This document is a comprehensive set of mechanical engineering design drawings for the Loch Raven Consolidated Boiler Spaces project located in Baltimore, Maryland for the U.S. Department of Veterans Affairs. The project involves a complex boiler facility renovation with 195 total engineering sheets covering multiple disciplines including mechanical, electrical, plumbing, fire protection, structural, and civil engineering.
Key technical details include the installation of three new boilers (each with 6,695 MBH output), a variable primary heating hot water system, gas and fuel oil piping infrastructure, gas detection systems, and extensive building control and automation systems. The design incorporates multiple safety features such as emergency shutoff valves, gas monitoring, fire alarm integration, and redundant control systems. The project is fully sprinklered and includes provisions for backup fuel sources including natural gas and liquefied propane gas. The bid documents are dated 07/07/2025, with a bid addendum issued on 09/24/2025, indicating an upcoming construction procurement process.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /0
V A
M C
L o c h R a v e n
B o ile r C o n s o lid a ti o n /0
V A
L R
B o ile r C o n s o lid a ti o n
R
M
E P
.r v t
/2
/2
:0
:0
A
M
G002
SHEET LIST Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
0123038
07/07/2025 SK AJZ
BID DOCUMENTS
512-23-154
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
G001 COVER SHEET
G002 SHEET LIST
G003 GENERAL NOTES
G100 CODE DATA
CIVIL
CN001 GENERAL NOTES
VI101 EXISTING CONDITIONS & SURVEY SHEET 1
VI102 EXISTING CONDITIONS & SURVEY SHEET 2
VI103 EXISTING CONDITIONS & SURVEY SHEET 3
VI104 EXISTING CONDITIONS & SURVEY SHEET 4
VI105 EXISTING CONDITIONS & SURVEY SHEET 5
BL101 SOIL BORING LOGS - 1
BL102 UTILITY TEST HOLE SURVEY
BL103 UTILITY TEST HOLE SURVEY
GC001 EROSION & SEDIMENT CONTROL NOTES
GC101 EROSION & SEDIMENT CONTROL PLAN PHASE I
GC102 EROSION & SEDIMENT CONTROL PLAN PHASE I & II
GC103 EROSION & SEDIMENT CONTROL PLAN PHASE I & II
GC201 EROSION & SEDIMENT CONTROL PLAN PHASE II
GC501 EROSION & SEDIMENT CONTROL DETAILS
GC502 EROSION & SEDIMENT CONTROL DETAILS
GC503 MICRO-BIO PLAN & PROFILE
CD101 SITE DEMOLITION PLAN
CD102 SITE DEMOLITION PLAN
CD103 SITE DEMOLITION PLAN
CS100 OVERALL SITE PLAN
CS101 SITE LAYOUT PLAN
CS102 SITE LAYOUT PLAN
CS103 SITE LAYOUT PLAN
CS501 SITE DETAILS
CS502 SITE DETAILS
CG101 SITE GRADING & DRAINAGE PLAN
CG102 SITE GRADING & DRAINAGE PLAN
CG103 SITE GRADING & DRAINAGE PLAN
CG501 GRADING & DRAINAGE DETAILS
CU101 SITE UTILITY PLAN
CU102 SITE UTILITY PLAN
CU103 SITE UTILITY PLAN
CU201 SANITARY SEWER PLAN & PROFILE
CU202 UTILITY SERVICE PROFILES
CU231 HOT WATER PIPE PLAN & PROFILE
CU241 HOT WATER PIPE PLAN & PROFILE
CU251 HOT WATER PIPE PLAN & PROFILE
CU261 HOT WATER PIPE PLAN & PROFILE
CU301 GAS LINE PLAN & PROFILE
CU302 GAS LINE PLAN & PROFILE
CU501 UTILITY DETAILS
CU502 UTILITY DETAILS
LS101 LANDSCAPE PLAN
LS102 LANDSCAPE PLAN
LS103 LANDSCAPE PLAN
LS501 LANDSCAPE DETAILS
STRUCTURAL
S-001 GENERAL NOTES AND ABBREVIATIONS
S-002 STATEMENT OF SPECIAL INSPECTIONS
SS100 FOUNDATION AND SLAB ON GRADE PLAN
SS101 MEZZANINE FRAMING PLAN
SS102 ROOF FRAMING PLAN
SS103 BOILER STACK SCREEN FRAMING PLAN
SS104 EQUIPMENT ENCLOSURE PLAN
SS105 MANHOLE 1 PLANS AND ELEVATIONS
SS106 MANHOLE 2 PLANS AND ELEVATIONS
SS107 MANHOLE 3 PLANS AND ELEVATIONS
SS108 MANHOLE 4 PLANS AND ELEVATIONS
S-301 CONCRETE DETAILS AND SECTIONS
S-302 CONCRETE DETAILS AND SECTIONS
S-303 CONCRETE DETAILS AND SECTIONS
S-304 MASONRY DETAILS AND SECTIONS
S-401 MASONRY DETAILS AND SECTIONS
S-501 STEEL DETAILS AND SECTIONS
ARCHITECTURAL
AS101 ARCHITECTURAL SITE PLAN
A001 WALL TYPES
A101-D DIMENSION PLAN
A101-N NOTE PLAN
A102 MEZZANINE PLAN
A103 ROOF PLAN
A104 ROOF PLAN
A105 ROOF PLAN - BUILDING 7
A111 TRANSFORMER ENCLOSURE PLAN & DETAILS
A112 BUILDING 1 & 4 DETAILS
A121 REFLECTED CEILING PLAN
A122 REFLECTED CEILING PLAN - MEZZANINE
A201 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A311 WALL SECTIONS
A312 WALL SECTIONS
A401 INTERIOR ELEVATIONS
A511 CASEWORK SECTIONS AND DETAILS
A601 DOOR SCHEDULE & DETAILS
AF100 FINISH PLANS & FINISH LEGEND
FIRE ALARM
FA001 FIRE ALARM ABBREVIATIONS, LEGEND, AND GENERAL NOTES
FA101 FIRE ALARM PLAN - LEVEL ONE
FA102 FIRE ALARM PLAN - MEZZANINE
FA501 FIRE ALARM DETAILS
FIRE PROTECTION
FX001 FIRE SUPPRESSION ABBREVIATIONS, LEGEND, AND GENERAL NOTES
FX101 FIRE SUPPRESSION PLAN - LEVEL ONE
FX102 FIRE SUPPRESSION PLAN - MEZZANINE
FX501 FIRE SUPPRESSION DETAILS
SHEET LIST
SHEET NUMBER SHEET NAME
PLUMBING
P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS
PS101 FIRST FLOOR UNDERSLAB PLAN - GRAVITY PIPING - NEW WORK
PS111 FIRST FLOOR PLAN - GRAVITY PIPING - NEW WORK
PS121 MEZZANINE PLAN - GRAVITY PIPING - NEW WORK
PS131 ROOF PLAN - GRAVITY PIPING - NEW WORK
PP111 FIRST FLOOR PLAN - PRESSURE PIPING - NEW WORK
PP121 MEZZANINE PLAN - PRESSURE PIPING - NEW WORK
P-301 PLUMBING SECTIONS
P-401 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-601 PLUMBING ISOMETRICS
P-602 PLUMBING ISOMETRICS
P-603 PLUMBING ISOMETRICS
P-801 PLUMBING SCHEDULES
MECHANICAL
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MS101 MECHANICAL NEW WORK SITE PLAN
MS100 MECHANICAL DEMOLITION SITE PLAN
MD104.1 BASEMENT PLAN - BLDG 1 - MECHANICAL - DEMOLITION - PH 1
MD104.2 BASEMENT PLAN - BLDG 1 - MECHANICAL - DEMOLITION - PH 2
MD105.2 FIRST FLOOR PLAN - BLDG 4 - MECHANICAL - DEMOLITION - PH 2
MD106.1 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - DEMOLITION - PH 1
MD106.2 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - DEMOLITION - PH 2
MD601 MECHANICAL INSTRUMENTATION - HHW BUILDING 1 DEMO. P&IDS
MD602 MECHANICAL INSTRUMENTATION - HHW BUILDING 4 DEMO. P&ID
MD603 MECHANICAL INSTRUMENTATION - HHW BUILDING 5 DEMO. PH 1 P&ID
MD604 MECHANICAL INSTRUMENTATION - HHW BUILDING 5 DEMO. PH 2 P&ID
MD605 MECHANICAL INSTRUMENTATION - HHW BUILDING 6 DEMO. - P&ID
MH101 FIRST FLOOR PLAN - MECHANICAL - NEW WORK
MH102 MEZZANINE PLAN - MECHANICAL - NEW WORK
MH103 ROOF PLAN - MECHANICAL - NEW WORK
MP101 FIRST FLOOR PLAN - MECHANICAL PIPING - NEW WORK
MP102 MEZZANINE PLAN - MECHANICAL PIPING - NEW WORK
MP104.1 BASEMENT PLAN - BLDG 1 - MECHANICAL - NEW WORK - PH 1
MP104.2 BASEMENT PLAN - BLDG 1 - MECHANICAL - NEW WORK - PH 2
MP105.1 FIRST FLOOR PLAN - BLDG 4 - MECHANICAL - NEW WORK - PH 1
MP105.2 FIRST FLOOR PLAN - BLDG 4 - MECHANICAL - NEW WORK - PH 2
MP106.1 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - NEW WORK - PH 1
MP106.2 BASEMENT PLAN - BLDG 5,6 - MECHANICAL - NEW WORK - PH 2
MP107.1 FIRST FLOOR PLAN - BLDG 7 - MECHANICAL - NEW WORK - PH 1
M-301 MECHANICAL SECTIONS
M-401 MECHANICAL ENLARGED PLANS
M-404 MECHANICAL ENLARGED PLANS
M-403 MECHANICAL ENLARGED PLANS
M-402 MECHANICAL ENLARGED PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL ISOMETRICS
M-801 MECHANICAL SCHEDULES
M-802 MECHANICAL SCHEDULES
MI001 P&ID NOTES, LEGENDS, & SYMBOLS
MI111 MECHANICAL INSTRUMENTATION - GAS MONITORING PLAN
MI601B MECHANICAL INSTRUMENTATION - HEATING HOT WATER CONTROLS
MI601A MECHANICAL INSTRUMENTATION - HEATING WATER SYSTEM P&ID
MI602 MECHANICAL INSTRUMENTATION - HHW DISTRIBUTION SYSTEM P&ID
MI603 MECHANICAL INSTRUMENTATION - FUEL OIL P&ID
MI604 MECHANICAL INSTRUMENTATION - NAT. GAS & LIQUID PROPANE P&ID
MI605 MECHANICAL INSTRUMENTATION - TREATED WATER SYSTEM P&ID
MI606 MECHANICAL INSTRUMENTATION - BOILER TRIM & TRAIN SYSTEM P&ID
MI607 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 1 P&ID
MI608 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 4 P&ID
MI609 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 5 PH 1 P&ID
MI610 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 5 PH 2 P&ID
MI611 MECHANICAL INSTRUMENTATION - HHW DIST. - BUILDING 6 P&ID
MI701 MECHANICAL CONTROLS I
MI702 MECHANICAL CONTROLS II
MI703 MECHANICAL CONTROLS III
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
E-100 ELECTRICAL SITE PLAN - DEMOLITION
E-101 ELECTRICAL SITE PLAN - NEW WORK
ED101 BASEMENT PLAN - BLDG 1 - ELECTRICAL - DEMOLITION
ED102.2 FIRST FLOOR PLAN - BLDG 4 - ELECTRICAL - DEMOLITION - PH 2
ED103.1 BASEMENT PLAN - BLDG 5 - ELECTRICAL - DEMOLITION - PH 1
ED103.2 BASEMENT PLAN - BLDG 5,6 - ELECTRICAL - DEMOLITION - PH 2
EL101 FLOOR PLAN - LIGHTING - NEW WORK
EL102 FLOOR PLAN - MEZZANINE LIGHTING
EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK
EP102 MEZZANINE PLAN - ELECTRICAL EQUIPMENT - NEW WORK
EP104 ROOF PLAN - ELECTRICAL - NEW WORK
EP103 FLOOR PLAN - GROUNDING - NEW WORK
EP105 BASEMENT PLAN - BLDG 1 - ELECTRICAL - NEW WORK
EP106.2 FIRST FLOOR PLAN - BLDG 4 - ELECTRICAL - NEW WORK - PH 2
EP107.1 BASEMENT PLAN - BLDG 5 - ELECTRICAL - NEW WORK - PH 1
EP107.2 BASEMENT PLAN - BLDG 5,6 - ELECTRICAL - NEW WORK - PH 2
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
E-602 ELECTRICAL DIAGRAMS
E-802 ELECTRICAL SCHEDULES
E-801 ELECTRICAL SCHEDULES
TECHNOLOGY
T-001 TECHNOLOGY LEGEND, ABBREV & GENERAL NOTES
T-100 TECHNOLOGY SITE PLAN
T-101 FLOOR PLAN - TECHNOLOGY - NEW WORK
T-102 MEZZANINE PLAN - TECHNOLOGY - NEW WORK
T-501 TECHNOLOGY – DETAILS
T-502 TECHNOLOGY – DETAILS
Total Sheet Count: 195
Revisions Date
1 Bid Addendum 1 09/24/2025
PROP. LOADING DOCK
BO
ILE
R
BL
DG
FF
E:
4.0
EX. ROAD
PROP. GRADE
+0
0 4 " W
AT
ER
LA
T.
AT
BU
ILD
IN
G
IN
V.:
5.8
RA
ILI
NG
+0
5 4 " W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.6
+0 6 4
" W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.6
+2
4 4 " W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.6
+2 5 4
" W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.6
+4
8.8 6 4
" W
AT
ER
LA
T.
AT
FU
TU
RE
8"
WA
TE
R
IN
V.:
4.2
10+21.21 EXIST. 18" RCP
INV.:199.50
+4
0.5 "F
UT
UR
E"
FI
BE
R
OP
TIC
IN
V.:
6.1
+4 1.5
PR
OP
OS
ED
U
GE
IN
V.:
6.8
10+06.5 4" FOOTER DRAIN
INV.:±198.16
PROP. WALK
PR
OP
. W
AL
L
PR
OP
. W
AL
L
+4
7.6 0 W
AT
ER
LIN
E V
AL
VE
SE
E D
ET
AIL
5, SH
EE
T C
U5
+1
4.1 6 4
5°
BE
ND
10+20.95
45° BEND
+2
6.8 1 4
5°
BE
ND
10+24.78
45° BEND
48.86 LF 4" C900 WATERLINE
+0
4.2 4"
° B
EN
D
+0
3 4 5°
BE
ND
1.5 7'
CL
EA
R
+3
3.5 6 4
5°
BE
ND
NOTE 1: CONTRACTOR SHALL
VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
EX. ROAD
PROP. GRADE
RA
ILI
NG
+4
4.9 7 6
" W
AT
ER
LA
T.
AT
FU
TU
RE
8"
W
AT
ER
IN
V.:
4.2
+0
0 6 " W
AT
ER
LA
T.
AT
BU
ILD
IN
G
IN
V.:
5.8
+0
5 6 " W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.2
+0 6 6
" W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.2
+2
4 6 " W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.2
+2 5 6
" W
AT
ER
LA
T.
AT
W
AL
L
IN
V.:
4.2
+3
7 "
EX
IST
IN
G"
FI
BE
R
OP
TIC
IN
V.:
6.1
+3 8 E
XIS
TIN
G
UG
E
IN
V.:
6.8
10+21.13 PROP. 18" RCP
INV.:199.60
BO
ILE
R
BL
DG
FF
E:
4.0
PROP. WALK
PR
OP
. W
AL
L
PR
OP
. W
AL
L
PROP. LOADING DOCK
10+06.5 4" FOOTERDRAIN
INV.:±198.16
+4
3.8 1 W
AT
ER
LIN
E V
AL
VE
SE
E D
ET
AIL
5, SH
EE
T C
U5
44.97 LF 6" C900 WATERLINE
+0
4.5 4"
° B
EN
D
+0
3 4 5°
BE
ND
1.4 6'
CL
EA
R
NOTE 1: CONTRACTOR SHALL
VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
PROP. WALK
PR
OP
. W
AL
L
EXISTING GRADE
34.6 LF 4" SANITARY SEWER @ 27.4%
(SEE SPECIFICATION FOR MATERIAL)
+0
0 4 " S
AN
ITA
RY
LA
T.
AT
BU
ILD
IN
G
IN
V.:
2.5
+0
5 4 " S
AN
ITA
RY
LA
T.
AT
W
AL
L
IN
V.:
0.0
+0
6 4 " S
AN
ITA
RY
LA
T.
AT
W
AL
L
IN
V.:
9.7
10+34.6 PROP. 8" SANITARY
INV.:193.00
+1
2.4 4"
EX
IST
IN
G
UG
E
IN
V.:
0.8
10+06.5 4" FOOTERDRAIN
BOILER BLDG FFE: 214.00
10+21.18 4" PROP. HOT WATR
INV.:195.33
10+10.00 CLEANOUT
RIM: 204.34
NOTE 1: CONNECT PROPOSED
LATERAL TO PROPOSED MAIN VIA
WYE CONNECTION VIA INSERTA
TEE. SEE DETAIL 4, SHEET CU502.
1.2 5'
CL
EA
R
+1
5.1 7 4
" C
LE
AN
OU
T
IN
V.:
8.7
NOTE 2: CONTRACTOR SHALL
VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
PROP. LOADING DOCK
EX. ROAD
PROP. GRADE
RA
ILI
NG
+0
0 4 " F
DC
LA
T.
AT
BU
ILD
IN
G
IN
V.:
5.8
+0
5 4 " F
DC
LA
T.
AT
W
AL
L
IN
V.:
4.7
+0
6 4 " F
DC
LA
T.
AT
W
AL
L
IN
V.:
4.7
+2
4 4 " F
DC
LA
T.
AT
W
AL
L
IN
V.:
4.7
+2
5 4 " F
DC
LA
T.
AT
W
AL
L
IN
V.:
4.7
+2
6.2 1 4
" F
DC
LA
T.
BE
ND
IN
V.:
4.7
BO
ILE
R
BL
DG
FF
E:
4.0
PROP. WALK
PR
OP
. W
AL
L
PR
OP
. W
AL
L
10+21.03 EXIST. 18" RCP
INV.:199.60
10+06.5 4" FOOTERDRAIN
INV.:±198.16
26.21 LF 4" C900 FDC LATERAL
+0
4.4 4"
° B
EN
D
+0
3 4 5°
BE
ND
4" FDC
NOTE 1: CONTRACTOR SHALL
VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
PROP. LOADING DOCK
EX. ROADPROP. GRADE
RA
ILI
NG
+0
0 4 " S
TO
RM
LA
T.
AT
BU
ILD
IN
G
IN
V.:
8.5
+0
5 4 " S
TO
RM
LA
T.
AT
W
AL
L
IN
V.:
4.8
+0 6 4
" S
TO
RM
LA
T.
AT
W
AL
L
IN
V.:
4.8
10+18.40 EXIST. 18" RCP
INV.:200.40
BO
ILE
R
BL
DG
FF
E:
4.0
PROP. WALK
PR
OP
. W
AL
L
PR
OP
. W
AL
L
+0
6.5 4"
FO
OT
ER
DR
AIN
IN
V.:
±1
.16
NOTE 1: CONNECT PROPOSED
LATERAL TO 18" RCP VIA INSERTA
TEE. SEE DETAIL 4, SHEET CU502.
18.4 LF 4" PVC SDR 35 STORM
UNDERDRAIN @ 1.0%
+0
4.7 5 4
5°
BE
ND
+0
1.1 2 4
5°
BE
ND
+1
3.5 8 4
5°
BE
ND
NOTE 2: CONTRACTOR SHALL
VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
EX. ROAD
PROP. GRADE
RA
ILI
NG
10+20.40 EXIST. 18" RCP
INV.:199.80
+0
0 6 " S
TO
RM
LA
T.
AT
BU
ILD
IN
G
IN
V.:
6.5
+0
5 6 " S
TO
RM
LA
T.
AT
W
AL
L
IN
V.:
5.0
+0 6 6
" S
TO
RM
LA
T.
AT
W
AL
L
IN
V.:
5.0
10+26.5 4" PROP. FDC
INV.:206.83
BO
ILE
R
BL
DG
FF
E:
4.0
PROP. WALK
PR
OP
. W
AL
L
PR
OP
. W
AL
L
PROP. LOADING DOCK
+0
6.5 4"
FO
OT
ER
DR
AIN
IN
V.:
±1
.16
NOTE 1: CONNECT PROPOSED
LATERAL TO 18" RCP VIA INSERTA
TEE. SEE DETAIL 4, SHEET CU502.10
+1 4.3
4"
PR
OP
. T
EL
E.
IN
V.:
7.0
0 -
SE
E N
OT
E 2
NOTE 2: ELEVATION IS SHOWN
FOR INTENT. SEE ARCHITECTURAL
PLANS FOR REFERENCE.
20.40 LF 6" PVC SDR 35 STORM
UNDERDRAIN @ 1.0%
+0
4.8 6 4
5°
BE
ND
+0 3.3
5 4 5°
BE
ND
+1
6.1 1 4
5°
BE
ND
1.4 9'
CL
EA
R
NOTE 3: CONTRACTOR SHALL
VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
PROP. LOADING
DOCK
BO
ILE
R
BL
DG
FF
E:
4.0
RA
ILI
NG
PROP. WALK
PR
OP
. W
AL
L
PR
OP
. W
AL
LEX. GRADE
10+17.98 EXIST. 18" STRM
INV.:200.50 ±
SEE NOTE 1, THIS PROFILE
PROP. RETAINING WALL ELEV.
9 LF 4" STORM
PVC SDR35 @ 1.0%
+1
1.9 5 4
" P
IV
IN
V.:
5.5
SE
E D
ET
AIL
ON
C
G5
NOTE 1: CONNECT PROPOSED
LATERAL TO 18" RCP VIA INSERTA
TEE. SEE DETAIL 4, SHEET CU502.
10+10.17 2.75'X2.75'
CATCH BASIN INV:205.10
SEE DETAIL 2 ON CG501
RI
M:
8.6
10+16.23 45° BEND
10+15.27 45° BEND
+1
6.2
° B
EN
D
NOTE 2: CONTRACTOR SHALL
VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
4"x4"x4" TEE, ANCHOR TO INSIDE WITH HILTI
BOLT, INSTALL CAPS AT ENDS AND DRILL 1.75"
HOLE AT BOTTOM OF HORIZONTAL CAP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
Au to de sk
D oc s:
//0
VA
M
C L oc h
R av en
Bo ile r C on so lid at io n/
8_
VA
L R
_B oi le r C on so lid at io n_
R
_M
EP
.rv t
1/
/2
1:
:5
PM
Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
512-23-154
07/07/2025 GS CA & AR
BID DOCUMENTS
Revisions Date
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRITY FEDERA
L
SERV I CES
MDE NUMBER 25 - SF - 0022
01 08/18/2025BID ADDENDUM 01
UTILITY SERVICE PROFILES
CU202
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
4" DOMESTIC WATER CONNECTION PROFILE1
6" FIRE WATER SERVICE CONNECTION PROFILE2
4" FDC CONNECTION PROFILE3
6" STORM LATERAL PROFILE4
4" STORM LATERAL PROFILE5
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
4-INCH STORM GRATE IN TRUCK DOCK PROFILE7
4" SANITARY LATERAL PROFILE6
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
10-YR
ELEV = 9.17
100-YR
ELEV = 9.53
09/24/2025
UP
GENERATOR
ELECTRICAL
CONTROL
ROOM
BREAK AREA
WATER
TREATMENT
LOCKERS -
WOMEN
TOILET/
TOILET/
SHOWER
BOILER
ROOM
Exterior
EXT
E1 80
E1 80
E1 130
10-IDU-1-1
E2 165
LOCKERS -
MEN
10-GBS-1-1
S21 2800
S1 100
T2 130
S4 220
S4 225S4 225
10-HWUH-1-1
10-HWUH-1-2
10-HWUH-1-6
10-B-1-1 10-B-1-2 10-B-1-3
18ø FE
18ø FE
18ø FE
10-PHWP-1-1 10-PHWP-1-2 10-PHWP-1-3
10-AS-1-1
10-FOPS-1-1
10-FOF-1-1
10-SHWP-1-3
10-SHWP-1-2
10-SHWP-1-1
BAS
GDS
7 7 7
10-HWUH-1-8
HAC
10x10 EA
10"x10" EA UP1
6" SA UP1
4ø SA
12" SA UP 1
6" SA UP1
10 10
36x80 EA
A B D E
C
10-ET-1-1 10-ET-1-2
10-RFS-1-1 10-RFS-1-2
12" AFF
T2 130 2
2T2 130
T2 130
E1 130
8x8 EA
10-ATU-1-1
S4 220
14x14 SA
E2 165
10"x10" EA UP 1
8ø SA
8x8 EA
T
10-ATU-1-1
S1 110
10-ATU-1-3
10-ATU-1-2
T
10-ATU-1-2
T
10-ATU-1-3
T2 150
T
10-IDU-1-1
8ø SA
68x86 OA
20x20 EA 20x20 EA
10-IDU-1-2
T
10-IDU-1-2
10-HWUH-1-4
10-HWUH-1-5
MAU CONTROL PANELS
10-HWUH-1-3
E3 1400
26"x18" EA UP
26"x18" EA UP E3 1400
10'-0" AFF
10'-6" AFF
GAS REGULATOR/METER SET
10ø FE
10ø FE
EP101
E4 150
T1 150
10-AST-02
10-AST-01
PROPANE
GAS
BOOSTER
S20 200
12" AFF
20"X20" OA UP8"X8" OA UP
6"x10" EA UP
E4 200
10'-0" AFF
EXHAUST
SILENCER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Au to de sk
D oc s:
//0
VA
M
C L oc h
R av en
Bo ile r C on so lid at io n/
8_
VA
L R
_B oi le r C on so lid at io n_
R
_M
EP
.rv t
9/
/2
3:
:5
PM
MH101
FIRST FLOOR PLAN - MECHANICAL -
NEW WORK
Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
0123038
07/07/2025 GSC ZGC
BID DOCUMENTS
512-23-154
CODED NOTES:
PROVIDE FIRE DAMPER AT PENETRATION OF MEZZANINE SLAB, ACCESS DOOR SHALL BE FROM
MEZZANINE SIDE SEE MH102 FOR CONTINUATION.
DOOR SHALL BE PROVIDED WITH DOOR GRILLE SIZED FOR 110 CFM TRANSFER MINIMUM.
BOILER CONTROL PANEL AND BMS DDC PANEL MOUNTED ON UNISTRUT FRAME.
MOUNT HWUH WITH BOTTOM OF UNIT HEATER MINIMUM 7'-0" A.F.F.
OA DUCT UP TO 10-GLP-3-5, SEE SHEET MH103 FOR CONTINUATION.
CONNECT 60x60 EA TO GENERATOR ENGINE DUCT FLANGE. PROVIDE RECIRCULATION AIR DAMPERS AS SHOWN ON CONTROL DIAGRAM. ROUTE 100x24 EA UP AND TRANSITION TO 80x36 EA TO GRAVITY
LOUVERED PENTHOUSE, SEE MH103 FOR CONTINUATION.
PREFABRICATED DOUBLE WALL BOILER VENT SYSTEM. ROUTE UP THROUGH ROOF WITHIN EQUIPMENT
SCREEN, SEE MH103 FOR CONTINUATION.
MECHANICAL CONTRACTOR TO INSTALL GENERATOR MUFFLER PER MANUFACTURER'S INSTALLATION GUIDELINES. PROVIDE ENGINE EXHAUST PIPE AS SHOWN TO BE SCH 40 CARBON STEEL WITH 3" OF
CALCIUM SILICATE INSULATION.
MAKE-UP AIR FOR GENERATOR UP TO GRAVITY LOUVERED PENTHOUSE WITH CONTROL DAMPER, SEE
MH103 FOR CONTINUATION. TERMINATE DUCT 10' AFF WITH WIRE MESH SCREEN.
TERMINATE EA DUCT 9' AFF, COVER OPENING WITH WIRE MESH SCREEN.
ALL REQUIRED CONTROL AND POWER WIRING AND CONDUIT BETWEEN MAU CONTROL PANEL AND MAU
SHALL BE PROVIDED BY THE CONTRACTOR. COORDINATE FINAL REQUIREMENTS WITH MAU
MANUFACTURER.
NN
0 2' 4' 8' 12'
1/4" = 1'-0"
1/4" = 1'-0"1 FIRST FLOOR PLAN - MECHANICAL - NEW WORK
Revisions Date
DRAWING SHEET NUMBER FOR CONTINUATION / CONNECTION
GRID LOCATION FOR CONTINUATION / CONNECTION
ARROW INDICATES DIRECTION OF FLOW
FROM ENERGY
CENTER DISTRIBUTION
SYSTEM SYSTEM / LOCATION DESCRIPTION
P&ID CONTROLS LEGEND
INSTRUMENT DESCRIPTION (TYP). REFER TO P&ID INSTRUMENT
DESCRIPTION TABLE.
INSTRUMENT NUMBER (TYP). REFER TO INSTRUMENT SCHEDULE.
DISCRETE DEVICE; LOCATED IN FIELD
DISCRETE DEVICE; LOCATED IN OR ON FRONT OF CENTRAL OR
MAIN PANEL.
PROCESS CONTROL; LOCATED IN FIELD
PROCESS CONTROL; LOCATED IN OR ON FRONT OF CENTRAL OR
MAIN PANEL
COMPUTER SYSTEMS AND SOFTWARE; SCADA INDICATION
DUCT SMOKE DETECTOR
STARTER
A ALARM
IMMERSION TEMPERATURE TRANSMITTER
W/ THERMOWELL
EMERGENCY PUSHBUTTON
AIR FLOW SENSOR
DUCT MOUNTED TEMPERATURE SENSOR
INDICATES AVERAGING ELEMENT SENSOR
VARIABLE FREQUENCY DRIVE
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
PARTICULATE TRANSMITTERPT
INDICATES PROBE SENSOR
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
CONTROLS LEGEND
NOTE: SOME SYMBOLS AND ABBREVIATIONS SHOWN MAY NOT PERTAIN TO THIS PROJECT
CONTROL GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
A.
B.
C.
A.
CONTRACTOR SHALL REVIEW SEQUENCES PRIOR TO PROGRAMMING AND SUGGEST MODIFICATIONS WHERE REQUIRED TO ACHIEVE THE DESIGN INTENT. CONTRACTOR MAY ALSO SUGGEST MODIFICATIONS TO IMPROVE PERFORMANCE AND STABILITY OR TO SIMPLIFY OR REORGANIZE LOGIC IN A MANNER THAT PROVIDES EQUAL
OR BETTER PERFORMANCE.
INCLUDE COSTS FOR MINOR PROGRAM MODIFICATIONS IF REQUIRED TO PROVIDE PROPER PERFORMANCE OF
THE SYSTEM.
UNLESS OTHERWISE INDICATED IN SOO, CONTROL LOOPS SHALL BE ENABLED AND DISABLED BASED ON THE
STATUS OF THE SYSTEM BEING CONTROLLED TO PREVENT WIND-UP.
THE TERM “PROVEN” (I.E. “PROVEN ON” / “PROVEN OFF”) SHALL MEAN THAT THE EQUIPMENT’S DI STATUS POINT
MATCHES THE STATE SET BY THE EQUIPMENT’S DO COMMAND POINT.
THE TERM “PID LOOP” OR “CONTROL LOOP” IS USED GENERICALLY FOR ALL CONTROL LOOPS AND SHALL NOT BE INTERPRETED AS REQUIRING PROPORTIONAL PLUS INTEGRAL PLUS DERIVATIVE GAINS ON ALL LOOPS. UNLESS SPECIFICALLY INDICATED OTHERWISE, DO NOT USE THE DERIVATIVE TERM ON ANY LOOPS UNLESS FIELD
TUNING IS NOT POSSIBLE WITHOUT IT.
ALL SET-POINTS, TIMERS, DEAD-BANDS, ETC. LISTED IN SEQUENCES SHALL BE CAPABLE OF BEING ADJUSTED BY THE OPERATOR WITHOUT HAVING TO ACCESS PROGRAMMING WHETHER INDICATED AS ADJUSTABLE IN SEQUENCES OR NOT. SOFTWARE (VIRTUAL) POINTS SHALL BE USED FOR THESE SET-POINTS. FIXED SCALAR NUMBERS SHALL NOT BE IMBEDDED IN PROGRAMS UNLESS THE VALUE WILL NEVER NEED TO BE ADJUSTED. PID GAINS SHALL BE ONLY ACCESSIBLE BY AUTOMATION TECHNICIAN AND HIDDEN FROM EVERYDAY OPERATOR.
VALUES FOR ALL POINTS, INCLUDING REAL (HARDWARE) POINTS USED IN CONTROL SEQUENCES SHALL BE CAPABLE OF BEING OVERRIDDEN BY THE USER (E.G. FOR TESTING AND COMMISSIONING). IF HARDWARE DESIGN PREVENTS THIS FOR HARDWARE POINTS, THEY SHALL BE EQUATED TO A SOFTWARE POINT AND THE SOFTWARE POINT SHALL BE USED IN ALL SEQUENCES. EXCEPTION: NOT REQUIRED FOR EMERGENCY
GENERATOR AND ELECTRICAL READ ONLY POINTS.
MOTOR SPEED CONTROL SET-POINTS:
MINIMUM SPEED SET-POINTS FOR ALL VFD-DRIVEN AND EC MOTOR EQUIPMENT SHALL BE THE GREATER OF
EITHER 6 HZ OR THE MINIMUM SPEED REQUIRED TO AVOID STALLING THE DEVICE SERVED.
MINIMUM SPEED FOR EACH PIECE OF EQUIPMENT SHALL BE STORED IN A SINGLE SOFTWARE POINT THAT SHALL BE USED IN PROGRAMMING (SUCH AS PID LOOP OUTPUT RANGE) AND ITS VALUE SHALL BE ASSIGNED TO THE MINIMUM SPEED SET-POINT STORED IN THE VFD VIA THE DRIVE NETWORK INTERFACE. IN THIS WAY THERE IS ONLY ONE MINIMUM SET-POINT, RATHER THAN SET-POINTS BOTH IN THE DRIVE AND IN THE
SOFTWARE WHICH COULD DIFFER.
MAXIMUM SPEED SET-POINT FOR MOTOR DRIVEN EQUIPMENT SHALL BE DETERMINED BY THE MAXIMUM ALLOWABLE OPERATIONAL SPEED BY THE MOTOR AND OR DRIVEN DEVICE MANUFACTURER. THE SPEED CONTROL SHALL NOT LIMIT THE MAXIMUM RUNNING SPEED TO 60 Hz UNLESS THAT IS THE MAXIMUM SPEED
ALLOWABLE BY THE MOTOR, FAN, OR PUMP.
9. FURTHER BOILER CONTROLLER REQUIREMNETS:
PARALLEL POSITIONING CONTROLLER MUST HAVE ORIGINAL EQUIPMENT MANUFACTURER PASSWORD
PROTECTED FEATURE
GAS
000000
GAS
TYPE
GAS TYPE SENSOR
VFD
CONTROL DEVICE NUMBERING SCHEME:
010000: OUTSIDE AIR
020000: RELIEF/EXHAUST AIR
030000: MIXED AIR
040000: SUPPLY AIR
050000: RETURN AIR
060000: CHILLED WATER
070000: STEAM
080000: HEATING HOT WATER
090000: AUXILIARY SYSTEMS
100000: GAS DETECTION
110000: FUEL GAS
120000: FUEL OIL
130000: BOILER FUEL TRAIN
140000: DOMESTIC COLD
150000: DOMESTIC HOT
160000: HOT WATER RECIRC.
170000: SOFTENED WATER
180000: FLUE GAS/BOILER EXHAUST
000000: GENERAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Au to de sk
D oc s:
//0
VA
M
C L oc h
R av en
Bo ile r C on so lid at io n/
8_
VA
L R
_B oi le r C on so lid at io n_
R
_M
EP
.rv t
9/
/2
3:
:0
PM
MI001
P&ID NOTES, LEGENDS, & SYMBOLS Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
0123038
07/07/2025 GSC ZGC
BID DOCUMENTS
512-23-154
INSTRUMENT DESCRIPTION TABLE
LE
TT
ER
FIRST LETTER SECOND LETTER
MEASURED OR INITIATED
VARIABLE MODIFIER
READOUT OR
PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER
A ANALYSIS ALARM ALARM / AUTOMATIC
B BURNER FLAME USERS CHOICE USERS CHOICE BEACON (LIGHT)
C CONDUCTIVITY CONTROL CLOSED
D DENSITY (MASS) OR
SPECIFIC GRAVITY
DIFFERENTIAL
E VOLTAGE (EMF) PRIMARY ELEMENT
F FLOW RATE RATIO (FRACTION)
G GAUGING (DIMENSIONAL) GLASS, GAUGE
H HAND (MANUALLY
INITIATED)
HORN (BUZZER) HIGH
I CURRENT (ELECTRICAL) INDICATE
J POWER SCAN
K TIME OR TIME SCHEDULE TIME RATE OF
CHANGE
CONTROL STATION
L LEVEL LIGHT (PILOT) LOW
M MOISTURE HUMIDITY MIDDLE OR
INTERMEDIATE
N CONSISTENCY USERS CHOICE USERS CHOICE USERS CHOICE
O USERS CHOICE ORIFICE
(RESTRICTION)
P PRESSURE OR VACUUM POINT (TEST)
CONNECTION
Q QUALITY INTEGRATE OR
TOTALIZE
R RADIOACTIVITY RECORD OR PRINT
S SPEED OR SOLENOID
FREQUENCY
SAFETY SWITCH
T TEMPERATURE TRANSMIT
U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION
V VISCOSITY OR
VIBRATION
VALVE, DAMPER, OR
LOUVER
W WEIGHT OR FORCE WELL
X UNCLASSIFIED X AXIS UNCLASSIFIED UNCLASSIFIED
Y EVENT, STATE, OR
PRESENCE
Y AXIS RELAY OR COMPUTE
Z POSITION OR DIMENSION Z AXIS DRIVE, ACTUATE, OR
UNCLASSIFIED FINAL
CONTROL ELEMENT
ZERO (SPEED OR
POSITION)
Revisions Date
UP
Gx
Kx
Jx
Ly
Lx
Hx
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
LINENCHUTE
CHUTE
TRASH
HR
RAMP UP
UP
UP
UP
FEC
FEC
FEC
H S
H S
H S
H S
H S
HS
HS
H S
AT
100101
UAHB
100101
AT
100102
UAHB
100102
AT
100103
UAHB
100103
AT
100104
UAHB
100104
AT
100200
UAHB
100201
AT
100301
UAHB
100301
BMS
10-BLR-01
BMS
10-BLR-02
BMS
10-BLR-03
GBS
10-GBS-01
BAS
GDS-1
FACP
GDS-1
AT
100401
UAHB
100401
UAHB
100202
UAHB
100203
UAHB
100302
10-B-1-1 10-B-1-2 10-B-1-3
10-SHWP-1-1
10-SHWP-1-2
10-SHWP-1-3
10-PHWP-1-1
10-PHWP-1-2
10-PHWP-1-3
10-FOPS-1-1
10-FOF-1-1
10-GBS-1-1
BAS
GAS
100101
CO
CH4
GAS
1-2
CO
CH4
GAS
100301
CO
CH4
GAS
100201
CO
GAS
1-3
CO
CH4
ZONE 2
ZONE 1
ZONE 3
BOILER ROOM
CONTROL
ROOM
WATER
TREATMENT
GENERATOR
ELECTRICAL
LOCKERS -
WOMEN
TOILET/
SHOWER
TOILET/
LOCKERS -
MEN
A B D E
C
GAS
1-4
CO
CH42
5 3
GAS
100401
C3H8
ZONE 4
GAS BOOSTER
PROPANE
ZONE 1
BOILER ROOM (102) & MEZZANINE
ZONE 3
GAS BOOSTER (114)
ZONE 2
CONTROL ROOM (104)
GAS DETECTION
SYSTEM CONTROLLER
GDS-1
NOTE SE
NS
OR
IN
PU
TS
AL
AR
M
OU
TP
UT
S
SA
FE
TY
SH
UT
DO
W
N
COMM POWER
6 7
GDS-1 BAS MAPPED POINTS
GAS LEVEL READING PER ZONE
LOW ALARM (PER ZONE)
HIGH ALARM (PER ZONE)
FAULT
LOCATED ON
MEZZANINE
LOCATED ON
MEZZANINE
ZONE 4
PROPANE (113)
LOCATED EXTERIOR
TO REAR CTRL RM
ENTRANCE
LOCATED EXTERIOR
TO MAIN ENTRANCE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Au to de sk
D oc s:
//0
VA
M
C L oc h
R av en
Bo ile r C on so lid at io n/
8_
VA
L R
_B oi le r C on so lid at io n_
R
_M
EP
.rv t
9/
/2
3:
:3
PM
MI111
MECHANICAL INSTRUMENTATION -
GAS MONITORING PLAN
Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
0123038
07/07/2025 GSC ZGC
BID DOCUMENTS
512-23-154
CODED NOTES:
GAS DETECTION CONTROLLER. BASIS OF DESIGN - MSA MODCON 75 TOUCH CONTROLLER. CONTROLLER SHALL BE PASSWORD PROTECTED AND
PASSWORD SHALL BE SHARED WITH APPROVED VA PERSONNEL.
GAS MONITOR WITH DUAL GAS SENSING. BASIS OF DESIGN - MSA ULTIMA X5000 GAS MONITOR. MONITOR SHALL BE MOUNTED AT 4'-0" - 6'-0" ABOVE FINISHED FLOOR FOR CARBON MONOXIDE (CO) SENSING AND THE METHANE (CH4) SENSOR SHALL BE PIPED UP TO WITHIN 6" - 10" OF UNDERSIDE
OF ROOF DECK. PROVIDE SENSORS WITH CALIBRATING PIPING/PORTS.
AUDIOVISUAL HORN AND STROBE, ACTIVATED BY GAS DETECTION SYSTEM. MOUNT HORN AND STROBES IN ACCORDANCE WITH NFPA 715 AT 80
INCHES ABOVE THE FINSIHED FLOOR.
BOILER BUILDING AUTOMATION SYSTEM CONTROL PANEL MOUNTED APPROXIMATELY 3 FT AFF. SEE CONTROLS DIAGRAMS FOR POINTS LIST AND
OTHER NETWORKING REQUIREMENTS.
LOCATE ADDITIONAL GAS MONITOR ON MEZZANINE LEVEL IN CENTRAL LOCATION.
WIRE MODBUS COMMUNICATION MODULE FROM GAS DETECTION CONTROLLER TO BUILDING AUTOMATION SYSTEM CONTROLS. MAP POINTS AS
INDICATED FOR MONITORING.
POWER BY DIV 26.
RELAY OUTPUT FROM GAS DETECTION SYSTEM FOR BURNER SHUTDOWN AT APPROPRIATE LEVEL OF ALARM. SEE SEQUENCE OF OPERATIONS.
RELAY OUTPUT FROM GAS DETECTION SYSTEM TO GAS BOOSTER SYSTEM LEAK DETECTOR RELAY FOR SHUTDOWN.
PROVIDE POWER SUPPLY TO ALARM RELAY IF WIRING DISTANCE EXCEEDS CONTROL PANEL AND OR HORN AND STROBE VOLTAGE DROP ALLOWANCE OR MINIMUM VOLTAGE INPUT. COORDINATE WITH MANUFACTURER AND DIV 26 PRIOR TO INSTALLATION.
WIRE ALARM SIGNAL FROM GAS DETECTION CONTROLLER TO THE FIRE ALARM CONTROL PANEL. INTEGRATE ALARM INTO THE FIRE ALARM SYSTEM
TO SOUND BASED ON THE SEQUENCE OF OPERATIONS BELOW.
MOUNT GAS SENSOR WITHIN 12 INCHES OF THE FLOOR.
1/8" = 1'-0"1 FIRST FLOOR PLAN - GAS DETECTION AND CONTROLS
N.T.S.
GAS DETECTION SYSTEM2
1.
2.
1.
1.
1.
A.
B.
C.
D.
2.
1.
2.
3.
A.
B.
a.
b.
C.
D.
4.
A.
B.
C.
D.
a.
b.
c.
E.
a.
b.
c.
5.
A.
B.
C.
D.
a.
E.
a.
GAS DETECTION SYSTEM (GDS)
A. GENERAL
THE GAS DETECTION SYSTEM CONSISTS OF A GAS DETECTION PANEL, GAS ANALYSIS INSTRUMENTS, AUDIO- VISUAL ALARM DEVICES, WIRING/CONDUIT, ASSOCIATED POWER DISTRIBUTION, AND CONNECTIONS TO
FACILITY CONTROLS PANELS AND EQUIPMENT.
THE GAS DETECTION SYSTEM SHALL MONITOR METHANE (CH4) GAS LEVELS AT THE CEILING AND CARBON MONOXIDE (CO) GAS LEVELS IN THE BREATHING ZONE. LEVELS MEASURED THAT OCCUR OUTSIDE OF NIOSH AND VHA SETPOINTS WILL BE ALARMED AND THE FOLLOWING SEQUENCES SHALL BE IMPLEMENTED AND
FOLLOWED.
B. EMERGENCY EQUIPMENT SHUTDOWN CIRCUIT
THE GDS SHALL BE DIRECTLY CONNECTED, THROUGH HARDWIRED SIGNAL, TO ALL BOILERS, GAS SHUTOFF VALVE, OIL SHUTOFF VALVE, OIL PUMP SHUTDOWN, AND VENTILATION EQUIPMENT, LOCATED IN THE ALARM ZONE, THROUGH DRY CONTACTS ON THE REMOTE EQUIPMENT. THE ALARM CIRCUIT SHALL BE POWERED IN A "NORMAL" STATE PER THE DETAIL PROVIDED ON THE DETAIL SHEET. LOSS OF POWER TO THE GDS OR AN ALARM STATE SHALL OPEN THE MONITORED CONTACTS ON THE GDS, THUS BREAKING THE CIRCUIT. AN "ALARM" STATE SHALL DISABLE ALL FUEL BURNING EQUIPMENT IN THE ZONE BY DISABLING THE HARDWIRED
LOOP.
C. SYSTEM ENABLE
THE SYSTEM SHALL ALWAYS BE ENABLED. LOSS OF AN ENABLED STATUS SHALL RESULT IN AN ALARM
SIGNAL TO THE BAS, THE FACP, AND DISABLING OF THE FUEL BURNING APPLIANCES.
D. NORMAL STATUS
THE GDS SHALL SEQUENTIALLY TAKE, ANALYZE, AND REPORT GAS CONDITIONS AT EACH SAMPLING POINT
IDENTIFIED IN THE DRAWINGS:
ZONE 1: BOILER ROOM (102) & MEZZANINE
ZONE 2: CONTROL ROOM (104)
ZONE 3: GAS BOOSTER ROOM (114)
ZONE 4: PROPANE ROOM (113)
THE FUEL BURNING APPLIANCE CIRCUITS SHALL BE ENABLED AND ALL FUEL BURNING EQUIPMENT SHALL BE ALLOWED TO OPERATE NORMALLY. FUEL BURNING EQUIPMENT INCLUDE BOILER NOS. 1, 2, AND 3 ONLY.
E. ALARMS/EMERGENCY OPERATION
FAULT - STATUS NOTIFICATION TO BAS TO INDICATE MAINTENANCE REQUIREMENT OR SYSTEM INSPECTION
REQUIREMENT. GDS CONTINUES TO OPERATE.
SYSTEM FAILURE - STATUS NOTIFICATION TO BAS TO INDICATE INORABILITY OF THE SYSTEM. ENABLE VENTILATION EQUIPMENT IN ALL ZONES, PROVIDE ALARM TO BAS, ACTIVATE ZONE ALARM EQUIPMENT.
CARBON MONOXIDE MONITORING AND ALARM
CARBON MONOXIDE IS PRODUCED BY COMBUSTION. CO WILL BE PRESENT IN AND AROUND THE BOILER BURNER, FLUE, AS WELL AS POTENTIALLY THE VALVE VAULT TO THE REAR OF BOILER 10-BLR-1. IT IS A
HEAVIER THAN AIR GAS.
ALL ALARM LEVELS LISTED HERE ARE BASED ON INDUSTRY ACCEPTED STANDARDS FOR SAFETY OF LIFE AND HEALTH. IN GENERAL, THE NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH
(NIOSH) AND THE OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION (OSHA) PROVIDE
RECCOMENDATIONS FOR ALARM LEVELS AND EXPOSURE LIMITS. COORDINATE FINAL SETPOINTS WITH THE VHA LIFE SAFETY TEAM FOR THIS STATION. COORDINATE WITH THE COR TO SET UP A MEETING TO
CONFIRM THE LEVELS FOR FINAL ACCEPTANCE.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH), TLV-TWA LISTS 25
PPM AS THE MAXIMUM ALLOWABLE CONCENTRATION FOR A WORKER'S CONTINUOUS EXPOSURE
IN ANY EIGHT HOUR PERIOD. THIS IS USED AS THE LOW ALARM SETPOINT FOR THIS DESIGN.
NIOSH LISTS 200 PPM AS THE MAXIMUM ALLOWABLE CONCENTRATION FOR SHORT TERM
EXPOSURE AT A 15-MINUTE MAXIMUM EXPOSURE LEVEL. ADDING A SAFETY MARGIN FOR
INCREASING CONCENTRATION IN THE SPACE, 100 PPM SHALL BE USED AS THE HIGH ALARM
SETPOINT FOR THIS DESIGN.
LOW ALARM, 25 PPM (CO) - PROVIDE ALARM TO THE BAS. IDENTIFY ALARM ZONE. BAS TO OVERRIDE VENTILATION SYSTEM TO MAXIMUM SPEED SIGNAL IF SYSTEM IS ON, OR ENABLE VENTILATION SYSTEM
AND OVERRIDE SPEED CONTROL TO MAXIMUM SPEED IF SYSTEM IS OFF.
HIGH ALARM, 100 PPM (CO) - LOW ALARM PLUS DISABLE FUEL BURNING APPLIANCE CIRCUIT (BOILER EPO
CIRCUIT), PROVIDE ALARM TO THE BAS, IDENTIFY ALARM ZONE.
METHANE (CH4) MONITORING AND ALARM
METHANE MAY BE LEAKED FROM GAS SYSTEM EQUIPMENT AND PIPING AS WELL AS THE GAS PIPING IN
AND AROUND THE BOILERS. METHANE IS A LIGHTER THAN AIR GAS.
THE FUEL GAS DETECTION SYSTEM SHALL BE INSTALLED, TESTED, AND COMISSIONED IN COMPLIANCE WITH ALL VHA STANDARDS AND CODES AS WELL AS NFPA 715, STANDARD FOR THE INSTALLATION OF
FUEL GASES DETECTION AND WARNING EQUIPMENT.
ALL ALARM LEVELS LISTED HERE ARE BASED ON INDUSTRY ACCEPTED STANDARDS FOR SAFETY OF LIFE AND HEALTH. IN GENERAL, THE NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH
(NIOSH) AND THE OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION (OSHA) PROVIDE
RECCOMENDATIONS FOR ALARM LEVELS AND EXPOSURE LIMITS. COORDINATE FINAL SETPOINTS WITH THE VHA LIFE SAFETY TEAM FOR THIS STATION. COORDINATE WITH THE COR TO SET UP A MEETING TO
CONFIRM THE LEVELS FOR FINAL ACCEPTANCE.
LOW ALARM, 5% BY VOLUME, NFPA 715, TABLE B.1, LOWER EXPLOSIVE LIMIT, LEL (CH4)
ZONE 1: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE
VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.
ZONE 2: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE
VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.
ZONE 3: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE
VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.
HIGH ALARM, 15% BY VOLUME, NFPA 715, TABLE B.1, UPPER EXPLOSIVE LILMIT, UEL (CH4) ZONE 1: DISABLE FUEL BURNING APPLIANCE CIRCUIT, PROVIDE ALARM TO THE BAS AND FIRE
ALARM CONTROL PANEL, ACTIVATE ALARM ZONE VENTILATION EQUIPMENT. IDENTIFY ALARM
ZONE.
ZONE 2: DISABLE FUEL BURNING APPLIANCE CIRCUIT, PROVIDE ALARM TO THE BAS AND FIRE
ALARM CONTROL PANEL, ACTIVATE ALARM ZONE VENTILATION EQUIPMENT. IDENTIFY ALARM
ZONE.
ZONE 3: SHUTDOWN GAS BOOSTER, DISABLE FUEL BURNING APPLIANCES IN OPERATION SERVED
BY GAS BOOSTER, PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE
ALARM ZONE VENTILATION, IDENTIFY ALARM ZONE.
PROPANE (C3H8) MONITORING AND ALARM
PROPANE MAY BE LEAKED FROM PROPANE GAS SYSTEM EQUIPMENT AND PIPING. PROPANE IS A
HEAVIER THAN AIR GAS.
THE FUEL GAS DETECTION SYSTEM SHALL BE INSTALLED, TESTED, AND COMISSIONED IN COMPLIANCE WITH ALL VHA STANDARDS AND CODES AS WELL AS NFPA 715, STANDARD FOR THE INSTALLATION OF
FUEL GASES DETECTION AND WARNING EQUIPMENT.
ALL ALARM LEVELS LISTED HERE ARE BASED ON INDUSTRY ACCEPTED STANDARDS FOR SAFETY OF LIFE AND HEALTH. IN GENERAL, THE NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH
(NIOSH) AND THE OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION (OSHA) PROVIDE
RECCOMENDATIONS FOR ALARM LEVELS AND EXPOSURE LIMITS. COORDINATE FINAL SETPOINTS WITH THE VHA LIFE SAFETY TEAM FOR THIS STATION. COORDINATE WITH THE COR TO SET UP A MEETING TO
CONFIRM THE LEVELS FOR FINAL ACCEPTANCE.
LOW ALARM, 2.1% BY VOLUME, NFPA 715, TABLE B.1, LOWER EXPLOSIVE LIMIT, LEL (CH4)
ZONE 4: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE
VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.
HIGH ALARM, 9.5% BY VOLUME, NFPA 715, TABLE B.1, UPPER EXPLOSIVE LILMIT, UEL (CH4) ZONE 4: PROVIDE ALARM TO THE BAS AND FIRE ALARM CONTROL PANEL, ACTIVATE ALARM ZONE
VENTILATION EQUIPMENT. IDENTIFY ALARM ZONE.
NN
0 4' 8' 16' 24'
1/8" = 1'-0"
Revisions Date 1 Bid Addendum 1 09/24/2025
INPUT/OUTPUT SUMMARY
POINT
DESCRIPTION
POINT TYPE
NOTESFUNCTION ID TAG NO. AI AO DI DO COMM
BMS 10-BLR-01 BURNER MANGEMENT SYS BOILER 1 X
BMS 10-BLR-02 BURNER MANGEMENT SYS BOILER 2 X
BMS 10-BLR-03 BURNER MANGEMENT SYS BOILER 3 X
GBS 10-GBS-01 GAS BOOSTER SKID CONTROL PANEL X
AT 100101 ANALYSIS TRANSMITTER X X
UAHB 100101 MUTLIVARIABLE ALARM HORN BEACON X
AT 100102 ANALYSIS TRANSMITTER X X
UAHB 100102 MUTLIVARIABLE ALARM HORN BEACON X
AT 100103 ANALYSIS TRANSMITTER X X
UAHB 100103 MUTLIVARIABLE ALARM HORN BEACON X
AT 100104 ANALYSIS TRANSMITTER X X
UAHB 100104 MUTLIVARIABLE ALARM HORN BEACON X
AT 100200 ANALYSIS TRANSMITTER X X
UAHB 100201 MUTLIVARIABLE ALARM HORN BEACON X
UAHB 100202 MUTLIVARIABLE ALARM HORN BEACON X
UAHB 100203 MUTLIVARIABLE ALARM HORN BEACON X
AT 100301 ANALYSIS TRANSMITTER X X
UAHB 100301 MUTLIVARIABLE ALARM HORN BEACON X
UAHB 100302 MUTLIVARIABLE ALARM HORN BEACON X
AT 100401 ANALYSIS TRANSMITTER X X
UAHB 100401 MUTLIVARIABLE ALARM HORN BEACON X
BAS GDS-1 BUILDING AUTOMATION SYSTEM X X
FACP GDS-1 FIRE ALARM CONTROL PANEL X
EQUIPMENT ALARM INFORMATION
ASHRAE G36 SECTION ALARM LEVELALARM DESCRIPTION DELAY TIMER
- SYSTEM FAULT 3 10 SEC
ALARM VALUE
PER FAULT
- SENSOR FAULT 3 10 SECPER FAULT
RESET CONDITION
ACKNOWLEDGE
ACKNOWLEDGE
- LOW ALARM (CO) 2 N/A>= 25 PPM
- HIGH ALARM (CO) 1 N/A>= 100 PPM MANUAL RESET
ACKNOWLEDGE
- LOW ALARM (CH4) 25% BY VOL. (LEL) N/A MANUAL RESET
NOTES::
A. MAP ALL POINTS AVAILABLE THROUGH BACNET, PROGRAM ASSOCIATED ALARM CODES TO BE DISPLAYED ON BOTH LOCAL CONTROLLER
AND BAS.
B. UNLESS OTHERWISE INDICATED, ALL POINTS SHOWN ARE FIELD/FACTORY HARDWIRED TO MANUFACTURERS STANDARD UNIT CONTROLLER. IN ADDITION TO STADARD FACTORY CONTROLS, ENSURE ALL ALL REQUIRED FIELD CONNECTIONS DEVICES ARE PROVIDE TO
ACHIEVE SEQUENCE OF CONTROLS.
HIGH ALARM (CH4) 115% BY VOL. (UEL) N/A MANUAL RESET
- SYSTEM FAILURE/OFFLINE 1RECEIVED INPUT 15 SEC MANUAL RESET
LOW ALARM (C3H8) 22.1% BY VOL. (LEL) N/A MANUAL RESET
HIGH ALARM (C3H8) 19.5% BY VOL. (UEL) N/A MANUAL RESET
M
PDT
080001
TT
080001
TT
080002
TT
080003
TT
080004
FE
080001
FT
080001
FE
080002
FT
080002
FCV
080001
TT
080003
BAS
FT
08TM01
FE
08TM01
TT
08TM01
TT
08TM02
FIC
08TM01
IT
080101
BAS
IT
080201
BAS
IT
080301
FCV
080101
ZSO
080101
ZT
080001PG
080103
BAS
10-TEMP
PG
080102
PG
080101
PG
080203
PG
080202
PG
080201
PG
080302
PG
080301
PG
080303
BAS
IT
080601
FCV
080601
ZSO
080601
PG
080603
PG
080602
PG
080601
BAS
IT
080501
FCV
080501
ZSO
080501
PG
080503
PG
080502
PG
080501
BAS
IT
080401
FCV
080401
ZSO
080401
PG
080403
PG
080402
PG
080401
FT
081001
FE
081001
TT
081001
TT
081002
FIC
081001
FT
080401
FE
080401
TT
080401
TT
080402
FIC
080401
10-BLR-01
(6,695 MBH
OUTPUT)
10-BLR-02
(6,695 MBH
OUTPUT)
10-BLR-03
(6,695 MBH
OUTPUT)
SAN
3/4" ED
CSF-01
3/4" HHWS
3/4" HHWS
3/4" HHWS
3/4" HHWS
3/4" HHWS
3/4" HHWS6" HHWR
8" HHWR
6" HHWS
(DECOUPLER)
SHWP-02
670 GPM
SHWP-01
670 GPM
FM
SHWP-03
670 GPM
ET-01
AS-01
PG
ET-02
AAV
SAN
TO BUILDING 4
MECHANICAL ROOM
FROM BUILDING 4
MECHANICAL ROOM
SW FROM MI605
RETURN WATER
TEMPERATURE
CONTROL VALVE
FM
HHWS FROM 10-BLR-01
HHWR TO 10-BLR-01
HHWS FROM 10-BLR-02
HHWR TO 10-BLR-02
HHWS FROM 10-BLR-03
HHWR TO 10-BLR-03
MI606
MI606
MI606
MI606
MI606
MI606
8" HHWS
(DECOUPLER)
TEMPORARY HOT WATER SYSTEM CAPACITIES
NOMINAL PEAK OUTPUT (MBH) - 6,695
HHW LWT (DEG F) - 180
HHW DELTA (DEG F) - 20
FLOWRATE (GPM) - 670 @ 20 DEG F
NATURAL GAS PRESS AVAIL (PSIG) - 2.4
NATURAL GAS CAPACITY AVAIL @ PRESS (CFH) - 8,400
FUEL OIL (ULSD) PRESS AVAIL (PSIG) - 100
FUEL OIL (ULSD) CAPACITY AVAIL @ PRESS (GPM) - 5
MINIMUM PUMP TDH (FT H20) - 55 (ADDITIONAL PRESSURE DROP OF
TEMPORARY PIPING, FITTINGS, VALVES, AND EQUIPMENT MUST BE
ADDED.)
4" HHWS 3" HHWS 3" HHWS 4" HHWS
6" HHWS
6" HHWR
6" HHWS
6" HHWR
6" HHWS
6" HHWR
TEMPORARY HOT
WATER BOILER
TEMP 6" HHWR
TEMP 6" HHWS
TEMPORARY PRIMARY HOT
WATER PUMP (10-PHWP-T)
OUTSIDEINSIDE
BLDG. 10
VFD
FM
FLOW COMPUTER (LOCATED
ON OR ADJACENT TO BOILER
CONTROL PANEL)
6" HHWS
6" HHWR
NO
NO
NC
VFD VFD
CODED NOTES:
TEMPORARY HEATING HOT WATER PIPING. PROVIDE AT THE TIME OF EQUIPMENT RENTAL. MINIMUM
SIZE REQUIRED FOR DESIGN FLOW CONDITIONS IS 6 INCHES.
MATCHED PAIR, SUPPLY AND RETURN TEMPERATURE TRANSMITTERS - PROVIDE THERMOWELLS.
PROVIDE AI ( SUPPLY TEMP.), AI (RETURN TEMP) TO FLOW COMPUTER.
ULTRASONIC FLOWMETER - SEE SPECIFICATIONS. CLAMP ON METER TYPE WITH REMOTE FLOW
COMPUTER. COORDINATE WITH DIVISION 26 FOR 120V, SINGLE-PHASE CIRCUIT FOR SELF-POWER CONTROLS. CONNECT FLOW COMPUTER TO DDC WITH AI (FLOW IN GPM), DI (FAULT), AI (TOTALIZATION), AI (SUPPLY CHW TEMP), AI (RETURN CHW TEMP), AI (INASTANTANEOUS BTU).
BUTTERFLY ISOLATION VALVES. PROVIDE WITH DEADEND SERVICE DESIGN AND BLIND FLANGE.
INSTALL SYSTEM DRAIN AT PLANT SIDE OF VALVE. CONNECT SYSTEM DRAIN WITH 1-1/2" BY-PASS AS
SHOWN FOR CHEMICAL TREATMENT AND CIRCULATION DURING PERIODS OF NON-USE.
TEMPORARY DDC PANEL - PROVIDE DDC PANEL LOCATED AS SHOWN ON THE PLANS. PANEL SHALL INCLUDE A BACNET CONNECTION FOR TEMPORARY EQUIPMENT, AO (PUMP SPEED), DO (PUMP START STOP), DI (PUMP/VFD FAULT), DI (BOILER FAULT), AI (BOILER CAPACITY), DI (BOILER STATUS). PROVIDE SPARE I/O TO INCLUDE 2 AI, 2 AO, 2 DI, AND 2 DO FOR USE AS NEEDED AT THE TIME OF RENTAL. BACNET
SHALL BE UTILZED FOR BOILER COMBUSTION CONTROL, BURNER MANAGEMENT CONTROL, GAS
DETECTION, FUEL SYSTEMS CONTROL, AND ALL OTHER CONTROL PANELS LOCATED IN OR ON THE
RENTAL TRAILER.
PROVIDE 1-1/2" BY-PASS AROUND MAIN ISOLATION VALVES AT PLANT HEADER. ONE BY-PASS SHALL BE A BALL VALVE. ONE BY-PASS SHALL BE A CALIBRATED BALANCE/CIRCUIT SETTER VALVE. MOUNT VALVES AT 5'-0" ABOVE FINISHED FLOOR, ON ADJACENT WALL. INITIAL SETTING SHALL BE 50 GPM.
COORDINATE OFF-LINE TREATMENT FLOW WITH FACILITY WATER TREATMENT PROGRAM TO ACHIEVE PROPER CORROSION INHIBITOR AND BIOCIDE APPLICATION. FLOW SHALL BE REVERSED DURING
OFFLINE OPERATION AND TREATMENT (FLOW FROM SUPPLY TO RETURN).
1-1/2" HHWR
NCNO
NONC
NC
1.
2.
3.
4.
5.
6.
7.
CIRCULATING PUMP VFD BAS CONNECTION REQUIREMENTS. PROVIDE THE FOLLOWING,
START/STOP (AO)
RUN STATUS (DI)
FAULT (DI)
COMMANDED SPEED (AI)
ACTUAL SPEED (AI)
VFD SPEED CONTROL (AO)
VFD INTERFACE (BACNET OR MODBUS)
ASDFASDF
7 7
VFD
PHWP-02
670 GPM
VFD
PHWP-03
670 GPM
6" HHWR
6" HHWR
PHWP-01
670 GPM
VFD
6" HHWR
TO BUILDING 10
MEZZANINE
FROM BUILDING 10
MEZZANINE
FM
3" HHWR
3" HHWS
FM
FLOW COMPUTER (LOCATED
ON ADJACENT WALL
FLOW COMPUTER (LOCATED
ON ADJACENT WALL
3" HHWR
3" HHWS
BUILDING 1
(XX GPM @
20 DEG F)
BUILDING 7
(XX GPM @
20 DEG F)
HHWR FROM BUILDING 1
HHWS TO BUILDING 1
HHWR FROM BUILDING 7
HHWS TO BUILDING 7
6" HHWS
6" HHWR
6" HHWS
6" HHWR
BOILER PLANT TANK YARD VAULT
BOILER PLANT
PIPE VAULT
TO BUILDING 5
MECHANICAL ROOM
FROM BUILDING 5
MECHANICAL ROOM 3" HHWR
3" HHWS
8" HHWR
8" HHWS
MH-1
MH-2
BUILDING 2
(100 GPM @
20 DEG F)
FUTURE HHWS FROM
BLDG. 2
FUTURE HHWS TO
BLDG. 2
MI606
MI606
FUT. 3" HHWR
FUT. 3" HHWS
NO
NC
4NO
MH-3
8" HHWR8" HHWS
8" HHWS
8" HHWR
8" HHWR
8" HHWS
8" HHWR
8" HHWS
8" HHWS
8" HHWR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Au to de sk
D oc s:
//0
VA
M
C L oc h
R av en
Bo ile r C on so lid at io n/
8_
VA
L R
_B oi le r C on so lid at io n_
R
_M
EP
.rv t
9/
/2
3:
:3
PM
MI601A
MECHANICAL INSTRUMENTATION -
HEATING WATER SYSTEM P&ID
Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
0123038
07/07/2025 GSC ZGC
BID DOCUMENTS
512-23-154
N.T.S.
HEATING HOT WATER SYSTEM P&ID1
Revisions Date
PRIMARY/SECONDARY HEATING HOT WATER SYSTEM
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
2.
3.
1.
2.
A.
B.
3.
A.
B.
4.
5.
6.
SEQUENCE OF OPERATION
HOT WATER BOILER NOS. 1, 2, AND 3
A. GENERAL
THREE NEW HEATING HOT WATER BOILERS (BLR-01, 02, AND 03) WILL SUPPORT THE LOCH RAVEN STATIONS' PEAK AND FUTURE HEATING HOT WATER LOAD. THE NOMINAL CAPACITY OF EACH GENERATOR IS AS FOLLOWS:
BOILER RATED OUTPUT FLOW
BLR-01 6.7 MILLION BTUH 670 GPM
BLR-02 6.7 MILLION BTUH 670 GPM
BLR-03 6.7 MILLION BTUH 670 GPM
THE HEATING PLANT AT LOCH RAVEN VAMC IS DESIGNED AS A PRIMARY/SECONDARY LOOP FLOW SYSTEM. THE PRIMARY LOOP INCLUDES THE BOILERS, CIRCULATING PUMPS (PHWPS), NEUTRAL BRIDGE/DECOUPLER, PIPING, VALVES, AND SPECIALTIES. THE SECONDARY LOOP INCLUDES THE DISTRIBUTION PUMPS (SHWPS), STATION BUILDING SYSTEMS, SUPPLY AND RETURN PIPING, VALVES, AND SPECIALTIES AND ALSO INCLUDES THE NEUTRAL BRIDGE/DECOUPLER. THESE
SYSTEMS OPERATE INDEPENDENT OF EACH OTHER.
A NEUTRAL BRIDGE/DECOUPLER IS LOCATED IN THE PLANT, HYDRAULICALLY SITUATED AT THE INTERFACE OF THE PRIMARY AND SECONDARY FLOW LOOPS. ITS PURPOSE IS TO PERMIT THE SECONDARY DISTRIBUTION AND PRIMARY CIRCULATION SYSTEMS TO OPERATE AT DIFFERENT LOAD BLOCKS AND FLOW RATES. FLOW IN THE SECONDARY LOOP IS
VARIABLE AND FLOW IN THE PRIMARY LOOP IS CONSTANT WITH EACH OPERATING BOILER.
THE BOILERS ARE INTENDED TO OPERATE AUTOMATICALLY WHEN STARTED. HOWEVER, IT IS NOT INTENDED THAT THE PLANT BAS BE ABLE AUTOMATICALLY START OR STOP GENERATORS. THE PLANT OPERATOR MUST INITIATE THE ACTUAL
START/RESTART/STOP FUNCTIONS.
THE PRIMARY AND SECONDARY PUMPS OPERATE EACH AS A BANK OF PUMPS. THE PUMPS AND BOILERS CAN BE
OPERATED RELATIVE TO HOURS OF OPERATION IN AN EFFORT TO BALANCE THE HOURS.
REFER TO THE “HEATING PLANT OPERATIONAL SEQUENCE MATRIX”, LOCATED ON THIS SHEET, FOR PLANT LOAD VERSUS EQUIPMENT OPERATION. SEVERAL OPERATIONAL SCENARIOS ARE AVAILABLE FOR THE DIFFERENT CAPACITY BLOCKS.
EQUIPMENT OPERATION FOR EACH LOAD BLOCK SHALL BE SELECTED BY THE PLANT OPERATORS. THE MATRIX SHALL BE GRAPHICALLY REPRESENTED, FOR OPERATOR REFERENCE, ON THE OPERATORS TERMINAL LOCATED IN THE CONTROL
ROOM.
SEPARATE HTHW DISTRIBUTION PUMPS MOVE WATER THROUGH A SECONDARY PIPING SYSTEM FROM THE PLANT TO OTHER BUILDINGS ON THE STATION. SEE THE OPERATING SEQUENCES FOR THE CIRCULATION PUMPS AND DISTRIBUTION
PUMPS FOR DETAILS.
THE FOLLOWING DESCRIPTIONS ARE FOR BOILER, BLR-01. OPERATION AND CONTROLS FOR ALL THREE UNITS SHALL BE
IDENTICAL.
IF THE HEATING HOT WATER RETURN TEMPERATURE, AS SENSED BY TE-1XX/TT-1XX, IS LESS THAN 180 F (ADJUSTABLE SET POINT) AND THE OPERATING BOILERS ARE ALL FIRING AT 100 PERCENT CAPACITY, THE BAS SHALL PROMPT THE
OPERATOR TO START ANOTHER BOILER.
INTERLOCKS
B. PERMISSIVE INTERLOCKS NECESSARY TO OPERATE HTHWG :
NEITHER THE EXPANSION TANK NOR THE DUMP TANK SHALL BE IN A STATE OF ALARM.
SINCE THE BOILER HAS THE POTENTIAL TO OPERATE WITH ANY CIRCULATION PUMP, NO INTERLOCK IS REQUIRED FOR PUMP OPERATION. HOWEVER, FE-1XX/FT-1XX SHALL INDICATE THAT FLOW THROUGH THE BOILER IS GREATER THAN 85
PERCENT OF FULL FLOW.
THE TEMPERATURE OF THE WATER AT THE OUTLET OF THE BOILER SHALL BE 180F OR HIGHER AS SENSED BY TE -1XX/TT-1XXB. THE BAS SHALL BE EQUIPPED WITH A MANUAL OVERRIDE OF THIS INTERLOCK FOR COLD START OF THE
PLANT WHEN OTHER BOILERS ARE OPERATING).
ADEQUATE NATURAL GAS PRESSURE SHALL BE PROVIDED AND MONITORED BY TE -1XXB/TT -1XXB AT 1.5 PSIG MINIMUM.
IF FUEL (DIESEL) OIL IS SELECTED AS THE OPERATING FUEL, ADEQUATE OIL PRESSURE SHALL BE PROVEN BY PSL-3XX AT
100 PSIG MINIMUM.
IF FUEL (DIESEL) OIL IS SELECTED AS THE OPERATING FUEL, ADEQUATE COMPRESSED AIR PRESSURE (ATOMIZING AIR) SHALL BE PROVEN BY PT -5XX AT 125 PSIG MINIMUM. ATOMIZING AIR IS PROVIDED BY ON-BOARD COMPRESSORS
LOCATED AT EACH BOILER.
TO OPERATE ANY COMBINATION OF HEATING HOT WATER BOILERS WITH A COMBINED NOMINAL CAPACITY LESS THAN OR EQUAL TO 6.7 MMBTUH, MUA-01 SHALL BE OPERATING AT ITS STAGE 1 SPEED (XX,XXX CFM). PERMISSIVE SHALL INCLUDE
CONFIRMATION OF AIRFLOW FROM THE AIRFLOW MONITOR ON MUA-01.
TO OPERATE ANY COMBINATION OF HEATING HOT WATER BOILERS WITH A COMBINED NOMINAL CAPACITY LESS THAN OR EQUAL TO 13.4 MMBTUH, MUA-01 SHALL BE OPERATING AT ITS STAGE 2 SPEED (XX,XXX CFM). PERMISSIVE SHALL INCLUDE
CONFIRMATION OF AIRFLOW FROM THE AIRFLOW MONITOR ON MUA-01.
IF MUA-01 EXPERIENCES A FAILURE AND IS UNABLE TO SATISFY AIR FLOW INTERLOCKS, THE OPERATOR SHALL SWITCH INTERLOCKS TO BACK-UP LOUVER IAL-01. THIS LOUVER SHALL REMAIN CLOSED UNTIL REQUIRED FOR BACK-UP
COMBUSTION AIR FLOW.
C. SAFETY INTERLOCKS: THE FOLLOWING INTERLOCKS SHALL STOP THE BOILER(S) .
THE EXPANSION TANK (HHWET-01) PRESSURE DROPS TO 40 PSIG (PSL -131 SEE PRESSURIZATION SYSTEM SEQUENCE).
INTERLOCK AND ALARM.
THE EXPANSION TANK (HHWET-01) PRESSURE RISES TO 100 PSIG (PSL-131 SEE PRESSURIZATION SYSTEM SEQUENCE).
INTERLOCK AND ALARM.
FLOW RATE SENSED BY FE -XXX/FT -XXX DROPS TO 80 PERCENT OF UNIT SET POINT. INTERLOCK AND ALARM.
D. TO PLACE A COLD BOILER INTO A “STAND-BY” CONDITION
THE OPERATOR SHALL SELECT BOILER TO BE PLACED IN “STAND-BY” FROM THE OPERATOR TERMINAL DISPLAY.
THE BAS SHALL PROMPT THE OPERATOR TO EXECUTE THE FOLLOWING PRE-START MANUAL STEPS:
OPEN 2-INCH BYPASS VALVES ON BOILER INLET AND OUTLET.
OPEN 2-INCH ISOLATION VALVES ON WARMUP LINE FROM BOILER CIRCULATION PUMPS.
MODULATING CONTROL VALVE FV-10XA SHALL BE FULLY CLOSED AND THE CONTROL LOOP WITH FE-10X/FT-10X INACTIVE.
OPEN 2-INCH BYPASS VALVES ON BOILER INLET AND OUTLET.
OPEN 2-INCH ISOLATION VALVES ON WARMUP LINE FROM BOILER CIRCULATION PUMPS.
MODULATING CONTROL VALVE FV-10XA AND FV-10XB SHALL BE FULLY CLOSED AND THE CONTROL LOOP WITH
FE-10X/FT-10X INACTIVE.
WHEN THE FLOW HAS BEEN PROVEN BY CURRENT SWITCH PDS-XXX, THE BAS SHALL INDICATE THAT BOILER IS
"WARMING".
WHEN THE TEMPERATURE OF THE WATER LEAVING THE BOILER RISES TO 160 DEG F (TE -10XB)/ TT -10XB WITH ADJUSTABLE SET POINT), THE BAS SHALL INDICATE THAT HTHWG-4 IS "STAND-BY".
F.
1.
2.
3.
a.
b.
c.
d.
e.
4.
G.
1.
2.
3.
4.
5.
6.
a.
b.
H.
1.
2.
3.
4.
5.
A.
1.
2.
3.
4.
5.
6.
7.
B.
1.
2.
3.
a.
b.
c.
d.
4.
5.
TO START A BOILER (WHEN OTHER BOILERS ARE OPERATING )
TO START A BOILER THE UNIT SHALL BE IN A "STAND-BY" CONDITION WITH THE LEAVING WATER TEMPERATURE AT 160 DEG F OR
WARMER.
THE BAS SHALL NOT BE CAPABLE OF PHYSICALLY STARTING A BOILER AUTOMATICALLY. BURNER OPERATION (FIRING) AT A
BOILER SHALL BE MANUALLY INITIATED FROM THE UNIT'S LOCAL CONTROL PANEL.
TO BEGIN FIRING A BOILER, THE PLANT OPERATOR SHALL SELECT THE RUN COMMAND VIA THE BAS OPERATOR TERMINAL. THIS
COMMAND SHALL INITIATE A PRE-START SEQUENCE AS FOLLOWS:
THE BAS SHALL PROMPT THE OPERATOR TO SELECT THE FUEL TO BURN. NATURAL GAS SHALL BE THE DEFAULT FUEL.
IF FUEL (DIESEL) OIL IS SELECTED, THE BAS SHALL INITIATE THE PUMP SELECTION SEQUENCE FOR FUEL OIL PUMPS (SEE
FUEL OIL PUMP CONTROL SEQUENCE).
THE BAS SHALL PROMPT THE PLANT OPERATOR TO START THE ASSOCIATED CIRCULATING PUMP. THE OPERATOR SHALL START THE PUMP VIA THE BAS OPERATOR TERMINAL (SEE PHWP CONTROL SEQUENCE). THE BAS SHALL OPEN FCV-XXXA TO 100%. A PERMISSIVE CONTACT SHALL BE MADE WHEN THE SIGNAL FROM FE -10X/FT10X INDICATES THAT FLOW TO THE HTHWG IS GREATER THAN 85 PERCENT OF THE RATED FLOW. THE BAS SHALL ACTIVATE THE CONTROL LOOP FOR FCV-XXXA SO THAT THE VALVE MODULATES IN RESPONSE TO THE SIGNAL FROM FE-XXX/FT -XXX ONCE THE PERMISSIVE IS ACTIVATED.
THE BAS SHALL PROMPT THE PLANT OPERATOR TO START THE MAKEUP AIR UNIT OR INCREASE THE FAN SPEED (SEE PLANT SEQUENCE MATRIX). HVAC EQUIPMENT SEQUENCES SHALL BE PER DRAWINGS. OPERATION PRIORITY SHALL BE ADJUSTED
PER THE MATRIX.
WHEN THE PERMISSIVE INTERLOCKS ARE MET, THE BAS SHALL INDICATE THAT THE UNIT IS “READY” TO START AND SHALL
MAKE THE RUN PERMISSIVE CONTACT TO THE LOCAL UNIT CONTROL PANEL.
THE OPERATOR SHALL START THE BOILER FROM THE UNIT'S LOCAL CONTROL PANEL UNDER "MANUAL" CONTROL. AFTER THE MANUFACTURER'S RECOMMENDED TIME ELAPSE, THE OPERATOR SHALL ADJUST THE UNIT CONTROLS TO "AUTOMATIC".
AUTOMATIC CONTROLS (FURNISHED WITH THE BOILERS )
SHALL MAINTAIN FLAME SAFETY (BURNER MANAGEMENT SYSTEM) AND REGULATE BURNER FIRING (COMBUSTION CONTROL
SYSTEM) TO MAINTAIN THE OUTLET WATER TEMPERATURE AT 180 DEG F (ADJUSTABLE).
WHEN THE BOILER BEGINS FIRING, THE BAS SHALL ACTIVATE THE CONTROL LOOP FOR FCV-XXXA SO THAT THE VALVE
MODULATES IN RESPONSE TO THE SIGNAL FROM FE-XXX/FT -XXX.
AFTER FCV-XXXA IS ACTIVE, THE BAS SHALL CLOSE FCV-XXXB. THE ACTUATION RATE SHALL BE RETARDED TO SLOW VALVE CLOSING. FCV-XXXA SHALL TRANSITION FROM FULLY OPEN TO FULLY CLOSED IN ABOUT 30 SECONDS.
FLOW CONTROL VALVE FV-XXXA REGULATES THE WATER FLOW THROUGH THE ASSOCIATED BOILER…