512-23-154 Bid Addendum 2 Change Log.pdf
PDF 145 KB Posted
- Solicitation number
- 36C24526R0014
About this file
This document is an Addendum Bulletin Summary for the Loch Raven Boiler Consolidation project (Project Number: 512-23-154). The second bid addendum, dated 1/12/2026, provides updates to specification and drawing changes for the project. Specification changes include the inclusion of design phase Geotechnical Report and Hazardous Material Investigation reports for contractor reference.
Drawing changes involve updates to multiple plans: CN001-LS501 civil plans were updated per MDE comments, FA101 added fire alarm devices to the fuel tank yard, FX001 clarified drawing notes, and M-801 updated schedule values for clarity in response to Bid RFIs. The bulletin instructs contractors to provide a Change of Work Proposal for any changes affecting time or contract sum, with detailed labor, material, overhead, and profit breakdowns. Contractors must respond to the bulletin or risk waiving rights to increased compensation or time extensions.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(321) 345-9026
305 East Drive Suite H
Melbourne, FL 32904 abovegroup@abovegroupinc.com
Addendum Bulletin Summary
1/12/2026
Project Name: Loch Raven Boiler Consolidation
Project Number: 512-23-154
Addendum/Change Bulletin Designation: Bid Addendum 2
Subject: Responses to Bid RFIs, VA Fire Life Safety Comments, MDE Approved Plans
This Bulletin is not a change order. If work described in this Bulletin involves a change in time or contract sum, provide on Change of Work Proposal for each line item, itemizing labor and material, overhead and profit price breakdown in accordance with the Specifications. Also include any time extensions, if required. Lump sum labor and material prices will not be accepted. If sub-contractors’ or suppliers’ prices are included in the prime contractor’s proposal, provide a copy of their quotation. If no response to a Bulletin is received within the time specified above, then the non-responding Contractor will be determined to not be affected by the change and any rights for increased compensation or time extensions shall be waived.
Specification Changes:
- Design phase Geotechnical Report and Hazardous Material Investigation reports included in Bid Addendum documentation for contractor reference only.
Drawing Changes:
• CN001-LS501: Civil plans updated per MDE comments.
• FA101: Added fire alarm devices to fuel tank yard
• FX001: Clarified drawing notes.
• M-801: Updated schedule values for clarity responding to Bid RFIs.