401 MASONRY DETAILS AND SECTIONS

S-501 STEEL DETAILS AND SECTIONS

ARCHITECTURAL

AS101 ARCHITECTURAL SITE PLAN

A001 WALL TYPES

A101-D DIMENSION PLAN

A101-N NOTE PLAN

A102 MEZZANINE PLAN

A103 ROOF PLAN

A104 ROOF PLAN

A105 ROOF PLAN - BUILDING 7

A111 TRANSFORMER ENCLOSURE PLAN & DETAILS

A112 BUILDING 1 & 4 DETAILS

A121 REFLECTED CEILING PLAN

A122 REFLECTED CEILING PLAN - MEZZANINE

A201 EXTERIOR ELEVATIONS

A301 BUILDING SECTIONS

A311 WALL SECTIONS

A312 WALL SECTIONS

A401 INTERIOR ELEVATIONS

A511 CASEWORK SECTIONS AND DETAILS

A601 DOOR SCHEDULE & DETAILS

AF100 FINISH PLANS & FINISH LEGEND

FIRE ALARM

FA001 FIRE ALARM ABBREVIATIONS, LEGEND, AND GENERAL NOTES

FA101 FIRE ALARM PLAN - LEVEL ONE

FA102 FIRE ALARM PLAN - MEZZANINE

FA501 FIRE ALARM DETAILS

FIRE PROTECTION

FX001 FIRE SUPPRESSION ABBREVIATIONS, LEGEND, AND GENERAL NOTES

FX101 FIRE SUPPRESSION PLAN - LEVEL ONE

FX102 FIRE SUPPRESSION PLAN - MEZZANINE

FX501 FIRE SUPPRESSION DETAILS

SHEET LIST

SHEET NUMBER SHEET NAME

PLUMBING

P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS

PS101 FIRST FLOOR UNDERSLAB PLAN - GRAVITY PIPING - NEW WORK

PS111 FIRST FLOOR PLAN - GRAVITY PIPING - NEW WORK

PS121 MEZZANINE PLAN - GRAVITY PIPING - NEW WORK

PS131 ROOF PLAN - GRAVITY PIPING - NEW WORK

PP111 FIRST FLOOR PLAN - PRESSURE PIPING - NEW WORK

PP121 MEZZANINE PLAN - PRESSURE PIPING - NEW WORK

P-301 PLUMBING SECTIONS

P-401 PLUMBING ENLARGED PLANS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-503 PLUMBING DETAILS

P-601 PLUMBING ISOMETRICS

P-602 PLUMBING ISOMETRICS

P-603 PLUMBING ISOMETRICS

P-801 PLUMBING SCHEDULES

MECHANICAL

M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS

MS101 MECHANICAL NEW WORK SITE PLAN

MS100 MECHANICAL DEMOLITION SITE PLAN

MD104.1 BASEMENT PLAN - BLDG 1 - MECHANICAL - DEMOLITION - PH 1

MD104.2 BASEMENT PLAN - BLDG 1 - MECHANICAL - DEMOLITION - PH 2

MD105.2 FIRST FLOOR PLAN - BLDG 4 - MECHANICAL - DEMOLITION - PH 2

MD106.1 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - DEMOLITION - PH 1

MD106.2 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - DEMOLITION - PH 2

MD601 MECHANICAL INSTRUMENTATION - HHW BUILDING 1 DEMO. P&IDS

MD602 MECHANICAL INSTRUMENTATION - HHW BUILDING 4 DEMO. P&ID

MD603 MECHANICAL INSTRUMENTATION - HHW BUILDING 5 DEMO. PH 1 P&ID

MD604 MECHANICAL INSTRUMENTATION - HHW BUILDING 5 DEMO. PH 2 P&ID

MD605 MECHANICAL INSTRUMENTATION - HHW BUILDING 6 DEMO. - P&ID

MH101 FIRST FLOOR PLAN - MECHANICAL - NEW WORK

MH102 MEZZANINE PLAN - MECHANICAL - NEW WORK

MH103 ROOF PLAN - MECHANICAL - NEW WORK

MP101 FIRST FLOOR PLAN - MECHANICAL PIPING - NEW WORK

MP102 MEZZANINE PLAN - MECHANICAL PIPING - NEW WORK

MP104.1 BASEMENT PLAN - BLDG 1 - MECHANICAL - NEW WORK - PH 1

MP104.2 BASEMENT PLAN - BLDG 1 - MECHANICAL - NEW WORK - PH 2

MP105.1 FIRST FLOOR PLAN - BLDG 4 - MECHANICAL - NEW WORK - PH 1

MP105.2 FIRST FLOOR PLAN - BLDG 4 - MECHANICAL - NEW WORK - PH 2

MP106.1 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - NEW WORK - PH 1

MP106.2 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - NEW WORK - PH 2

MP107.1 FIRST FLOOR PLAN - BLDG 7 - MECHANICAL - NEW WORK - PH 1

M-301 MECHANICAL SECTIONS

M-401 MECHANICAL ENLARGED PLANS

M-404 MECHANICAL ENLARGED PLANS

M-403 MECHANICAL ENLARGED PLANS

M-402 MECHANICAL ENLARGED PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-601 MECHANICAL ISOMETRICS

M-801 MECHANICAL SCHEDULES

M-802 MECHANICAL SCHEDULES

MI001 P&ID NOTES, LEGENDS, & SYMBOLS

MI111 MECHANICAL INSTRUMENTATION - GAS MONITORING PLAN

MI601B MECHANICAL INSTRUMENTATION - HEATING HOT WATER CONTROLS

MI601A MECHANICAL INSTRUMENTATION - HEATING WATER SYSTEM P&ID

MI602 MECHANICAL INSTRUMENTATION - HHW DISTRIBUTION SYSTEM P&ID

MI603 MECHANICAL INSTRUMENTATION - FUEL OIL P&ID

MI604 MECHANICAL INSTRUMENTATION - NAT. GAS & LIQUID PROPANE P&ID

MI605 MECHANICAL INSTRUMENTATION - TREATED WATER SYSTEM P&ID

MI606 MECHANICAL INSTRUMENTATION - BOILER TRIM & TRAIN SYSTEM P&ID

MI607 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 1 P&ID

MI608 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 4 P&ID

MI609 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 5 PH 1 P&ID

MI610 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 5 PH 2 P&ID

MI611 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 6 P&ID

MI701 MECHANICAL CONTROLS I

MI702 MECHANICAL CONTROLS II

MI703 MECHANICAL CONTROLS III

ELECTRICAL

E-001 ELECTRICAL LEGENDS & SYMBOLS

E-002 ELECTRICAL GENERAL NOTES

E-100 ELECTRICAL SITE PLAN - DEMOLITION

E-101 ELECTRICAL SITE PLAN - NEW WORK

ED101 BASEMENT PLAN - BLDG 1 - ELECTRICAL - DEMOLITION

ED102.2 FIRST FLOOR PLAN - BLDG 4 - ELECTRICAL - DEMOLITION - PH 2

ED103.1 BASEMENT PLAN - BLDG 5 - ELECTRICAL - DEMOLITION - PH 1

ED103.2 BASEMENT PLAN - BLDG 5,6 - ELECTRICAL - DEMOLITION - PH 2

EL101 FLOOR PLAN - LIGHTING - NEW WORK

EL102 FLOOR PLAN - MEZZANINE LIGHTING

EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK

EP102 MEZZANINE PLAN - ELECTRICAL EQUIPMENT - NEW WORK

EP104 ROOF PLAN - ELECTRICAL - NEW WORK

EP103 FLOOR PLAN - GROUNDING - NEW WORK

EP105 BASEMENT PLAN - BLDG 1 - ELECTRICAL - NEW WORK

EP106.2 FIRST FLOOR PLAN - BLDG 4 - ELECTRICAL - NEW WORK - PH 2

EP107.1 BASEMENT PLAN - BLDG 5 - ELECTRICAL - NEW WORK - PH 1

EP107.2 BASEMENT PLAN - BLDG 5,6 - ELECTRICAL - NEW WORK - PH 2

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL DIAGRAMS

E-602 ELECTRICAL DIAGRAMS

E-802 ELECTRICAL SCHEDULES

E-801 ELECTRICAL SCHEDULES

TECHNOLOGY

T-001 TECHNOLOGY LEGEND, ABBREV & GENERAL NOTES

T-100 TECHNOLOGY SITE PLAN

T-101 FLOOR PLAN - TECHNOLOGY - NEW WORK

T-102 MEZZANINE PLAN - TECHNOLOGY - NEW WORK

T-501 TECHNOLOGY – DETAILS

T-502 TECHNOLOGY – DETAILS

Total Sheet Count: 195

Revisions Date

1 Bid Addendum 1 09/24/2025

PROP. LOADING DOCK

BO

ILE

R

BL

DG

FF

E:

4.0

EX. ROAD

PROP. GRADE

+0

0 4 " W

AT

ER

LA

T.

AT

BU

ILD

IN

G

IN

V.:

5.8

RA

ILI

NG

+0

5 4 " W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.6

+0 6 4

" W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.6

+2

4 4 " W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.6

+2 5 4

" W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.6

+4

8.8 6 4

" W

AT

ER

LA

T.

AT

FU

TU

RE

8"

WA

TE

R

IN

V.:

4.2

10+21.21 EXIST. 18" RCP

INV.:199.50

+4

0.5 "F

UT

UR

E"

FI

BE

R

OP

TIC

IN

V.:

6.1

+4 1.5

PR

OP

OS

ED

U

GE

IN

V.:

6.8

10+06.5 4" FOOTER DRAIN

INV.:±198.16

PROP. WALK

PR

OP

. W

AL

L

PR

OP

. W

AL

L

+4

7.6 0 W

AT

ER

LIN

E V

AL

VE

SE

E D

ET

AIL

5, SH

EE

T C

U5

+1

4.1 6 4

5°

BE

ND

10+20.95

45° BEND

+2

6.8 1 4

5°

BE

ND

10+24.78

45° BEND

48.86 LF 4" C900 WATERLINE

+0

4.2 4"

° B

EN

D

+0

3 4 5°

BE

ND

1.5 7'

CL

EA

R

+3

3.5 6 4

5°

BE

ND

NOTE 1: CONTRACTOR SHALL

VERIFY ALL UTILITY CROSSINGS

PRIOR TO CONSTRUCTION.

EX. ROAD

PROP. GRADE

RA

ILI

NG

+4

4.9 7 6

" W

AT

ER

LA

T.

AT

FU

TU

RE

8"

W

AT

ER

IN

V.:

4.2

+0

0 6 " W

AT

ER

LA

T.

AT

BU

ILD

IN

G

IN

V.:

5.8

+0

5 6 " W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.2

+0 6 6

" W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.2

+2

4 6 " W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.2

+2 5 6

" W

AT

ER

LA

T.

AT

W

AL

L

IN

V.:

4.2

+3

7 "

EX

IST

IN

G"

FI

BE

R

OP

TIC

IN

V.:

6.1

+3 8 E

XIS

TIN

G

UG

E

IN

V.:

6.8

10+21.13 PROP. 18" RCP

INV.:199.60

BO

ILE

R

BL

DG

FF

E:

4.0

PROP. WALK

PR

OP

. W

AL

L

PR

OP

. W

AL

L

PROP. LOADING DOCK

10+06.5 4" FOOTERDRAIN

INV.:±198.16

+4

3.8 1 W

AT

ER

LIN

E V

AL

VE

SE

E D

ET

AIL

5, SH

EE

T C

U5

44.97 LF 6" C900 WATERLINE

+0

4.5 4"

° B

EN

D

+0

3 4 5°

BE

ND

1.4 6'

CL

EA

R

NOTE 1: CONTRACTOR SHALL

VERIFY ALL UTILITY CROSSINGS

PRIOR TO CONSTRUCTION.

PROP. WALK

PR

OP

. W

AL

L

EXISTING GRADE

34.6 LF 4" SANITARY SEWER @ 27.4%

(SEE SPECIFICATION FOR MATERIAL)

+0

0 4 " S

AN

ITA

RY

LA

T.

AT

BU

ILD

IN

G

IN

V.:

2.5

+0

5 4 " S

AN

ITA

RY

LA

T.

AT

W

AL

L

IN

V.:

0.0

+0

6 4 " S

AN

ITA

RY

LA

T.

AT

W

AL

L

IN

V.:

9.7

10+34.6 PROP. 8" SANITARY

INV.:193.00

+1

2.4 4"

EX

IST

IN

G

UG

E

IN

V.:

0.8

10+06.5 4" FOOTERDRAIN

BOILER BLDG FFE: 214.00

10+21.18 4" PROP. HOT WATR

INV.:195.33

10+10.00 CLEANOUT

RIM: 204.34

NOTE 1: CONNECT PROPOSED

LATERAL TO PROPOSED MAIN VIA

WYE CONNECTION VIA INSERTA

TEE. SEE DETAIL 4, SHEET CU502.

1.2 5'

CL

EA

R

+1

5.1 7 4

" C

LE

AN

OU

T

IN

V.:

8.7

NOTE 2: CONTRACTOR SHALL

VERIFY ALL UTILITY CROSSINGS

PRIOR TO CONSTRUCTION.

PROP. LOADING DOCK

EX. ROAD

PROP. GRADE

RA

ILI

NG

+0

0 4 " F

DC

LA

T.

AT

BU

ILD

IN

G

IN

V.:

5.8

+0

5 4 " F

DC

LA

T.

AT

W

AL

L

IN

V.:

4.7

+0

6 4 " F

DC

LA

T.

AT

W

AL

L

IN

V.:

4.7

+2

4 4 " F

DC

LA

T.

AT

W

AL

L

IN

V.:

4.7

+2

5 4 " F

DC

LA

T.

AT

W

AL

L

IN

V.:

4.7

+2

6.2 1 4

" F

DC

LA

T.

BE

ND

IN

V.:

4.7

BO

ILE

R

BL

DG

FF

E:

4.0

PROP. WALK

PR

OP

. W

AL

L

PR

OP

. W

AL

L

10+21.03 EXIST. 18" RCP

INV.:199.60

10+06.5 4" FOOTERDRAIN

INV.:±198.16

26.21 LF 4" C900 FDC LATERAL

+0

4.4 4"

° B

EN

D

+0

3 4 5°

BE

ND

4" FDC

NOTE 1: CONTRACTOR SHALL

VERIFY ALL UTILITY CROSSINGS

PRIOR TO CONSTRUCTION.

PROP. LOADING DOCK

EX. ROADPROP. GRADE

RA

ILI

NG

+0

0 4 " S

TO

RM

LA

T.

AT

BU

ILD

IN

G

IN

V.:

8.5

+0

5 4 " S

TO

RM

LA

T.

AT

W

AL

L

IN

V.:

4.8

+0 6 4

" S

TO

RM

LA

T.

AT

W

AL

L

IN

V.:

4.8

10+18.40 EXIST. 18" RCP

INV.:200.40

BO

ILE

R

BL

DG

FF

E:

4.0

PROP. WALK

PR

OP

. W

AL

L

PR

OP

. W

AL

L

+0

6.5 4"

FO

OT

ER

DR

AIN

IN

V.:

±1

.16

NOTE 1: CONNECT PROPOSED

LATERAL TO 18" RCP VIA INSERTA

TEE. SEE DETAIL 4, SHEET CU502.

18.4 LF 4" PVC SDR 35 STORM

UNDERDRAIN @ 1.0%

+0

4.7 5 4

5°

BE

ND

+0

1.1 2 4

5°

BE

ND

+1

3.5 8 4

5°

BE

ND

NOTE 2: CONTRACTOR SHALL

VERIFY ALL UTILITY CROSSINGS

PRIOR TO CONSTRUCTION.

EX. ROAD

PROP. GRADE

RA

ILI

NG

10+20.40 EXIST. 18" RCP

INV.:199.80

+0

0 6 " S

TO

RM

LA

T.

AT

BU

ILD

IN

G

IN

V.:

6.5

+0

5 6 " S

TO

RM

LA

T.

AT

W

AL

L

IN

V.:

5.0

+0 6 6

" S

TO

RM

LA

T.

AT

W

AL

L

IN

V.:

5.0

10+26.5 4" PROP. FDC

INV.:206.83

BO

ILE

R

BL

DG

FF

E:

4.0

PROP. WALK

PR

OP

. W

AL

L

PR

OP

. W

AL

L

PROP. LOADING DOCK

+0

6.5 4"

FO

OT

ER

DR

AIN

IN

V.:

±1

.16

NOTE 1: CONNECT PROPOSED

LATERAL TO 18" RCP VIA INSERTA

TEE. SEE DETAIL 4, SHEET CU502.10

+1 4.3

4"

PR

OP

. T

EL

E.

IN

V.:

7.0

0 -

SE

E N

OT

E 2

NOTE 2: ELEVATION IS SHOWN

FOR INTENT. SEE ARCHITECTURAL

PLANS FOR REFERENCE.

20.40 LF 6" PVC SDR 35 STORM

UNDERDRAIN @ 1.0%

+0

4.8 6 4

5°

BE

ND

+0 3.3

5 4 5°

BE

ND

+1

6.1 1 4

5°

BE

ND

1.4 9'

CL

EA

R

NOTE 3: CONTRACTOR SHALL

VERIFY ALL UTILITY CROSSINGS

PRIOR TO CONSTRUCTION.

PROP. LOADING

DOCK

BO

ILE

R

BL

DG

FF

E:

4.0

RA

ILI

NG

PROP. WALK

PR

OP

. W

AL

L

PR

OP

. W

AL

LEX. GRADE

10+17.98 EXIST. 18" STRM

INV.:200.50 ±

SEE NOTE 1, THIS PROFILE

PROP. RETAINING WALL ELEV.

9 LF 4" STORM

PVC SDR35 @ 1.0%

+1

1.9 5 4

" P

IV

IN

V.:

5.5

SE

E D

ET

AIL

ON

C

G5

NOTE 1: CONNECT PROPOSED

LATERAL TO 18" RCP VIA INSERTA

TEE. SEE DETAIL 4, SHEET CU502.

10+10.17 2.75'X2.75'

CATCH BASIN INV:205.10

SEE DETAIL 2 ON CG501

RI

M:

8.6

10+16.23 45° BEND

10+15.27 45° BEND

+1

6.2

° B

EN

D

NOTE 2: CONTRACTOR SHALL

VERIFY ALL UTILITY CROSSINGS

PRIOR TO CONSTRUCTION.

4"x4"x4" TEE, ANCHOR TO INSIDE WITH HILTI

BOLT, INSTALL CAPS AT ENDS AND DRILL 1.75"

HOLE AT BOTTOM OF HORIZONTAL CAP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

Au to de sk

D oc s:

//0

VA

M

C L oc h

R av en

Bo ile r C on so lid at io n/

8_

VA

L R

_B oi le r C on so lid at io n_

R

_M

EP

.rv t

1/

/2

1:

:5

PM

Loch Raven Construct Consolidated Boiler Spaces

BALTIMORE MD

512-23-154

07/07/2025 GS CA & AR

BID DOCUMENTS

Revisions Date

INTEGRITY

FEDERAL SERVICES

CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.ifs-ae.com

IN

TE

GRITY FEDERA

L

SERV I CES

MDE NUMBER 25 - SF - 0022

01 08/18/2025BID ADDENDUM 01

UTILITY SERVICE PROFILES

CU202

GRAPHICAL SCALE: 1"=5'

5 2.5 0 5 10 15

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

GRAPHICAL SCALE: 1"=5'

5 2.5 0 5 10 15

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

GRAPHICAL SCALE: 1"=5'

5 2.5 0 5 10 15

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

GRAPHICAL SCALE: 1"=5'

5 2.5 0 5 10 15

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

GRAPHICAL SCALE: 1"=5'

5 2.5 0 5 10 15

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

4" DOMESTIC WATER CONNECTION PROFILE1

6" FIRE WATER SERVICE CONNECTION PROFILE2

4" FDC CONNECTION PROFILE3

6" STORM LATERAL PROFILE4

4" STORM LATERAL PROFILE5

GRAPHICAL SCALE: 1"=5'

5 2.5 0 5 10 15

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

4-INCH STORM GRATE IN TRUCK DOCK PROFILE7

4" SANITARY LATERAL PROFILE6

GRAPHICAL SCALE: 1"=5'

5 2.5 0 5 10 15

10-YR

ELEV = 9.17

100-YR

ELEV = 9.53

09/24/2025

UP

GENERATOR

ELECTRICAL

CONTROL

ROOM

BREAK AREA

WATER

TREATMENT

LOCKERS -

WOMEN

TOILET/

TOILET/

SHOWER

BOILER

ROOM

Exterior

EXT

E1 80

E1 80

E1 130

10-IDU-1-1

E2 165

LOCKERS -

MEN

10-GBS-1-1

S21 2800

S1 100

T2 130

S4 220

S4 225S4 225

10-HWUH-1-1

10-HWUH-1-2

10-HWUH-1-6

10-B-1-1 10-B-1-2 10-B-1-3

18ø FE

18ø FE

18ø FE

10-PHWP-1-1 10-PHWP-1-2 10-PHWP-1-3

10-AS-1-1

10-FOPS-1-1

10-FOF-1-1

10-SHWP-1-3

10-SHWP-1-2

10-SHWP-1-1

BAS

GDS

7 7 7

10-HWUH-1-8

HAC

10x10 EA

10"x10" EA UP1

6" SA UP1

4ø SA

12" SA UP 1

6" SA UP1

10 10

36x80 EA

A B D E

C

10-ET-1-1 10-ET-1-2

10-RFS-1-1 10-RFS-1-2

12" AFF

T2 130 2

2T2 130

T2 130

E1 130

8x8 EA

10-ATU-1-1

S4 220

14x14 SA

E2 165

10"x10" EA UP 1

8ø SA

8x8 EA

T

10-ATU-1-1

S1 110

10-ATU-1-3

10-ATU-1-2

T

10-ATU-1-2

T

10-ATU-1-3

T2 150

T

10-IDU-1-1

8ø SA

68x86 OA

20x20 EA 20x20 EA

10-IDU-1-2

T

10-IDU-1-2

10-HWUH-1-4

10-HWUH-1-5

MAU CONTROL PANELS

10-HWUH-1-3

E3 1400

26"x18" EA UP

26"x18" EA UP E3 1400

10'-0" AFF

10'-6" AFF

GAS REGULATOR/METER SET

10ø FE

10ø FE

EP101

E4 150

T1 150

10-AST-02

10-AST-01

PROPANE

GAS

BOOSTER

S20 200

12" AFF

20"X20" OA UP8"X8" OA UP

6"x10" EA UP

E4 200

10'-0" AFF

EXHAUST

SILENCER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Au to de sk

D oc s:

//0

VA

M

C L oc h

R av en

Bo ile r C on so lid at io n/

8_

VA

L R

_B oi le r C on so lid at io n_

R

_M

EP

.rv t

9/

/2

3:

:5

PM

MH101

FIRST FLOOR PLAN - MECHANICAL -

NEW WORK

Loch Raven Construct Consolidated Boiler Spaces

BALTIMORE MD

0123038

07/07/2025 GSC ZGC

BID DOCUMENTS

512-23-154

CODED NOTES:

PROVIDE FIRE DAMPER AT PENETRATION OF MEZZANINE SLAB, ACCESS DOOR SHALL BE FROM

MEZZANINE SIDE SEE MH102 FOR CONTINUATION.

DOOR SHALL BE PROVIDED WITH DOOR GRILLE SIZED FOR 110 CFM TRANSFER MINIMUM.

BOILER CONTROL PANEL AND BMS DDC PANEL MOUNTED ON UNISTRUT FRAME.

MOUNT HWUH WITH BOTTOM OF UNIT HEATER MINIMUM 7'-0" A.F.F.

OA DUCT UP TO 10-GLP-3-5, SEE SHEET MH103 FOR CONTINUATION.

CONNECT 60x60 EA TO GENERATOR ENGINE DUCT FLANGE. PROVIDE RECIRCULATION AIR DAMPERS AS SHOWN ON CONTROL DIAGRAM. ROUTE 100x24 EA UP AND TRANSITION TO 80x36 EA TO GRAVITY

LOUVERED PENTHOUSE, SEE MH103 FOR CONTINUATION.

PREFABRICATED DOUBLE WALL BOILER VENT SYSTEM. ROUTE UP THROUGH ROOF WITHIN EQUIPMENT

SCREEN, SEE MH103 FOR CONTINUATION.

MECHANICAL CONTRACTOR TO INSTALL GENERATOR MUFFLER PER MANUFACTURER'S INSTALLATION GUIDELINES. PROVIDE ENGINE EXHAUST PIPE AS SHOWN TO BE SCH 40 CARBON STEEL WITH 3" OF

CALCIUM SILICATE INSULATION.

MAKE-UP AIR FOR GENERATOR UP TO GRAVITY LOUVERED PENTHOUSE WITH CONTROL DAMPER, SEE

MH103 FOR CONTINUATION. TERMINATE DUCT 10' AFF WITH WIRE MESH SCREEN.

TERMINATE EA DUCT 9' AFF, COVER OPENING WITH WIRE MESH SCREEN.

ALL REQUIRED CONTROL AND POWER WIRING AND CONDUIT BETWEEN MAU CONTROL PANEL AND MAU

SHALL BE PROVIDED BY THE CONTRACTOR. COORDINATE FINAL REQUIREMENTS WITH MAU

MANUFACTURER.

NN

0 2' 4' 8' 12'

1/4" = 1'-0"

1/4" = 1'-0"1 FIRST FLOOR PLAN - MECHANICAL - NEW WORK

Revisions Date

DRAWING SHEET NUMBER FOR CONTINUATION / CONNECTION

GRID LOCATION FOR CONTINUATION / CONNECTION

ARROW INDICATES DIRECTION OF FLOW

FROM ENERGY

CENTER DISTRIBUTION

SYSTEM SYSTEM / LOCATION DESCRIPTION

P&ID CONTROLS LEGEND

INSTRUMENT DESCRIPTION (TYP). REFER TO P&ID INSTRUMENT

DESCRIPTION TABLE.

INSTRUMENT NUMBER (TYP). REFER TO INSTRUMENT SCHEDULE.

DISCRETE DEVICE; LOCATED IN FIELD

DISCRETE DEVICE; LOCATED IN OR ON FRONT OF CENTRAL OR

MAIN PANEL.

PROCESS CONTROL; LOCATED IN FIELD

PROCESS CONTROL; LOCATED IN OR ON FRONT OF CENTRAL OR

MAIN PANEL

COMPUTER SYSTEMS AND SOFTWARE; SCADA INDICATION

DUCT SMOKE DETECTOR

STARTER

A ALARM

IMMERSION TEMPERATURE TRANSMITTER

W/ THERMOWELL

EMERGENCY PUSHBUTTON

AIR FLOW SENSOR

DUCT MOUNTED TEMPERATURE SENSOR

INDICATES AVERAGING ELEMENT SENSOR

VARIABLE FREQUENCY DRIVE

OPPOSED BLADE DAMPER

PARALLEL BLADE DAMPER

PARTICULATE TRANSMITTERPT

INDICATES PROBE SENSOR

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

CONTROLS LEGEND

NOTE: SOME SYMBOLS AND ABBREVIATIONS SHOWN MAY NOT PERTAIN TO THIS PROJECT

CONTROL GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

A.

B.

C.

A.

CONTRACTOR SHALL REVIEW SEQUENCES PRIOR TO PROGRAMMING AND SUGGEST MODIFICATIONS WHERE REQUIRED TO ACHIEVE THE DESIGN INTENT. CONTRACTOR MAY ALSO SUGGEST MODIFICATIONS TO IMPROVE PERFORMANCE AND STABILITY OR TO SIMPLIFY OR REORGANIZE LOGIC IN A MANNER THAT PROVIDES EQUAL

OR BETTER PERFORMANCE.

INCLUDE COSTS FOR MINOR PROGRAM MODIFICATIONS IF REQUIRED TO PROVIDE PROPER PERFORMANCE OF

THE SYSTEM.

UNLESS OTHERWISE INDICATED IN SOO, CONTROL LOOPS SHALL BE ENABLED AND DISABLED BASED ON THE

STATUS OF THE SYSTEM BEING CONTROLLED TO PREVENT WIND-UP.

THE TERM “PROVEN” (I.E. “PROVEN ON” / “PROVEN OFF”) SHALL MEAN THAT THE EQUIPMENT’S DI STATUS POINT

MATCHES THE STATE SET BY THE EQUIPMENT’S DO COMMAND POINT.

THE TERM “PID LOOP” OR “CONTROL LOOP” IS USED GENERICALLY FOR ALL CONTROL LOOPS AND SHALL NOT BE INTERPRETED AS REQUIRING PROPORTIONAL PLUS INTEGRAL PLUS DERIVATIVE GAINS ON ALL LOOPS. UNLESS SPECIFICALLY INDICATED OTHERWISE, DO NOT USE THE DERIVATIVE TERM ON ANY LOOPS UNLESS FIELD

TUNING IS NOT POSSIBLE WITHOUT IT.

ALL SET-POINTS, TIMERS, DEAD-BANDS, ETC. LISTED IN SEQUENCES SHALL BE CAPABLE OF BEING ADJUSTED BY THE OPERATOR WITHOUT HAVING TO ACCESS PROGRAMMING WHETHER INDICATED AS ADJUSTABLE IN SEQUENCES OR NOT. SOFTWARE (VIRTUAL) POINTS SHALL BE USED FOR THESE SET-POINTS. FIXED SCALAR NUMBERS SHALL NOT BE IMBEDDED IN PROGRAMS UNLESS THE VALUE WILL NEVER NEED TO BE ADJUSTED. PID GAINS SHALL BE ONLY ACCESSIBLE BY AUTOMATION TECHNICIAN AND HIDDEN FROM EVERYDAY OPERATOR.

VALUES FOR ALL POINTS, INCLUDING REAL (HARDWARE) POINTS USED IN CONTROL SEQUENCES SHALL BE CAPABLE OF BEING OVERRIDDEN BY THE USER (E.G. FOR TESTING AND COMMISSIONING). IF HARDWARE DESIGN PREVENTS THIS FOR HARDWARE POINTS, THEY SHALL BE EQUATED TO A SOFTWARE POINT AND THE SOFTWARE POINT SHALL BE USED IN ALL SEQUENCES. EXCEPTION: NOT REQUIRED FOR EMERGENCY

GENERATOR AND ELECTRICAL READ ONLY POINTS.

MOTOR SPEED CONTROL SET-POINTS:

MINIMUM SPEED SET-POINTS FOR ALL VFD-DRIVEN AND EC MOTOR EQUIPMENT SHALL BE THE GREATER OF

EITHER 6 HZ OR THE MINIMUM SPEED REQUIRED TO AVOID STALLING THE DEVICE SERVED.

MINIMUM SPEED FOR EACH PIECE OF EQUIPMENT SHALL BE STORED IN A SINGLE SOFTWARE POINT THAT SHALL BE USED IN PROGRAMMING (SUCH AS PID LOOP OUTPUT RANGE) AND ITS VALUE SHALL BE ASSIGNED TO THE MINIMUM SPEED SET-POINT STORED IN THE VFD VIA THE DRIVE NETWORK INTERFACE. IN THIS WAY THERE IS ONLY ONE MINIMUM SET-POINT, RATHER THAN SET-POINTS BOTH IN THE DRIVE AND IN THE

SOFTWARE WHICH COULD DIFFER.

MAXIMUM SPEED SET-POINT FOR MOTOR DRIVEN EQUIPMENT SHALL BE DETERMINED BY THE MAXIMUM ALLOWABLE OPERATIONAL SPEED BY THE MOTOR AND OR DRIVEN DEVICE MANUFACTURER. THE SPEED CONTROL SHALL NOT LIMIT THE MAXIMUM RUNNING SPEED TO 60 Hz UNLESS THAT IS THE MAXIMUM SPEED

ALLOWABLE BY THE MOTOR, FAN, OR PUMP.

9. FURTHER BOILER CONTROLLER REQUIREMNETS:

PARALLEL POSITIONING CONTROLLER MUST HAVE ORIGINAL EQUIPMENT MANUFACTURER PASSWORD

PROTECTED FEATURE

GAS

000000

GAS

TYPE

GAS TYPE SENSOR

VFD

CONTROL DEVICE NUMBERING SCHEME:

010000: OUTSIDE AIR

020000: RELIEF/EXHAUST AIR

030000: MIXED AIR

040000: SUPPLY AIR

050000: RETURN AIR

060000: CHILLED WATER

070000: STEAM

080000: HEATING HOT WATER

090000: AUXILIARY SYSTEMS

100000: GAS DETECTION

110000: FUEL GAS

120000: FUEL OIL

130000: BOILER FUEL TRAIN

140000: DOMESTIC COLD

150000: DOMESTIC HOT

160000: HOT WATER RECIRC.

170000: SOFTENED WATER

180000: FLUE GAS/BOILER EXHAUST

000000: GENERAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Au to de sk

D oc s:

//0

VA

M

C L oc h

R av en

Bo ile r C on so lid at io n/

8_

VA

L R

_B oi le r C on so lid at io n_

R

_M

EP

.rv t

9/

/2

3:

:0

PM

MI001

P&ID NOTES, LEGENDS, & SYMBOLS Loch Raven Construct Consolidated Boiler Spaces

BALTIMORE MD

0123038

07/07/2025 GSC ZGC

BID DOCUMENTS

512-23-154

INSTRUMENT DESCRIPTION TABLE

LE

TT

ER

FIRST LETTER SECOND LETTER

MEASURED OR INITIATED

VARIABLE MODIFIER

READOUT OR

PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER

A ANALYSIS ALARM ALARM / AUTOMATIC

B BURNER FLAME USERS CHOICE USERS CHOICE BEACON (LIGHT)

C CONDUCTIVITY CONTROL CLOSED

D DENSITY (MASS) OR

SPECIFIC GRAVITY

DIFFERENTIAL

E VOLTAGE (EMF) PRIMARY ELEMENT

F FLOW RATE RATIO (FRACTION)

G GAUGING (DIMENSIONAL) GLASS, GAUGE

H HAND (MANUALLY

INITIATED)

HORN (BUZZER) HIGH

I CURRENT (ELECTRICAL) INDICATE

J POWER SCAN

K TIME OR TIME SCHEDULE TIME RATE OF

CHANGE

CONTROL STATION

L LEVEL LIGHT (PILOT) LOW

M MOISTURE HUMIDITY MIDDLE OR

INTERMEDIATE

N CONSISTENCY USERS CHOICE USERS CHOICE USERS CHOICE

O USERS CHOICE ORIFICE

(RESTRICTION)

P PRESSURE OR VACUUM POINT (TEST)

CONNECTION

Q QUALITY INTEGRATE OR

TOTALIZE

R RADIOACTIVITY RECORD OR PRINT

S SPEED OR SOLENOID

FREQUENCY

SAFETY SWITCH

T TEMPERATURE TRANSMIT

U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION

V VISCOSITY OR

VIBRATION

VALVE, DAMPER, OR

LOUVER

W WEIGHT OR FORCE WELL

X UNCLASSIFIED X AXIS UNCLASSIFIED UNCLASSIFIED

Y EVENT, STATE, OR

PRESENCE

Y AXIS RELAY OR COMPUTE

Z POSITION OR DIMENSION Z AXIS DRIVE, ACTUATE, OR

UNCLASSIFIED FINAL

CONTROL ELEMENT

ZERO (SPEED OR

POSITION)

Revisions Date

UP

Gx

Kx

Jx

Ly

Lx

Hx

T

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

LINENCHUTE

CHUTE

TRASH

HR

RAMP UP

UP

UP

UP

FEC

FEC

FEC

H S

H S

H S

H S

H S

HS

HS

H S

AT

100101

UAHB

100101

AT

100102

UAHB

100102

AT

100103

UAHB

100103

AT

100104

UAHB

100104

AT

100200

UAHB

100201

AT

100301

UAHB

100301

BMS

10-BLR-01

BMS

10-BLR-02

BMS

10-BLR-03

GBS

10-GBS-01

BAS

GDS-1

FACP

GDS-1

AT

100401

UAHB

100401

UAHB

100202

UAHB

100203

UAHB

100302

10-B-1-1 10-B-1-2 10-B-1-3

10-SHWP-1-1

10-SHWP-1-2

10-SHWP-1-3

10-PHWP-1-1

10-PHWP-1-2

10-PHWP-1-3

10-FOPS-1-1

10-FOF-1-1

10-GBS-1-1

BAS

GAS

100101

CO

CH4

GAS

1-2

CO

CH4

GAS

100301

CO

CH4

GAS

100201

CO

GAS

1-3

CO

CH4

ZONE 2

ZONE 1

ZONE 3

BOILER ROOM

CONTROL

ROOM

WATER

TREATMENT

GENERATOR

ELECTRICAL

LOCKERS -

WOMEN

TOILET/

SHOWER

TOILET/

LOCKERS -

MEN

A B D E

C

GAS

1-4

CO

CH42

5 3

GAS

100401

C3H8

ZONE 4

GAS BOOSTER

PROPANE

ZONE 1

BOILER ROOM (102) & MEZZANINE

ZONE 3

GAS BOOSTER (114)

ZONE 2

CONTROL ROOM (104)

GAS DETECTION

SYSTEM CONTROLLER

GDS-1

NOTE SE

NS

OR

IN

PU

TS

AL

AR

M

OU

TP

UT

S

SA

FE

TY

SH

UT

DO

W

N

COMM POWER

6 7

GDS-1 BAS MAPPED POINTS

GAS LEVEL READING PER ZONE

LOW ALARM (PER ZONE)

HIGH ALARM (PER ZONE)

FAULT

LOCATED ON

MEZZANINE

LOCATED ON

MEZZANINE

ZONE 4

PROPANE (113)

LOCATED EXTERIOR

TO REAR CTRL RM

ENTRANCE

LOCATED EXTERIOR

TO MAIN ENTRANCE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Au to de sk

D oc s:

//0

VA

M

C L oc h

R av en

Bo ile r C on so lid at io n/

8_

VA

L R

_B oi le r C on so lid at io n_

R

_M

EP

.rv t

9/

/2

3:

:3

PM

MI111

MECHANICAL INSTRUMENTATION -

GAS MONITORING PLAN

Loch Raven Construct Consolidated Boiler Spaces

BALTIMORE MD

0123038

07/07/2025 GSC ZGC

BID DOCUMENTS

512-23-154

CODED NOTES:

GAS DETECTION CONTROLLER. BASIS OF DESIGN - MSA MODCON 75 TOUCH CONTROLLER. CONTROLLER SHALL BE PASSWORD PROTECTED AND

PASSWORD SHALL BE SHARED WITH APPROVED VA PERSONNEL.

GAS MONITOR WITH DUAL GAS SENSING. BASIS OF DESIGN - MSA ULTIMA X5000 GAS MONITOR. MONITOR SHALL BE MOUNTED AT 4'-0" - 6'-0" ABOVE FINISHED FLOOR FOR CARBON MONOXIDE (CO) SENSING AND THE METHANE (CH4) SENSOR SHALL BE PIPED UP TO WITHIN 6" - 10" OF UNDERSIDE

OF ROOF DECK. PROVIDE SENSORS WITH CALIBRATING PIPING/PORTS.

AUDIOVISUAL HORN AND STROBE, ACTIVATED BY GAS DETECTION SYSTEM. MOUNT HORN AND STROBES IN ACCORDANCE WITH NFPA 715 AT 80

INCHES ABOVE THE FINSIHED FLOOR.

BOILER BUILDING AUTOMATION SYSTEM CONTROL PANEL MOUNTED APPROXIMATELY 3 FT AFF. SEE CONTROLS DIAGRAMS FOR POINTS LIST AND

OTHER NETWORKING REQUIREMENTS.

LOCATE ADDITIONAL GAS MONITOR ON MEZZANINE LEVEL IN CENTRAL LOCATION.

WIRE MODBUS COMMUNICATION MODULE FROM GAS DETECTION CONTROLLER TO BUILDING AUTOMATION SYSTEM CONTROLS. MAP POINTS AS

INDICATED FOR MONITORING.

POWER BY DIV 26.

RELAY OUTPUT FROM GAS DETECTION SYSTEM FOR BURNER SHUTDOWN AT APPROPRIATE LEVEL OF ALARM. SEE SEQUENCE OF OPERATIONS.

RELAY OUTPUT FROM GAS DETECTION SYSTEM TO GAS BOOSTER SYSTEM LEAK DETECTOR RELAY FOR SHUTDOWN.

PROVIDE POWER SUPPLY TO ALARM RELAY IF WIRING DISTANCE EXCEEDS CONTROL PANEL AND OR HORN AND STROBE VOLTAGE DROP ALLOWANCE OR MINIMUM VOLTAGE INPUT. COORDINATE WITH MANUFACTURER AND DIV 26 PRIOR TO INSTALLATION.

WIRE ALARM SIGNAL FROM GAS DETECTION CONTROLLER TO THE FIRE ALARM CONTROL PANEL. INTEGRATE ALARM INTO THE FIRE ALARM SYSTEM

TO SOUND BASED ON THE SEQUENCE OF OPERATIONS BELOW.

MOUNT GAS SENSOR WITHIN 12 INCHES OF THE FLOOR.

1/8" = 1'-0"1 FIRST FLOOR PLAN - GAS DETECTION AND CONTROLS

N.T.S.

GAS DETECTION SYSTEM2

1.

2.

1.

1.

1.

A.

B.

C.

D.

2.

1.

2.

3.

A.

B.

a.

b.

C.

D.

4.

A.

B.

C.

D.

a.

b.

c.

E.

a.

b.

c.

5.

A.

B.

C.

D.

a.

E.

a.

GAS DETECTION SYSTEM (GDS)

A. GENERAL

THE GAS DETECTION SYSTEM CONSISTS OF A GAS DETECTION PANEL, GAS ANALYSIS INSTRUMENTS, AUDIO- VISUAL ALARM DEVICES, WIRING/CONDUIT, ASSOCIATED POWER DISTRIBUTION, AND CONNECTIONS TO

FACILITY CONTROLS PANELS AND EQUIPMENT.

THE GAS DETECTION SYSTEM SHALL MONITOR METHANE (CH4) GAS LEVELS AT THE CEILING AND CARBON MONOXIDE (CO) GAS LEVELS IN THE BREATHING ZONE. LEVELS MEASURED THAT OCCUR OUTSIDE OF NIOSH AND VHA SETPOINTS WILL BE ALARMED AND THE FOLLOWING SEQUENCES SHALL BE IMPLEMENTED AND

FOLLOWED.

B. EMERGENCY EQUIPMENT SHUTDOWN CIRCUIT

THE GDS SHALL BE DIRECTLY CONNECTED, THROUGH HARDWIRED SIGNAL, TO ALL BOILERS, GAS SHUTOFF VALVE, OIL SHUTOFF VALVE, OIL PUMP SHUTDOWN, AND VENTILATION EQUIPMENT, LOCATED IN THE ALARM ZONE, THROUGH DRY CONTACTS ON THE REMOTE EQUIPMENT. THE ALARM CIRCUIT SHALL BE POWERED IN A "NORMAL" STATE PER THE DETAIL PROVIDED ON THE DETAIL SHEET. LOSS OF POWER TO THE GDS OR AN ALARM STATE SHALL OPEN THE MONITORED CONTACTS ON THE GDS, THUS BREAKING THE CIRCUIT. AN "ALARM" STATE SHALL DISABLE ALL FUEL BURNING EQUIPMENT IN THE ZONE BY DISABLING THE HARDWIRED

LOOP.

C. SYSTEM ENABLE

THE SYSTEM SHALL ALWAYS BE ENABLED. LOSS OF AN ENABLED STATUS SHALL RESULT IN AN ALARM

SIGNAL TO THE BAS, THE FACP, AND DISABLING OF THE FUEL BURNING APPLIANCES.

D. NORMAL STATUS

THE GDS SHALL SEQUENTIALLY TAKE, ANALYZE, AND REPORT GAS CONDITIONS AT EACH SAMPLING POINT

IDENTIFIED IN THE DRAWINGS:

ZONE 1: BOILER ROOM (102) & MEZZANINE

ZONE 2: CONTROL ROOM (104)

ZONE 3: GAS BOOSTER ROOM (114)

ZONE 4: PROPANE ROOM (113)

THE FUEL BURNING APPLIANCE CIRCUITS SHALL BE ENABLED AND ALL FUEL BURNING EQUIPMENT SHALL BE ALLOWED TO OPERATE NORMALLY. FUEL BURNING EQUIPMENT INCLUDE BOILER NOS. 1, 2, AND 3 ONLY.

E. ALARMS/EMERGENCY OPERATION

FAULT - STATUS NOTIFICATION TO BAS TO INDICATE MAINTENANCE REQUIREMENT OR SYSTEM INSPECTION

REQUIREMENT. GDS CONTINUES TO OPERATE.

SYSTEM FAILURE - STATUS NOTIFICATION TO BAS TO INDICATE INORABILITY OF THE SYSTEM. ENABLE VENTILATION EQUIPMENT IN ALL ZONES, PROVIDE ALARM TO BAS, ACTIVATE ZONE ALARM EQUIPMENT.

CARBON MONOXIDE MONITORING AND ALARM

CARBON MONOXIDE IS PRODUCED BY COMBUSTION. CO WILL BE PRESENT IN AND AROUND THE BOILER BURNER, FLUE, AS WELL AS POTENTIALLY THE VALVE VAULT TO THE REAR OF BOILER 10-BLR-1. IT IS A

HEAVIER THAN AIR GAS.

ALL ALARM LEVELS LISTED HERE ARE BASED ON INDUSTRY ACCEPTED STANDARDS FOR SAFETY OF LIFE AND HEALTH. IN GENERAL, THE NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH

(NIOSH) AND THE OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION (OSHA) PROVIDE

RECCOMENDATIONS FOR ALARM LEVELS AND EXPOSURE LIMITS. COORDINATE FINAL SETPOINTS WITH THE VHA LIFE SAFETY TEAM FOR THIS STATION. COORDINATE WITH THE COR TO SET UP A MEETING TO

CONFIRM THE LEVELS FOR FINAL ACCEPTANCE.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH), TLV-TWA LISTS 25

PPM AS THE MAXIMUM ALLOWABLE CONCENTRATION FOR A WORKER'S CONTINUOUS EXPOSURE

IN ANY EIGHT HOUR PERIOD. THIS IS USED AS THE LOW ALARM SETPOINT FOR THIS DESIGN.

NIOSH LISTS 200 PPM AS THE MAXIMUM ALLOWABLE CONCENTRATION FOR SHORT TERM

EXPOSURE AT A 15-MINUTE MAXIMUM EXPOSURE LEVEL. ADDING A SAFETY MARGIN FOR

INCREASING CONCENTRATION IN THE SPACE, 100 PPM SHALL BE USED AS THE HIGH ALARM

SETPOINT FOR THIS DESIGN.

LOW ALARM, 25 PPM (CO) - PROVIDE ALARM TO THE BAS. IDENTIFY ALARM ZONE. BAS TO OVERRIDE VENTILATION SYSTEM TO MAXIMUM SPEED SIGNAL IF SYSTEM IS ON, OR ENABLE VENTILATION SYSTEM

AND OVERRIDE SPEED CONTROL TO MAXIMUM SPEED IF SYSTEM IS OFF.

HIGH ALARM, 100 PPM (CO) - LOW ALARM PLUS DISABLE FUEL BURNING APPLIANCE CIRCUIT (BOILER EPO

CIRCUIT), PROVIDE ALARM TO THE BAS, IDENTIFY ALARM ZONE.

METHANE (CH4) MONITORING AND ALARM

METHANE MAY BE LEAKED FROM GAS SYSTEM EQUIPMENT AND PIPING AS WELL AS THE GAS PIPING IN

AND AROUND THE BOILERS. METHANE IS A LIGHTER THAN AIR GAS.

THE FUEL GAS DETECTION SYSTEM SHALL BE INSTALLED, TESTED, AND COMISSIONED IN COMPLIANCE WITH ALL VHA STANDARDS AND CODES AS WELL AS NFPA 715, STANDARD FOR THE INSTALLATION OF

FUEL GASES DETECTION AND WARNING EQUIPMENT.

ALL ALARM LEVELS LISTED HERE ARE BASED ON INDUSTRY ACCEPTED STANDARDS FOR SAFETY OF LIFE AND HEALTH. IN GENERAL, THE NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH

(NIOSH) AND THE OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION (OSHA) PROVIDE

RECCOMENDATIONS FOR ALARM LEVELS AND EXPOSURE LIMITS. COORDINATE FINAL SETPOINTS WITH THE VHA LIFE SAFETY TEAM FOR THIS STATION. COORDINATE WITH THE COR TO SET UP A MEETING TO

CONFIRM THE LEVELS FOR FINAL ACCEPTANCE.

LOW ALARM, 5% BY VOLUME, NFPA 715, TABLE B.1, LOWER EXPLOSIVE LIMIT, LEL (CH4)

ZONE 1: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE

VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.

ZONE 2: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE

VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.

ZONE 3: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE

VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.

HIGH ALARM, 15% BY VOLUME, NFPA 715, TABLE B.1, UPPER EXPLOSIVE LILMIT, UEL (CH4) ZONE 1: DISABLE FUEL BURNING APPLIANCE CIRCUIT, PROVIDE ALARM TO THE BAS AND FIRE

ALARM CONTROL PANEL, ACTIVATE ALARM ZONE VENTILATION EQUIPMENT. IDENTIFY ALARM

ZONE.

ZONE 2: DISABLE FUEL BURNING APPLIANCE CIRCUIT, PROVIDE ALARM TO THE BAS AND FIRE

ALARM CONTROL PANEL, ACTIVATE ALARM ZONE VENTILATION EQUIPMENT. IDENTIFY ALARM

ZONE.

ZONE 3: SHUTDOWN GAS BOOSTER, DISABLE FUEL BURNING APPLIANCES IN OPERATION SERVED

BY GAS BOOSTER, PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE

ALARM ZONE VENTILATION, IDENTIFY ALARM ZONE.

PROPANE (C3H8) MONITORING AND ALARM

PROPANE MAY BE LEAKED FROM PROPANE GAS SYSTEM EQUIPMENT AND PIPING. PROPANE IS A

HEAVIER THAN AIR GAS.

THE FUEL GAS DETECTION SYSTEM SHALL BE INSTALLED, TESTED, AND COMISSIONED IN COMPLIANCE WITH ALL VHA STANDARDS AND CODES AS WELL AS NFPA 715, STANDARD FOR THE INSTALLATION OF

FUEL GASES DETECTION AND WARNING EQUIPMENT.

ALL ALARM LEVELS LISTED HERE ARE BASED ON INDUSTRY ACCEPTED STANDARDS FOR SAFETY OF LIFE AND HEALTH. IN GENERAL, THE NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH

(NIOSH) AND THE OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION (OSHA) PROVIDE

RECCOMENDATIONS FOR ALARM LEVELS AND EXPOSURE LIMITS. COORDINATE FINAL SETPOINTS WITH THE VHA LIFE SAFETY TEAM FOR THIS STATION. COORDINATE WITH THE COR TO SET UP A MEETING TO

CONFIRM THE LEVELS FOR FINAL ACCEPTANCE.

LOW ALARM, 2.1% BY VOLUME, NFPA 715, TABLE B.1, LOWER EXPLOSIVE LIMIT, LEL (CH4)

ZONE 4: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE

VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.

HIGH ALARM, 9.5% BY VOLUME, NFPA 715, TABLE B.1, UPPER EXPLOSIVE LILMIT, UEL (CH4) ZONE 4: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE

VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.

NN

0 4' 8' 16' 24'

1/8" = 1'-0"

Revisions Date 1 Bid Addendum 1 09/24/2025

INPUT/OUTPUT SUMMARY

POINT

DESCRIPTION

POINT TYPE

NOTESFUNCTION ID TAG NO. AI AO DI DO COMM

BMS 10-BLR-01 BURNER MANGEMENT SYS BOILER 1 X

BMS 10-BLR-02 BURNER MANGEMENT SYS BOILER 2 X

BMS 10-BLR-03 BURNER MANGEMENT SYS BOILER 3 X

GBS 10-GBS-01 GAS BOOSTER SKID CONTROL PANEL X

AT 100101 ANALYSIS TRANSMITTER X X

UAHB 100101 MUTLIVARIABLE ALARM HORN BEACON X

AT 100102 ANALYSIS TRANSMITTER X X

UAHB 100102 MUTLIVARIABLE ALARM HORN BEACON X

AT 100103 ANALYSIS TRANSMITTER X X

UAHB 100103 MUTLIVARIABLE ALARM HORN BEACON X

AT 100104 ANALYSIS TRANSMITTER X X

UAHB 100104 MUTLIVARIABLE ALARM HORN BEACON X

AT 100200 ANALYSIS TRANSMITTER X X

UAHB 100201 MUTLIVARIABLE ALARM HORN BEACON X

UAHB 100202 MUTLIVARIABLE ALARM HORN BEACON X

UAHB 100203 MUTLIVARIABLE ALARM HORN BEACON X

AT 100301 ANALYSIS TRANSMITTER X X

UAHB 100301 MUTLIVARIABLE ALARM HORN BEACON X

UAHB 100302 MUTLIVARIABLE ALARM HORN BEACON X

AT 100401 ANALYSIS TRANSMITTER X X

UAHB 100401 MUTLIVARIABLE ALARM HORN BEACON X

BAS GDS-1 BUILDING AUTOMATION SYSTEM X X

FACP GDS-1 FIRE ALARM CONTROL PANEL X

EQUIPMENT ALARM INFORMATION

ASHRAE G36 SECTION ALARM LEVELALARM DESCRIPTION DELAY TIMER

- SYSTEM FAULT 3 10 SEC

ALARM VALUE

PER FAULT

- SENSOR FAULT 3 10 SECPER FAULT

RESET CONDITION

ACKNOWLEDGE

ACKNOWLEDGE

- LOW ALARM (CO) 2 N/A>= 25 PPM

- HIGH ALARM (CO) 1 N/A>= 100 PPM MANUAL RESET

ACKNOWLEDGE

- LOW ALARM (CH4) 25% BY VOL. (LEL) N/A MANUAL RESET

NOTES::

A. MAP ALL POINTS AVAILABLE THROUGH BACNET, PROGRAM ASSOCIATED ALARM CODES TO BE DISPLAYED ON BOTH LOCAL CONTROLLER

AND BAS.

B. UNLESS OTHERWISE INDICATED, ALL POINTS SHOWN ARE FIELD/FACTORY HARDWIRED TO MANUFACTURERS STANDARD UNIT CONTROLLER. IN ADDITION TO STADARD FACTORY CONTROLS, ENSURE ALL ALL REQUIRED FIELD CONNECTIONS DEVICES ARE PROVIDE TO

ACHIEVE SEQUENCE OF CONTROLS.

HIGH ALARM (CH4) 115% BY VOL. (UEL) N/A MANUAL RESET

- SYSTEM FAILURE/OFFLINE 1RECEIVED INPUT 15 SEC MANUAL RESET

LOW ALARM (C3H8) 22.1% BY VOL. (LEL) N/A MANUAL RESET

HIGH ALARM (C3H8) 19.5% BY VOL. (UEL) N/A MANUAL RESET

M

PDT

080001

TT

080001

TT

080002

TT

080003

TT

080004

FE

080001

FT

080001

FE

080002

FT

080002

FCV

080001

TT

080003

BAS

FT

08TM01

FE

08TM01

TT

08TM01

TT

08TM02

FIC

08TM01

IT

080101

BAS

IT

080201

BAS

IT

080301

FCV

080101

ZSO

080101

ZT

080001PG

080103

BAS

10-TEMP

PG

080102

PG

080101

PG

080203

PG

080202

PG

080201

PG

080302

PG

080301

PG

080303

BAS

IT

080601

FCV

080601

ZSO

080601

PG

080603

PG

080602

PG

080601

BAS

IT

080501

FCV

080501

ZSO

080501

PG

080503

PG

080502

PG

080501

BAS

IT

080401

FCV

080401

ZSO

080401

PG

080403

PG

080402

PG

080401

FT

081001

FE

081001

TT

081001

TT

081002

FIC

081001

FT

080401

FE

080401

TT

080401

TT

080402

FIC

080401

10-BLR-01

(6,695 MBH

OUTPUT)

10-BLR-02

(6,695 MBH

OUTPUT)

10-BLR-03

(6,695 MBH

OUTPUT)

SAN

3/4" ED

CSF-01

3/4" HHWS

3/4" HHWS

3/4" HHWS

3/4" HHWS

3/4" HHWS

3/4" HHWS6" HHWR

8" HHWR

6" HHWS

(DECOUPLER)

SHWP-02

670 GPM

SHWP-01

670 GPM

FM

SHWP-03

670 GPM

ET-01

AS-01

PG

ET-02

AAV

SAN

TO BUILDING 4

MECHANICAL ROOM

FROM BUILDING 4

MECHANICAL ROOM

SW FROM MI605

RETURN WATER

TEMPERATURE

CONTROL VALVE

FM

HHWS FROM 10-BLR-01

HHWR TO 10-BLR-01

HHWS FROM 10-BLR-02

HHWR TO 10-BLR-02

HHWS FROM 10-BLR-03

HHWR TO 10-BLR-03

MI606

MI606

MI606

MI606

MI606

MI606

8" HHWS

(DECOUPLER)

TEMPORARY HOT WATER SYSTEM CAPACITIES

NOMINAL PEAK OUTPUT (MBH) - 6,695

HHW LWT (DEG F) - 180

HHW DELTA (DEG F) - 20

FLOWRATE (GPM) - 670 @ 20 DEG F

NATURAL GAS PRESS AVAIL (PSIG) - 2.4

NATURAL GAS CAPACITY AVAIL @ PRESS (CFH) - 8,400

FUEL OIL (ULSD) PRESS AVAIL (PSIG) - 100

FUEL OIL (ULSD) CAPACITY AVAIL @ PRESS (GPM) - 5

MINIMUM PUMP TDH (FT H20) - 55 (ADDITIONAL PRESSURE DROP OF

TEMPORARY PIPING, FITTINGS, VALVES, AND EQUIPMENT MUST BE

ADDED.)

4" HHWS 3" HHWS 3" HHWS 4" HHWS

6" HHWS

6" HHWR

6" HHWS

6" HHWR

6" HHWS

6" HHWR

TEMPORARY HOT

WATER BOILER

TEMP 6" HHWR

TEMP 6" HHWS

TEMPORARY PRIMARY HOT

WATER PUMP (10-PHWP-T)

OUTSIDEINSIDE

BLDG. 10

VFD

FM

FLOW COMPUTER (LOCATED

ON OR ADJACENT TO BOILER

CONTROL PANEL)

6" HHWS

6" HHWR

NO

NO

NC

VFD VFD

CODED NOTES:

TEMPORARY HEATING HOT WATER PIPING. PROVIDE AT THE TIME OF EQUIPMENT RENTAL. MINIMUM

SIZE REQUIRED FOR DESIGN FLOW CONDITIONS IS 6 INCHES.

MATCHED PAIR, SUPPLY AND RETURN TEMPERATURE TRANSMITTERS - PROVIDE THERMOWELLS.

PROVIDE AI ( SUPPLY TEMP.), AI (RETURN TEMP) TO FLOW COMPUTER.

ULTRASONIC FLOWMETER - SEE SPECIFICATIONS. CLAMP ON METER TYPE WITH REMOTE FLOW

COMPUTER. COORDINATE WITH DIVISION 26 FOR 120V, SINGLE-PHASE CIRCUIT FOR SELF-POWER CONTROLS. CONNECT FLOW COMPUTER TO DDC WITH AI (FLOW IN GPM), DI (FAULT), AI (TOTALIZATION), AI (SUPPLY CHW TEMP), AI (RETURN CHW TEMP), AI (INASTANTANEOUS BTU).

BUTTERFLY ISOLATION VALVES. PROVIDE WITH DEADEND SERVICE DESIGN AND BLIND FLANGE.

INSTALL SYSTEM DRAIN AT PLANT SIDE OF VALVE. CONNECT SYSTEM DRAIN WITH 1-1/2" BY-PASS AS

SHOWN FOR CHEMICAL TREATMENT AND CIRCULATION DURING PERIODS OF NON-USE.

TEMPORARY DDC PANEL - PROVIDE DDC PANEL LOCATED AS SHOWN ON THE PLANS. PANEL SHALL INCLUDE A BACNET CONNECTION FOR TEMPORARY EQUIPMENT, AO (PUMP SPEED), DO (PUMP START STOP), DI (PUMP/VFD FAULT), DI (BOILER FAULT), AI (BOILER CAPACITY), DI (BOILER STATUS). PROVIDE SPARE I/O TO INCLUDE 2 AI, 2 AO, 2 DI, AND 2 DO FOR USE AS NEEDED AT THE TIME OF RENTAL. BACNET

SHALL BE UTILZED FOR BOILER COMBUSTION CONTROL, BURNER MANAGEMENT CONTROL, GAS

DETECTION, FUEL SYSTEMS CONTROL, AND ALL OTHER CONTROL PANELS LOCATED IN OR ON THE

RENTAL TRAILER.

PROVIDE 1-1/2" BY-PASS AROUND MAIN ISOLATION VALVES AT PLANT HEADER. ONE BY-PASS SHALL BE A BALL VALVE. ONE BY-PASS SHALL BE A CALIBRATED BALANCE/CIRCUIT SETTER VALVE. MOUNT VALVES AT 5'-0" ABOVE FINISHED FLOOR, ON ADJACENT WALL. INITIAL SETTING SHALL BE 50 GPM.

COORDINATE OFF-LINE TREATMENT FLOW WITH FACILITY WATER TREATMENT PROGRAM TO ACHIEVE PROPER CORROSION INHIBITOR AND BIOCIDE APPLICATION. FLOW SHALL BE REVERSED DURING

OFFLINE OPERATION AND TREATMENT (FLOW FROM SUPPLY TO RETURN).

1-1/2" HHWR

NCNO

NONC

NC

1.

2.

3.

4.

5.

6.

7.

CIRCULATING PUMP VFD BAS CONNECTION REQUIREMENTS. PROVIDE THE FOLLOWING,

START/STOP (AO)

RUN STATUS (DI)

FAULT (DI)

COMMANDED SPEED (AI)

ACTUAL SPEED (AI)

VFD SPEED CONTROL (AO)

VFD INTERFACE (BACNET OR MODBUS)

ASDFASDF

7 7

VFD

PHWP-02

670 GPM

VFD

PHWP-03

670 GPM

6" HHWR

6" HHWR

PHWP-01

670 GPM

VFD

6" HHWR

TO BUILDING 10

MEZZANINE

FROM BUILDING 10

MEZZANINE

FM

3" HHWR

3" HHWS

FM

FLOW COMPUTER (LOCATED

ON ADJACENT WALL

FLOW COMPUTER (LOCATED

ON ADJACENT WALL

3" HHWR

3" HHWS

BUILDING 1

(XX GPM @

20 DEG F)

BUILDING 7

(XX GPM @

20 DEG F)

HHWR FROM BUILDING 1

HHWS TO BUILDING 1

HHWR FROM BUILDING 7

HHWS TO BUILDING 7

6" HHWS

6" HHWR

6" HHWS

6" HHWR

BOILER PLANT TANK YARD VAULT

BOILER PLANT

PIPE VAULT

TO BUILDING 5

MECHANICAL ROOM

FROM BUILDING 5

MECHANICAL ROOM 3" HHWR

3" HHWS

8" HHWR

8" HHWS

MH-1

MH-2

BUILDING 2

(100 GPM @

20 DEG F)

FUTURE HHWS FROM

BLDG. 2

FUTURE HHWS TO

BLDG. 2

MI606

MI606

FUT. 3" HHWR

FUT. 3" HHWS

NO

NC

4NO

MH-3

8" HHWR8" HHWS

8" HHWS

8" HHWR

8" HHWR

8" HHWS

8" HHWR

8" HHWS

8" HHWS

8" HHWR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Au to de sk

D oc s:

//0

VA

M

C L oc h

R av en

Bo ile r C on so lid at io n/

8_

VA

L R

_B oi le r C on so lid at io n_

R

_M

EP

.rv t

9/

/2

3:

:3

PM

MI601A

MECHANICAL INSTRUMENTATION -

HEATING WATER SYSTEM P&ID

Loch Raven Construct Consolidated Boiler Spaces

BALTIMORE MD

0123038

07/07/2025 GSC ZGC

BID DOCUMENTS

512-23-154

N.T.S.

HEATING HOT WATER SYSTEM P&ID1

Revisions Date

PRIMARY/SECONDARY HEATING HOT WATER SYSTEM

1.

2.

3.

4.

5.

6.

7.

8.

9.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1.

2.

3.

1.

2.

A.

B.

3.

A.

B.

4.

5.

6.

SEQUENCE OF OPERATION

HOT WATER BOILER NOS. 1, 2, AND 3

A. GENERAL

THREE NEW HEATING HOT WATER BOILERS (BLR-01, 02, AND 03) WILL SUPPORT THE LOCH RAVEN STATIONS' PEAK AND FUTURE HEATING HOT WATER LOAD. THE NOMINAL CAPACITY OF EACH GENERATOR IS AS FOLLOWS:

BOILER RATED OUTPUT FLOW

BLR-01 6.7 MILLION BTUH 670 GPM

BLR-02 6.7 MILLION BTUH 670 GPM

BLR-03 6.7 MILLION BTUH 670 GPM

THE HEATING PLANT AT LOCH RAVEN VAMC IS DESIGNED AS A PRIMARY/SECONDARY LOOP FLOW SYSTEM. THE PRIMARY LOOP INCLUDES THE BOILERS, CIRCULATING PUMPS (PHWPS), NEUTRAL BRIDGE/DECOUPLER, PIPING, VALVES, AND SPECIALTIES. THE SECONDARY LOOP INCLUDES THE DISTRIBUTION PUMPS (SHWPS), STATION BUILDING SYSTEMS, SUPPLY AND RETURN PIPING, VALVES, AND SPECIALTIES AND ALSO INCLUDES THE NEUTRAL BRIDGE/DECOUPLER. THESE

SYSTEMS OPERATE INDEPENDENT OF EACH OTHER.

A NEUTRAL BRIDGE/DECOUPLER IS LOCATED IN THE PLANT, HYDRAULICALLY SITUATED AT THE INTERFACE OF THE PRIMARY AND SECONDARY FLOW LOOPS. ITS PURPOSE IS TO PERMIT THE SECONDARY DISTRIBUTION AND PRIMARY CIRCULATION SYSTEMS TO OPERATE AT DIFFERENT LOAD BLOCKS AND FLOW RATES. FLOW IN THE SECONDARY LOOP IS

VARIABLE AND FLOW IN THE PRIMARY LOOP IS CONSTANT WITH EACH OPERATING BOILER.

THE BOILERS ARE INTENDED TO OPERATE AUTOMATICALLY WHEN STARTED. HOWEVER, IT IS NOT INTENDED THAT THE PLANT BAS BE ABLE AUTOMATICALLY START OR STOP GENERATORS. THE PLANT OPERATOR MUST INITIATE THE ACTUAL

START/RESTART/STOP FUNCTIONS.

THE PRIMARY AND SECONDARY PUMPS OPERATE EACH AS A BANK OF PUMPS. THE PUMPS AND BOILERS CAN BE

OPERATED RELATIVE TO HOURS OF OPERATION IN AN EFFORT TO BALANCE THE HOURS.

REFER TO THE “HEATING PLANT OPERATIONAL SEQUENCE MATRIX”, LOCATED ON THIS SHEET, FOR PLANT LOAD VERSUS EQUIPMENT OPERATION. SEVERAL OPERATIONAL SCENARIOS ARE AVAILABLE FOR THE DIFFERENT CAPACITY BLOCKS.

EQUIPMENT OPERATION FOR EACH LOAD BLOCK SHALL BE SELECTED BY THE PLANT OPERATORS. THE MATRIX SHALL BE GRAPHICALLY REPRESENTED, FOR OPERATOR REFERENCE, ON THE OPERATORS TERMINAL LOCATED IN THE CONTROL

ROOM.

SEPARATE HTHW DISTRIBUTION PUMPS MOVE WATER THROUGH A SECONDARY PIPING SYSTEM FROM THE PLANT TO OTHER BUILDINGS ON THE STATION. SEE THE OPERATING SEQUENCES FOR THE CIRCULATION PUMPS AND DISTRIBUTION

PUMPS FOR DETAILS.

THE FOLLOWING DESCRIPTIONS ARE FOR BOILER, BLR-01. OPERATION AND CONTROLS FOR ALL THREE UNITS SHALL BE

IDENTICAL.

IF THE HEATING HOT WATER RETURN TEMPERATURE, AS SENSED BY TE-1XX/TT-1XX, IS LESS THAN 180 F (ADJUSTABLE SET POINT) AND THE OPERATING BOILERS ARE ALL FIRING AT 100 PERCENT CAPACITY, THE BAS SHALL PROMPT THE

OPERATOR TO START ANOTHER BOILER.

INTERLOCKS

B. PERMISSIVE INTERLOCKS NECESSARY TO OPERATE HTHWG :

NEITHER THE EXPANSION TANK NOR THE DUMP TANK SHALL BE IN A STATE OF ALARM.

SINCE THE BOILER HAS THE POTENTIAL TO OPERATE WITH ANY CIRCULATION PUMP, NO INTERLOCK IS REQUIRED FOR PUMP OPERATION. HOWEVER, FE-1XX/FT-1XX SHALL INDICATE THAT FLOW THROUGH THE BOILER IS GREATER THAN 85

PERCENT OF FULL FLOW.

THE TEMPERATURE OF THE WATER AT THE OUTLET OF THE BOILER SHALL BE 180F OR HIGHER AS SENSED BY TE -1XX/TT-1XXB. THE BAS SHALL BE EQUIPPED WITH A MANUAL OVERRIDE OF THIS INTERLOCK FOR COLD START OF THE

PLANT WHEN OTHER BOILERS ARE OPERATING).

ADEQUATE NATURAL GAS PRESSURE SHALL BE PROVIDED AND MONITORED BY TE -1XXB/TT -1XXB AT 1.5 PSIG MINIMUM.

IF FUEL (DIESEL) OIL IS SELECTED AS THE OPERATING FUEL, ADEQUATE OIL PRESSURE SHALL BE PROVEN BY PSL-3XX AT

100 PSIG MINIMUM.

IF FUEL (DIESEL) OIL IS SELECTED AS THE OPERATING FUEL, ADEQUATE COMPRESSED AIR PRESSURE (ATOMIZING AIR) SHALL BE PROVEN BY PT -5XX AT 125 PSIG MINIMUM. ATOMIZING AIR IS PROVIDED BY ON-BOARD COMPRESSORS

LOCATED AT EACH BOILER.

TO OPERATE ANY COMBINATION OF HEATING HOT WATER BOILERS WITH A COMBINED NOMINAL CAPACITY LESS THAN OR EQUAL TO 6.7 MMBTUH, MUA-01 SHALL BE OPERATING AT ITS STAGE 1 SPEED (XX,XXX CFM). PERMISSIVE SHALL INCLUDE

CONFIRMATION OF AIRFLOW FROM THE AIRFLOW MONITOR ON MUA-01.

TO OPERATE ANY COMBINATION OF HEATING HOT WATER BOILERS WITH A COMBINED NOMINAL CAPACITY LESS THAN OR EQUAL TO 13.4 MMBTUH, MUA-01 SHALL BE OPERATING AT ITS STAGE 2 SPEED (XX,XXX CFM). PERMISSIVE SHALL INCLUDE

CONFIRMATION OF AIRFLOW FROM THE AIRFLOW MONITOR ON MUA-01.

IF MUA-01 EXPERIENCES A FAILURE AND IS UNABLE TO SATISFY AIR FLOW INTERLOCKS, THE OPERATOR SHALL SWITCH INTERLOCKS TO BACK-UP LOUVER IAL-01. THIS LOUVER SHALL REMAIN CLOSED UNTIL REQUIRED FOR BACK-UP

COMBUSTION AIR FLOW.

C. SAFETY INTERLOCKS: THE FOLLOWING INTERLOCKS SHALL STOP THE BOILER(S) .

THE EXPANSION TANK (HHWET-01) PRESSURE DROPS TO 40 PSIG (PSL -131 SEE PRESSURIZATION SYSTEM SEQUENCE).

INTERLOCK AND ALARM.

THE EXPANSION TANK (HHWET-01) PRESSURE RISES TO 100 PSIG (PSL-131 SEE PRESSURIZATION SYSTEM SEQUENCE).

INTERLOCK AND ALARM.

FLOW RATE SENSED BY FE -XXX/FT -XXX DROPS TO 80 PERCENT OF UNIT SET POINT. INTERLOCK AND ALARM.

D. TO PLACE A COLD BOILER INTO A “STAND-BY” CONDITION

THE OPERATOR SHALL SELECT BOILER TO BE PLACED IN “STAND-BY” FROM THE OPERATOR TERMINAL DISPLAY.

THE BAS SHALL PROMPT THE OPERATOR TO EXECUTE THE FOLLOWING PRE-START MANUAL STEPS:

OPEN 2-INCH BYPASS VALVES ON BOILER INLET AND OUTLET.

OPEN 2-INCH ISOLATION VALVES ON WARMUP LINE FROM BOILER CIRCULATION PUMPS.

MODULATING CONTROL VALVE FV-10XA SHALL BE FULLY CLOSED AND THE CONTROL LOOP WITH FE-10X/FT-10X INACTIVE.

OPEN 2-INCH BYPASS VALVES ON BOILER INLET AND OUTLET.

OPEN 2-INCH ISOLATION VALVES ON WARMUP LINE FROM BOILER CIRCULATION PUMPS.

MODULATING CONTROL VALVE FV-10XA AND FV-10XB SHALL BE FULLY CLOSED AND THE CONTROL LOOP WITH

FE-10X/FT-10X INACTIVE.

WHEN THE FLOW HAS BEEN PROVEN BY CURRENT SWITCH PDS-XXX, THE BAS SHALL INDICATE THAT BOILER IS

"WARMING".

WHEN THE TEMPERATURE OF THE WATER LEAVING THE BOILER RISES TO 160 DEG F (TE -10XB)/ TT -10XB WITH ADJUSTABLE SET POINT), THE BAS SHALL INDICATE THAT HTHWG-4 IS "STAND-BY".

F.

1.

2.

3.

a.

b.

c.

d.

e.

4.

G.

1.

2.

3.

4.

5.

6.

a.

b.

H.

1.

2.

3.

4.

5.

A.

1.

2.

3.

4.

5.

6.

7.

B.

1.

2.

3.

a.

b.

c.

d.

4.

5.

TO START A BOILER (WHEN OTHER BOILERS ARE OPERATING )

TO START A BOILER THE UNIT SHALL BE IN A "STAND-BY" CONDITION WITH THE LEAVING WATER TEMPERATURE AT 160 DEG F OR

WARMER.

THE BAS SHALL NOT BE CAPABLE OF PHYSICALLY STARTING A BOILER AUTOMATICALLY. BURNER OPERATION (FIRING) AT A

BOILER SHALL BE MANUALLY INITIATED FROM THE UNIT'S LOCAL CONTROL PANEL.

TO BEGIN FIRING A BOILER, THE PLANT OPERATOR SHALL SELECT THE RUN COMMAND VIA THE BAS OPERATOR TERMINAL. THIS

COMMAND SHALL INITIATE A PRE-START SEQUENCE AS FOLLOWS:

THE BAS SHALL PROMPT THE OPERATOR TO SELECT THE FUEL TO BURN. NATURAL GAS SHALL BE THE DEFAULT FUEL.

IF FUEL (DIESEL) OIL IS SELECTED, THE BAS SHALL INITIATE THE PUMP SELECTION SEQUENCE FOR FUEL OIL PUMPS (SEE

FUEL OIL PUMP CONTROL SEQUENCE).

THE BAS SHALL PROMPT THE PLANT OPERATOR TO START THE ASSOCIATED CIRCULATING PUMP. THE OPERATOR SHALL START THE PUMP VIA THE BAS OPERATOR TERMINAL (SEE PHWP CONTROL SEQUENCE). THE BAS SHALL OPEN FCV-XXXA TO 100%. A PERMISSIVE CONTACT SHALL BE MADE WHEN THE SIGNAL FROM FE -10X/FT10X INDICATES THAT FLOW TO THE HTHWG IS GREATER THAN 85 PERCENT OF THE RATED FLOW. THE BAS SHALL ACTIVATE THE CONTROL LOOP FOR FCV-XXXA SO THAT THE VALVE MODULATES IN RESPONSE TO THE SIGNAL FROM FE-XXX/FT -XXX ONCE THE PERMISSIVE IS ACTIVATED.

THE BAS SHALL PROMPT THE PLANT OPERATOR TO START THE MAKEUP AIR UNIT OR INCREASE THE FAN SPEED (SEE PLANT SEQUENCE MATRIX). HVAC EQUIPMENT SEQUENCES SHALL BE PER DRAWINGS. OPERATION PRIORITY SHALL BE ADJUSTED

PER THE MATRIX.

WHEN THE PERMISSIVE INTERLOCKS ARE MET, THE BAS SHALL INDICATE THAT THE UNIT IS “READY” TO START AND SHALL

MAKE THE RUN PERMISSIVE CONTACT TO THE LOCAL UNIT CONTROL PANEL.

THE OPERATOR SHALL START THE BOILER FROM THE UNIT'S LOCAL CONTROL PANEL UNDER "MANUAL" CONTROL. AFTER THE MANUFACTURER'S RECOMMENDED TIME ELAPSE, THE OPERATOR SHALL ADJUST THE UNIT CONTROLS TO "AUTOMATIC".

AUTOMATIC CONTROLS (FURNISHED WITH THE BOILERS )

SHALL MAINTAIN FLAME SAFETY (BURNER MANAGEMENT SYSTEM) AND REGULATE BURNER FIRING (COMBUSTION CONTROL

SYSTEM) TO MAINTAIN THE OUTLET WATER TEMPERATURE AT 180 DEG F (ADJUSTABLE).

WHEN THE BOILER BEGINS FIRING, THE BAS SHALL ACTIVATE THE CONTROL LOOP FOR FCV-XXXA SO THAT THE VALVE

MODULATES IN RESPONSE TO THE SIGNAL FROM FE-XXX/FT -XXX.

AFTER FCV-XXXA IS ACTIVE, THE BAS SHALL CLOSE FCV-XXXB. THE ACTUATION RATE SHALL BE RETARDED TO SLOW VALVE CLOSING. FCV-XXXA SHALL TRANSITION FROM FULLY OPEN TO FULLY CLOSED IN ABOUT 30 SECONDS.

FLOW CONTROL VALVE FV-XXXA REGULATES THE WATER FLOW THROUGH THE ASSOCIATED BOILER…