This document is a Fire Suppression Abbreviations, Legend, and General Notes drawing for the Loch Raven Consolidated Boiler Spaces project for the U.S. Department of Veterans Affairs in Baltimore, Maryland. The drawing provides comprehensive technical specifications for a new wet pipe fire sprinkler system, detailing installation requirements, design criteria, and compliance standards including NFPA 13, IBC, and VA-specific guidelines. Key technical specifications include sprinkler head coverage (maximum 225 sq ft per head for light hazard areas, 130 sq ft for ordinary hazard, and 100 sq ft for extra hazard), pipe material specifications (black steel schedule 40 for 2" and smaller, schedule 10 for 2.5" and larger), and specific requirements for different building areas such as boiler rooms, electrical rooms, and generator rooms. The project involves a new fire protection system design with specific hydraulic calculation requirements, testing protocols, and seismic design considerations.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPRINKLER PIPE
ELBOW
TEE
CHECK VALVE
CONTROL VALVE
WATERFLOW INDICATOR
BACKFLOW PREVENTER
2-1/2" FIRE HOSE VALVE
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
EXTRA HAZARD GROUP 1
FIRE DEPARTMENT CONNECTION
HORIZONTAL SPLIT CASE FIRE PUMP
JOCKEY PUMP
SECURE BOUNDARY
RF SHIELDING BOUNDARY
FIRE PUMP CONTROL PANEL
JOCKEY PUMP CONTROL PANEL
UPRIGHT SPRINKLER HEAD
*NOTE: NOT ALL SYMBOLS USED
JPCP
FPCP
NEW
JPCP
FPCP
EXISTING
JPCP
FPCP
DEMO
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/0
V A
M C
L o c h
R a v e n
B o ile r C o n s o lid a ti o n /0
V
A L
R B o ile r C o n s o lid a ti o n
R
F
.r v t
/1
/2
:5
:5
A
M
1/12/2026 10:51:51 AM1/12/2026 10:51:51 AM
FX001
FIRE SUPPRESSION
ABBREVIATIONS, LEGEND, AND
GENERAL NOTES
Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
512-23-154
07/07/2025 PJ DML
BID DOCUMENTS
FIRE SUPPRESSION ABBREVIATIONS FIRE SUPPRESSION LEGEND FIRE SUPPRESSION GENERAL NOTES
1. THE FIRE PROTECTION SCOPE OF WORK INVOLVES INSTALLATION OF A NEW WET PIPE FIRE SPRINKLER SYSTEM SERVING THE ENTIRE AREA OF THE NEW BOILER PLANT AS INDICATED ON THE DRAWINGS.
2. ALL AREAS ARE TO BE PROTECTED WITH AUTOMATIC SPRINKLER SYSTEMS UNLESS OTHERWISE NOTED.
3. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:
A. CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (NOVEMBER 2023)
B. IBC - INTERNATIONAL BUILDING CODE, 2024
C. NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION
D. NFPA 70 - NATIONAL ELECTRIC CODE, 2023 EDITION
E. NFPA 101 - LIFE SAFETY CODE, 2024 EDITION
F. NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2022 EDITION
4. PROVIDE A COMPLETE, AUTOMATIC WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 REQUIREMENTS AND VA STANDARDS IN ALL AREAS AS NOTED ON PLANS.
5. IN GENERAL, SPRINKLERS SHALL BE ARRANGED FOR A MAXIMUM COVERAGE OF UNDER 225 SQUARE FEET PER HEAD FOR LIGHT HAZARD OCCUPANCIES AND 130 SQUARE FEET PER HEAD FOR ORDINARY HAZARD OCCUPANCIES AND 100 SF FOR EXTRA HAZARD OCCUPANCIES.
COORDINATE WITH OTHER DISCIPLINES TO AVOID OBSTRUCTIONS SUCH AS LIGHTS, DIFFUSERS, ETC.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE PIPING AND SPRINKLER HEADS FOR PROPER COVERAGE IN EACH AREA AND ADD ADDITIONAL HEADS TO OBTAIN PROPER COVERAGE AS REQUIRED BY VARIATIONS IN FIELD LOCATIONS AND OBSTRUCTIONS AT NO ADDITIONAL COST TO OWNER. OBTAIN FINAL APPROVED ARCHITECTURAL LAYOUTS BEFORE LAYING OUT WORKING DRAWINGS.
7. PAINT AND LABEL ALL NEW SPRINKLER PIPE IN ACCORDANCE WITH SPECIFICATION 21 13 13.
8. IN UNFINISHED ROOMS WITH NO CEILING PROVIDE UPRIGHT TYPE SPRINKLER HEADS. COORDINATE HEAD LOCATIONS WITH HVAC CONTRACTOR TO MAINTAIN ADEQUATE COVERAGE ABOVE AND BELOW LARGE DUCTWORK AND OTHER OBSTRUCTIONS AS GOVERNED BY NFPA 13.
9. CONTRACTOR SHALL SEAL ALL PIPE WALL AND FLOOR PENETRATIONS IN FIRE RATED BARRIERS WITH A LISTED FIRE STOP SYSTEM. SEE ARCHITECTURAL LIFE SAFETY PLAN FOR LOCATIONS OF SMOKE AND FIRE RATED PARTITIONS AND BARRIERS.
10. COORDINATE SPRINKLER PIPE RUNS WITH DUCTWORK, PLUMBING PIPING, AND LIGHTS. MAINTAIN 4'' CLEAR ABOVE LIGHTS. DO NO INTERFERE WITH DUCT ACCESS DOORS.
11. PIPE SIZES 2” AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40 WITH THREADED END CONNECTIONS. PIPE SIZES 2.5” AND LARGER SHALL BE BLACK STEEL SCHEDULE 10 WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE ROLLED GROOVED ONLY.
HANGERS SHALL BE IN ACCORDANCE WITH NFPA 13. PROVIDE DRY SPRINKLER DROPS TO AREAS SUBJECT TO FREEZING. SPRINKLERS IN AREAS WITHOUT CEILINGS SHALL HAVE ROUGH BRASS OR FACTORY STANDARD FINISH. ALL COMPONENTS SHALL BE UL LISTED AND FM
APPROVED.
12. FLUSH, TEST, AND INSPECT WATER SUPPLY AND SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND 25. COMMISSION SYSTEM IN ACCORDANCE WITH MANUFACTURER, NFPA 13, COR, AND COMMISSIONING AGENT REQUIREMENTS. PROVIDE COPIES OF O&M MANUALS, CORRECTED SUBMITTALS, AS-BUILT SHOP DRAWINGS, AND TWO COPIES OF NFPA 25 TO OWNER, PROVIDE SYSTEM MAINTENANCE AND OPERATION INSTRUCTIONS TO OWNER'S PERSONNEL. SCHEDULE ACCEPTANCE TESTING TO BE WITNESSED BY CONTRACTING OFFICER'S REPRESENTATIVE (COR). PROVIDE CONTRACTOR'S CERTIFICATION AND TESTING PAPERWORK PER NFPA 13 AND 25.
13. HYDRAULICALLY DESIGN SYSTEM PER NFPA 13 AND IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL. CALCULATED DEMAND INCLUDING HOSE STREAM REQUIREMENTS SHALL FALL NO LESS THAN 10 PERCENT BELOW THE AVAILABLE WATER SUPPLY CURVE. PROVIDE A NEW FLOW TEST IN ACCORDANCE WITH NFPA 13 AND NFPA 291 PROCEDURES. SUBMIT HYDRAULIC CALCULATIONS TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).
14. PREPARE SCALED WORKING DRAWINGS IN ACCORDANCE WITH NFPA 13 SHOWING LAYOUT AND DETAILS OF SPRINKLER SYSTEM. SUBMIT DRAWINGS SHOWING LAYOUT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).
15. THE DESIGN CRITERIA FOR THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13:
A. LIGHT HAZARD CLASSIFICATION: 0.10 GPM/SF DENSITY OVER 1500 SF FIRE AREA.
B. ORDINARY HAZARD GROUP-1 CLASSIFICATION: 0.15 GPM/SF DENSITY OVER 1500 SF FIRE AREA.
C. ORDINARY HAZARD GROUP-2 CLASSIFICATION: 0.20 GPM/SF DENSITY OVER 1500 SF FIRE AREA.
D. EXTRA HAZARD GROUP-1 CLASSIFICATION: 0.30 GPM/SF DENSITY OVER 2500 SF FIRE AREA.
16. PROVIDE ADDITIONAL SPRINKLER HEADS AS REQUIRED BY CEILING CONFIGURATION TO MEET REQUIREMENTS OF NFPA 13.
17. PROVIDE FM APPROVED QUICK RESPONSE SPRINKLERS IN ALL AREAS, EXCEPT THAT STANDARD RESPONSE SPRINKLERS SHALL BE PROVIDED IN THE BOILER ROOM AND STANDARD RESPONSE FUSIBLE LINK SPRINKLERS SHALL BE PROVIDED IN THE ELECTRICAL ROOM AND
GENERATOR ROOM.
18. PROVIDE HEADGUARDS FOR ALL SPRINKLERS IN THE BOILER ROOM AND WHERE THE SPRINKLER IS INSTALLED LESS THAN 7 FEET 6 INCHES OVER ANY FINISHED FLOOR OR WORKING PLATFORM.
19. COMPLY WITH SEISMIC DESIGN REQUIREMENTS AS NECESSARY. REFER TO STRUCTURAL DRAWINGS FOR SEISMIC DESIGN CATEGORY INFORMATION.
20. CONTRACTOR TO ENSURE THAT ALL FIXED OBSTRUCTIONS OVER 4 FT IN WIDTH ARE PROVIDED WITH SPRINKLER PROTECTION UNDERNEATH IN ACCORDANCE WITH NFPA 13, 9.5.5.3.1. CONTRACTOR SHALL BE AWARE THAT THE BUILDING HAS EXTENSIVE UTILITY OBSTRUCTIONS
THROUGHOUT AND THESE OBSTRUCTIONS MAY NOT ALL BE INDICATED ON THE PLANS HEREIN.
21. OPEN GRATE FLOORING OVER 4 FT IN WIDTH SHALL REQUIRE SPRINKLER PROTECTION BELOW THE GRATING IN ACCORDANCE WITH NFPA 13, 9.5.5.3.1.1.
22. PROVIDE A SINGLE AIR VENT ON THE NEW WET PIPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13, 8.1.5.
SCHED SCHEDULE
SBV SUPERVISED BUTTERFLY VALVE
S SUPPLY
RPZ REDUCED PRESSURE ZONE
RN RISER NIPPLE
RM ROOM
REQ REQUIRED
RCV RISER CONTROL VALVE
R RISER/RADIUS/RETURN
PSI POUNDS PER SQUARE INCH
PS PRESSURE SWITCH
PER PRIMARY ELEVATOR RECALL
OH ORDINARY HAZARD
OD OUTSIDE DIAMETER
MNS MASS NOTIFICATION SYSTEM
LOC LOCAL OPERATING CONSOLE
LH LIGHT HAZARD
KH KITCHEN HOOD SUPPRESSION SYSTEM
ID INSIDE DIAMETER
HT HEAT TRACING
HL HI/LOW AIR SUPERVISORY
HGT HEIGHT
GF GENERATOR FAULT
GR GENERATOR RUNNING
GPM GALLONS PER MINUTE
GC GENERAL CONTRACTOR
GA GAUGE
FT FEET
FS FLOW SWITCH
FPT FIRE PUMP TRANSFER SWITCH IN EMERGENCY POSITION
FPR FIRE PUMP RUNNING
FPP FIRE PUMP PHASE REVERSAL
FPO FIRE PUMP POWER AVAILABLE
FPL FIRE PUMP POWER/PHASE LOSS
FPF FIRE PUMP FAULT
FPE FIRE PUMP EMERGENCY ISOLATING SWITCH OPEN
FP FIRE PUMP
FM FACTORY MUTUAL
FLR FLOOR
FHV FIRE HOSE VALVE
FH FIRE HAT
FFE FINISHED FLOOR ELEVATION
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FDC FIRE DEPARTMENT CONNECTION
FD FLOOR DRAIN
FMCP FIRE ALARM/MASS NOTIFICATION CONTROL PANEL
FA FIRE ALARM
EXIST EXISTING
ETR EXISTING TO REMAIN
EST ELEVATOR SHUNT TRIP
EQUIP EQUIPMENT
EPS ELEVATOR SHUNT TRIP POWER MONITORING
EPR ELEVATOR PRIMARY FLOOR RECALL
EMER EMERGENCY
ELEV ELEVATOR
EL ELEVATION
EJ EXPANSION JOINT
EH EXTRA HAZARD ZCA ZONE CONTROL ASSEMBLY
EFS ELEVATOR FIRE HAT SOLID WS WET SYSTEM
EFF ELEVATOR FIRE HAT FLASHING WP WEATHERPROOF
EF EXHAUST FAN W/O WITHOUT
EB ELECTRIC BELL WMG WATER MOTOR GONG
EAR ELEVATOR ALTERNATE FLOOR RECALL W/ WITH
EA EACH VAC VOLT, ALTERNATING CURRENT
E ELEVATOR RECALL UNO UNLESS NOTED OTHERWISE
DN DOWN/DROP NIPPLE UL UNDERWRITERS' LABORATORY
DIM DIMENSION TYP TYPICAL
DIA DIAMETER TS TAMPER SWITCH
DH DOOR HOLD TOR TOP OF RISER
DD DUCT SMOKE DETECTOR TEMP TEMPERATURE
DC DIRECT CURRENT SYST-FEED SPRINKLER SYSTEM FEED MAIN
DEMO DEMOLISH, DEMOLITION SYST SYSTEM
DBA DECIBEL A-WEIGHTED STS SHUNT TRIP SUPERVISION
DACT DIGITAL ALARM COMMUNICATOR TRANSMITTER STOR STORAGE
CV CONTROL VALVE STP STANDPIPE
CTR CENTER ST STROBE
COR CONTRACTING OFFICER'S REPRESENTATIVE SSI SECURITY SYSTEM INTERFACE
CONT CONTINUE/ CONTINUOUS SR SLEEPING ROOM
CLG CEILING SQ SQUARE
CIS COMMON INTELLIGIBILITY SCORE SP/ST SPEAKER/ STROBE
CHV CHECK VALVE SPKR SPRINKLER
BOR BOTTOM OF RISER SPEC SPECIFICATION
BFP BACK FLOW PREVENTER SP SPEAKER
BATT BATTERY SO SOUND SYSTEM OVERRIDE
AS AUTOMATIC SPRINKLER SIM SIMILAR
ALV ALARM CHECK VALVE SGV SUPERVISED GATE VALVE
AHU AIR HANDLING UNIT SDC SMOKE DAMPER CONTROL
AFF ABOVE FINISHED FLOOR SD SMOKE DETECTOR
AAR AUTOMATIC AIR RELEASE SCV SUPERVISED CONTROL VALVE
PRICING NOTES
REFERENCE DIVISION 1 SPECIFICATIONS FOR A COMPREHENSIVE LIST OF REQUIREMENTS. ALTERNATES FOUND WITHIN THE CONSTRUCTION DOCUMENTS ARE CLARIFIED AS FOLLOWS:
A. ALTERNATE NO.1: BASE BID EXCEPT DELETE MEZZANINE LEVEL FIT OUT.
Revisions Date
2 Bid Addendum 2 01/12/26
| Sheets |
| FX001 - FIRE SUPPRESSION ABBREVIATIONS, LEGEND, AND GENERAL NOTES |